You are on page 1of 1

Inspector chooses 50% or

Inspector sends this Reliability Supervisor Reliability Supervisor


25% of CML's Assigned based
circuit to the Reliability assigns CML's according sends the marked up
Supervioser and copies
off of access and reliability
to high corrosion rate Inspection ISO back to
contract supervisor. supervisor recommendations
strategy. the Inspector
(Depending on circuit criticality)
Yes

Inspector verify's
inspection scope. If a High
corrosion piping rate strategy follow
yes. If a vessel or low corrosion
rate piping strategy follow NO. No
Inspector assigns
CML's according to
applicable strategy

Inspector progresses through


normal process of completing
Inspection.

Once approved Reliability


Inspector submits
Reliability reviews supervisor sends UT data to
report in Meridium as
and approves report. Sohail Kahn to make TML
Normal
Module

This step is only completed for


first inspection. Once done a
follow up process will be
ClickCharts © NCH Software issued to enter new UT data.