1. The Bill of Quantities usually contains the following part Bills, which have been grouped according to the nature or timing of the work:
and
2. Bidders shall price the Bill of Quantities in local currency only and shall indicate in the Schedule of Adjustments the percentage expected
for payment in foreign currency or currencies.
CS ELECTRONICS ENGINEERING SERVICES
Silway 7, Polomolok South Cotabato
Tel No. 0909-391-6149 / 0915-966-4391
NON VAT Reg.TIN 915-938-763-00000
Prk. Mabuhay Ext Silway 7 9504 Polomolok
South Cotabato, Philippines
Item no. Description Quantity Unit Unit Cost Material Cost Labor Cost OCM VaT Total
Mobilization And
101 1 lot 1,000,500.50 1,000,500.50 989,900.80 238,848.16 2,229,249.46
Demolition
Temporary
102 1 lot 669,900.00 669,900.00 66,500.00 88,368.00 824,768.00
Housing Facility
Occupational
103 Safety, Security 1 lot 669,900.00 669,900.00 66,500.00 88,368.00 824,768.00
and Health
Communication and
104 1 lot 106,050.56 106,050.56 10,590.00 13,996.87 130,637.43
Logistics
Item no. Description Quantity Unit Unit Cost Material Cost Labor Cost OCM VaT Total
Reinforced Concrete
***
Works
201 Concrete Column 20,000 pc/s 1,135.00 22,700,000 6,879,000 2,208,000 3,814,440 35,610,440
Reinforced Steel
***
Works
202 10mm dia. RSB 60,000 pc/s 186.65 11,199,000 3,355,500 1,125,200 1,881,564 17,561,264
12mm dia. RSB 30,000 pc/s 258.07 7,742,100 2,654,900 905,800 1,356,336 12,659,136
Formworks and
***
Scaffoldings
203 Formworks 2,048 sq.m 648.82 1,328,783.36 358,500 130,900 218,182 2,036,365.36
Steel Scaffoldings 2,048 sq.m 328.60 672,972.80 213,800 73,500 115,232.74 1,075,505.54
Item no. Description Quantity Unit Unit Cost Material Cost Labor Cost OCM VaT Total
*** Equipments
302 Boom Truck 1,820 hr/s 2,450 4,459,000 449,000 588,960 5,496,960
Total for Specified Provisional Sums (carried forward to Grand Summary (B), p. )