Sr. No.

Description Yes / No Data


1 Check the Piping According to the given Drawing
Design
2 Check all Chiller Accessories installaed properly
according to the drawing
3 Chiller and accessory environment clean from
vendor
4 Adequate chiller & accessory access for
maintenance
If Air cooled check that the Adequate air
5 curculation is properly and the hot air should
exhaust in the atomsphere
6 If water Cooled check that there should
adequate place for cleaning the condensers
7 Pressure gauges & thermometers installed
where specified
8 Before Commissioning conform that the vendor
have taken the Hydrotest
Remarks