INSPECTION & TEST PLAN (ITP)

Activity: SURVEY WORK (RAS LAFFAN) ITP No: 3433-HGERL-1-25-0001 Rev. A


Reference : Method Statement for Survey Works Date : 22/09/2013

Legends: P - Perform the Activity; I - Inspection; W - Witness; H - Hold point; R - Review; S - Surveilance; AFC - Approved for Construction

Quantum Inspection Authority


SL. Method of
Parameters to checked Controlling documents of check / Acceptance criteria Verification documents
NO. check
Test L&T LSC QP

1.0 Survey Work (Level & Setting-out)

Calibration Certificate,
every 6 QCS 2010 Sec. 1 Part 8
1.1 Survey Instrument Calibration Calibration Certificate Lab. Test Checklist (3433-HGERL-1- H I/R S/R
months Cl. 8.7.7
25-0001-F01)
AFC drawing 3433-
Establishment of Temporary Bench Checklist (3433-HGERL-1-
HGERL-1-64-0001-001, , *QP Civil Spec Sect. 1
1.2 Mark Pillars (TBM) w.r.t. Reference Survey 100% 25-0001-F02 &3433- H I/R R
*QP Specification Sect. CL.1.7, 1.8 & 1.9
Bench Mark (RBM) HGERL-1-25-0001-F03)
1 CL.1.7, 1.8 & 1.9

AFC drawing -3433-


HGERL-1-66-0001-001, Insp. Request, Checklist
*QP Civil Spec Sect. 1
1.3 Marking setting-out for structures 3433-HGERL-1-67-0001- Survey 100% (3433-HGERL-1-25-0001- H H R
CL.1.9
001 , *QP Specification F02)
Sect. 1 CL.1.9
EPIC for Power Supply Project
through Submarine Cables
from Ras Laffan to Halul
3433-HGERL-1-25-0001-
CONTRACT NUMBER GC11106800 DOC. NO.
F01
PROJECT NUMBER 3433 REV. A
CLIENT QATAR PETROLEUM DATE 22/09/2013
CONTRACTOR LSC&S / L&T

SURVEY WORKS CHECKLIST


IR REF NO:
LOCATION: STRUCTURE:
ACTIVITY:
DRAWING/DOC. REF NO:

S.NO. DESCRIPTION NA Y/N REMARKS


1 HSE risks and requirements recognised?
Surveying instruments have valid calibration certificates and in good
2
working condition?
3 Data and documents verified prior to layout work?
4 Established reference points for survey.
5 Bench marks are maintained at all times during construction.
Verify survey setting including location, elevation, orientation &
6
dimension conforms to the AFC drawing.
Check stakes/peg are set, sufficiently maintained and not disturbed by
7
construction activities.

Comment/s:

ORGN. L&T LSC&S QP


SIGNATURE

NAME

DATE
EPIC for Power Supply Project through
Submarine Cables
from Ras Laffan to Halul
CONTRACT NUMBER GC11106800 DOC. NO. 3433-HGERL-1-25-0001-F02
PROJECT NUMBER 3433 REV. A
CLIENT QATAR PERTROLEUM DATE 22/09/2013
CONTRACTOR LSC&S/ L&T

SURVEY REPORT

IR REF NO: INSTRUMENT NO:


LOCATION:
COORDINATES
MARK DESCRIPTION REMARKS
NORTHING EASTING
NO.
Design Actual Diff Design Actual Diff

ORGN. L&T LSC&S QP


SIGNATURE

NAME

DATE
EPIC for Power Supply Project through
Submarine Cables from Ras Laffan to
Halul
CONTRACT NUMBER GC11106800 DOC. NO. 3433-HGERL-1-25-0001-F03
PROJECT NUMBER 3433 REV. A
CLIENT QATAR PERTROLEUM DATE 22/09/2013
CONTRACTOR LSC&S/ L&T

SURVEY REPORT

IR REF NO: INSTRUMENT NO:


LOCATION:

MARK ELEVATION
DESCRIPTION REMARKS
NO. Design Actual Diff

ORGN. L&T LSC&S QP

SIGNATURE

NAME

DATE