Professional Documents
Culture Documents
Peristaltic Pump
Peristaltic Pump
1 2 3
P_G_0103_SW
1
2
P DX 0177 SW
15
Overview of equipment and control elements
6 2
3
5 4
P_G_0105_SW
10 11 12 13 14 15
Fig. 4
1 LCD screen
2 [Menu] key
3 Clickwheel
4 [Priming] key
5 [STOP/START] key
6 [Back] key
7 Fault indicator (red)
8 Warning indicator (yellow)
9 Operating indicator (green)
10 "Config I/O” terminal
11 "Hose rupture indicator" terminal
12 "External control" terminal
13 "Metering monitor" terminal (no function)
14 "Level switch" terminal
15 Slot for relays and optional modules
16
Assembly
1 2 3 4 5 6
P_DX_0180_SW
Fig. 8
n Ensure that the system is at atmospheric pressure.
n Adhere to the material safety data sheet for the feed chemical.
n Prevent the escape of feed chemical.
n If necessary take protective measures.
1. Press [STOP/START] to bring the pump to a stop (manually).
2. Empty the liquid end (turn the liquid end upside down and allow the
feed chemical to run out; flush out with a suitable medium; flush the
liquid end thoroughly when using hazardous feed chemicals!).
3. Go to the ‘Hose replacement’ menu.
ð ‘Go to change position?’ appears.
WARNING!
The rotating rotor may crush things or draw them in.
– The bearing cover must not be removed yet.
24
Dimensional drawings
19 Dimensional drawings
– Compare the dimensions on the dimensional
drawing with those of the pump.
– All dimensions are in mm.
P DX 0063 SW
102