Sr.
Description Data (Yes / No / NA) Remarks
No.
RY RB YB
2 Check Voltage Line to Line (400-450)
RN YN BN
3 Check Voltage Phase to Natural (should be 210-250)
If chiller is (1W + 1S) then please shut off the inlet and
19 outlet butterfly of standby chiller afterward do the
commissioning
When star the pump first kick the pump and check the
20
rotation of the pump.