Department : Electrical
The OHE of above said section of SBP division is to be charged with 25 KV AC Traction as
regular measure. Necessary safety precautions/measures to be observed by the staff
working therein.
We have understood the safety precautions as explained and as token of above, we have
acknowledge with our signature/LTI.
1
2
3
4
5
6
7
8
9
10
Sl. Name Designation/ Signature of Initial of Remarks
No. Dept Staff with the
date counselor
with date
26
27
28
29
30
31
32
33
34
35
Office of the
To
Sr. DEE/TRD/SBP,
ECo. Railway,
SBP.
All Electrical works of BHUSAN POWER STEEL LTD modified lines and cross overs have
been completed in all respects and ready for charging as regular measure.
The EIG documents as per latest Proformas and test reports are enclosed herewith
for kind recommendation and obtaining EIG’s approval from competent authority.
UNIT HEAD
AVP/JSWBPSL/LPG