CHILLER INSTALLATION CHECKLIST

SITE NAME: PIDILITE VAPI


Sr. No. Description Yes / No / NA Data Remarks
1 Chiller schemtic drawing printout
2 Chiller Electrical Penal drawing printout

3 Chiller Cable Size Properly Installed with LUGS & Gland

4 Pump Cable Size Properly Installaed with LUGS & Gland

5 Check the Piping According to the given Drawing Design

Check all Chiller Accessories installaed properly according


6
to the drawing

Check the Capacity of the Condenser, Primary & Secondary


7
pump should be according to the drawing

8 If Pot Stainer installed should be installed horizontal only

If PHE Installation please check properly that inlet and


9
outlet should be connected properly

10 Flow Switch Also should be installation toward the flow

Three Way valve should also installed according to arrow


11
mention on the three way valve

Check properly that the three way bypass line should be


12
connected properly to the return line

13 Chiller and accessory environment clean from vendor

14 Adequate chiller & accessory access for maintenance

If differential presssure switch installated should be


15
connected properly with angle valve

If Air cooled check that the Adequate air curculation is


16
proper and the hot air should exhaust in the atomsphere

If water Cooled check that there should adequate place for


17
cleaning the condensers

Pressure gauges & thermometers installed


18
where specified

Before Commissioning conform that the vendor have taken


19
the Hydrotest

Electrical Penal Installed Properly, door should open,


20
Should not located in open if not IP65

Raw Water Connection Provided in Hot / well or buffer


21
Tank or Make up Water
22 Raw Water Connection Provided in Cooling tower Sump

Cooling Tower Overflow line should be connected properly


23
to drain line

If PVC Tank used conform the equilizing line installed


24
properly

25 Check that support should provided on every 3-4 Meter


length

26 Air Purge valve should be provide if the system is closed on


proper place

27 Butterfly Vlve should be properly open any gauge or


thermostate should not faule in the opening and closing
28 Air vent should be provide on air Seperator

29 Drain valves to be provide in inlet, outlet of chillers and


suction and discharge of the pumps air seperators