NO.OF PHASE WEEK COMPLETION


WEEKS PLAN WORK
ACTIVE PLAN REPORT WORK

Week 1 Preparati ● Main project completed


March 1 on idea(IoT/Micro
to Phase controllers/Oth
4 er electrical
electronics
system based)
● 10 Journal
paper
collected &
reviewed
● Main
project
topic
finalized
Week 2 Preparati ● Main project Main project completed
March 14 on block Synopsis
to 19 Phase diagram,
circuit
diagram and
list of
material,
synopsis
Week 3 Preparati ● Main project Main Project completed
March 21 on Block Synopsis
to 26 Phase diagram,
circuit
diagram and Report Preparation
list of (front page,
material certificate page,
● Compone Acknowledgement
nts Page, Table of
purchase contents)
● Required
software
and
installation
Week 4 Design Phase Hardware design Report completed
March 28 ● Each block Presentation
to April 2 (Li-Fi (Chapter 1)
Week 5 Transmitter, Report completed
Receiver) Presentation
April 4
circuit design (Chapter 2)
to 9
& overall
circuit design
Week 6 Implementati Hardware / Report Presentation completed
April 11 on Phase Software (Chapter 3 & 4)
to 15 Implementation
● Connection &
Interfacing
Simulation of
Week 7 Li- Fi Report completed
April 18 Transmitter, Presentation
to 22 Li-Fi (Chapter 5)
Receiver,
Week 8 Review - 1 completed
Arduino uno.
April 25
to 29
Week 9 Testing Completion of Report completed
May 2 to Phase working Hardware Presentation
6 ● Verification of (Chapter 6)
the working of completed
Week 10 Report Preparation
designed
May 9 to (Conclusion, List of
circuits
13 Tables, List of
/
Figures)
Develop
Week 11 Draft copy of completed
ed
May 16 to program completed final
20 ● Analyzing report
then errors submission to
occurred project guide
● Troubleshooti
ng the errors
Week 12 Output and ● Checking the Project Report 2nd completed
May 23 Result desired correction
to 27 Analyze outputs,
Phase Analyzing
Week 13 Review – 2 completed
output
May 30 to ● Graphic
June 3 al
analysis Incomplete
Week 14 Project Report
of
June 6 3rd correction
Result
to 10 ● Outcome of
Week the result ● Project Incomplete
15 June Report
13 to 17 submission
to guide
● Final
Project
Report
review by
HOD
● Final
Project
Submissi
on
Week Final viva- Preparing final Final review Incomplete
16 June voce viva voce PPT,
20 to 24 Hardware video