You are on page 1of 1

DX340LCA-K

15 Dr Pr Pi Pi N Pb Pb N Pi Pi Pr Dr 15 C/V PA
SH
PG
14 Hydraulic Schematic

B Forward

A Forward
Dr GA
Option Applied Part 24. Proportional Valve 1. Pump
A Left
25. High Press. Return Filter 2. Pilot Filter
One-way ; Joystick Button & Pedal 24 29 30 Breaker
26. One/Two-way Select V/V 3. Solenoid Valve (Cut Off)
Filter
One / Two-way 24 26 28 29 30 25 28. Stop Valve 4. Accumulator (Package)

Backward B
Backward A
Mu 29. OPT. Pedal Valve 1 5. Solenoid Valve
Rotating ; Joystick Switch & Pedal 31 32 33 34 46
2 4 5 0 3 1
30. Shuttle Valve for OPT. 6. Joystick Valve (L)
Quick Coupler 36 32. Additional Gear Pump 7. Joystick Valve (R)
Dr
Travel Motor (L) Pa 16 Pa
Travel Motor (R) Dr Pattern Change Valve (ISO BHL) 40
33. Sol. V/V for Rotating 8. Pedal Valve
Am GB
B Right 34. Rotating Valve 9. Shuttle Valve
Two Pump ; One / Two-way 41 42 35. OPT. Pedal Valve 2 10. Control Valve
O 36. Quick Clamp Valve S 11. Boom Cylinder
P 39. Sol. Valve E3C T 12. Arm Cylinder
T 40. Pattern Change Valve D 13. Bucket Cylinder
41. Stop V/V for Two Pump 14. Swing Device
42. Sol. V/V for Two Pump 15. Travel Device
16. Center Joint
11 11 DR4
V2 T E
12 17. Restriction Valve
DR2 DR3 18. Restriction Valve
10 X1 of Pump
ps2 T2 DR1 T1 T3 ps1
X1 of Pump
23 C2
19. Oil Cooler
20. Return Filter
Pi1
21. Air Breather
C2 C2
22. Hydraulic Tank
pc1
E E 23. Lock Valve
A5
B5
Pi1 Pi1
T T Arm2 Arm1 pb9
pb9 pb5 2 4 2
V2 V2

23 23 pa9 34 a A B 1 3 1
pa9
pc2
pa5
A8 pc3 P
from #32
B8
B4 35 T P T P 8 T P 29
pb8 Boom1 Boom2 pb4 80kg/cm2
100kg/cm2

13 pa8 pa4
B3 T
B7
A3 b Opt. Pedal 2 Opt. Pedal 1
A7
Bucket Swing L.Travel R.Travel
pb3 2 1 2 1 4 3 2 1
pb7 CW CCW Forward Forward
pa3 Backward Backward
pa7 pi4
L.H pb6 pa6 pb1 pa1
Pi B2
B6 A2

A6
Option pb2 28
Travel(L) 250kg/cm2 P4
pb6
pa2
26
L
pa6 B1
C
28 A B
A1 A T
Travel(R) B R.H
pb1
pa1
6 T P T P 7
X
P1 33 2 2
Valve(Left) Valve(Right) 25 from Joystick(L) Switch 1 3 1 3
P2 P3 pr PH PA PP PT P1 pb5 4 4
Swing Arm Boom Bucket
PH of Sol. V/V pa9 1 3 2 4 2 4 1 3
pb9
Swing Motor SH Left Dump Down Crowd
A1 A2 A3 Right Crowd Up Dump
T A1 C1
A3
B1 D1
40
17 19 ISO A2 C2 BHL
B2 D2
Pcr=2.0k
to #34
41 42
Pcr=2.0k P1
P2 P3
pa5 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10
18 9 30
from Pressure Switch on #30
32 B1 S1 B2 B3 B5 B6 B7 B8 B9 S1 B10
ps2 B4
R3 R1
36 pa3 pb3 pb5 pb8 pa7 pa8 pb7 pb2 pa2
21 X1 Hammer Operating pa5

Travel High Speed


10u

4 Sol. V/V P3 pc1 pc2 Pi


A
P

PH

Hammer/Shear
0.5k 0.05k
Safety Cut-off

Pressure up
A1
10u
T

Drive Pump

Select
B

Engine
20 S ACC P2 HO TR2 PH BS
A B
177u
T LH-HI RH-HI
22 Idle Pump
24 (Close) (Open)
A2
T
X3
ps1 P1 3
M3 5
1 X1
ps1 X1 P0 P3 P4 P-REAR/STEERING LS

R4 R2
from Pressure Switch on #30
P1
39 P-FRONT/BRAKE
TANK
PILOT
DRAIN
from Joystick(R) Button
Hammer Select Operating from Joystick(R) Switch
Shear Select Operating
2

DX340LCA-K Hydraulic Schematic / Electrical Schematic


11-1-3

You might also like