GENERAL REQUIREMENTS
( SPECIFICATION )
5.1 Preparation, Approval, Issue and Revision of the Project Quality Plans
6.0 Procedures, Work Instructions & Checklists (Corporate & Contract Specific)
ADDC/AADC Company
6 ADDC/AADC
Representative
Corporate
Quality Manual
Project
Quality Plan
Key Document
Work Instructions
Audit Checklists
(Note: The following listing is purely for example purposes and is not intended to be a definitive
list of Procedures for a particular type of Contract).
Contract Management
Contract Review
Project Quality Plan
Planning & Scheduling
Document Control
Labor, Materials & Plant Resourcing
Provisional Acceptance Certificate
Training
Quality Auditing
Technical Queries
Tend Notice & Variations
Control of Non-Conforming Product
Corrective Action
Third Party Certification (if required in Scope of Work)
Design
Design control
Drawing control
Design Verification & Technical Reviews
Control of Specifications, ADDC/AADC Standard Specification, Codes & Standards
Preparation of Requisitions
Materials Tracking & Reporting
Reviewing Vendor Documentation
As Built Information
Operation & Maintenance Manuals
Procurement
Mechanical Works
On Plot Piping
Off Plot Piping
Welding
Installation of Static Equipment
Installation of Rotating Equipment
Painting & Coating
Non-Destructive Examination NDE
Electrical Works
Safeguarding
Installing Instrumentation
Instrument Air Supply
System Cabling
DCS Systems
SCADA
Factory & Site Acceptance Testing
Installation of Telecommunication Equipment
APPENDIX B
S. No. Description of Equipment Tests required Number of visits Third Party Remarks
to be witnessed by Inspections
by ADDC/AADC/ required
ADDC/AADC/ ENGINEER’s
ENGINEER’s Representatives
Representatives
(Yes/No) (Yes/No)
1. 3ph Electricity Meters Y 1 No
Direct Connected
3.
Notes:
(1) Details of equipment requiring witness testing by ADDC/AADC/ENGINEER’s representatives, number of visits and/or
Third Party Inspections shall be filled by ADDC/AADC considering the requirements of each project.
(2) Cost of witnessing the tests by ADDC/AADC representatives shall be borne by ADDC/AADC.