GUSAN CONSTRUCTION BENGAL CO.

LTD
ESTABLISHMENT OF SEWERAGE SYSTEM IN CHATTOGRAM METROPOLITAN (PHASE 1) PESSCM-1/W1

Fecal Sludge Treatment Facilities


Location Item Standard Length Width Height Area

1 75.25
2 74.75
Water Stopper CJ P01
Wall 3 51.5
4 25

1 81.5
2 81
Water Stopper CJ P02
Wall 3 51.5
4 25
O. LTD
1) PESSCM-1/W1

Thickness EA Total Quantity Unit

4 301 M
2 149.5 M
2 103 M
22 550 M
Sub-Total : 1103.5 M
4 326 M
2 162 M
2 103 M
24 600 M
Sub-Total : 1191 M
Total : 2294.5 M