You are on page 1of 12

Well Testing RouteKW

INTRODUCTION
Objectives of Well Testing

Well testing is the science of interpreting the reservoir's response


to a change in the production (or injection) conditions.

Why is it important to interpret this response?

What is the measured reservoir response?

Field:
(k, S, re, h, ɸ, Pr)

input output
Reservoir
(Change in Flowrate) (Pressure Response)

Compare
Model:

(k, S, re, h, ɸ, Pr)

input output
Mathematical
(Change in Flowrate) Model (Pressure Response)

1 www.routekw.com
Well Testing RouteKW

Objectives of Well Testing:


1. Reservoir Evaluation
2. Reservoir Management
3. Reservoir Description

1. Reservoir Evaluation:

a. Permeability
- Reservoir Conductivity or Flow Capacity ( )

- Transmissibility ( )

b. Reservoir Pressure: What does each of the following terms


represent?
- Initial Reservoir Pressure ( ):

- Average Reservoir Pressure ( ):

2 www.routekw.com
Well Testing RouteKW

c. Reservoir Boundaries
- Radius to Boundary ( ): Draw a figure to showcase this term.

How can the radius to boundary be used to calculate the


reservoir’s pore volume?

- Storativity ( )

- Closed or open boundaries: Draw two figures that explain


the closed and open boundaries of a reservoir.

3 www.routekw.com
Well Testing RouteKW

d. Effect of Skin

………………….. …………………..

How is the effect of skin measured?

2. Reservoir Management:

Provide two examples of the uses of reservoir management.

4 www.routekw.com
Well Testing RouteKW

3. Reservoir Description:

….………….. ……………… ………………

NOTE:
 Well testing provides a means of estimating only bulk
reservoir properties. Explain.

5 www.routekw.com
Well Testing RouteKW

Types of Well Tests I

Are well tests long?

During a typical well test, the flowrate is maintained constant and


the well flowing pressure is monitored with time.

Common Well Tests:

1. Drawdown Test (describe):

Pwf

6 www.routekw.com
Well Testing RouteKW

Why does Pwf decrease when the well is opened for production?

Conditions of the drawdown test:


1.

2.

Describe the pressure profile before production, during production


and after production stops for a long time.

radius

radius

radius

7 www.routekw.com
Well Testing RouteKW

Why is the Pr < Pi after production?

2. Build-up Test (describe):

Pws

Conditions:
1.

Why is the drawdown test usually favored over the build-up test?

8 www.routekw.com
Well Testing RouteKW

Types of Well Tests II

Other Well Tests:

1. Injection Test (describe):

Pwf

Why does Pwf increase during injection?

9 www.routekw.com
Well Testing RouteKW

2. Fall-off Test (describe):

Pws

3. Interference Test

What is the major difference between the interference test and the
other tests?

What are the uses of interference tests?


1.

2.

10 www.routekw.com
Well Testing RouteKW

The interference test requires one active well and one (or more)
observation well(s). Differentiate between these types of wells:

Active Well:

Observation Well:

How is the communication between wells explained by an


interference test?

How are properties between wells in different directions be found


through interference tests?

11 www.routekw.com
Well Testing RouteKW

4. Drill Stem Test (DST):

When is this test done?

What is the importance of the Drill Stem Test?


1.

2.

12 www.routekw.com

You might also like