1 Check the Piping According to the given Drawing Design 2 Check all Chiller Accessories installaed properly according to the drawing 3 Chiller and accessory environment clean from vendor 4 Adequate chiller & accessory access for maintenance If Air cooled check that the Adequate air 5 curculation is properly and the hot air should exhaust in the atomsphere 6 If water Cooled check that there should adequate place for cleaning the condensers 7 Pressure gauges & thermometers installed where specified 8 Before Commissioning conform that the vendor have taken the Hydrotest Remarks