CABLES TERMINATION
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMINATION
Site High Voltage Testing of Cables
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMINATION - 1
DC Hi-pot Test On Cables
Micro
Ampere
It = I1+I2+I3
I1 - leakage current across the cable insulator
I2 - depends on the capacitance of the cable
I3 - p
polarization current
I2
It
I1
I3
time/minutes
5 10 15
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMINATION - 2
Advantages of DC test
• The test set is small and portable.
Disadvantages of DC test
• DC breakdown voltage very much higher than
equivalent AC breakdown voltage for same fault.
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMINATION - 3
AC at 50 Hz versus AC at 0
0.1
1 Hz
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMINATION - 4
Series resonant test set
R
L
Vout C
AC
Mains
VE C - capacitance of the test object
L - variable inductance
regulator excitation
transformer
• Able to provide very high test voltage to a test object having very
high capacitance from a low voltage, low kVA source.
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMINATION - 6
Equation
VE
Vout =
(ωRC ) 2 + (1 − ω 2 LC ) 2
at resonance, ω 2 LC = 1
VE
h Vout =
then
ωRC
Vout ωL
= = Q, where Q is the quality factor of the circuit
VE R
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMIN8TION - 7
IEEE P400.2-2004 for AC VLF
Site Testing of Cables
• 15 minutes
i t att 2 to
t 3 times
ti phase
h t neutral
to t l voltage
lt
• p
pass/fail test
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMIN8TION - 8
Variable HV Polarity
Voltage Transformer Switch
50 Hz
HV
230 V
VLF
Sinusoidal
Rate-of-Rise Rectifier and
Discharge Network
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMIN8TION - 9
Dissipation Factor
- Equivalent Circuit for Cable Insulation
I
IR IC IR
V
tan δ =
R C IC
⎛ 1 ⎞
=V
R ⎜⎝ VωC ⎟⎠
IC I
1
=
RωC
δ
IR
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMIN8TION - 10
Dissipation Factor or
Tangent Delta Measurement
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMIN8TION - 11
CRE CBE
CRB
Red
phase
Bl
Blue
phase
CRE , CYE , CBE - capacitance
it b t
between
conductor to earth.
CYE
85°C
25°C
Voltage / kV
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMIN8TION - 13
Dissipation Factor in %
5 10 15 20 25 30 Time
Applied Voltage/kV
Dissipation Factor -Voltage Behavior
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMIN8TION - 14
Dissipation Factor Typical Values
JMPS J.M.PANG & SEAH (PTE) LTD SITE TESTING OF CABLE TERMIN8TION - 15
PARTIAL DISCHARGE
MEASUREMENT IN
CABLE TERMINATION
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION
Partial Discharge - Equivalent circuit
Cable insulation
Cavity
CV
CP
CS
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 1
Partial Discharge in Cables
• Vb is a function of pd where,
p = ggas ppressure
d = gas gap separation
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 2
Partial Discharge in Cables
Vb
pd
Cavity that does not discharge at the operating voltage of the cable are
quite harmless.
harmless
But cavity that discharges at operating voltage cannot be tolerated, since
the ensuing degradation of the insulation due to partial discharge will
l d to
lead t breakdown
b kd off the
th insulation.
i l ti
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 3
Partial Discharge
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 4
Partial Discharge – Off Line Measurement
step-up cable under test
transformer Blocking inductor
coupling
capacitor
p
Standard
capacitor,CS
Pico-Coulomb
PD measurement Pulse
set Generator
Calibration circuit
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 5
Partial discharge
sensors
HFCT type
TEV type
(High frequency Capacitor coupler
(Transient earth Ultrasonic type Embedded RTD
current type
voltage)
transformers)
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 6
Partial Discharge – What Is TEV?
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 7
Partial Discharge – Transient Earth Voltage
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 8
Partial Discharge – Transient Earth Voltage
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 9
JOINT
Probes
DETECTOR
EM WAVE
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 11
Partial Discharge- TEV Sensor from IPEC of UK
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 12
Partial Discharge-
Discharge- Good TEV readings for 24kV rated Toshiba AIS, VCB
Front Reading (DB)
PANEL
Jan-03 Mar-03 Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03
1 3 3 2 3 2 1 1 1 1 1 1
2 3 3 2 0 2 1 1 1 1 1 1
3 3 2 2 0 1 1 1 1 1 1 1
4 3 3 2 3 2 2 1 1 1 1 1
5 3 3 3 0 2 1 2 1 1 1 1
6 3 4 2 0 2 1 1 1 1 1 1
7 3 0 1 3 2 1 1 1 1 1 1
8 3 0 1 2 1 1 1 1 1 1 1
9 3 2 2 2 1 1 1 1 1 1 1
10 3 2 2 2 1 1 1 1 1 1 1
11 4 2 1 0 2 1 1 1 1 1 1
12 4 2 1 0 2 1 1 1 1 1 1
13 3 3 2 1 2 1 2 1 1 1 1
14 3 4 2 1 2 1 0 1 1 1 1
15 4 2 1 2 2 1 0 1 1 1 1
16 4 0 0 2 2 1 1 1 1 1 1
17 4 0 0 1 1 1 1 1 1 1 1
18 4 0 0 0 1 1 1 1 1 1 1
19 4 3 0 0 2 1 1 1 1 1 1
20 4 3 3 1 2 1 1 1 1 1 1
BACKGROUND 2 2 3 2 2 1 2 1 4 1 1
11 3 0 0 0 2 1 1 1 1 0 2
12 3 0 0 0 2 1 1 2 1 1 1
13 3 0 1 0 2 1 2 2 1 1 1
14 3 3 3 3 2 2 2 2 1 2 2
15 4 4 2 3 2 1 3 2 1 2 2
16 3 4 2 2 2 1 2 2 1 0 2
17 3 3 3 2 2 1 2 1 1 1 1
18 3 3 4 1 1 1 2 1 1 1 1
19 3 4 4 1 1 1 2 2 1 2 1
20 3 3 3 0 1 1 2 2 1 2 2
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION -13
Partial Discharge – What is HFCT?
• HFCT = high frequency current transformer
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 14
Partial Discharge - Split core HFCT sensor (300kHz to 20MHz)
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 15
10
1.0
0.8
0.6
0.4
0.2
0
0MHz 10MHz 100MHz
Partial Discharge Frequency Spectrum
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 16
0 1.3 6.7 104 180 222 222 224 218 200
Partial Discharge
Discharge- Frequency response of HFCT
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION - 17
Partial Discharge – Transfer Impedance
Output Voltage
Transfer Impedance =
Input
p Current
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION -18
50
45
e (mV/mA))
40
35
mpedance
30
25
Transfer im
20
15
10
T
0
0.010 0.100 1.000 10.00 100.0
Frequency (MHz)
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION -19
What is Ultrasound?
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION -20
Ultrasound- Airborne ultrasonic sensor with output in the ultrasonic
frequency
q y range
g ((40kHz ± 1kHz))
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION -21
Ultrasound-Contact ultrasonic sensor with output in the ultrasonic
frequency range (100kHz ± 20kHz)
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION -22
Ultrasound-Contact ultrasonic sensor with output in the audio
frequency range (20Hz to 5000Hz)
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION -23
Ultrasound-Airborne ultrasonic sensors with output in the audio
frequency range (20Hz to 5000Hz)
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION -24
Ultrasound – Frequency Range
3) The
Th sound
d off iinternal
t l partial
ti l di
discharge.
h (20kH
(20kHz - 30kHz)
30kH )
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION -25
Ultrasound – Block Diagram for Ultrasonic Measurement
ULTRASONIC DETECTOR
OSCILLATOR 20 Hz TO 5000 Hz
EAR PHONE
20 kHz TO AMPILFIER
100 kHz PIEZO-ELECTRIC
PIEZO ELECTRIC
SENSOR SOUND RECORDER
MIXER
A/D MINI DISC D/A
EAR PHONE
SOUND CARD FFT SOFTWARE
COMPUTER
JMPS J.M.PANG & SEAH (PTE) LTD PARTIAL DISCHARGE MEASUREMENT IN CABLE TERMINATION -26