Condensing plant

Operating Documentation Condenser Pressure Protection


Functional Description

Process Engineering Function of Condenser sure measurements are monitored for a minimum limit for de-
Pressure Protection (Low Vacuum Trip) 2oo3 termining that the system is depressurized. This enable pre-
(failsafe) vents damage to the condenser or to the rupture diaphragms
being caused by inadvertently admitting steam into a non-
The task of the condenser pressure protection is to pro- evacuated condenser.
tect the last stages of the LP blading against impermissible
vibrations, impermissible windage and low condenser vac- SIL Requirements
uums. It also has the task of protecting the casing/shell of the
The condenser pressure protection is configured in fail-
LP turbine and condenser against an unallowable rise in pres-
safe technology and therefore satisfies the Safety Integrity
sure.
Level 2 (SIL2) requirement according to IEC 61508 "Func-
Protection functions are implemented for each condenser tional Safety of Electrical / Electronic / Programmable Elec-
steam space, regardless of whether the condenser steam tronic Safety Related Systems" / IEC 61511 "Functional Safe-
space connects one, two or three LP turbines. ty - Safety-Instrumented Systems for the Process Industry
Sector"
Description and Function
Condenser pressure protection with fixed limit
Condenser pressure is recorded using three absolute
values
pressure transducers 10MAG10CP002, 10MAG10CP003
and 10MAG10CP004. Staggered condenser pressure protection equipment is
broken down into separate 2oo3 standard circuits with fixed
An additional absolute pressure transducer with a smaller trip limits, pre-trip alarm limits (warning limits) and the dedi-
Transmittal, reproduction, dissemination and/or editing of this document as well
as utilization of its contents and communication thereof to others without express
authorization are prohibited. Offenders will be held liable for payment of
damages. All rights created by patent grant or registration of a utility model or

measuring range (10MAG10CP012) measures condenser cated enables.


pressure during operation and this is used as a reference
measurement for the three absolute pressure transducers Each pair of values formed by the trip limit and the pre-
10MAG10CP002, 10MAG10CP003 and 10MAG10CP004. trip alarm limit is activated using an appropriate technological
enable. The enable can consist of individual process-related
Generator motoring (reverse power) is limited to 4 s on limits or logic gating and ensures that the condenser and the
Copyright © Siemens Energy 2020 - All Rights Reserved

initiation of turbine trip due to condenser pressure protection. turbine are adequately protected at all times. At the same
The protection functions for each condenser steam space times, these enable signals ensure that unwanted annuncia-
are in each case divided up between two protection circuits. tions can be suppressed during shutdowns and startup pro-
cedures, provided this is allowed by the overall plant condi-
All trip criteria with fixed limits are compiled in the first
tion.
protection circuit. All actuators which have to be controlled in
design patent are reserved.

order to establish a safe condition are selected in a corre- Bypass trip and turbine trip at MAX4
sponding logic. Violation of individual trip limits can therefore
The highest limit MAX4 primarily serves to protect the
result in bypass trip only, turbine trip only or in an overall trip
condenser against excessive pressure and as a precaution-
of the turbine and the bypass system. Every limit which results
ary measure against bursting of the rupture diaphragms in the
in tripping is preceded by a warning limit (pre-alarm).
condenser. It acts on both the turbine trip and the bypass trip
The time delayed turbine condenser pressure protection systems.
is realized in a second protection circuit. This protection circuit
The pre-trip alarm limit HIGH4 precedes the trip limit
initiates a turbine trip depending on the steam pressure up-
MAX4. This pre-trip alarm informs the plant operator about
stream of the LP turbine. The warning preceding the trip ac-
the critical condition before trip is initiated.
tuation is activated without time delay when the limit value
curve is violated. The trip actuation is delayed by 5 minutes. Trip initiation via limit MAX4 and the pre-trip alarm HIGH4 for
the turbine are enabled when one of the pressure transducers
An enabling logic depending on process criteria is imple-
upstream of the IP bypass stations admitting steam into the
mented to ensure that the condenser pressure protection is
condenser detects a minimum pressure in the system. This
not permanently active during plant standstill and when the
ensures that a trip signal is not permanently active when the
condenser is not evacuated.
condenser is not evacuated. Damage to the rupture dia-
As the condenser pressure protection must satisfy SIL2 re- phragms due to opening (also only brief opening) of a bypass
quirements, the limit value formation and enabling logic are station or a turbine inlet valve with steam upstream of the by-
also implemented in failsafe technology. pass stations is avoided.
A failsafe steam turbine speed signal is used for formation
Class: Restricted

Bypass trip at MAX3


of the limit values for speed (see steam turbine protection
system). If the failsafe steam turbine speed signal fails, The next limit down MAX3 serves to protect the LP blad-
speed-dependent enables are permanently activated. ing and acts solely on the bypass trip systems.

Steam pressure upstream of the intermediate-pressure


bypass stations is read in via failsafe equipment. These pres-

Siemens Energy MAG &MFE020 2-1-MA5-372-M0007 / 1-3


MA13324 0520 EN

1/3
Condensing plant
Operating Documentation Condenser Pressure Protection
Functional Description

It is designed to prevent the LP blading coasting down When the trip limit is triggered an annunciation is issued
against an excessive condenser pressure (backpressure). that turbine trip will be initiated with a 5 minute delay.
However, it is selected such that there is no response when
This curve is formed using the pressure in the crossover
the steam turbine is being operated with the allowable con-
line upstream of the LP turbine measured with the 3 pressure
denser pressure range, i.e. below the pre-trip alarm limit
transducers 10MAC11CP001, 10MAC11CP002 and
HIGH2. If the turbine is operated above the pre-trip limit
10MAC11CP003.
HIGH2 the risk of a bypass trip with turbine trip increases with
increasing condenser pressure. The reason being that on Trip actuation via limit value curve is released when the
changeover from turbine operation to bypass operation the turbine speed is higher than 50% of nominal speed.
condenser pressure can rise to almost double the original
value. Monitoring functions

The pre-trip alarm limit HIGH3 precedes the trip limit Count of operating hours
MAX3. This pre-trip alarm informs the plant operator about The time for which the last stage blades of the LP turbine
the critical condition before trip is initiated. may be operated at increased condenser pressures is re-
Trip initiation via the limit MAX3 and the pre-trip alarm stricted; the accumulated time of operation under such con-
HIGH3 for the bypass stations are enabled via a memory ditions is therefore monitored. Appropriate annunciations are
function when a defined minimum turbine speed RELS2 has issued at an early stage to provide the plant operator with
been reached and condenser pressure is for the first time timely information on accumulated time operated under these
lower than the pre-trip limit. The memory is reset when the conditions.
Transmittal, reproduction, dissemination and/or editing of this document as well
as utilization of its contents and communication thereof to others without express
authorization are prohibited. Offenders will be held liable for payment of
damages. All rights created by patent grant or registration of a utility model or

speed again falls below the set limit RELS2.


Bypass operation with high condenser pressures
Turbine and bypass trip at MAX2 Admission of steam to the condenser via the bypass sta-
The limit MAX2 serves to protect the LP blading and ini- tions is enabled as soon as condenser pressure has dropped
tially acts solely on the turbine trip systems. below the HIGH3 warning limit. A fast reduction of condenser
Copyright © Siemens Energy 2020 - All Rights Reserved

pressure must be ensured. If steam is admitted to a condens-


If condenser pressure is the cause responsible for trip-
er with inadequate vacuum for an extended period, this can
ping the turbine at this limit then bypass trip is initiated parallel
result in erosion in the condenser in the medium and long
to bypass trip.
term. The time spent under these conditions is monitored.
Response of the condenser pressure protection at MAX2
can only occur if another fault has already occurred (e.g. fail- Requirements in the event of a fault
ure of circulating water pumps). For this reason, bypass trip Failure of one measuring point has no effect on proper
design patent are reserved.

is initiated at an early stage to prevent the turbine from coast- functioning of the protection circuits. A further failure in meas-
ing down at an excessive condenser pressure (backpres- ured value acquisition for the protection or failure of all three
sure). Immediate bypass trip initiation only preempts the in- measuring points causes immediate turbine and bypass trip.
evitable trip, as the condenser pressure generally rises until The operating personnel are notified by corresponding pre-
the MAX3 limit responds. If the turbine coasts down against alarms (warning messages).
an excessive condenser pressure this can result in increased
The limit curve for the condenser pressure protection is
service life consumption for the LP last-stage blading.
set to a fixed value corresponding to the minimum value of
The pre-trip alarm limit HIGH2 precedes the trip limit the limit curve if two or three malfunctioning measured value
MAX2. This pre-trip alarm informs the plant operator about acquisitions are detected in the crossover line upstream of
the critical condition before trip is initiated. the LP turbine (10MAC11CP001, 10MAC11CP002,
Trip initiation via the MAX2 limit for the turbine and the 10MAC11CP003). This measure increases availability with-
HIGH2 pre-trip alarm are enabled when the turbine speed out compromising safety as it means that failure of two or
approaches the first critical speed range. three measurements required for the limit curve does not au-
tomatically result in turbine trip.
Trip initiation via the MAX2 limit for the bypass station is
enabled if this limit in the condenser pressure protection was Annunciations
responsible for initiating turbine trip and the turbine speed is
greater than 50% of the rated speed. Various annunciations can be output by the condenser
pressure protection system depending on the operating sta-
Condenser pressure protection for steam turbine tus. Consequences and any necessary action by the operat-
Class: Restricted

with limit value curve ing personnel are described in comments on annunciations.
The limit curve for the condenser pressure protection lies Appropriate annunciations are issued in the control room
below the fixed condenser pressure protection limit MAX2. On on violation of limits or faults in the condenser pressure pro-
activation it initiates a turbine trip only. tection system.

Siemens Energy MAG &MFE020 2-1-MA5-372-M0007 / 2-3


MA13324 0520 EN

2/3
Condensing plant
Operating Documentation Condenser Pressure Protection
Functional Description

Trip initiation is always annunciated. Bypass operation with excessive condenser pressures
should be limited to prevent erosion damage to the condenser
The operating time at which the last-stage blades of the
in the medium and long term. For this reason, annunciations
LP turbine are subjected to elevated condenser pressure
are issued at staggered intervals when operation at high con-
(backpressure) is monitored as this is restricted and an an-
denser pressures is detected.
nunciation is issued when the allowable total accumulated
time is exceeded.
Transmittal, reproduction, dissemination and/or editing of this document as well
as utilization of its contents and communication thereof to others without express
authorization are prohibited. Offenders will be held liable for payment of
damages. All rights created by patent grant or registration of a utility model or

Copyright © Siemens Energy 2020 - All Rights Reserved


design patent are reserved.
Class: Restricted

Siemens Energy MAG &MFE020 2-1-MA5-372-M0007 / 3-3