Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction.
Page 2 of 18
INSPECTION TEST PLAN (ITP)
Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction.
Approved Method of
Statement, AFC
drawings '3433-HGERL-
1-66-0001-001, '3433- *QP Civil Spec. (Sect. 3
HGERL-1-66-0001-002, Clause 3.26 & 3.28.1)
Checklist (3433-HGERL-1-
1.3 Cover, binding wires and spacers. '3433-HGERL-1-66-0001- Inspection 100% ,Proj. Spec (3433- I I R
25-0003-F01)
003, *QP Civil Spec. HGERL-1-14-0004 Rev.
(Sect. 3 Clause 3.26 & A CL. 2.5.3 ),
3.28.1) ,Proj. Spec (3433-
HGERL-1-14-0004 Rev.
A CL. 2.5.2)
Page 3 of 18
INSPECTION TEST PLAN (ITP)
Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction.
2.0 Formwork
Approved Method
Statement, QCS, *QP *QP Civil Spec (Sect. 3
Type of form, supporting
Civil Spec (Sect. 3 Inspection / Clause 3.23.1) Proj. Approved Method
2.1 arrangements & design of 100% I S/R R
Clause 3.23.1) Proj. Verification Spec (3433-HGERL-1- Statement & Drawing
formworks.
Spec (3433-HGERL-1-14- 14-0004 Rev.A CL. 7.1)
0004 Rev. A CL. 7.1)
Page 4 of 18
INSPECTION TEST PLAN (ITP)
Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction.
Page 5 of 18
INSPECTION TEST PLAN (ITP)
Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction.
Page 6 of 18
INSPECTION TEST PLAN (ITP)
Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction.
For each
*QP Specification Clause Batching Plant
3.1 Approval of Concrete Source concrete Client Approval Pre Qualification document R H R
1.34.2 visit
supplier
Page 7 of 18
INSPECTION TEST PLAN (ITP)
Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction.
3 trial mix
for each mix
*QP Civil Spec (Sect. 3
design, 6
Clause 3.9) Proj. Spec
nos. *QP Civil Spec (Sect. 3
(3433-HGERL-1-14-0004
150x150x15 Clause 3.9) Proj. Spec Lab test reports, QP
3.3 Approval of Trial mix Rev. A CL. 3.9), QCS Cube test W H R
0 mm cubes (3433-HGERL-1-14- Approval
2010, Sec. 5 Part 5,
each mix (3 0004 Rev. A CL. 3.9)
QCS 2010 Sec. 1 Part 8
for 7 days &
Cl.8.16
3 for 28
days)
Page 8 of 18
INSPECTION TEST PLAN (ITP)
Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction.
Approved Method
Statement (3433-HGE-1-
19-0001), AFC Drawings
'3433-HGERL-1-66-0001-
For each *QP Spec. (Sect. 3 Checklist (3433-HGERL-1-
4.1 Alignment, Level & Orientation 001,'3433-HGERL-1-66- Survey I I/R R
pour Clause 3.23.7) 25-0003-F03)
0001-002,'3433-HGERL-
1-66-0001-003, *QP
Spec. (Sect. 3 Clause
3.23.7)
Page 9 of 18
INSPECTION TEST PLAN (ITP)
Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction.
Approved Method
Statement (3433-HGE-1-
19-0001), AFC Drawings
'3433-HGERL-1-66-0001- *QP Civil Spec (Sect. 3
Embedded items, i.e. sleeves, joints,
001,'3433-HGERL-1-66- Clause 3.23 & 3.28)
water stops, achor bolts & all other Inspection / For each Checklist (3433-HGERL-1-
4.2 0001-002,'3433-HGERL- Proj. Spec (3433- I I R
embedments related/prior to Verification pour 25-0003-F03)
1-66-0001-003, *QP Civil HGERL-1-14-0004 Rev.
concrete pouring
Spec (Sect. 3 Clause A CL 2.8)
3.23 & 3.28) Proj. Spec
(3433-HGERL-1-14-0004
Rev. A CL. 2.8)
Page 10 of 18
INSPECTION TEST PLAN (ITP)
Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction.
Page 11 of 18
INSPECTION TEST PLAN (ITP)
Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction.
1 test per
load or as
*QP Civil Spec (Sect. 3 *QP Civil Spec (Sect. 3
per 10m³ for
Clause 3.10 & 3.11), Clause 3.10 & 3.11) , Concrete Pour Card/
5.1 Concrete Slump & Temperature Field Testing the first W W R
QCS 2010 Sec. 5 Part 6 QCS 2010 Sec. 5 Part 6 Record
50m³, then 1
Clause 6.4 & 6.6 Clause 6.4 & 6.6
slump
thereafter
min. of 6
cubes for
each pour,
*QP Civil Spec (Sect. 3 *QP Civil Spec (Sect. 3
for large
Clause 3.10 & 3.11), Clause 3.10 & 3.11) , Concrete Pour Card/
5.2 Concrete Cube Sampling Sampling pour, 6 W S R
QCS 2010 Sec. 5 Part 6 QCS 2010 Sec. 5 Part 6 Record
cubes for
Clause 6.4 & 6.5 Clause 6.4 & 6.5
every 50m³
or part of
50m³
Approved Method
Statement (3433-HGE-1-
*QP Civil Spec (Sect. 3
19-0001) , *QP Civil For each
Clause 3.25) Proj. Spec Checklist (3433-HGERL-1-
6.1 Finishes Spec (Sect. 3 Clause Visual structure I S R
(3433-HGERL-1-14- 25-0003-F04)
3.25) Proj. Spec (3433- poured
0004 Rev. A CL. 8.5)
HGERL-1-14-0004 Rev.
A CL. 8.5)
Page 12 of 18
INSPECTION TEST PLAN (ITP)
Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction.
Approved Method
Statement (3433-HGE-1-
*QP Civil Spec (Sect. 3
19-0001), *QP Civil Spec For each
Visual / Clause 3.24) Proj. Spec Checklist (3433-HGERL-1-
6.2 Striking/Stripping of Formworks (Sect. 3 Clause 3.21.2), structure I S R
Verification (3433-HGERL-1-14- 25-0003-F04)
Proj. Spec (3433-HGERL- poured
0004 Rev. A CL 7.10)
1-14-0004 Rev. A CL.
7.10 )
Approved Method
Statement (3433-HGE-1-
*QP Civil Spec (Sect. 3
19-0001), *QP Civil Spec For each
Honey comb, surface cracks & touch Clause 3.30) Proj. Spec Checklist (3433-HGERL-1-
6.3 (Sect. 3 Clause 3.21.2), Visual structure H W W
up (3433-HGERL-1-14- 25-0003-F04)
Proj. Spec (3433-HGERL- poured
0004 Rev. A CL. 10.0)
1-14-0004 Rev. A CL
10.0)
Approved Method
Statement (3433-HGE-1-
*QP Civil Spec (Sect. 3
19-0001) , *QP Civil For each
Clause 3.21.2), Proj. Checklist (3433-HGERL-1-
6.4 Curing of Concrete Spec (Sect. 3 Clause Visual structure I S R
Spec (3433-HGERL-1- 25-0003-F04)
3.21.2), Proj. Spec (3433- poured
14-0004 Rev. A CL. 9.0)
HGERL-1-14-0004 Rev.
A CL. 9.0)
Page 13 of 18
EPIC for Power Supply Project
through Submarine Cables
from Ras Laffan to Halul
3433-HGERL-1-25-0003-
CONTRACT NUMBER GC11106800 DOC. NO.
F01
PROJECT NUMBER 3433 REV. A
CLIENT QATAR PETROLEUM DATE 11/11/2013
CONTRACTOR LSC&S/ L&T Page: 1 of 1
Comment/s:
NAME
DATE
Page 15 of 18
EPIC for Power Supply Project
through Submarine Cables
from Ras Laffan to Halul
3433-HGERL-1-25-0003-
CONTRACT NUMBER GC11106800 DOC. NO.
F02
PROJECT NUMBER 3433 REV. A
CLIENT QATAR PETROLEUM DATE 11/11/2013
CONTRACTOR LSC&S/ L&T Page: 1 of 1
FORMWORK CHECKLIST
IR REF NO:
LOCATION: STRUCTURE:
ACTIVITY:
DRAWING/DOC. REF NO:
Comment/s:
SIGNATURE
NAME
DATE
Page 16 of 18
EPIC for Power Supply Project
through Submarine Cables
from Ras Laffan to Halul
3433-HGERL-1-25-0003-
CONTRACT NUMBER GC11106800 DOC. NO.
F03
PROJECT NUMBER 3433 REV. A
CLIENT QATAR PETROLEUM DATE 11/11/2013
CONTRACTOR LSC&S/ L&T Page: 1 of 1
Comment/s:
SIGNATURE
NAME
DATE
Page 17 of 18
EPIC for Power Supply Project
through Submarine Cables
from Ras Laffan to Halul
3433-HGERL-1-25-0003-
CONTRACT NUMBER GC11106800 DOC. NO.
F04
PROJECT NUMBER 3433 REV. A
CLIENT QATAR PETROLEUM DATE 11/11/2013
CONTRACTOR LSC&S/ L&T Page: 1 of 1
Comment/s:
NAME
DATE
Page 18 of 18