You are on page 1of 273

F A I S A L J A S S I M I N D U ST R I E S L . L . C .

We Bring Life to Your Building

AIR OUTLETS

For PROJECT:

VILLA -117-

CONSULTANT : M/s A POINT CONSULTANT

MAIN Contractor : M/s Palace group general contractor L.L.C.

MEP Contractor : M/s TARGET INTERNATIONAL L.L.C.


INDEX

SL NO DESCRIPTION REMARKS
01 INTRODUCTION
COMPANY PROFILE, CERTIFICATIONS
02 AND LIST OF REFERENCE PROJECTS IN
UAE
03 STANDARDS AND CODE OF PRACTICE
COMPLIANCE STATEMENT ACCORDING
04
TO CONTRACT SPECIFICATION
05 SCHEDULE OF TECHNICAL DATA
06 METHOD STATEMENT (IF REQUIRE)
MATERIAL SAFETY DATA SHEET (IF
07
REQUIRE)
PRODUCT CATALOGUE / EQUIPMENT
08
SELECTION SHEET
CATALOGUE, (OPERATION &
09
MAINTENANCE MANUAL (IF REQUIRE)
10 PRODUCT APPROVAL
LOCAL SUPPLIES WITH REGISTRATION
11
CERTIFICATE
12 TEST CERTIFICATE
INTRODUCTION
Subject: FLOWTECH Air Distribution Specialist - Introduction Letter

We would like to introduce ourselves as “FLOWTECH” - a leading Air Distribution Specialist and
Manufacturer from Dubai, UAE. And we belong to the eminent family of M/s. Faisal Jassim Trading
Co. / Faisal Jassim Industries.

M/s FAISAL JASSIM TRADING CO. L.L.C. was established in 1988, as a partnership between a number
of qualified engineers specialized in the Electrical & Mechanical fields related to the building services
industry. And since has forged for itself a venerable reputation of expertise and excellence in its fields.
It is a veritable achievement considering the fiercely competitive market that diversifies almost as
swiftly as it develops.

We are well-equipped with the pertinent certifications viz. ISO 9001 Quality Certification, ISO 14001
Environmental Certification and ISO 18001 Safety Certifications.

Our strength lies in the commitment and dedication of Faisal Jassim’s staff and the vision to foresee
and adapt to changing industry trends & demands. This attitude is appreciated by our patrons and
partners alike and, is reflected in a glowing track record and countless satisfied customers.

Our sales engineers have received adequate training on the different products we represent. We strive
to evaluate the client’s specification and provide an adequate response to meet their requirement.

FLOWTECH - with its projects spreading over the entire Middle East and Africa, are now considered
one of the prominent Air Outlet specialists in the region.

And our expertise lies in our products as follows.

• Grilles – Double Deflection, Single Deflection, Linear Bar, Egg Crate, Perforated, Floor,
Security, Decorative e.t.c
• Diffusers - Circular, Square, Rectangular, Ceiling mounted, Wall mounted, Perforated, Linear
Slot, Flowbar, Plaster, Jet, Drum Jet, Swirl, Laminar Flow, Decorative e.t.c.
• Louvers - Sand Trap, Wall mounted, Flush Mounted, Fresh Air, Exhaust Air, Heavy Duty,
Gravity, Acoustic e.t.c
• Variable Air Volume (VAV) Terminal Units - Pressure Independent, Bypass, Diffuser type, With
Electric Heater e.t.c.
• Dampers - Volume Control, Motorized, Back Draft, Non Return, Pressure Relief e.t.c.
• Sound Attenuators
• Access Door
• Disc valves

We FLOWTECH understand the importance of having an excellent service back up and workshop
facility. And we have ensured that our technicians are experienced and well-equipped with tools and
machinery to execute quality work. We always keep adequate spares, enabling us to attend the after-
sales service and in order to guarantee the quality of our supplied item.

Our main office is located in Dubai with branch offices in Abu Dhabi, Qatar, Oman, KSA & Iraq. Our
workshop, assembly lines & storage are located in Dubai Investment Park (DIP-1), Dubai in a purpose
built 6,000m2 facility. And we have an in-house Powder Coating plant as well!

Our products are tested in accordance with the relavant International Standards and codes by
prominent laboratories like INTERTEK U.S.A. and, in accordance with ASHRAE 70, ADC 1062, AMCA
500, AHRI 880, ASHRAE 130, ASTM E477 and BS EN 13181 – all manufactured in adherence to the
SMACNA standards.

Also, FLOWTECH is very much into OEM business and have some prominent partners in Middle East
and Africa. And we are looking forward to building such relationships in other parts of the world as well.

We hope that you would consider us to be a part in your quest for efficient Air Distribution Engineering
and can assure you a competitive price, preeminent quality and optimum service.

Please find a list of our projects as shown below.

For more information and other details regarding our products, please send an email at
flowtech@fjtco.com or visit our website at http://www.flowtechind.com

For further queries, please do not hesitate to contact the undersigned.

Truly Yours,

FLOWTECH
COMPANY PROFILE, CERTIFICATIONS
AND LIST OF REFERENCE PROJECTS
IN UAE
WE
BRING
LIFE
TO YOUR
BUILDING

Faisal Jassim Group


II Faisal Jassim Group
Webring 11ft toyourbu1lcflng

ABOUT US
Established in 1988, Faisal Jassim Trading Company LLC specializes in the
engineering, manufacturing and trading of products and systems, in the
electrical and mechanical fields related to the building services industry.
Today, we have earned a respected reputation of expertise and excellence,
employing in excess of 950 qualified staff with facilities exceeding 2500m2.

As we focused on our specialization, we have ensured that we bring in the


world's best manufacturers to GCC. Since the very beginning, we have been
persistent in serving the building services industry with dedication and
commitment. Our organization continues to expand and grow, driven by our
vision.

Today, we are a group of enterprises having interest in several diversified


strategic business segments across the region, resulting in the formation
of Faisal Jassim Group, upholding the same values and principles of our
flagship entity.

We are constantly working on improving our services and expanding


our line of products to ensure a comprehensive coverage of the building
services industry. We have enhanced our local manufacturing and production
capabilities, to cater to our increased market share in GCC countries.

OUR CORE VALUES


Character Partnership
We are respectful, honest, positive We strive to achieve our common
and fair to all stakeholders. goals through interdependency and
collaboration
Continuous Improvement Commitment
We embrace a culture of continuously We take ownership of achieving our
improving our products, our processes mission to the complete satisfaction
and ourselves. of all our stakeholders

We will foster
growth through
new ideas,
new products
and strong
partnership.
Raphael Khlat
President
Faisal Jassim Group

VISION
To be the preferred partner in supplying products for the
building services industry.

MISSION
• To provide our clients competitive and premium quality
equipment and services.
• To strengthen the acceptability of our brands with clients
and contractors throughout the GCC.
• To seek growth through new ideas, new products and
strong partnerships.
• To set offices or develop factories in the GCC market
closer to our customer base.
• To recruit, train and retain the best talent in the industry.
• To continuously improve our business processes leading
to prompt and efficient sales and after sales services.
OUR BUSINESS PLATFORMS
We manage our business based on three diversified segments, within the building service industry:

- Distribution and Trading


- Manufacturing and Assembly
- After Sales Services and Maintenance

OUR TEAM
Our leadership team is led by the President Raphael Khlat and the Chief Executive Officer Azzam Messaykeh,
supported by heads of sales, marketing, finance, human resources, information technology, manufacturing,
logistics and after sales service as well as the leaders of our other growth centers across the region.

We are organized into multiple divisions according to the line of products and services we offer.
Our experienced engineering and sales team, along with technicians and support staff, are well qualified
in providing solutions that are customized to client needs. Through the years we have built strong relationships
with our principals and partners, who have contributed to our team innovations and latest technology
breakthroughs. We encourage a customer focused culture and believe in going the extra mile to deliver
against our promises and exceeding customer expectations.
LINE OF PRODUCTS
We have a strong business development drive, and hence, our product
portfolio and partnership has been growing with time.

Our product portfolio currently includes:


1. PUMPING EQUIPMENT AND PACKAGES 5. VALVES AND ACTUATORS, DISTRICT COOLING
EQUIPMENT AND SERVICES
• Chilled Water Pumps - Xylem Bell & Gossett,
Xylem Goulds • Balancing and Control Valves - IMI Hydronic Engineering
• Domestic Water Pumps – Xylem Goulds • Infrastructure Valves – ABO, AWS
• Fire Fighting Pumps – Xylem A-C Fire Pumps • Standard Valves – i-tap
• Sewage Pumps- Xylem Flygt • Actuators – Schiebel
• Hydronic Specialties – Xylem Bell and Gossett • Heat Exchangers – Sondex
• Pressurization Unit and Booster and Transfer • Cooling Towers - Kelvion
Packages – Aquaflo • Centrifugal Sand Separators – Lakos
• Ice Thermal Storage -Cryogel
2. AIR CONDITIONING EQUIPMENT • Self Cleaning Filtration Systems -STF Filtros

• Air Handling Units – Euroclima 6. FANS AND ACCESSORIES


• Fan Coil Units – Euroclima
• Chillers - Climaveneta • Greenheck Fans
• Air-Cooled Packaged Units - Samsung • Pollrich DLK Fans
• VRF and Ducted Split DX System - Samsung • Air Vent Technology Fans
• Mini Split DX System - Samsung
7. LOW VOLTAGE SWITCHGEAR AND CONTROL PANELS
3. AIR TERMINAL AND CONTROL DEVICES,
DUCTING AND INSULATION PRODUCTS • LV Switchgear Panels - Promaster/ABB
• Control Panels - Promaster/ABB
• Grills, Registers, Diffusers, Dampers, • Automation Panels - Promaster/ABB
Sound Attenuators, Louvers and VAV Boxes - Flowtech
• Closed Cell Rubber Insulation – Armacell 8. LIGHTS AND FITTINGS
• Pre-insulated Ducts: Kingspan Koolduct
• DISANO and other major brands like Fosnova, Sylvania,
4. BOILERS, SOLAR WATER HEATING SYSTEM Concord, Switchmade , Lug Lighting, Linealight, Side,
AND PLUMBING EQUIPMENT Atiled, Venture Lighting, Gewiss.

• Hot Water, Steam and Condensing Boilers 9. BUS BAR SYSTEMS: PowerBar
– Cleaver Brooks
• Solar Hot Water System Packages and Solutions 10. FJ CARE
- Lacaze and Radiant
• Calorifiers – Lacaze • Maintenance,service and spare parts for large
• Pressure Reducing Valves – Honeywell and i-tap air-conditioning installations.
• Pex Pipe with Bronze Fittings – GF JRG
OUR BRANDS
OUR MANUFACTURING CAPABILITIES
We have our in-house facilities for manufacturing and assembling the following products, each having 6000 square meter
of dedicated production space and employing more than 200 qualified staff.

Flowtech Air Distribution Specialties and Duct Accessories


The facility has dedicated production lines separately for air terminal and air control devices, equipped with
state-of-the-art tools and machineries and an in-house powder coating plant.

Promaster Low Voltage Switchgear and Systems


A well laid out, sophisticated, air conditioned manufacturing facility incorporates pneumatic lines along with
the required tools, busbar fabrication machines, hand tools and other related machineries.

Aquaflo Pumping Packages and Solutions


The pump assembly unit has the capacity to deliver a minimum of 70 booster package sets and 25 chilled water pumps
on a daily basis, with a testing area, a paint shop and a pump control panel assembly center.

These products are backed up by an extensive portfolio of services and a high level expertise covering a wide variety
of applications in the building service industry.

SOLUTIONS EXPERTISE
We offer the full spectrum of engineering support and We frequently conduct CPDs (Continuing Professional
are the one-stop solution for all the requirements of Development) and technical presentations on various
MEP products and systems. We support our stakeholders topics with the support of our principals to enhance these
right from the concept and design stage to the project initiatives and go the extra mile to make sure your
execution by providing: requirements are met.

- Value Engineering We prioritize customer satisfaction


- Equipment Selections and Sizing
- Package Solutions
by managing and analyzing their needs,
- Testing and Commissioning with the goal of improving our strategic
business alliances.
AFTERMARKET SUPPORT AND SERVICES
We are committed to deliver high quality Mechanical, Electrical and
Plumbing equipment with its services in a timely manner to the agreed
specifications. We understand the importance of having excellent service
backup and workshop facilities. We have ensured that our technicians
are experienced and well-equipped with tools and machinery to execute
quality work.
We keep adequate spares, enabling us to attend to FJ Care: A maintenance arm of Faisal Jassim Group,
after-sales service and guarantee the quality of our executing maintenance contracts, after sales services,
supplied equipment. We are also committed to backup support and workshop facilities for Air Conditioning
continuously measure, review and improve our working Equipment.
and quality objectives to maximize our customers’
satisfaction, with optimal utilization of resources.

QUALITY AND CERTIFICATIONS


• ISO 9001:2008 • ASTA,KEMA, UL type test certification as per
IEC 61439-2 for Promaster LV Panels.
• ISO 14001:2004
• ETL-SEMCO test certification as per ASHRAE 70-1991
• OHSAS 18001:2007
for Flowtech air distribution products.
HEALTH, SAFETY AND ENVIRONMENTAL POLICY
Faisal Jassim Trading Co. LLC incorporates Health, Safety
and Environmental (HSE) measures as a mutual objective
for the management and employees at all levels, and
considers this objective as a responsibility equal to that
of any other function.

We have implemented the health,safety and environment


management system at our facilities, which was developed
to conform to the ISO 14001 standard for environmental
management, and to the OHSAS 18001 standards for
occupational health and safety.

Safety responsibilities are defined in employees job


descriptions and measured regularly with rewards for
outstanding performance. We are committed to building
a culture of accountability and a safer work environment for
our employees.

CORPORATE SOCIAL RESPONSIBILITY INITIATIVES

We are committed to contributing to the community and the environment by taking part in many initiatives, such as:

1. GO GREEN 4. SUPPORT STUDENT EDUCATION & TRAINING


Emirates Green Building Council (EGBC) honored us for the through contributions, and support of special programs
support and promotion of sustainable buildings in the UAE. that receive and train university students.

2. ENCOURAGE SPORTS Our management takes part in organizing gala dinners


Yalla sports presented an appreciation award to us in to collect funds to assist university students in need.
recognition of our tremendous dedication and extreme support
to Dubai Investment Park Inter-Company Olympiad. We have 5. SUPPORT MEP INDUSTRY
won the championship for years along with many individual We are a constant sponsor of events contributing to the
awards for winning sports events. advancement of the MEP Industry and its leaders.

3. SUPPORT NEEDY CHILDREN 6. SUPPORT LOCAL CHARITY


Certificate of appreciation was presented in gratitude We support CSR initiatives the most recent being
for our generous contribution and commitment to Bait at the Rashid Centre for the Disabled Children, Dubai.
Al Khair Society and support for the “Orphanage Care Project”.
OUR NETWORK

FJ Electrical Engineering
and General Trading Co. Ltd
Iraq Kurdistan-Erbil, Ankawa FJ Trading & Engineering Co.WLL
Tel: +964 662252917 Doha
Tel: +964 662252916 Barwa Commercial Avenue
E-mail: fjiraq@fjtco.com Room No. : C102 & C103
Sayer Building, Block 08, Industrial Area,
P. O. Box 31859, Doha, Qatar
Tel: +974 40018888
Fax: +974 40018877
E-mail: fjtrdg@emirates.net.ae

Faisal Jassim Trading Co. L.L.C


Tawreed Co. L.L.C. Abu Dhabi
Riyadh Room 202, Al Hosn Tower,
Suleimaniyya area Al Nasr Street
P.O.Box: 240601, Riyadh 11322, P. O. Box 10638, Abu Dhabi, U.A.E.
Saudi Arabia Tel: +971 2 62 19772
Tel: +966 11 4633338 Fax: +971 2 62 19773
Fax: +966 11 4633338 E-mail: fjtauh@emirates.net.ae
E-mail: fjtrdg@emirates.net.ae
Website: www.tawreedco.com
Faisal Jassim Trading Co. L.L.C
Dubai, DIP
P. O. Box 1871, Dubai U.A.E.
Tel: +971 4 8105105
Fax: +971 4 8105106
E-mail: fjtrdg@emirates.net.ae

FJCare Technical Services L.L.C


Al Qusais – Showroom
Faisal Jassim Trading Company Showroom 1 Dubai Res. Oasis
Faisal Jassim Trading Company Damascus St. Al Qusais 2,Dubai
Africa Al Khuwair Tel. #04 258-2640
B19 Residence Fatma Regency 2045 P. O. Box 412, Muscat Fax. #04 258-2641
Ain Zaghoun-Tunis- Tunisie Sultanate of Oman E-mail: enquiries@fjcare.com
Mob: 00216 98 904 795 Tel: +968 24486365
E-mail: fjtrdg@emirates.net.ae Fax: +968 24486346
E-mail: fjoman@fjtco.com
CONNECT TO US

Visit us at www.fjtco.com
Email: corporate@fjtco.com
Telephone +971 4 8105105

FOLLOW US ONLINE

ae.linkedin.com/in/FJTCO

@Life2UrBuilding

Faisal Jassim Group


PROJECT LIST REFERENCE- UNITED ARAB EMIRATES

PROJECT CONSULTANT CONTRACTOR LOCATION YEAR OF COMPLETION

BRIDGES PHASE 1 AND 2 AECOM MAPCO ABU DHABI ON GOING

AL REEM MALL ABU DHABI DEWAN ARCHITECTS + ENGINEER ITENERA GHANTOOT JV ABU DHABI ON GOING

VILLANOVA VILLAS 1388 VILLAS ATKINS EFECO DUBAI ON GOING

CHAWLA CONSULTING
THE FIEDS 1028 SEMI DETACHED VILLAS- MEYDAN DUBAI GBH INTERNATIONAL CONTRACTING CO LLC DUBAI ON GOING
ENGINEERS

DEIRA WATERFRONT PLOT 1 & 2 IBA CHINA STATE CONSTRUCTION DUBAI ON GOING

DUBAI DOWNTOWN VIEWS 2 ARCH GROUP CHINA STATE CONSTRUCTION DUBAI ON GOING

CREEK GATE AT DUBAI CREEK HARBOUR NORR TRINITY ENGINEERING DUBAI ON GOING

VILLANOVA VILLAS AT DUBAI LAND ARIF & BINTOAK TRINITY ENGINEERING DUBAI ON GOING

ROVE HOTEL AT CITY WALK ARCH GROUP TRINITY ENGINEERING DUBAI ON GOING

PARK HEIGHTS 1 AND 2 KHATIB & ALAMI SHAPOORJI PALLONJI & CO MIDDLE EAST DUBAI ON GOING

EMIRATES SPECIALITY HOSPITAL IBA IEMS DUBAI ON GOING

GRAND RAMEE HOTEL AT BUSINESS BAY ARCH GROUP IEMS DUBAI ON GOING

RESIDENTIAL BUILDING AT QASBA ASAK AL KAUTHER SHARJAH ON GOING

LACASA ARCHITECTURAL
PARAMOUNT TOWER HOTEL NASCON ENGINEERING CONTRACTING DUBAI ON GOING
CONSULTANT

MOHAMMED BIN RASHID AL MAKTHOUM CITY DISTRICT AE7 MS CONSTRUCTION DUBAI ON GOING

MARINA RISE TOWER- AL REEM ISLAND KHATIB AND ALAMI AL SWEIDI AND SHAMS ABU DHABI ON GOING

PROPOSED RESIDENTIAL BUILDING (3+B+G+21 TYP FLOORS+


GOLDEN SQUARE NOOR AL YEMEN DUBAI ON GOING
ROOF) AT IMPZ

YAS SOUTH INTEGRATED DESTINATION RESORT DEVELOPMENT WSP BK GULF LLC ABU DHABI ON GOING

FREIBURG CONTRACTING AND GENERAL


AL FALAH PLAZA RESIDENTIAL COMPLEX WSP ABU DHABI ON GOING
MAINTENANCE LLC

2107-263 CONSTRUCTION OF ZAYED PORT CRUISE TERMINAL- FREIBURG CONTRACTING AND GENERAL
AMAR GOLDEN LLC ABU DHABI ON GOING
2 MAINTENANCE LLC

THE ONE HOTEL AT BUSINESS BAY HME HEAT AND POWER DUBAI ON GOING

ICD BROOKFIELD AECOM MBM ABU DHABI ON GOING

G+2P+6 COMMERCIAL + RESIDENTIAL BUILDING AT AL


ARKIPLAN TRINITY ENGINEERING DUBAI ON GOING
SATWA

AL ANDALUS TOWER ECG EMT ELECTROMECHANICAL CONTRACTING DUBAI ON GOING

ROYAL ATLANTIS DEC SPECON LLC DUBAI ON GOING

DUBAI CREEK HARBOR- CREEK RISE TOWER RAMBOLL MIDDLE EAST UNITED MASTERS ELECTROMECHANICAL LLC DUBAI ON GOING

ONE ZABEEL WSP ALEMCO DUBAI ON GOING


KINGS COLLEGE HOSPITAL WME SHAPOORJI PALLONJI & CO MIDDLE EAST DUBAI ON GOING

PIVOT ENGINEERING & GENERAL CONTRACTING


SERENA CASA DORA PHASE 2 AT WADI AL SAFA- 7 DEWAN ARCHITECTS + ENGINEER DUBAI 2020
COMPANY

4B+G+15+ROOF COMMERCIAL AND RESIDENTIAL BUILDING


NEB EMAC DUBAI 2020
AT AL MAMZAR

SERENA BELLA CASA PHASE 1 AT WADI AL SAFA-7 DEWAN ARCHITECTS + ENGINEER VERGER DELPORTE UAE LTD DUBAI 2019

ABORAIA ELECTROMECHANICAL LLC / GREEN


MAMSHA AL SAADIYAT ISLAND DEWAN ARCHITECTS + ENGINEER ABU DHABI 2019
ADEPTECH LLC

AL SHAFAR UNITED ELECTROMECHANICAL


BLUE WATERS RESIDENTIAL CKR CONSULTING ENGINEERS DUBAI 2019
ENGINEERING

AKOYA OXYGEN- SANCTUARY CLUSTER (388 VILLAS) KEO AL JADEED DUBAI 2019

AKOYA VILLAS 2670 ACE EFECO DUBAI 2019

CARAWAN ELECTRICAL AND MECHANICAL


ARABIAN RANCHES II REEM COMMUNITY HOUSES AL GURG CONSULTANTS DUBAI 2019
WORKS LLC

ENGINEERING CONSORTIUM
THE RESIDENCE AT MARINA GATE- 2 ALEMCO DUBAI 2019
CONSULTING ENGINEERS

BN.NS ENGINEERING
DUBAI CREEK HARBOR- PHASE IA UNDERGROUND PARK NASCON ENGINEERING CONTRACTING DUBAI 2019
CONSULTANTS

ACACIA 01- DUBAI HILLS NEB SOBHA ELECTRO MECHANICAL WORKS DUBAI 2019

500 VILLA'S LIVING LEGEND AL BURJ ENGINEERING DELTA AL EMARATE BUILDING CONTRACTING DUBAI 2019

KHALIFA UNIVERSITY ELITE DESIGNE FIBREX CONSTRUCTION ABU DHABI 2018

HIGHER COLLEGES OF TECHNOLOGY AT BANIYAS - ABU


ELITE DESIGNE TORNADO GROUP ABU DHABI 2018
DHABI

EREC BUILDING NO.35- MINISTRY OF JUSTICE & FEDERAL


DEC & HILL INTERNATIONAL ECOTHERM CONTRACTING LLC ABU DHABI 2018
COURTS COMPLEX

KINGS COLLEGE HOSPITAL AT DUBAI HILLS WME SHAPOORJI PALLONJI & CO MIDDLE EAST DUBAI 2018

MARQUISE TOWER ERGA IEMS DUBAI 2018

AL AJMI ENGINEERING
SUSTAINABLE CITY SUN MIDDLE EAST DUBAI 2018
CONSULATANS

AL SHAFAR UNITED ELECTROMECHANICAL


G+3P+32 COMMERCIAL BUILDING DUBAI 2017
ENGINEERING

AL SHAFAR UNITED ELECTROMECHANICAL


CITY WALK HYDER DUBAI 2017
ENGINEERING

BURJ SIDE TERRACE TOWER ZAS/PSE AL ITTIHAD DUBAI 2016

THE DISTINCTION TOWER ZAS/PSE EMIRATES TECHNICAL & THERMAL SYSTEMS CO. DUBAI 2015

OPUS TOWER CLARKE SAMADHIN HAYDON DUBAI 2015

OFFICE TOWER FOR SHK. TAHNOON IAN BANHAM ASSOCIATES COMMODORE ABU DHABI 2015

AL SHAFAR UNITED ELECTROMECHANICAL


ITIHAD MUSEUM CH2M HILL DUBAI 2015
ENGINEERING

GEMAC ENGINEERING
MUHARRAQ MALL AL MOAYYED AIR CONDITIONING- BAHRAIN BAHRAIN 2014
CONSULTANT

KHALIFA A DATA CENTRE AECOM EMIRATES TECHNICAL ASSOCIATES ABU DHABI 2014

JUMEIRAH COLLEGE CLARKE SAMADHIN TRINITY ENGINEERING DUBAI 2014

DRAGON MART HOTEL DAR AL HANDASSAH POWER POINT ELECTRICAL AND MECHANICAL DUBAI 2014

Abu Dhabi Future School Phase 3, Package 2 DEWAN UNIVERSAL VOLTAS ABU DHABI 2014
THE LAND MARK- DOPA AND FOUNDATION PROPERTY EMIRATES TECHNICAL ASSOCIATES 2013

RUWAIS HOUSING COMPLEX PACKAGE 12 NO. 6042 ADNOC SIGMA ABU DHABI 2013

OFFICER'S ACCOMODATION KHATIB & ALAMI UNIVERSAL VOLTAS ABU DHABI 2013

3B+G+4 PLAZA RESIDENCE-1 RESIDENTIAL BUILDING AT


NEB BRIDGEWAY ELECTROMECHANICAL DUBAI 2013
JUMEIRAH VILLAGE, DUBAI

OBERMEYER ENGINEEERING
ZAYED UNIVERSITY HABTOOR SPECON ABU DHABI 2012
CONSULTING

UNIVERSITY OF SHARJAH TEACHING HOSPITAL CANSULT GECO MECHANICAL & ELECTRICAL SHARJAH 2012

GLOBAL ENGINEERING
MOBIS WAREHOUSE AT JAFZA ON PLOT NO. S60108 BRIDGEWAY ELECTROMECHANICAL DUBAI 2012
CONSULTANTS

GRAHAM JONS ALEWAN


MALE & FEMALE HEALTH CLUB, RUWAIS HOUSING COMPLEX BRIDGEWAY ELECTROMECHANICAL ABU DHABI 2012
ENGINEERING

AL SHIRAWI ELECTRICAL & MECH. ENGINEERING


G+3 BUILDING AT MUHAISNAH 4 BLOCKS AL HASHEMI DUBAI 2012
Co. LLC

G+15 AL NADHA PROJECT SEED ENGINEERING ROTARY - HUMM (MEP) SERVICES UAE LLC DUBAI 2012

EMIRATES CALL CENTER BILT MIDDLE EAST DUBAI 2012

JLA INTERNATIONAL
AL SILA VILLA (P/105) ENGINEERING / KEO Pivot Engineering & General Contracting Co. WLL DUBAI 2012
INTERNATIONAL CONSULTANTS
AL RAHA BEACH DEVELOPMENT AL MUNEERA AT KHOR AL
AL BURJ ENGINEERING / AECOM AL FUTTAIM CARILLION ABU DHABI 2012
RAHA-00400

AL FALAH COMMUNITY VILLAS FLUOR / GHM EL MECH - ALEC MEP JOINT VENTURE ABU DHABI 2012

AL FALAH COMMUNITY VILLAS FLUOR / GHM AL JABER ABU DHABI 2012

NAGA ARCHITECH DESIGNER


AL AIN (P/104) PLANNER ./ KEO INTERNATIONAL Pivot Engineering & General Contracting Co. WLL ABU DHABI 2012
CONSULTANTS
ADISC - RESIDENTIAL, LEISURE & COMMERCIAL COMPOUND -
WS ATKINS EMIRATES TECHNICAL & THERMAL SYSTEMS CO. ABU DHABI 2012
385 VILLAS

ADISC - RESIDENTIAL, LEISURE & COMMERCIAL COMPOUND -


WS ATKINS THERMO L.L.C. ABU DHABI 2012
385 VILLAS

UAE UNIVERSITY AL AIN AECOM AL HABTOOR SPECON ABU DHABI 2011

POLICE RESIDENTIAL COMPLEX PLS019 UNITED MASTERS ELECTROMECHANICAL LLC 2011

ISFAHAN CITY CENTER PROJECT PROLEED International Constrcution & Trade (ICAT Fzco.) 2011

ICAD RESIDENTIAL II - ASCORP ABU DHABI 2011

HIGHLAND RESORT VILLAS W-51 AUH ALEC BUILDING EXCELLENCE ABU DHABI 2011

AL REEF DOWNTOWN CRANG & BINTOAKE FIBREX -TOLEDO ABU DHABI 2011

ADNOC HOSPITAL AT RUWAIS ADNOC THERMO L.L.C. ABU DHABI 2011

2B+G+4P+16 TYP AT DUBAI NUTEK DYNAMO ELECTROMECHANICAL DUBAI 2011

RITAJ RESIDENTIAL COMPLEX AT DIP AJEC ALPHANOOR ELECTRO MECHANICAL WORKS DUBAI 2010

RIFFA VIEWS-LAGOON VILLAS, BAHRAIN MSCEB G.P. ZACHARIADES (OVERSEAS) LTD. BAHRAIN 2010

MURUR MIXED USE COMPLEX - AJMAN AJ DESIGN ALI MOOSA & SONS CONTRACTING AJMAN 2010

AONBOOHSAZANE HOMAYE TEHRAN PRIME


KISH TWIN TOWER 2010
PROPERTY DEVELOPERS

JUMEIRAH ZABEEL SARAY HOTEL SHADEED ENGINEERING ZSML CONSTRUCTION DUBAI 2010
GREEN COMMUNITY WEST KHATIB & ALAMI ALPHANOOR ELECTRO MECHANICAL WORKS DUBAI 2010

GOLF GARDENS RESIDENTIAL COMMUNITY PROJECT ABU PIVOT ENGINEERING & GENERAL CONTRACTING
OTAK INTERNATIONAL 2010
DHABI Co. WLL

Duhail & Umm Al Qurn Water Reservoirs KEO HASTIE INTERNATIONAL PTY. LTD 2010

DENTAL HOSPITAL - SHARJAH UNIVERSITY CANSULT GECO MECHANICAL & ELECTRICAL SHARJAH 2010

CITY CENTER EXPANSION PHASE III SHANGRILLA & MERWEB


MSCEB, HOK AL HABTOOR SPECON LEINGTHON GROUP 2010
HOTELS

CENTRIUM TOWER@IMPZ-DUBAI NEB/ARENCO ALI MOOSA & SONS CONTRACTING DUBAI 2010

AMERICAN SCHOOL IN DUBAI RMJM DRAKE & SCULL DUBAI 2010

GEMAC ENGINEERING
11 STOREY BUILDING @ AL SEEF AL MOAYYED AIR CONDITIONING (BAHRAIN) BAHRAIN 2010
CONSULTANT

NAKILAT SHIP REPAIRING YARD, Qatar Petroleum ROYAL HASKONING/ COWI AL MOAYYED AIR CONDITIONING (BAHRAIN) BAHRAIN 2010

MINISTRY OF HIGHER EDUCATION TOWER - SUDAN ENJAZ ENGINEERING DURA 2009

MEYDAN TAK/CKR TRANS GULF ELECTROMECH DUBAI 2009

MEYDAN TAK/CKR AL HANI / CAN / KBK DUBAI 2009

JUMEIRAH PARK-377 VILLAS DAR AL HANDASSAH EMIRATES TRADING AGENCY DUBAI 2009

INDIGO ICON TOWER, DUBAI ATKINS TRINITY ENGINEERING DUBAI 2009

Dubai International City Phase 1 -CBD 29 Bldgs. ECG JSCOM INTERNATIONAL Co. DUBAI 2009

DALMA MALL, ABU DHABI DIAR CONSULTANT / RMJM HASTIE INTERNATIONAL PTY. LTD ABU DHABI 2009

ALDAR HEADQUARTERS, AL RAHA BEACH DEVELOPMENT, ABU


ARUP CONSPEL EMIRATES LLC ABU DHABI 2009
DHABI

3B+G+18 AT IMPZ BDPL GULF OMEGA ENGINEERING LLC DUBAI 2009

2 TOWERS AT SPORT CITY QHC EMIRATES TRADING AGENCY DUBAI 2009

THE SQUARE PROJECT OF 4 BUILDINGS AT AL MAMZAR IAN BANHAM DUBAI MASTERS DUBAI 2008

MOTOR CITY AREA 2 (UP TOWN), DUBAI WSP STS Al Ta'afuf DUBAI 2008

MOTOR CITY AREA 1, DUBAI WSP THERMO L.L.C. DUBAI 2008

MIRDIF VILLA’S & APARTMENT , DUBAI KING CONSULTANT CHINA STATE CONSTRUCTION DUBAI 2008

MAG 218 TOWER AT DUBAI MARINA NEB MAG DUBAI 2008

LIWA HEIGHTS AT PLOT JLT-PH2 WS, JUMERIAH LAKE


ELMACS Co. LLC DUBAI 2008
TOWERS, DUBAI

JUMEIRAH PARK-419 VILLAS DAR AL HANDASSAH EMIRATES TRADING AGENCY DUBAI 2008

JUMEIRAH LAKE TOWER - B2 TOWER CHINA STATE CONSTRUCTION DUBAI 2008

JBR HOTEL 03 RMJM AL AHMADIA CONTRACTING DUBAI 2008

G+5P+25 TYP (4 TOWERS) AT AL NAHDA, SHARJAH FOR MR.


AL SABAH ELECTRO-MECH. CONT. EST DUBAI 2008
ALI AHMED SALIM AL OWAIS

BAY GATE APARTMENT , DUBAI WHITBY & BIRD CHINA STATE CONSTRUCTION DUBAI 2008

HEGAZY ENGINEERING
ARBIFT TOWER, SHARJAH VERGER et DELPORTE UAE LTD. SHARJAH 2008
CONSULTANTS
ANANTARA & TIARA RESIDENCE, DUBAI DAR AL HANDASSAH DRAKE & SCULL DUBAI 2008

AL MUSAFFAH MALL, ABU DHABI DIAR CONSULTANT HASTIE INTERNATIONAL PTY. LTD ABU DHABI 2008

ACADEMIC CITY @ KNOWLEDGE VILLAGE IANBANHAM BMG DUBAI 2008

5 TOWERS AT SPORT CITY QHC EMIRATES TRADING AGENCY DUBAI 2008

SHK HAMADAN AWARDS BLDG., DUBAI ARKITEKNIK INTERNATIONAL BK GULF DUBAI 2007

IBIS HOTEL SEED ENGINEERING ROTARY - HUMM (MEP) SERVICES UAE LLC 2007

G+6 OFFICE BLDG (4 BLDGS) & ON PLOT NO # 598-1208, AT


ARENCO EMIRATES TECHNICAL & THERMAL SYSTEMS CO. DUBAI 2007
DI PARK FOR ARENCO REAL ESTATE

G+15 AT RAK AL FUTTAIM ENGINEERING COMPANY LLC RAS AL KHAIMAH 2007

EMARR SCHOOLS, ARABIAN RANCHES & GREENS, DUBAI EMARR Direct JASAF BLDG. TECHNOLOGY DUBAI 2007

DIFC ZONE 8 B, DUBAI WATERMAN EMIRATES A & P PARASKEVIDES DUBAI 2007

CHURCHILL TOWER IANBANHAM OMEGA ENGINEERING LLC 2007

6 BLDG. RESIDENTIAL / COMMERCIAL @ MAMZAR IANBANHAM AL HABTOOR SPECON DUBAI 2007

TWIN TOWER FOR AL KHALEEJ NEWSPAPER, SHARJAH AL KHALEEJ NEWSPAPER AL MUHANAD ELECTROMECHANICAL SHARJAH 2006

SKY GARDEN TOWER @ DIFC ATKINS BADER AL MULLA DUBAI 2006

SHARJAH AQUARIUM BUILDING CANSULT GECO MECHANICAL & ELECTRICAL SHARJAH 2006

PALM JUMEIRAH LUXURY VILLAGE KEO NAEL ENERGY &GENERAL EST. DUBAI 2006

MARITIME MUSEUM CANSULT GECO MECHANICAL & ELECTRICAL SHARJAH 2006

G + 2 EMPLOYEE ACCOMMODATIONS BUILDING ARENCO ALPHANOOR ELECTRO MECHANICAL WORKS DUBAI 2006

FRONT C D & E VILLAGE @ PALM ISLAND JUMEIRAH KEO ATG DUBAI 2006

COUNSIL OF CONSULTANT BLDG. @ SHARJAH COUNSIL CONSULTANT KARAM GROUP OF COMPANYS (ON SITE) SHARJAH 2006

B+G+M+12 RESIDENTIAL DEVELOPMET PORT SAEED, DUBAI ARKITEKNIK INTERNATIONAL TRINITY ENGINEERING DUBAI 2006

B+G+20 RESIDENTIAL / COMMECIAL BUILDING GULF INT’L SOLICO CONTRACTING DUBAI 2006

AL QUASBA VILLA TIGER CONTRACTING CO DUBAI 2006

2+B+G+M+4+ROFF COMM. & RESIDENTIAL KLING CONSULT ULTIMATE POWER DUBAI 2006

RABBAN TOWER @ WEST BAY EXPORT ALMOAYYAD AIR CONDITIONING DUBAI 2005

MARINA DIAMOND 3, 4 TOWER AL AJMI FAWAZ REFRIGERATION & A/C CO DUBAI 2005

LABOUR ACCOMODATION FOR LABOUR CONTRACTING TALIB AL HAWAI DUBAI 2005

G+M+15 BLDG. ASWAR ENGINEERING DUBAI 2005

THE PALM JUMEIRAH SIGNATURE HOMES KEO CONSULTANT ADVANCE TECHNICAL GROUP DUBAI 2004

J-330-WARE HOUSE & ADMIN JEBEL ALI DUBAI MACE INTERNATIONAL AMANA STEEL BLDG CONT CO DUBAI 2004

C2504 SCHLUMBERGER MLC MEA LEARNING CENTRE MORGAN THERMO L.L.C. 2004
3B+G+20 AL ASMAWI TOWER SHARJAH ADNAN SAFFARINI FAWAZ REFRIGERATION & A/C CO SHARJAH 2004

RAMEZ HYPER MARKET KAD CONSULTANT OMEGA ENGINEERING LLC 2003

NEW H Q OF GENERAL PENSION & SOCIETIES CANSULT LEMCON GENERAL CONTRACTING 2003

NATIONAL BANK OF UMM-AL-QUWAIN APEX ELECTRO MECHANICAL UMM AL QUWAIN 2003

G+P+13+CLUB HOUSE RESI JEBEL ALI DUBAI ARCON OMEGA ENGINEERING LLC DUBAI 2003

G+7 SHARJAH AL TORATH TIGER CONTRACTING CO SHARJAH 2003

PORT SAEED CONSULTANCY


G+4 ( 4 BLDG) DUBAI S.S.LOOTAH DUBAI 2003
OFFICE

INTERNATIONAL ENGINEERING
G+3P+21 SHARJAH TIGER CONTRACTING CO SHARJAH 2003
CENTER

G+3P+16 SHARJAH ACADEMIC CONSULTANTS UNEC SHARJAH 2003

G+3P+15 VILLAS @ AL KHAN AL TURATH TIGER CONTRACTING CO DUBAI 2003

G+2P+HC (HEALTH CLUB) + 15 SHARJAH GULF INTERNATIONAL CITY ENGINEERING SHARJAH 2003

G+2P+13 (2 BLDG) SHARJAH AL MADAR CONSULTANT AL MADAR SHARJAH 2003

G+2P+12 SHARJAH GULF INTERNATIONAL CITY ENGINEERING SHARJAH 2003

G+2P+12 SHARJAH AL TORATH TIGER CONTRACTING CO SHARJAH 2003

G+2P+12 SHARJAH GULF INTERNATIONAL CITY ENGINEERING SHARJAH 2003

G+2 EMPLOOYEE ACCOMODATION DUBAI ARENCO ALPHANOOR ELECTRO MECHANICAL WORKS DUBAI 2003

G+16 BLDG SHARJAH AL BASHIQ MECH CONT SHARJAH 2003

G+13 BLDG SHARJAH AL BASIL CENTRAL A/C WORKS SHARJAH 2003

G+10 SHARJAH AL TORATH TIGER CONTRACTING CO SHARJAH 2003

B+G+19 SHARJAH KATEEB & AL ALAMI TIGER CONTRACTING CO SHARJAH 2003

B+G+17 SHARJAH AL TORATH TIGER CONTRACTING CO SHARJAH 2003

APARTMENT @ SHARJAH PENINSULA ELECT. MECH’L SHARJAH 2003

AL JEDAF RESI BLDG DUBAI ARIF & BINTOAK B K GULF DUBAI 2003

+G+3 BLDG KARAMA DUBAI AL SHIRAWI ELECTROMECHANICAL DUBAI 2003

PROJECT LIST REFERENCE- SULTANATE OF OMAN


PROJECT CONSULTANT CONTRACTOR LOCATION YEAR OF COMPLETION

NIZWA UNIVERSITY COWI LARSON TECHNICAL TRADING & CONTRACTING OMAN ON GOING

ALAMUR ENGINEERING
SALALAH GRAND MALL ADHI OMAN OMAN ON GOING
CONSULTANT
THUMRAIT PRISON ROP AL TURKI ENTERPRISES OMAN ON GOING

MALL OF OMAN AECOM BAHWAN ENGINEERING OMAN ON GOING

E-SPACE ENGINEERING
POLICE COLLEGE PACKAGE D @ ROP, NIZWA AL TURKI ENTERPRISES OMAN ON GOING
CONSULTANT

AMJAAD ENGINEERING
MOVEN PICK FOUR STAR HOTEL PROJECT AL GHOBRAH UTILITY AIR CONDITIONING OMAN ON GOING
CONSULTANT

EHAF ENGINEERING
OFFICE 2 BUILDING @GHUBRAH AL SEEB TECHNICAL (SARCO) OMAN ONGOING
CONSULTANT

EDGE ENGINEERING
M-STUDIO MILLENNIUM ADHI OMAN OMAN ONGOING
CONSULTANT

E-SPACE ENGINEERING
POLICE COLLEGE PACKAGE C @ ROP, NIZWA SAIF SALIM ESSA AL HARASI OMAN ON GOING
CONSULTANT

HOUSING COMPLEX FOR STUDENT AND BOYS @AL KHOUD FACE ARCHITECTURE & DESIGN SHAKSY ENGINEERING OMAN ONGOING

CONSTRUCTION OF CENTRAL BANK OF OMAN IN SOHAR & AL WAHA ENGINEERING &


UTILITY AIR CONDITIONING OMAN ONGOING
SALALAH CONSULTANT

HEAD QUARTERS BUILDING FOR OMAN SHIPPING COMPANY MODERN CENTRE ELECTRICAL &
LINES & VISIONS INTERNATIONAL OMAN 2019
AT BAUSHER SANITARY LLC.

CONSTRUCTION OF HEALTH CENTER AT LIWA AAW & Partners LLC AL TASNIM ENTERPRISES OMAN 2019

NMC HOSPITAL AL HAIL MODULAR CONCEPT LLC ASSOCIATE TECHNICAL SERVICE OMAN 2019

SPECIAL TASK FORCE, AL ANSAB ROP UNITED BUSINESS MAP OMAN 2019

ALAMUR ENGINEERING
VOX CINEMA AT NIZWA GRAND MALL NASEEM AL BATINAH OMAN 2019
CONSULTANT

POLICE STATION COMPLEX @RAWDHA ROP UNITED BUSINESS MAP OMAN 2019

KHAZZAN GAS PROJECT JACOBS CARILLION ALAWI OMAN 2019

ENGINEERING INNOVATION
LULU MALL AT AL AMERAT ELECTRO MECHANICS OMAN 2019
DESIGN & CONSULTING

ROP STABLE COMPLEX AT WATTAYAH ROP ABU HATIM GROUP OMAN 2019

MARRIOT HOTEL - OCEC, SEEB WS ATKINS BAHWAN ENGINEERING OMAN 2019

OMAN CONVENTION CENTRE - PACKAGE


SSH INTL DRAKE & SCULL OMAN 2019
3

WAVE PROJECT P10 & P12 PARSONS AL TURKI ENTERPRISES OMAN 2019

OMANTEL HEAD QUARTERS BUILDING SSH INTL AL TURKI ENTERPRISES OMAN 2019

SALALAH IPP 2 SEPCOM AL ABADI OMAN 2018

BP KHAZZAN OMAN WS ATKINS ALEMCO OMAN 2018

PUBLIC MAJLIS AT BAUSHER & NAKHAL RCA UTILITY AIR CONDITIONING OMAN 2018

CONSTRUCTION OF GRID STATION AT SFZ MOTT MCDONALD GALFAR OMAN 2018

ROP AT WADI AL MA'AWAL MAJAN ENGG SAIF SALIM ESSA AL HARASI OMAN 2018

RDC AT AL KHOUD ROP HUSSAIN FADHIL OMAN 2018

SHIP MALL AT GHUBRA AMJAAD UTILITY AIR CONDITIONING OMAN 2018

GODWIN ANSTEN
THE WAVE PLAZA 4- STAR HOTEL VOLTAS OMAN 2018
JOHNSON (GAJ)

SHIP MALL AT GHUBRA AMJAAD UTILITY AIRCONDITIONING OMAN 2018


BP KHAZZAN OMAN WS ATKINS ALEMCO OMAN 2017

CCC OMAN NEW HEADQUARTERS AT AL SHATTI MAJAAN ENGINEERING AL ANSARI OMAN 2017

MARKAZ AL BAHJA SHOPPING COMPLEX EXPANSION -- UTILITY AIRCONDITIONING OMAN 2017

CONSTRUCTION OF GRID STATION AT AL KAMIL MEDC GALFAR ENGG & CONT.LLC OMAN 2017

THE WAVE MUSCAT, P6 BUILDING PARSONS AL TURKI OMAN 2017

THYPOON FACILITIES AT ADAM AIRBASE HILL INTL/ MOD DRAKE & SCULL OMAN 2017

MIXED USED DEVELOPMENT AT BAUSHER MAIN PACKAGE-


PASI & OFFICE BLDG DAR AL HANDASAH BEC OMAN 2017

OMAN OASIS MALL (CENTER POINT) OUTLET LINES & VISIONS AIRMECH OMAN 2017

SHARQIAH UNIVERSITY PHASE II AT IBRA NICOLSON JONES/ NEO AL WATANYIAH OMAN 2017

MARS HYPERMARKET AT AL KHOUD, OMAN AL FAHER ENGG UNIQUE CONTRACTING OMAN 2017

RESIDENTIAL BUILDINGS- SARAYA BANDAR JISSAH HOTEL &


RESORTS WS ATKINS INTERNATIONAL AL HAJIRY/ TOWELL OMAN 2017

AL SAADA MALL AT SALALAH UTILITY AIRCONDITIONING OMAN 2017

ENGINEERING CONSULTANT
NEW AUDITORIUM AT RUWAIS GROUP BRIDGEWAY ELECTROMECHANICAL UAE 2017

AL FANAR HOTEL AT SALALAH MAURIYA BEC OMAN 2016

ROP COMPLEX AT BIDBID ROP MODERN GULF OMAN 2016

PRIMARY SUBSTATION AT JABAL SEIFFAH MEDC MODERN CENTRE ELECTRICAL & SANITARY LLC. OMAN 2016

HOME CENTER LINES & VISIONS SEMAC OMAN 2016

NIZWA GRAND MALL AMJAD UTILITY AIR CONDITIONING OMAN 2015

AMJAAD ENGINEERING
DUQM HOTEL STAGE 1 CONSULTANCY DRAKE & SCULL INTERNATIONAL LLC - OMAN OMAN 2015

AMJAAD ENGINEERING
DUQM HOTEL STAGE 1 - OMAN CONSULTANCY DRAKE & SCULL INTERNATIONAL LLC - OMAN OMAN 2015

OMAN CONVENTION CENTRE PACKAGE 1 SSHI BEC OMAN 2015

OMAN DATA CENTRE SYSKA HENNESSY ELECTROMECHANICS, OMAN OMAN 2015

RADISSON HOTEL PROJECT @ SOHAR  - OMAN EIDC OMAN SHAPOORJI CONSTRUCTION LLC OMAN 2015

HAIDER AND DARWISH TWIN VILLA LINES & VISIONS CUBE LLC OMAN 2015

NEW FRENCH SCHOOL AT SEEB MAJAN ENGINEERING ELECTROMECHANICS OMAN 2015

OMAN PHARMACEUTICAL PRODUCTS (OPP) ______ IRACO OMAN 2015

CLINICAL LABORATORY AT BAIT AL BARAKAH ______ IRACO OMAN 2015

AIR TRAFFIC CONTROL TOWER AT MASIRAH GULF ENGINEERING/ MOD SEA DREAMS LLC OMAN 2015

SUB COMMAND CENTER AT METHAN AND SHAUIT MAJAN ENGINEERING/ MOD ELECTROMECHANICS OMAN 2015

AMJAAD ENGINEERING
BARKA GRAND CENTRE MALL CONSULTANCY HUSSAIN FADHIL OMAN 2015

OMAN AVENUE MALL COWI & PARTNERS ELECTROMECHANICS OMAN 2015


ANANTARA HOTEL EIDC SHAMEL INTL INDUSTRIES TRD.&CONT.LLC OMAN 2015

NEW BUILDING- C AT WATTAYAH COAST STATION OMANTEL GALFAR ENGG & CONT. LLC OMAN 2015

COMMERCIAL & RESIDENTIAL BUILDING AT MAWALEH - OMAN NEO NATIONAL UNITED ENGG & CONTG CO LLC. OMAN 2014

JABAL AL AKHDAR RESORT HOTEL - OMAN WS ATKINS INTERNATIONAL DRAKE & SCULL INTERNATIONAL LLC - OMAN OMAN 2014

ROTANA SALALAH PROJECT - OMAN MURIYA BEC OMAN 2014

SHANDEN AL HAIL - OMAN GULF ENGG CONSULTANCY NATIONAL UNITED ENGG & CONTG CO LLC. OMAN 2014

TRA BUILDING PROJECT AT SEEB - OMAN NEO MODERN CENTRE ELECTRICAL & SANITARY LLC. OMAN 2014

AZAIBA HOTEL - OMAN KADRI CONSULTANT GALFAR ENGG & CONT.LLC OMAN 2014

HORMUZ GRAND HOTEL, OMAN KADRI CONSULTANT GALFAR ENGG & CONT. LLC OMAN 2014

OTE SHOWROOM PROJECT AT WATTAYAH  - OMAN IAN BANHAM ASSOCIATES BEC OMAN 2013

ACCOMMODATION BLOCKS  - MILITARY TECHNICAL COLLEGE


AT SEEB -OMAN NEO SHAMEL INTL INDUSTRIES TRD.&CONT.LLC OMAN 2013

CONSULTING ENGG SERVICES


MISNISTRY OF TOURISM AT AL KHUWAIR LLC MODERN CENTRE ELECTRICAL & SANITARY LLC OMAN 2013

COMMERCIAL AND RESIDENTIAL BUILDING AT AL KHUWAIR-


OMAN NATIONAL UNITED ENGG & CONTG CO LLC. OMAN 2013

COMMERCIAL AND RESIDENTIAL BUILDING AT WADIKABIR,


OMAN ARAB ENGG BUREAU NATIONAL UNITED ENGG & CONTG CO LLC. OMAN 2013

CARTON FACTORY AT SUWAIQ- OMAN SEMAC & PARTNERS IRACO OMAN 2013

RESIDENTIAL VILLA AT AL KHOUD OMAN OXSPRING ASSOCIATES OMAN SHAPOORJI CONSTRUCTION LLC OMAN 2013

SAI HEADQUARTERS BUILDING OMAN NEO MODERN CENTRE ELECTRIAL & SANITARY LLC OMAN 2013

MOSQUE AT AL KHOUD SHAMEL INTL INDUSTRIES TRD.&CONT.LLC OMAN 2013

SULTAN QABOOS UNIVERSITY NEO SHAMEL INTL INDUSTRIES TRD.&CONT.LLC OMAN 2013

BANK OF BEIRUT AL HAMADD CONTRACTOR OMAN 2013

NEW HQ BLDG FOR THE MISNISTRY OF LEGAL AFFAIRS-


OMAN NEO SHAMEL INTL INDUSTRIES TRD.&CONT.LLC OMAN 2013

ASIE ETUDES ENGINEERING NATIONAL UNITED ENGINEEIRNG &


CENTRAL CONTROL BLDG. CONSULTING LLC CONTRACTING CO. LLC - OMAN OMAN 2012

COMPLEX FOR MUSCAT ROYAL PHILHARMONIC ORCHESTRA


NAGMAT PHASE II ROYAL COURT AFFAIRS DRAKE & SCULL INTERNATIONAL LLC - OMAN OMAN 2012

FLORIST BUILDING OMAN ROYAL COURT AFFAIRS AL ANSARI TRADING OMAN 2012

JABRIN ENGG CONSULTANCY


THE KUWATI MANAGERS COMPANY BUILDING, OMAN BUREAU AL SEEB TECHNICAL EST (SARCO) OMAN 2012

PROJECT LIST REFERENCE- STATE OF QATAR


PROJECT CONSULTANT CONTRACTOR LOCATION YEAR OF COMPLETION

CONTAINER TERMINAL AND OPEN LOUNGES AT SPORTS


ASTAD AL JABER ELECTOMECHANICAL QATAR ON GOING
MARINA

NATIONAL SERVICE ACADEMY TRAINING CAMP DIWAN AL EMARA QATAR ELECTROMECHANICAL SOLUTIONS QATAR ON GOING
HAMAD AL MOHAMMAD AL FUTTAIM & VOLTAS
VENDOME MALL  SALFO QATAR ON GOING
QATAR JOINT VENTURE

AL UDEID AIRBASE, QATAR WHITE YOUNG DELTA/ MAPCO QATAR ON GOING

BOULEVARD MALL, QATAR DARA ARCHITECTS SEG / BLUESTAR QATAR ON GOING

RESIDENTIAL BLDG C5 & C6 @ LUSAIL, QATAR SALFO MARINA TRADING QATAR ON GOING

RESIDENTIAL VILLA DEVELOPMENT @ EIN KHALED EHAF HASSANESCO QATAR 2019

CSU 4 QATAR UNIVERSITY QDC BLUESTAR QATAR 2019

SOMERSET HOTEL APARTMENTS ENGG. ADNAN SAFFARINI AL JABER ELECTOMECHANICAL QATAR 2019

QTECH SWITCHGEAR FACTORY QDC QTEC ELECTROMECHANICAL QATAR 2019

SAUDIA WARE HOUSE SAHILAT CONSULTING MARINE ENGINEERING AND CONTG. QATAR 2019

214 RESIDENTIAL VILLAS AND MOSQUE @ AL RAYYAN CEG HASSANESCO QATAR 2019

SOUTH PLAZA- KATARA HOSPITALITY KEO BOOM GENERAL CONTRACTOR QATAR 2018

VIVA BAHARIYA - 12 & 13 SHAKER VOLTAS QATAR 2018

AL FARDAN TOWER @ LUSAIL AEB CDC QATAR 2018

TRINITY ENGINEERING / STERLING AND WILSON


ABRAJ 3,4,5 & 6 KEO QATAR 2018
MIDDLE EAST WLL

LUSAIL OFFICE TOWER COMM 18 EHAF RADIANT QATAR 2018

WAJBA 4 PALACES, QATAR DARA ARCHITECTS KBN/GCT QATAR 2018

SALWA BEACH RESORT, QATAR DAR AL HANDASAH EFECO QATAR 2018

AL BAKER TOWER UNIVERSAL DESIGN CENTER ARGON GLOBAL WLL QATAR 2018

FOX HILLS NEW RESIDENCE G1-10 AT LUSAIL DOHA, QATAR DARA ARCHITECTS AL SEAL CONTRACTING, QATAR QATAR 2018

ABU HAMOUR MALL, QATAR DARA ARCHITECTS AL SEAL CONTRACTING QATAR 2017

AL KHUBAISY / AL KHAYAT VILLAS, QATAR ERGA RADIANT QATAR 2017

AL MEERA CONVENTIONAL STORES, QATAR AEB MARINE AIR CONDITIONING / ARABIAN MEP QATAR 2017

AL MERQAB MALL - DOHA, QATAR DARA ARCHITECTS TERNA QATAR 2017

AL WAAB MALL, QATAR ADNAN SAFARINI QEMS QATAR 2017

ASPIRE ACADEMY EXPANSION, QATAR KEO CDC QATAR 2017

SHAZA KEMPENSKI HOTEL, QATAR CEG TRINITY ENGINEERING QATAR 2017

FALCON TOWER, QATAR SOUTH WEST ARCHITECTS ETA STAR QATAR QATAR 2016

MALL OF QATAR - HOTEL, QATAR ERGA RADIANT QATAR 2016

MALL OF QATAR, QATAR KEO DRAKE & SCULL, QATAR QATAR 2016

MURAIKH COMPOUND, QATAR DARA ARCHITECTS RADIANT QATAR 2016

HORIZON PROJECT, QATAR ACG TECHNOBLUE QATAR 2015


AL ASMAKH TOWER, QATAR EHAF HASSANESCO, QATAR QATAR 2015

AL TAWOON TOWER- MINISTRY OF FINANCE, QATAR FAIM DESIGN VECTOR ELECTRO MECHANICAL, QATAR QATAR 2015

ASPIRE HOSPITAL, QATAR DIMENSIONS ENGG HAMTON QATAR 2015

DCP MARINA PHASE 1- DOHA, QATAR AEB BUTEC, QATAR QATAR 2015

FOX HILLS NEW RESIDENCE, QATAR MEDAD TRINITY ENGINEERING QATAR 2015

IBA TOWER AT LUSAIL, QATAR QATARI HOME MECHATRONICS QATAR 2015

MARZA MALAZ AT PEARL QATAR AEB CONSTRUCTION DEVELOPMENT QATAR QATAR 2015

NOURA PARK, QATAR DARA ARCHITECTS MARINE AIR CONDITIONING QATAR 2015

PORTO ARABIA - 14B@PEARL, QATAR FAITHFUL+GOULD MECHATRONICS QATAR 2014

TRADER HOTEL, QATAR DEWAN MAPES, QATAR QATAR 2014

AL WAAB CITY, QATAR ECG / DAR AL HANDASSAH ETA STAR QATAR QATAR 2014

CENTRO HOTEL, QATAR AEB ARABIAN MEP QATAR 2014

LUSAIL TWIN TOWER, QATAR AEB AL SAFA CONTRACTING QATAR 2014

MESILLA VILLAS, QATAR EHAF GET/PROSPEROUS QATAR QATAR 2014

OFFICE BLDG AT AIRPORT ROAD - DOHA, QATAR AEB AL SAFA CONTRACTING QATAR 2014

QATAR NAVIGATION COMMERCIAL BLDG, QATAR EHAF HKH QATAR 2014

3 NOS HYPER MARKET, QATAR SOUTH WEST ARCHITECTS ETA STAR QATAR QATAR 2013

AL WAJBA CLUBHOUSE, QATAR GHD/CUNDALL STRUCTURAL, QATAR QATAR 2013

DOHA NORTH SEWERAGE TREATMENT & ASSOCIATED


KEO KEPPEL SEGHERS QATAR QATAR 2013
WORKS, QATAR

OUR OWN ENGLISH HIGH SCHOOL, QATAR GAJ / SCOTT WILSON TRINITY ENGINEERING QATAR 2013

SHERATON HOTEL RENOVATION, QATAR JAIN &PARTNERS RADIANT-EFECO JV, QATAR QATAR 2012

3 NOS HYPER MARKET, DOHA SOUTH WEST ARCHITECTS ETA STAR QATAR QATAR 2012

AL TAHER MALL AT IRAQ ELECTROMECHANICS, OMAN QATAR 2012

AL MAJEED TOWER - DOHA, QATAR AEB AL SEAL CONTRACTING & TRADING CO. QATAR 2012

BANANA ISLAND, QATAR ECG/ SHAKER AKTOR, QATAR QATAR 2012

AL RAYYAN VILLAGE RESIDENTIAL COMPLEX, DOHA PROJACS AL FINIQIA CONTRACTING & TRADING CO. QATAR 2011

MZ PARTNERS CONSULTING
AL WAJBAH PALACE QATAR ELECTROMECHANICAL GROUP QATAR 2010
ENGINEERS

AL ARRAB QATAR ELECTROMECHANICAL


5 TOWERS AT PORTO ARABIA, THE PEARL, QATAR DAR AL HANDASSAH QATAR 2008
ENGINEERING

HORIZON TOWER, QATAR MZ CONSULTING ENGINEERS AL SEAL CONTRACTING QATAR 2008

RESIDENTIAL DEVELOPMENT PROJECT -138 VILLAS, QATAR QDC ETA STAR QATAR QATAR 2008

LAGOON PLAZA TOWER, QATAR MZ & PARTNERS AL SEAL CONTRACTING QATAR 2007
PROJECT LIST REFERENCE- KINGDOM OF SAUDI ARABIA
PROJECT CONSULTANT CONTRACTOR LOCATION YEAR OF COMPLETION

KSA ONGOING
JIZAN UNIVERSITY COLLEGE

ARCHEN EL SEIF ENGINEERING CONTRACTING CO RIYADH KSA ONGOING


MINSTRY OF INTERIOR HEADQUARTER JEDDAH

ONGOING
TABUK UNIVERSITY

DAR ENGINEERING DRAKE & SCULL KSA KSA 2017


KING FAHAD MEDICAL CITY

EXPORT GULF AIR FILTERS CO KSA 2003


SAUDI ARABIA

EXPORT BIN MEHRI EST KSA 2003


SAUDI ARABIA

PROJECT LIST REFERENCE- AFRICA


PROJECT CONSULTANT CONTRACTOR LOCATION YEAR OF COMPLETION

PARLIAMENT BUILDING-NEW CAPITAL EXPORT EVERTRUST EGYPT 2021

MINISTRIES DISTRICT-NEW CAPITAL EXPORT EVERTRUST EGYPT 2021

AZURI TOWER EXPORT ITB NIGERIA 2020

EPC EXPORT ITB NIGERIA 2020

MZIZIMA TOWER EXPORT DERM TANZANIA 2020

AL HOUCIMA THEATRE EXPORT ICM MOROCCO 2019

INTERCONTINONTAL HOTEL EXPORT EVERTRUST EGYPT 2019

CARREFOUR MARKET EXPORT SAYANI BROTHER UGANDA 2019

2018
KURAMO BEACH RESIDENCE- LAGOS EXPORT  ITB NIGERIA

2018
NADOR AIRPORT-MOROCCO EXPORT ICM MOROCCO

2017
CASABLANCA AIRPORT TERMINAL 1- MOROCCO EXPORT ICM MOROCCO

2016
NOUAKCHOTT AIRPORT - MAURITANIA EXPORT ALNAJAH MAURITANIA

2015
HOLIDAY INN-ALGERIA EXPORT GLOBAL COLD ALGERIA

2015
RADISSON BLU- ALGERIA EXPORT GLOBAL COLD ALGERIA

THE OCTAGON- ACCRA GHANA EXPORT ALTANTIC CLIMATE CONTROL GHANA 2015

LAGOS RESIDENCES- NIGERIA EXPORT HVAC SOLUTION NIGERIA 2015

PHC STADIUM- LAGOS NIGERIA EXPORT HVAC SOLUTION NIGERIA 2015


COOPER PHARMACEUTICAL FACTORY- TBARKA TUNISIE EXPORT GETF CLIM TUNISIA 2014

NOUACKCHUTT AIRPORT- MAURITANIA EXPORT AL NAJAH MAURITANIA 2014

OLAND STOCK - KENYA COOLXTREME LTD KENYA 2012

HILTON HOTEL KAMPALA UGANDA DCPRO ENGINEERING The Aya Group of Companies UGANDA 2011

PROJECT LIST REFERENCE- OTHERS


PROJECT REFERENCES & LOCATION CONSULTANT CONTRACTOR LOCATION YEAR OF COMPLETION

MICA MALL @ KISH ISLAND, IRAN TORENTEC AL AHAMADIAH IRAN ON GOING

AMAZON WAREHOUSE DATA CENTER AECOM KARTEC BAHRAN 2018

TOYOTA SHOWROOM, BAHRAIN MSCEB SAAJ INTERNATIONAL TRADING EST. BAHRAN 2018

MAITAGA AIRPORT OFFICE- TRIPOLIE LIBYA EXPORT EL ESTICHERI LIBYA 2013

AL FAISAL INTERNATIONAL FOR GENERAL


AL HAYAT HOSPITAL EXTENSION - IRAQ ENGINEER MUTIQ AL ANI IRAQ 2012
TRADING

MEGA DEAL PROJECT IN IRAQ HAUNDAI POWER ENGINEERING WORLD IRAQ 2011

KUWAIT EXPORT YUSUF AL-GHANIM & SONS ENG. KUWAIT 2006


STANDARDS AND CODE OF PRACTICE
This is to certify that the Management System of

Faisal Jassim Industries LLC


P.O. Box: 113825, Dubai Investments Park # 1, Dubai, United Arab Emirates.

has been assessed and registered by Gabriel Registrar as conforming


to the requirements of :

ISO 45001:2018
Occupational Health and Safety Management System
The Occupational Health and Safety Management System is applicable to :

Design, Manufacture, Assemble, Installation, Testing &


Commissioning, After Sales and Supply of Electrical
and Mechanical Equipments. Pump Packages, Electrical
Switchgears, Air Terminals, Solar Energy Systems
(Thermal & Photo Voltaic) Boilers, Calorifiers, A/C
CB-MS-2702
Equipments, Plumbing Equipments, A/C Ducting, Fans, [UAF is a Member of IAF]
Heat Pumps, Lighting, PIR Insulation.

For the issuing office


GABRIEL REGISTRAR
P.O. Box: 127273, Dubai, United Arab Emirates.

CERTIFICATE NUMBER INITIAL CERTIFICATION DATE CERTIFICATE VALID TILL


GR21-301279 29-March-2021 23-February-2024

INITIAL CERTIFICATION DATE (OHSAS)


24-February-2018
Authorized Representative
OHSAS migration audit date : 18-March-2021

1st Surveillance due before : 23-February-2022 | 2nd Surveillance due before : 23-February-2023

Registered Accreditation Office:


Accredited by United Accreditation Foundation [UAF]
400 North Center DR, STE 202, Norfolk, VA 23502, United States Of America.

This certificate remains valid while the holder maintains the management system in accordance with the standards
above, which will be periodically audited as per the schedule mentioned above for its Validity.
Lack of fulfilment as set out in the certification agreement may render this certificate Invalid. In the issuance of this
certificate, Gabriel Registrar assumes no Liability to any party other than to the client, and then only in accordance
with the agreed upon certification agreement.
This certificate remains the property of Gabriel Registrar Certificate Issuing Services LLC and must be returned on
request. Validity of this certificate may be confirmed at www.gabrielregistrar.com, directly through QR code by using
any device with correct information or email to admin@gabrielregistrar.com www.gabrielregistrar.com
This is to certify that the Management System of

Faisal Jassim Industries LLC


P.O. Box: 113825, Dubai Investments Park # 1, Dubai, United Arab Emirates.

has been assessed and registered by Gabriel Registrar as conforming


to the requirements of :

ISO 9001:2015
Quality Management System
The Quality Management System is applicable to :

Design, Manufacture, Assemble, Installation, Testing &


Commissioning, After Sales and Supply of Electrical
and Mechanical Equipments. “Pump Packages, Electrical
Switchgears, Air Terminals, Solar Energy Systems (Thermal
& Photo Voltaic) Boilers, Calorifiers, A/C Equipments,
Plumbing Equipments, A/C Ducting, Fans, Heat Pumps,
Lighting, PIR Insulation.”
[EA/NACE: 18/28.13, 19/27.12]

CERTIFICATE NUMBER RE-CERTIFICATION DATE CERTIFICATE VALID TILL Authorized Representative


0702000290 18-January-2022 04-December-2024
Gabriel Registrar
Certificate Issuing Services LLC
INITIAL CERTIFICATION DATE
05-December-2018 P.O. Box: 127273, 2nd December Street,
Dubai, United Arab Emirates.
1st Surveillance due before : 04-December-2022 | 2nd Surveillance due before : 04-December-2023

CB-QMS-079

This certificate remains valid while the holder maintains the management system in accordance with the standards
above, which will be periodically audited as per the schedule mentioned above for its Validity.
Lack of fulfilment as set out in the certification agreement may render this certificate Invalid. In the issuance of this
certificate, Gabriel Registrar assumes no Liability to any party other than to the client, and then only in accordance
with the agreed upon certification agreement.
This certificate remains the property of Gabriel Registrar Certificate Issuing Services LLC and must be returned on
request. Validity of this certificate may be confirmed at www.gabrielregistrar.com, directly through QR code by using
any device with correct information or email to admin@gabrielregistrar.com www.gabrielregistrar.com
This is to certify that the Management System of

Faisal Jassim Industries LLC


P.O. Box: 113825, Dubai Investments Park # 1, Dubai, United Arab Emirates.

has been assessed and registered by Gabriel Registrar as conforming


to the requirements of :

ISO 14001:2015
Environmental Management System
The Environmental Management System is applicable to :

Design, Manufacture, Assemble, Installation, Testing &


Commissioning, After Sales and Supply of Electrical
and Mechanical Equipments. Pump Packages, Electrical
Switchgears, Air Terminals, Solar Energy Systems
(Thermal & Photo Voltaic) Boilers, Calorifiers, A/C
CB-MS-2704
Equipments, Plumbing Equipments, A/C Ducting, Fans, [UAF is a Member of IAF]
Heat Pumps, Lighting, PIR Insulation.

For the issuing office


GABRIEL REGISTRAR
P.O. Box: 127273, Dubai, United Arab Emirates.

CERTIFICATE NUMBER RE-CERTIFICATION DATE CERTIFICATE VALID TILL


GR18-300506 29-March-2021 23-February-2024

INITIAL CERTIFICATION DATE


24-February-2018
Authorized Representative
1st Surveillance due before : 23-February-2022 | 2nd Surveillance due before : 23-February-2023

Registered Accreditation Office:


Accredited by United Accreditation Foundation [UAF]
400 North Center DR, STE 202, Norfolk, VA 23502, United States Of America.

This certificate remains valid while the holder maintains the management system in accordance with the standards
above, which will be periodically audited as per the schedule mentioned above for its Validity.
Lack of fulfilment as set out in the certification agreement may render this certificate Invalid. In the issuance of this
certificate, Gabriel Registrar assumes no Liability to any party other than to the client, and then only in accordance
with the agreed upon certification agreement.
This certificate remains the property of Gabriel Registrar Certificate Issuing Services LLC and must be returned on
request. Validity of this certificate may be confirmed at www.gabrielregistrar.com, directly through QR code by using
any device with correct information or email to admin@gabrielregistrar.com www.gabrielregistrar.com
COMPLIANCE STATEMENT
ACCORDING TO CONTRACT
SPECIFICATION
N/A
SCHEDULE OF TECHNICAL DATA
N/A
METHOD STATEMENT (IF REQUIRE)
N/A
MATERIAL SAFETY DATA SHEET (IF
REQUIRE)
PRODUCT CATALOGUE / EQUIPMENT
SELECTION SHEET
GRI
LLESANDREGI
STERS
C

SDG Si
ngl
eDefl e
cti
onGr i
ll
e
SDR Si
ngl
eDefl e
cti
onRe gi
st
er
DDG Doubl
eDe flect
ionGril
l
e
DDR Doubl
eDe flect
ionRegi
ste
r
FBG Fi
xedBl
adeGr i
ll
e
FBR Fi
xedBl
adeRe gi
st
er
ECG Eg
gCr a
teGr i
l
le
ECR Eg
gCr a
teRegis
ter
PAG Per
for
atedAirGril
l
e
PAR Per
for
atedAirRegi
ste
r
DG DoorGril
le
DEG Decor
ati
veGr i
l
le
DER Decor
ati
veRe g
ist
er
FLG Fi
l
terGri
ll
e
F
AIS
ALJ
ASS
IMI
NDUS
TRI
ES(
L.L
.C.
)
P.
O.Box1871Pl
ot#5 98-1152
Du
baiI
nves
tmentPa
rk-Du bai
,UAE
Tel
.#0 4810-
5105
Fa
x.#0 4810-
5106
Emai
l:
fj
tr
dg@emir
ates
.net
.
ae
Websi
te:www.
fai
sal
j
ass
im.a
e
GRI
LLESANDREGI
STERS

SI
NGLEDEFLECTI
ON GRI
LLE&SI
NGLEDEFLECTI
ON REGI
STER

S
ing
leDe
fl
ect
ionGr
il
le(
SDG)

S
ing
leDe
fl
ect
ionGr
il
le(
SDG)

S
ing
leDe
fl
ect
ionRe
gis
ter(
SDR)

S
ing
leDe
fl
ect
ionGr
il
le&S
ing
leDe
fl
ect
ionRe
gis
ter

SDGa ndSDRa reg ril


leswithasi
ngl
esetofv e
r ti
cal Gril
l
esandRe gi
ste
rscanbes uppl
ie
di na nyofthe
orhor izontalbl adesus edt ode ectairint he f
oll
owin
gstan
d a
rdswid
th-1 50
mm( 6”)
,200 mm( 8”
),
hori
zontalorv e r
ti
c aldirecti
onres
pecti
vel
y,tos ui
t 250mm (10”)&300mm ( 12”
).Non- s
tanda r
dsize
s
therequi r
eda i
rpa tt
ern.SDG isag ri
ll
ewi t
hout canbeorder
e dtosui
tth
ede si
gnerspecic at
ion
s.
oppos e
dbl ade sdampe r( OBD)andiscommonl y
useda sas idewa llreturna i
rgri
ll
e.SDRont he OBDa r
ee asi
l
yremov a
bleandat
tachedtoth
ef r
ame
otherha nd,i spr ov idedwi thopposedbl a des byme ansof(S
)cli
pstoensur
eti
ghtgr
ipandmax i
mum
damper( OBD)t of acil
i
t at
eprecis
ea i
rv olume ex
ibi
li
ty.Thedamp e
rismadeof ext
rudedal
umini
um
cont
r ol
.SDRi susua ll
yuse dasasuppl
yairregist
er bar
s.Thed amperopeningi
seasi
l
yadjus
tedbyme ans
onsidewa ll
a ppli
cations. ofac ontroll
everthatisdri
venbyas crew dri
ver
f
rom thefrontfa
ceoft hereg
is
ter.
F
ramesandbl
ade
sar
emadeofext
rude
dal
umi
ni
um
a
ll
oy6063toT6Hea
tTr
eat
me n
t.

F
lan
gesa
rea
vai
l
abl
ein1
0,1
3,2
0,2
5an
d30
mmwi
dt
h.

C-
1
GRI
LLESANDREGI
STERS

DOUBLEDEFLECTI
ON GRI
LLE&DOUBLEDEFLECTI
ON REGI
STER

Doubl
eDe
fl
ect
ionRe
gis
ter(
DDR)

Doubl
eDe
fl
ect
ionGr
il
le(
DDG)

Doubl
eDe
fl
ect
ionRe
gis
ter(
DDR)

Doubl
eDe
fl
ect
ionGr
il
le&Doubl
eDe
fl
ect
ionRe
gis
ter

DDG a ndDDRa regril


l
eswi t
ht wos etofbl ades Gril
l
esandRe g
ist
erscanbesuppl
ie
di na nyofthe
-vertic
a l
andh ori
zontal-use
dt odee ctairi
nbot h f
oll
owin
gstan
dardwidt
hs-150
mm( 6”),
20 0mm( 8
” )
,
theh ori
zontal
andv ert
ical
dir
e c
ti
ons.DDGi sag ri
l
le 250mm (10”
)&300mm ( 12”
).Non -s
tandardsi
zes
withoutoppos edbl adesda mper( OBD)a ndis canbeorder
edtos ui
tth
edesi
gnerspecic a
ti
ons
.
common lyusedasas i
dewa llre
turnairg r
il
le
.DDR
i
spr ovidedwithoppos edbladesdampe r( OBD)t o OBD a reeasi
l
yr emovableanda t
tachedt othe
f
acil
itat
epr eci
seairvolumec ontr
ol.DDRi susuall
y f
ramebyme ansof(S)cl
ipstoensur
etightgri
pand
useda sas u
pplyai
rr e
gist
erons i
dewa l
l appl
ica
tions
. maxi
mu m exib
il
it
y.Th
ed amperi
sma deof e
xtr
uded
al
umin
iumb a
rs.
Thed a
mp eropen
ingi
seasi
lyadj
ust
ed
F
ramesandbl
ade
sar
emadeofext
rude
dal
umi
ni
um bymeansofacon t
rol
lev
e rt
hati
sdri
venbyas crew
a
ll
oy6063toT6Hea
tTr
eat
me n
t. dr
ive
rfrom t
hefrontf
aceoftheregi
st
er.

F
lan
gesa
rea
vai
l
abl
ein1
0,1
3,2
0,2
5an
d30
mm wi
dt
h.

C-
2
GRI
LLESANDREGI
STERS

FI
XED BLADEGRI
LLEAND REGI
STER-FBG &FBR

45˚F
ixe
dBl
adeGr
il
le(
FBG)

F
ixe
dBl
adeGr
il
le(
FBG)

F
ixe
dBl
adeRe
gis
ter(
FBR)

Pr
oduc
tFe
atur
es:

FBGandFBRa regri
l
leswithase tofh or
iz
ontal I
nsul
ati
ngga
ske
t(opt
ional
)i
sx e
da r
oundth
eb a
ck
bla
desx edata nangl
eof4 5 °
. FBG isagri
ll
e ofthefr
ametoprev
e nti
nlt
rat
ionofa
irbet
ween
wit
houtoppose
db l
ade sdamp e
r( OB D)andis th
eframeandthewal
l.
commonl
yusedasawa l
lmo un
tedr et
urnai
rgri
l
l
e.
FBRispr
ovidedwithop posedb ladesdamper OBD a r
eeasil
yr emovableanda tta
chedt othe
(
OBD)t ofaci
li
tat
ep r
e ci
seairvolumec ontr
ol.
f
rameb ymeansof(S)cl
i
pst oen s
ureti
ghtgri
pand
maxi
mu m exi
bil
i
ty.Th
ed a
mp erismadeof e
xtr
uded
Thex edbl
aderet
urnai
rgri
ll
esar
eus
edi
n
cool
i
ng,
hea
ti
ngan
da i
rve
nti
la
ti
on. al
umini
umbars
.Thed a
mp eropeni
ngiseas
i
lyadj
ust
ed
byme a
nsofacontrol
lev
erthatisdri
venbyas c
rew
Fr
amesandbla
de sar
emadeofextr
uded dri
verf
rom t
hefrontf
aceoft h
er egi
st
er.
a
lumi
ni
umal
loy6063t
oT6Hea
tTre
atment
.

F
la
nge
sar
eav
ai
la
bl
ei
n10
,13
,20
,25a
nd3
0mmwi
dt
h.
C-
3
GRI
LLESANDREGI
STERS

EGG CRATEGRI
LLEAND REGI
STER -ECG &ECR

Eg
gCr
ateGr
il
le(
ECG)

Eg
gCr
ateGr
il
le(
ECG)

Eg
gCr
ateRe
gis
ter(
ECR)

Theeggcr
ateg
ril
l
esareei
therceil
i
ngmount edor Thec or
eofaneggcr
ateg
ri
ll
eismadeofal
umin
ium
wal
lmounteda
irter
minal
de v
icesuse
da sexhaus
t str
ipsas
sembl
edt
oformequa
ll
ysi
zedanddi
st
ri
bute
d
ai
rgr
il
l
esf
ordomesti
candindus
tr
iala
ppli
cat
i
on s
. squarecel
l
s.

Therel
ativ
elyla
rgeef
fect
iv
ea r
ea(90%)oft heegg The30mm a ngef
ramei
sma
deofext
ruded
cra
tegri
l
lepermit
sbet
terper
for
manceforre
tu r
na i
r al
umi
ni
um ba
rs.
appl
ic
ati
on.Thisres
ult
sinlow pr
essuredropa nd
l
own oi
selevel
. I
nsula
ti
ngga
ske
t( opt
ional
)isxedar
oundth
eback
ofthefr
ametopr ev
e nti
nltr
ati
onofa
irbet
wee
n
th
ef r
ameandthewa l
l.

C-
4
GRI
LLESANDREGI
STERS

PERFORATED GRI
LLEAND REGI
STER-PAG &PAR

Pe
rfor
ate
dAi
rGr
il
le(
PAG)

Pe
rfor
ate
dAi
rGr
il
le(
PAG)

Pr
oduc
tFe
atur
es:

Theperf
orat
edai
rgri
l
lesar
ee i
the
rc e
il
in
gmou nt
ed Theper f
oratedsheetcanbema deofStai
nl
ess
orwal
lmou nt
edai
rter
minaldevi
cesuseda
sretu
rn Steel,Galv
anizedSteel
,orAlumini
um powder
ai
rgri
l
lesfordomest
icandindust
ria
lappl
ica
ti
ons. coatedt
oRAL9010t o9016a
ss t
anda
rd.

The
yarec
ompos
edofpe
rfor
ate
dsh
eet
sxe
dtoa Thef
ramei
sma
deofext
rudeda
lumi
ni
um ba
rs.
f
ra
me .
Fl
ang
esar
eav
ail
abl
ein10,13,20,25a
nd30mm
St
anda
rdperf
ora
tedfa
ceiswit
h 3mm or5mm wi
dth.
di
amet
erh
ole
sonsta
gger
edce
nter
s.
I
nsula
ti
nggaske
t( opt
ional
)i
sx eda r
oundthebac
k
Otheropti
onsa
rea
vai
l
abl
easperc
ust
omer ofthefra
met opr ev
e nti
nltr
ati
onofa i
rbetwee
n
r
equi
remen
t. th
ef r
amea n
dt hewall.Ot
hercol
orsava
il
abl
easper
decora
torrequ
est.

C-
5
GRI
LLESANDREGI
STERS

DOORGRI
LLE(
DG)(
NON-
VISI
ON GRI
LLE)

Non-
Vis
ionDoorGr
il
le(
DG)

DoorGr
il
leS
ect
ion(
DG)

Pr
oduc
tFe
atur
es: Ty
peofF
ixi
ng:

Thedoorgr
il
l
es(Non-Vi
si
on/Pa r
ti
ti
on)ar
e us h Vi
si
bl
escr
e w xing
mount
edai
rter
mina
ldevi
cesu
sedfora
irmovement Mi
nimum par
ti
ti
onthi
cknes
s:25mm
bet
weentwocondi
ti
onedspace
swhil
eprevent
ing Maxi
mum part
it
i
ont h
ick
ness
:55mm
vi
si
on.

Theyareconst
ruct
edasi
nvert
edVsha
pebla
des
ass
embledoneabovet
heothe
r,wi
thxeds
paci
ng
toafr
amec a
ll
edthexedfr
ame.

Fi
xedf
ramei
sin
sta
ll
edonones
ideoft
hepart
it
i
on,
whi
leas
li
di
ngf
rameisxedont
h eot
hers
ide
.

Sl
i
din
gfra
mee nabl
est
heuseofadoorg
ri
ll
etos
uit
di
f
fer
entpar
ti
ti
onthi
ckn
ess
.

Vi
si
bl
eSc
rewF
ixi
ng(
VSF
)

C-
6
DECORATI
VEGRI
LLES

DECORATI
VEGRI
LLES(
DEG)/DECORATI
VEREGI
STER(
DER)

Withhi
ghdemandf
oraes
the
tic
sthe
seday
s,more Decora
tiv
egri
ll
esc
a nhavevert
ica
lorhoriz
ontal
andmor ec
ustomersa
reenquiri
ngaboutthe bl
adesa
ndadamper
, i
fre
qui
red.
Simi
lar
ly
,dec
orat
iv
e
dec
orat
i
vegr
il
le
s. gr
il
l
escanhav
ethecoreanddamperasrequ
ire
d.

Fl
owtec
hdecor
ati
veg
ril
lescomesi
nav a
riet
yof Av
ai
la
blei
nPowde
redCoat
edRAL9016asst
anda
rd.
des
ig
nsanda
rec
ommonlyuse
dinMaj
li
s,
atr
ium,et
c. Ot
herpowde
rcoa
tednis
hesa
reav
ai
la
bleasopt
i
ons.

De
cor
ati
veGr
il
le(
DEG)

De
cor
ati
veGr
il
le(
DEG)

C-
7
GRI
LLESANDREGI
STERS

FI
LTERGRI
LLE(
FLG)

Awa s
habl
ealu
minium medi
altercanbeadded
tot
heretur
ngri
ll
etoforma lt
ergri
l
le.
Iti
sx ed
att
hebackoft
hegri
ll
eandcanbeeas
il
yremove
d.
Theal
umini
um lteri
s25mm thi
ck.

Wh encombin
inga l
t
erwi
thagri
l
le
,th
eg r
il
l
ecan
a
lsobema d
etoopenli
kea
nordi
nar
ydoortogi
ve
exi
bil
it
yofacces
stothe l
terf
orclea
ningor
r
e pl
ace
me nt
.

F
il
terGr
il
le(
FLG)

OPPOSED BLADESDAMPER

FLOWTE CHOBDi sxedtothere


arfr
ameof
SDR,DDR,FBR,
ECR,&PARmode l
sbyme a
ns
of“S
”cla
mpfore
aseof
remova
landcon
str
uct
i
on
ri
gi
di
ty.

Toadj
ustth
eOBDope n
ing,t
urntheadj
ust
ment
scr
ewa v
ail
abl
eatthefr
ontfaceoftheregi
st
er
(Cl
ock
wis
etoOp e
n/ Coun
terCloc
kwis
etoClos
e). Oppos
edBl
adeDa
mpe
r(OBD)

Oppos
edBl
adeDa
mpe
r(OBD)

C-
8
GRI
LLESANDREGI
STERS

MOUNTI
NG OPTI
ONS
Conc
eal
edTy
peF
ixi
ng-Wa
llOnl
y(CS
F)

Conc
eal
edTy
peF
ixi
ng-Wa
llOnl
y(CS
F)

Vi
si
bl
eSc
rewF
ixi
ng-Wa
llorCe
il
ing(
VSF
)

Vi
si
bl
eSc
rewF
ixi
ng-Wa
llorCe
il
ing(
VSF
)

Vi
si
bl
eSc
rewF
ixi
ngwi
thBr
ack
ets

Vi
si
bl
eSc
rewF
ixi
ngwi
thBr
ack
ets

FI
NISH OPTI
ONS

Av
ail
abl
einPowde
rCoa
tedRAL9010a
ndRAL9016s
tan
dar
dcol
or

Ot
herpowde
rcoa
tedn
ish
esa
rea
vai
l
abl
eonr
equ
est

C-
9
GRI
LLESANDREGI
STERS

ORDERI
NG SYSTEM

RALCode
Col
or

Wi
dt
hinmm
orin
ch

L
engt
hinmm
ori
nch

V-f
ron
tbarver
ti
cal
H-f
rontba
rhori
zont
al

SDG :
Sing
ledee cti
ongri
ll
e
SDR :
Sing
ledee cti
onregi
st
er
DDG :
Do ubl
ed ee c
ti
ong r
il
l
e
DDR :
Do ubl
ed ee c
ti
onregi
ste
r
FBG :
Fix
edb l
adeg r
il
l
e
FBR :
Fix
edb l
aderegis
ter
FLG :
Fil
t
erGr i
l
le
PAG :
Perf
orate
da i
rgri
ll
e
PAR :
Perf
orate
da i
rregi
st
er
ECG :
Eggcrat
eg r
il
l
e
ECR :
Eggcrat
er e
gis
ter
DG :Do orgri
l
le
DEG:De c
o r
ati
vegri
ll
e
DER:De c
o r
ati
veregi
st
er
Or
der
ingS
yst
em

ORDERI
NG EXAMPLE

DDR-V-1200X200-9010 Not
es:
St
andsf
orDoubleDee c
ti
onRe g
is
ter
,wit
h 1. ForSDG, S
DR, DDGa n
dDDRou r
Ver
ti
cal
Bla
desinfr
ont
,si
ze1200mm x200mm st
andar
dproducti
oni
sfr
ontba
rs
an
dpowde rc
oatedRAL9010. hori
zon
talunl
esss
pec
icall
yment
i
oned
oth
erwis
e.

2. Areg
is
teri
sagri
l
lewit
hoppose
dblade
ECG -1200X150-9016 da
mperx edonthebackwi
thScl
amps.
Sta
ndsf
orEggCr
ateGri
ll
e,si
ze1200mm x
150mm wi
t
hpowde rc
oatedRAL9016.

C-
10
GRI
LLESANDREGI
STERS

GENERALNOTES

Pag
esonwa r
dsgi
veperf
ormancedat
aforal
lmodel
s 5.NCa ndPress
ureval
uesshown ,arebasedona
an
dv a
ri
ants
,andun
les
sother
wis
esta
tedthef
ol
lowi
ng complet
eunitwi t
ha nopposedbl adeinthefull
y
ge
neraln
otesappl
y: openposit
ionforthesuppl
yregisterandwithout
damperforthereturngri
ll
e.Theda mpershould
1.Th rowsshownaretothr
eete
rminal
vel
oci
tyof onl
ybeu s
edfor neba l
anc
ing
,asfore ver
ydoubli
ng
0.
25m/s ,
0.5
0m/s,
0.7
5m/s,
(50f
pm,10
0fpm,150
fpm) ofpr
e s
sur
et h
ereisaresul
ti
ngin
cre a
s ei
nthen oi
se
withsupplyai
ratcondi
ti
onswit
hma x∆T=10k l
evelof+9dBforsuppl
y,or+5dBf ore x
haust
.
cool
in
g .
6.Mode lswit
hr educedne ck
s.Thereisa‘dil
uti
on
2.F orst
andar
droom he
ightof2
.75metr
es,t
hrows eff
ect’
onpe rf
orma nceforthes
emode l
s,astheai
r
shouldbetakenast
hedist
ancetothenea
restwal
l tendstospreadbe hi
ndt hecore,r
e duci
ngthrows
(mini
mu m pl
andi
mensi
on,MPD). byu pt
o2 0%,dependi
ngont herel
at
ionshi
pb e
tween
thenecksizeandt heba sedi
ff
usersize
.Formor e
3.Toa voidai
r ow‘ dumpin
g’onc ooli
ngcyc
lesat i
n f
ormati
on,pl
easec h
e c
kwi t
hthefactor
y.
th
eg r
il
l
ec ore
,iti
sadvis
ablet
oe ns
urethatth
en ec
k
vel
oci
ti
esdon otdropbelow0.75m/s(150f
pm). 7.Thef ollowingtable
sincludether esult
soft est
conductedons amplesofa irterminals.Thet est
4.Thea coust
icda
tawerete s
tedinaccordanceto res
ult
sincludeNoi seCr i
te
ria(NC) ,sta
ticpre s
sure
ASHRAE7 0
-1991st
anda
rd.Theoc tav
eban dsound ver
susai
r ow, t
hrowa ndeff
ecti
vearea.Extr
apolat
ion
powerlevel
sobtai
nedwe replott
e dtode t
ermine wasusedt oobt a
inthepe rf
orma n
cef orothe rsi
zes
thepointofta
ngencywit
ht hehighestra
nkNoi se andotherpa rame t
erswit
hinther a
ng eofpr oducts
Cri
ter
iacurve(
NC)t oes
tabli
shtheNC. menti
one da bove.

Noi
seCri
t
eri
arat
in
gswer
edet
ermi
nedbysu
btr
act
i
ng Te
stme
thodi
ncl
ude
dinRe
por
t.
r
oom abs
orpti
onof10dBf
rom t
hesoundpower
l
eve
ldat
a.

TESTREPORTS

C-
11
GRI
LLESANDREGI
STERS

PERFORMANCEDATA -SIUNI
TS

S
YMBOL
S NOTES
L/
Sec :
AirVolumei nLit
respersecond. Thela
rgethr
owv al
uesarebasedont
he
Af :
Eff
ecti
vefreeareainsquar
eme t
ers
. mini
mumt er
minalve
loci
tyof0.
25m/s
ec.
Vf :
FaceVe l
oci
tyinme ter
spers e
cond. Themiddl
ethrowv a
lue
sa r
ebasedon
Ak :
Ne ckAreainsquareme te
rs. th
eme di
umt ermi
nalve
loci
tyof0.
50m/s
ec.
Vk :
Ne ckVeloci
tyinme t
erspersecond. Thesmall
thr
owv al
uesarebasedont
he
Ps :
Stat
icpress
ureinPa s
cal
. maxi
mu mtermina
lvel
ocit
yof0.75m/
sec
.
Pv :
Veloci
typressu
reinPa s
cal
.
Pt :
Totalpress
ureinPascal
. CONDI
TIONS
Th :
Throwi nme te
rs. Su
pplyorReturnasindi
cat
ed.
NC :
NoiseCr i
ter
ia. Nois
eCriter
iaval
uesarebase
don(
10dB)
r
oom att
enuati
on.
Damperisfu
ll
yope n.
Maxi
mu mroom height=4.0m
Maxi
mu m Cool
ing@ ΔT=10K

Not
es:

C-
12
GRI
LLESAND REGI
STERS

SUPPLYAI
RREGI LLES: SDG,
STERS&GRI SDR,DDG,DDR,FBG,FBR SI
-UNI
TS

AI
R S
IZE(
mm xmm)
F
LOW
L/
s DEFL
ECTION
NECKAREAm2
FREEAREAm2
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
S
een
ote
sonpa
geC-
11 Con
td.
.
.
3
GRI
LLESAND REGI
STERS

SUPPLYAI
RREGI LLES: SDG,
STERS&GRI SDR,DDG,DDR,FBG,FBR SI
-UNI
TS

AI
R S
IZE(
mm xmm)
F
LOW
L/
s DEFL
ECTION
NECKAREAm2
FREEAREAm2
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
FACEVEL
OCI TYm/
s
NECKVEL
OCI TYm/
s
Ps(Pa
)
Pt(
Pa)
THROW ( m)
NC
S
een
ote
sonpa
geC-
11

4
RETURN AI
RREGI
STERS&GRI
LLES: SDG,SDR,DDG,DDR,FBG,FBR SI
-UNI
TS

AI
R
F
LOW S
IZE(
mm xmm)
L/
s
NECKAREAm2
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
S
een
ote
sonpa
geC-
11 Cont
d..
.

C-
15
GRI
LLESAND REGI
STERS

RETURN AI
RREGI
STERS&GRI
LLES: SDG,SDR,DDG,DDR,FBG,FBR SI
-UNI
TS

AI
R
F
LOW S
IZE(
mm xmm)
L/
s
NECKARE
Am2
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC

S
een
ote
sonpa
geC-
11 Cont
d..
.

C-
16
GRI
LLESAND REGI
STERS

RETURN AI
RREGI
STERS&GRI
LLES: SDG,SDR,DDG,DDR,FBG,FBR SI
-UNI
TS

AI
R
F
LOW S
IZE(
mm xmm)
L/
s
NECKAREAm2
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
NE
CKVEL
OCI TYm/
s
Pv(Pa
)
Ps(
Pa)
NC
S
een
ote
sonpa
geC-
11

C-
17
EGG CRATEGRI STERS: ECG & ECR
LLES&REGI SI
-UNI
TS

CORE COREVEL
OCI
TY(
m/s
)
AREA NOMINALSI
ZES VEL
OCI
TYPRES
SURE(
Pa)
(
m2) (mm xmm)
NEGATI
VES
P(Pa
)
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
S
een
ote
sonpa
geC-
11

C-
18
PERFORATED GRI STERS:PAG,
LLES&REGI PAR SI
-UNI
TS

COREVEL
OCITY
(
m/s)

COREAREA NOMI
NALS
IZES VELOCI
TY
(
m2) PRES
SUREPv(
Pa)

NEGATI
VES
P(Pa
)
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L
/s
NC
L
/s
NC
S
een
ote
sonpa
geC-
11

C-
19
PERFORATED GRI
LLES&REGI
STERS:PAG,PAR SI
-UNI
TS

COREVEL
OCITY
(
m/s)
COREAREA NOMI
NALS
IZES VELOCI
TY
(
m2) PRES
SUREPv(
Pa)

NEGATI
VES
P(Pa
)
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L/
s
NC
L
/s
NC
S
een
ote
sonpa
geC-
11

C-
20
LLES: DG
DOORGRI SI
-UNI
TS

CORE
VEL
OCITY
(m/s
)

VELOCITY
COREAREA NOMI
NALS I
ZES PRESS
URE
(
m2) (mm xmm) (Pa
)

NEGATI
VES
P
(
Pa)

L
/s
NC
L
/s
NC
L
/s
NC
L
/s
NC
L
/s
NC
L
/s
NC
L
/s
NC
L
/s
NC
L
/s
NC
L
/s
NC
L
/s
NC
L
/s
NC
S
een
ote
sonpa
geC-
11

C-
21
GRI
LLESANDREGI
STERS

PERFORMANCEDATA -I
PUNI
TS

S
YMBOL
S NOTES
CFM :
AirVolumei ncubi
cf e
etperminute. Thela
rgethr
owv al
uesarebasedont h
e
Af :
Eff
ecti
vefreeareai
ns quar
efeet. mini
mumt er
minalve
loci
tyof50fpm.
Vf :
FaceVe l
oci
tyinfeetperminute
. Themiddl
ethrowv a
lue
sa r
eba s
e don
Ak :
Ne ckAreainsquarefeet. th
eme di
umt ermi
nalve
loci
tyof100fpm.
Vk :
Ne ckVeloci
tyinfe
e tperminut
e. Thesmall
thr
owv al
uesarebasedont he
Ps :
Stat
icpress
ureinincheswatergaug
e. maxi
mu mtermina
lvel
ocit
yof150fpm.
Pv :
Veloci
typressur
einincheswatergaug
e.
Pt :
Totalpress
ureinincheswate
rg au
ge. CONDI
TIONS
Th :
Throwi nfeet. Su
pplyorReturnasindi
cat
ed.
NC :
NoiseCr i
ter
ia. Nois
eCriter
iaval
uesarebase
don(
10dB)
r
oom att
enuati
on.
Damperisfu
ll
yope n.
Maxi
mu mroom height=4.0m
Maxi
mu m Cool
ing@ ΔT=10K

Not
es:

C-
22
GRI
LLESAND REGI
STERS

SUPPL
YAI
RREGI
STERS& GRI
LLES: SDG,SDR,DDG,DDR,FBG,FBR I
P-UNI
TS

S
IZE(
inxi
n)

AIR
F
L OW
CFM DEFL
ECTI
ON
NECKAREASQ.
FT. 0.
441 0.
592 0.
667 0.
743 0.
893 1.
001 1.
120 1.
206 1.
270 1.
346 1.
518 1.
572 1.
830 1.
916 2.
131 2.
304 2.
777 3.
251
FREEAREASQ.
FT.
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
S
een
ote
sonpa
geC-
21 Con
td.
.
.

C-
23
GRI
LLESAND REGI
STERS

SUPPLYAI
RREGI LLES: SDG,
STERS&GRI SDR,DDG,DDR,FBG,FBR I
P-UNI
TS

S
IZE(
inxi
n)

AIR
F
L OW
CFM DEFL
ECTI
ON
NECKAREASQ.
FT. 0.
441 0.
592 0.
667 0.
743 0.
893 1.
001 1.
120 1.
206 1.
270 1.
346 1.
518 1.
572 1.
830 1.
916 2.
131 2.
304 2.
777 3.
251
FREEAREASQ.
FT.
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
FACEVELOCITYFPM
NECKVELOCITYFPM
Ps(i
n-wg)
Pt(i
n-
wg)
THROW (FT)
NC
S
een
ote
sonpa
geC-
21

C-
24
GRI
LLESANDREGI
STERS

RETURN AI
RREGI
STERS&GRI
LLES: SDG,SDR,DDG,DDR,FBG,FBR I
P-UNI
TS

AIR
SI
ZE
F
L OW
(
inxin
)
(CFM)
NECKAREA(
SQ.
FT.
)
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC

S
een
ote
sonpa
geC-
21 Cont
d..
.

C-
25
RETURN AI
RREGI LLES: SDG,
STERS&GRI SDR,DDG,DDR,FBG,FBR I
P-UNI
TS

AIR
SI
ZE
F
L OW
(
inxin)
(CFM)
NECKAREA(
SQ.
FT.
)
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC

S
een
ote
sonpa
geC-
21 Cont
d..
.

C-
26
RETURN AI
RREGI
STERS&GRI
LLES: SDG,SDR,DDG,DDR,FBG,FBR I
P-UNI
TS

AIR
SI
ZE
F
L OW
(
inxin)
(CFM)
NECKAREA(
SQ.
FT.
)
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC
NE
CKVEL
OCITY(F
PM)
Pv(i
n-
wg)
Ps(
in-
wg)
NC

S
een
ote
sonpa
geC-
21 Cont
d..
.

C-
27
EGG CRATEGRI STERS: ECG & ECR
LLES&REGI I
P-UNI
TS

CORE COREVEL
OCI
TY(
FPM)
NOMI
NALS I
ZES
AREA VEL
OCI
TYPRES
SURE(
in-
wg)
(
inxi
n)
(
SQ.F
T) NEGATI
VES
P(i
n- )
wg
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
S
een
ote
sonpa
geC-
21

C-
28
PERFORATED GRI
LLES&REGI
STERS:PAG,PAR I
P-UNI
TS

COREVEL
OCI
TY(
FPM)
COREAREA VEL
OCITYPRES
SURE
(SQ.
FT) NOMI
NALS
IZES
Pv(
in-
wg)
NEGATI
VES
P(i
n-wg
)
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
S
een
ote
sonpa
geC-
21

C-
29
PERFORATED GRI
LLES&REGI
STERS:PAG,PAR I
P-UNI
TS

COREVELOCI
TY
(
FPM)
VEL
OCITY
COREARE
A NOMI
NALS
IZES PRES
SUREPv(
in-
wg)
(SQ.
FT)
NEGATI
VES
P(i
n-wg
)

CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC

S
een
ote
sonpa
geC-
21

C-
30
LLES: DG
DOORGRI I
P-UNI
TS

CORE
VELOCI
TY
(F
PM)

COREAREA NOMINALSI
ZES VELOCITY
PRESS
URE
(SQ.
FT) (
inxi
n)
(i
n-wg
)

NEGATIVES
P
(
in-
wg)

CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
CF
M
NC
S
een
ote
sonpa
geC-
21

C-
31
L
INEARBARGRI
LLES

DDL
BG Doubl
eDe
fl
ect
ionL
ine
arBa
rGr
il
le
(
Dou
bleDee
cti
onWi
t
hou
tDa
mpe
r)

DDL
BR Doubl
eDe
fl
ect
ionL
ine
arBa
rRe
gis
ter
(
Dou
bleDee
cti
onWi
t
hDa
mpe
r)

S
DLBG S
ing
leDe
fl
ect
ionL
ine
arBa
rGr
il
le
(
Si
ngl
eDee
cti
onWi
t
hou
tDa
mpe
r)

S
DLBR S
ing
leDe
fl
ect
ionL
ine
arBa
rRe
gis
ter
(
Si
ngl
eDee
cti
onWi
t
hDa
mpe
r)

F
AIS
ALJ ASSI
MI NDUSTRIES(L.
L.C.
)
P
.O.Box1 871Pl
ot#5 98-115
2
DubaiI
n v
estmentP
ark-Du bai
,UAE
Tel
.#04810-5105
Fax.#0 4810-
5106
Email
:f
jt
rdg@emir
ates
.net
.a
e
We bsi
te:www.
fa
isa
lj
ass
im.
ae
APPLI
CATI
ONS

FLOWTE CHL i
nea
rBarGri
ll
e(LBG)isasi
dewa l
l
gri
l
lewi
thacombin
ati
onofx edprolehori
zon
tal
bl
adesi
nfron
tandadj
ust
abl
evert
ic
albl
adesi
nrear
asanopt
ion.

Withit
shighcapaci
tya ndpl eas
antaesthetic
s
F
LOWTECH Li nearBa rGril
les&Reg is
tersa r
e
c
ommon l
yuse
dinrel
ati
vel
ylar
ges p
aceswit
hd oubl
e
v
oidss
uchasDome s
,Ope nLobbies,
Mall
s,Atri
ums,
a
ndBu i
l
dingEnt
ran
ces,wh e
rebot hthe
sefeatures
a
rerequi
re
d.
Doubl
eDe
fl
ect
ionL
ine
arBa
rGr
il
le(
DDL
BG)
F
ort
hispur
poseFL
OWTE CHDDL BR&DDL BG
c
anbesuppl
ie
dinbothstr
aig
htandcur
veshape
t
osui
tth
eint
eri
orgeome
tryofth
eser
vedspac
e.

FLOWTE CHL i
nearBarGri
ll
escanals
obeu s
edas
aconventi
onalsuppl
ya ndreturngril
l
eora sa
combinati
onofbot h.Thereof,blinddummy
segmentscanbeor deredtoi ntegra
teinthe
decor
ati
veout
l
ookoft hewholewall
.

OpposedBl adesDamper sares uppliedby


F
L OWTECHt oa c
hie
veprec
is
econ
troloverth
eair
owvol
ume. OBD isusedf
or netuningtheai
r
owvol
umesa ndshoul
dnotbeuseda sabranc
h
v
olumecon
troldamper.
S
ing
leDe
fl
ect
ionL
ine
arBa
rGr
il
le(
SDL
BG)
I
nF LOWTECH DDL BR&DDL BG ver
ti
calr
ear
bl
adesareus
edfordi r
ec t
ionalai
r ow cont
rol
.
Typi
cal
l
y,t
hes
ebladesca nbea dj
ust
edtoachi
eve
th
erequi
reda
irdi
st
ri
bu t
ionpa t
ter
n.

BL
ADES

F
RAME

OBD
L
ine
arBa
rRe
gis
ter

D-
1
LI
NEARBARGRI
LLES

PRODUCTFEATURES

Ma
ter
ial
: S
tanda
rdWi
dths
:
Fr
ameandbarbl
adesar
ema deofextr
uded Li
nearBa
rGril
l
es/Regi
st
ersc
anbes
uppl
i
edi
nan
y
al
umi
ni
uma l
l
oy6063toT6HeatTr
eatment
. oft
hefol
lowi
ngst
anda
rdwidt
hs:
TheOppos
edBl
adesDamperi
sal
soextr
uded
al
umi
ni
uma l
l
oy6063/
T6. 100mm (
4-i
nch
es)
150mm (
6-i
nch
es)
Ba
rBl
adeDe
fl
ect
ion: 200mm (
8-i
nch
es)
250mm (
10-
inch
es)
Thefr
ontba
rbl
adeiss
uppl
i
eda
soneoft
het
hre
e 300mm (
12-
inch
es)
f
oll
owi
ngcongu
rat
ions
:
Non-st
andards
izesc
anbeor
der
edt
osui
tthe
1.Ze
roDeect
i
onArr
ange
me nt:(
4mm) de
sig
nerspe
cica
ti
ons.
Nodeect
i
ontoa
ir owdir
ecti
on

Oppos
edBl
ade
sDa
mpe
r:
FLOWTE CHOBDi sx
edtoth
erearf
ra
meofLBR
4mm bl
adewi
th0°de
fl
ect
ion
byme a
nsof“S”c
lampf
ore
aseofr
emovala
ndr
igi
d
cons
tr
ucti
on.
2.Ze
roDeect
i
onArr
ange
me nt:(
6.4mm)
Nodeect
i
ontoa
ir owdir
ecti
on Toa dj
ustt
heOBD openi
ng,tur
ntheadj
ust
ment
scr
ew avai
labl
eatt
hefrontfac
eoftheregis
ter
(Cl
ockwi
setoOpen/Counte
rClock
wis
etoClose)
.

6.
4mm bl
adewi
th0°de
fl
ect
ion
Cur
vedS
egme
nts
:

3.
Sin
gleDeect
i
onArr
ang
ement: CurvedSegmentsareavail
ablef
orbot
hsi
dewa
ll
Theai
r owi
sdeect
ed15-De
gtoon
esi
de cu
rves(CS)andcei
l
ingcur
ves(CP)
,wi
thami
ni
mum
r
adiu
sofcu r
vat
ureof1000mm.

Forspec
iali
nst
al
la
ti
ons
,ourt
echni
ci
ancanvi
si
tthe
proj
ectsi
teandtaket
heact
ualmeasur
ementsto
6.
4mm bl
adewi
th15°de
fl
ect
ion
ensu
reape r
fec
tt .

CURVEDBARGRI
LLE
BarGril
leca
nbes uppl
i
edasawall
typecur
vewit
h
ami ni
mum r adi
usof1meter
.Ourt ec
hnici
anwil
l
assi
stint aki
ngs i
temeasurementsforspeci
al
cu
r v
a t
ures
.
1m
:
us
i
Rad
m
mu
ni
Mi

Cur
vedL
ine
arBa
rGr
il
le Cur
vedS
hapeL
ine
arBa
rGr
il
le

D-
2
LI
NEARBARGRI
LLES

SI
NGLEDEFLECTI
ON LI
NEARBARGRI
LLE&REGI
STER-SDLBG &SDLBR

S
ing
leDe
fl
ect
ionL
ine
arBa
rGr
il
le(
SDL
BG)

S
ing
leDe
fl
ect
ionL
ine
arBa
rGr
il
le(
SDL
BG)

S
ing
leDef
l
ect
ionLi
nea
rBa
rReg
ist
er(
SDLBR)

Pr
oduc
tsF
eat
ure
s:
There
tur
nli
nearbargri
l
lei
sawal
lmoun
tedgri
l
le, Theret
urnli
nearbargri
l
lei
scompos e
dofasetof
us
edasanexhaus
torretur
ninc
ool
in
g,hea
ti
ngor xedhori
zonta
lstr
aig
htbarsat
tachedtoafr
ame,
ai
rve
nti
la
ti
onappl
icat
i
ons. bothman
ufac
tur
edfr
ome xtr
ude
da l
umini
umse
cti
ons
.

Thest
andar
dfr
ontbl
adewi
dthi
s4mm whe
reasa F
la
nge
sar
eav
ai
la
blei
n10
,13
,20
,25a
nd3
0mmwi
dt
h.
6.
4mm bl
adeal
soi
savai
l
abl
ewit
hce
nte
rtocen
ter
12.
5mm.
D-
3
LI
NEARBARGRI
LLES

SI
NGLEDEFLECTI
ON LI
NEARBARGRI
LLE&REGI
STER15O -SDLBG &SDLBR

S
ing
leDe
fl
ect
ionL
ine
arBa
rGr
il
le(
SDL
BG)-Wi
th5.
5mm Bl
ade15O -TYPEA

17mm

S
ing
leDe
fl
ect
ionL
ine
arBa
rGr
il
le(
SDL
BG)-Wi
th5.
5mm Bl
ade15O-TYPEA

17mm

S
ing
leDef
l
ect
ionLi
nea
rBa
rReg
ist
er(
SDLBR)-Wi
th5.
5mm Bl
ade15O -TYPEA
Pr
oduc
tsF
eat
ure
s:
Thesuppl
yli
nea
rba
rgri
ll
eisawall
mount
edsuppl
y Thesupplyli
nearbargri
ll
eiscomposedofas e
tof
gri
ll
eusedincool
ing
,hea t
ingorai
rvent
il
ati
on xedhor iz
ont a
ls t
rai
ghtba r
sinfrontfaceand
appl
ic
ati
ons
. i
ndivi
dual
lyadj
u s
tabl
evert
ical
dee ct
orsintherea
r
tocontr
olair owpa t
ter
n.Bothmanufa
ctur
edfrom
Thest
andar
dfr
ontbl
adewi
dt
his5
.5mm wi
t
hce
nte ext
rudeda l
umini
ums ect
i
on s
.
toce
nter17mm.
F
la
nge
sar
eav
ai
la
blei
n10
,13
,20
,25a
nd3
0mmwi
dt
h.

D-
3A
LI
NEARBARGRI
LLES

SI
NGLEDEFLECTI
ON LI
NEARBARGRI
LLE&REGI
STER15O -SDLBG &SDLBR

S
ing
leDe
fl
ect
ionL
ine
arBa
rGr
il
le(
SDL
BG)-Wi
th5.
5mm Bl
ade15O -TYPEB

12.
5mm

S
ing
leDe
fl
ect
ionL
ine
arBa
rGr
il
le(
SDL
BG)-Wi
th5.
5mm Bl
ade15O -TYPEB

12.
5mm

S
ing
leDef
l
ect
ionLi
nea
rBa
rReg
ist
er(
SDLBR)-Wi
th5.
5mm Bl
ade15O -TYPEB

Pr
oduc
tsF
eat
ure
s:
There
tur
nli
nearbargri
l
lei
sawal
lmoun
tedgri
l
le, Theret
urnli
nearbargri
l
lei
scompos e
dofasetof
us
edasanexhaus
torretur
ninc
ool
in
g,hea
ti
ngor xedhori
zonta
lstr
aig
htbarsat
tachedtoafr
ame,
ai
rve
nti
la
ti
onappl
icat
i
ons. bothman
ufac
tur
edfr
ome xtr
ude
da l
umini
umse
cti
ons
.

Thest
anda
rdf
rontbl
adewi
dthi
s5.
5mm wi
t
h F
la
nge
sar
eav
ai
la
blei
n10
,13
,20
,25a
nd3
0mmwi
dt
h.
ce
nte
rtocent
er12.
5mm.

D-
3B
LI
NEARBARGRI
LLES

DOUBLEDEFLECTI
ON LI
NEARBARGRI
LLE&REGI
STER-DDLBG &DDLBR

Doubl
eDe
fl
ect
ionL
ine
arBa
rGr
il
le(
DDL
BG)

Doubl
eDe
fl
ect
ionL
ine
arBa
rGr
il
le(
DDL
BG)

Doubl
eDef
l
ect
ionLi
nea
rBa
rReg
ist
er(
DDLBR)
Pr
oduc
tsF
eat
ure
s:
Thesuppl
yli
nea
rba
rgri
ll
eisawall
mount
edsuppl
y Thesupplyli
nearbargri
ll
eiscomposedofas e
tof
gri
ll
eusedincool
ing
,hea t
ingorai
rvent
il
ati
on xedhor iz
ont a
ls t
rai
ghtba r
sinfrontfaceand
appl
ic
ati
ons
. i
ndivi
dual
lyadj
u s
tabl
evert
ical
dee ct
orsintherea
r
tocontr
olair owpa t
ter
n.Bothmanufa
ctur
edfrom
Thest
andar
dfr
ontbl
adewi
dthi
s4mm wher
easa ext
rudeda l
umini
ums ect
i
on s
.
6.
4mm bla
deal
soisa
vai
l
abl
ewit
hcen
tert
ocent
er
12.
5mm. F
la
nge
sar
eav
ai
la
blei
n10
,13
,20
,25a
nd3
0mmwi
dt
h.

D-
4
LI
NEARBARGRI
LLES

MOUNTI
NG /FI
NISH OPTI
ONS

Avai
la
blei
nPowde
rCoa
tedRAL9010or9016a
s
st
andar
d.
Oth
erpowde
rcoa
tedn
ish
esa
rea
vai
l
abl
eupon
r
eques
t

Fi
xi
ngopt
ionsa
reConc
e a
ledSpr
ingF
ixi
ng(
CSF
)
Conc
eal
edTy
peF
ixi
ng-Wa
llOnl
y(CS
F)
orVi
si
bl
eS c
rewFi
xi
ng(VSF)

ACCESSORI
ES

CORNERPI CP1/
ECE( CP2/
CP3/
CP4)
Corn
erPi
ecesa
reavai
l
abl
eforal
lst
anda
rdsi
zes
.
Si
t
eme a
sur
ementsa
repre
ferr
edtoensur
eaperf
ect
t
.
Vi
si
bl
eSc
rewF
ixi
ng-Wa
llorCe
il
ing(
VSF
)

X Y

B
Y
90
O
90
O

B
Ce
il
ingMount
edCor
ne CP1)
r90O ( Wa
llMount
edCor
ner-I
nsi
deF
ace(
CP3)

90
O

X Y

Ce
il
ingMount
edCor
ne CP2)
r>90O ( Wa
llMount
edCor
ner-Out
si
deF
ace(
CP4)

D-
5
LI
NEARBARGRI
LLES

ORDERI
NG SYSTEM

RALCode
Col
or

Wi
dt
hinmm
orin
ch

L
engt
hinmm
ori
nch

0°Dee
cti
on
15°Deect
i
on

DDLBG:Doubl
eDeecti
onLinearBarGri
ll
e
DDLBR:
Dou bl
eDeect
ionLinea
rBa rRegi
st
er
SDL
BG:Sin
gleDeec
ti
onL i
nearBarGril
l
e
SDL
BR:Si
ngl
eDeecti
onLinea
rBa rRegi
st
er

Or
der
ingS
yst
em

ORDERI
NG EXAMPLE

DDLBR -0°-1200mm x300mm -9016


Sta
ndsf
orDoubl
eDee c
ti
onLi
nea
rBarReg
is
ter0°an
gledeec
ti
on,
300mm wi
dea
n d1200mm l
ong
,wit
hpowdercoat
edRAL9016

F
orCurvedSegme
nts,remarkofcur
v at
ureandpl
anof
c
urv
atur
eshall
bei
ncludedinorder.
(
Act
ualon-s
it
emeasurementsar
er equi
red.
)

D-
6
LI
NEARBARGRI
LLES

GENERALNOTES

Pag
esonwardsgi
veperf
ormanc
edataf
oral
lmodel
s 5.NC, andPres
sureval
uess hown ,
areba sedona
an
dv a
ri
ant
s,an
du n
les
sother
wis
est
at
edthef
ol
lowi
ng compl eteunitwitha noppos edbladeda mperin
ge
neraln
otesappl
y: thef ul
lyopenpos i
ti
onfort hesupplyre gi
sterand
withoutda mperforthereturnli
nearba rgri
ll
e.The
1.Th rowssh
owna retothre
ete
rmin
alv
eloci
t
yof dampers houl
donlybeus edf or neba l
anci
ng,as
0.
25m/s,0.
5m/s
,0.
75m/s,(50f
pm,
100f
pm,150f
pm) forev erydoubli
ngofpress ur
et hereisar esul
ti
ng
withsuppl
yairatcondit
ionswi
thmax∆T=10k i
nc reaseinthenoiselevelof+9dBf orsuppl y
,or
cool
in
g . +5dBf orexha
ust.

2. Fors
tand
ardr
oomh e
ightof2
.75met
res
,thr
ows 6.Mode l
swithreducednecks
.The reisa‘di
lut
ion
shoul
dbetakena
sth
edistancetoth
eneare
stwal
l eff
ect’
onpe rf
ormanceforthes
emode ls,
asthea i
r
(min
imum pl
andi
mens
ion,MPD). tendst
os pr
eadbe h
indthecor
e,reducingthr
owsby
upt o20%,dependingontherel
ationshi
pbe t
we en
3. Toavoi
dair ow‘dumpi
ng’oncool
ingcy
cle
sat thenecks i
zeandtheba sedi
ff
users i
ze.Formor e
th
eg r
il
l
ecore
,iti
sadvi
sa
blet
oe ns
urethatt
heneck i
n f
ormati
on,pl
easecheckwit
hthefa c
tory.
vel
oci
ti
esdonotdropbel
ow0.75m/s,(
150f
pm).
7.Thef ollowingtablesi
ncludet here s
ult
softests
4.Th ea cous
ti
cdatawerete st
edinaccordanceto conductedons ampl esofa i
rt erminals
.Thet est
ASHRAE7 0-19
91standa
rd.Th eoctav
eban dsound res
ult
sincludeNoi seCr i
ter
ia( NC) ,
stati
cpress
ure
powe rle
ve l
sobta
inedwe replottedtode t
ermine ver
susai
r ow, t
hrowa ndeff
ecti
vea r
ea.Extr
apol
ati
on
thepointoftange
ncywitht hehighestr
ankNoi se wasusedt oobt ai
nthepe rf
orma nceforot h
ersize
s
Crit
eriacurve(NC)t oes tabl
ishtheNC.Noi se andotherpa rame t
erswithi
nt her a
ng eofproducts
Crit
eriarati
ngsweredet erminedbys ubtract
ing menti
one da bove.
room absorpti
onof10dBf rom thesoundpowe r
l
e v
eldata.

TESTREPORTS

D-
7
LI
NEARBARGRI
LLES

PERFORMANCEDATA -I
PUNI
TS

S
YMBOL
S NOTES
L/S
ec:
AirVolumei nl
itr
espe rsec
on d. Thela
rgethr
owv al
uesarebasedont h
e
Af :Eff
ecti
vefreeareainsquareme t
er/perL
m. mini
mumt er
minalve
loci
tyof0.
25m/ s
ec.
Vf :
FaceVeloci
tyinme te
rpe rsecond. Themiddl
ethrowv a
lue
sa r
ebasedon
Ak :Ne ckAreainsquareme ters/perLm. th
eme di
umt ermi
nalve
loci
tyof0.50m/s
ec.
Vk :
Ne ckVeloci
tyinme t
erspers ec
ond. Thesmall
thr
owv al
uesarebasedont he
Pt :
Totalpress
ureinPascal. maxi
mu mtermina
lvel
ocit
yof0.75m/sec
..
Th :
Throwinme te
rs.
NC :NoiseCr i
ter
ia. CONDI
TIONS
Suppl
yorRe turnasindic
ated.
NoiseCr i
te
ri
av al
uesareba se
don(
10dB)
r
oom a t
tenuat
ion.
Dampe risf
ull
yope n.
Maximumr oom height=4. 0m
Maximum Cooling@ ΔT=10K
Correc
tiononn oi
secr i
ter
iaNC
L= 1000mm c orrec
tion+0dB
L= 2000mm c orrec
tion+3dB
Not
es: L= 3000mm c orrec
tion+5dB

D-
8
LI
NEARBARGRI
LLES

DOUBLEDEFLECTI
ON LI
NEARBARGRI
LLES&REGISTERS
-DDLBG &DDLBR SI
-UNI
TS
0°DE
FLE
CTI
ON BL
ADES
WIDTH AIRFLOW NECK FACE Pt(
Pa) THROW @
NC
(
mm) (L/S
)/LM VELOCITY(m/
s)VELOCITY(m/
s) (
0.25/
0.50/
0.75)m/
s

D-
9
LI
NEARBARGRI
LLES

DOUBLEDEFLECTI
ON LI
NEARBARGRI
LLES&REGISTERS
-DDLBG &DDLBR SI
-UNI
TS

WIDTH AIRFLOW NECK FACE Pt(


Pa) THROW @
NC
(
mm) (L/S
)/LM VELOCITY(m/
s) VELOCITY(m/
s) (
0.25/
0.50/
0.75)m/
s

D-
10
LI
NEARBARGRI
LLES

SI
NGLEDEFLECTI
ON LI
NEARBARGRI
LLES&REGI STERS
-SDLBG &SDLBR SI
-UNI
TS

WIDTH AIRFLOW
Pt(
Pa) NC
(
mm) (L/S
)/LM

D-
11
LI
NEARBARGRI
LLES

PERFORMANCEDATA -I
PUNI
TS

S
YMBOL
S NOTES
CFM :
AirVolumei ncubi
cf e
etperminut
e. Thela
rgethr
owv al
uesarebasedont h
e
Af :Eff
ecti
vefreeareai
ns quar
efeet/perL.
Ft. mini
mumt er
minalve
loci
tyof50fpm.
Vf :
FaceVeloci
tyinfeetperminut
e. Themiddl
ethrowv a
lue
sa r
eba s
e don
Ak :Ne ckAreainsquarefeet/perL.F
t. th
eme di
umt ermi
nalve
loci
tyof100fpm.
Vk :
Ne ckVeloci
tyinfe
e tperminut
e. Thesmall
thr
owv al
uesarebasedont he
Pt :
Totalpress
ureinincheswate
rgauge. maxi
mu mtermina
lvel
ocit
yof150fpm.
Th :
Throwinf eet.
NC :NoiseCr i
ter
ia. CONDI
TIONS
Suppl
yorRe turnasindi
cat
ed.
NoiseCr i
te
ri
av al
uesarebase
don(
10dB)
r
oom a t
tenuat
ion.
Dampe risf
ull
yope n.
Maximumr oom h e
ight=4.0m
Maximum Cooling@ ΔT=10K
Correc
tiononn oi
secr i
t
eri
aNC
L= 3f eetcorrec
ti
on+4dB
L= 6f eetcorrec
ti
on+6dB
Not
es: L=10f eetcor
recti
on+9dB

D12
LI
NEARBARGRI
LLES

DOUBLEDEFLECTI
ON LI
NEARBARGRI
LLES&REGISTERS
-DDLBG &DDLBR I
P-UNI
TS
AI
RF LOW
WI
DTH (
in) Vk(
FPM) Vf(
FPM) Pt(
in-
wg) THROW @ (
50/
100/
150)
FPM NC
(CFM/LF
T)

D-
13
LI
NEARBARGRI
LLES

DOUBLEDEFLECTI
ON LI
NEARBARGRI
LLES&REGISTERS
-DDLBG &DDLBR I
P-UNI
TS

WI
DTH AI
RF LOW NECK FACE
Pt(
in-
wg) THROW @ (
50/
100/
150)
FPM NC
(
in) (CFM/LF
T) VELOCITY(
FPM) VELOCITY(
FPM)

D-
14
LI
NEARBARGRI
LLES

SI
NGLEDEFLECTI
ON LI
NEARBARGRI
LLES&REGI STERS
-SDLBG &SDLBR I
P-UNI
TS

AI
RF LOW
WI
DTH (
in) Pt(
in-
wg) NC
(CFM/LF
T)

D-
15
L
INEARSL
OTDI
FFUSERS

S
LSD S
uppl
yLine
arSlotDif
fus
erwi
thHi
t&Mi
ssDa
mpe
r
a
ndwithDefl
ector
s

RLS
D Retur
nLinea
rSl
otDif
fus
erwi
thHi
tDa
mpe
r
andwit
houtDef
l
ect
ors

S
LSD-
B S
uppl
yL i
nearS
lotDif
fus
erwi
thHi
t&Mi
ssDa
mpe
r
a
ndwithoutDefl
ect
ors

RLS
D-B Ret
urnLine
arS
lotDif
fus
erwi
thHi
tDa
mpe
r
andwit
houtDef
le
ctor
s

S
LSD-
HF S
uppl
yLine
arSlotDif
fus
erwit
hHi t&Mis
sDa
mpe
r
a
ndwithDefl
ector
s-Hidde
nF ra
meT y
pe

RLS
D-HF Retur
nLi ne
arSl
otDif
fus
erwit
hHi
tDamper
andwithoutDe
fl
ect
ors-Hidde
nFr
ameTy
pe

S
LSD-
P S
uppl
yPla
ste
rLine
a rS
lotDif
fuserwi
thHi
t&Mi
ssDa
mpe
r
a
ndwithDef
lec
tors-Pla
ste
rT y
pe

RL
SD-
P Retur
nPl as
terLi
nearSl
otDif
fus
erwithHi
tDa
mpe
r
andwithoutDefl
ect
ors-Pl
ast
erType
LI
NEARSLOTDI
FFUSERS

APPLI
CATI
ONS
LI
NEARSLOTDI
FFUSERS

LI
NEARSLOTDI
FFUSER(
SLSD &RLSD)

45oS
uppl
yLi
nea
rSl
otDi
f
fus
ers(
SLS
D) 90oS
uppl
yLi
nea
rSl
otDi
f
fus
ers(
SLS
D)

Pr
oduc
tsF
eat
ure
s:

B
Ty
peS
LSDwi
thDe
fl
ect
orsa
ndHi
t&Mi
ssDa
mpe
rs
LI
NEARSLOTDI
FFUSERS

DI
MENSI
ONS(
FIXED 45°ENDCAP)

25 8 8 25

B
Ty
peS
LSDwi
thDe
fl
ect
orsa
ndHi
t&Mi
ssDa
mpe
rs
LI
NEARSLOTDI
FFUSERS

DI
MENSI
ONS(
REMOVABLE90°END CAPMODEL)

45 89 133 177 221 265 309 355

81 125 170 215 260 304 347 393

40 79 118 157 198 235 274 315

76 115 154 193 235 272 312 354

36 70 104 138 172 206 240 274

72 106 140 174 208 244 276 313

A
50

B
Ty
peS
LSDwi
thDe
fl
ect
orsa
ndHi
t&Mi
ssDa
mpe
rs(
90°EndCa
pMode
l)
LI
NEARSLOTDI
FFUSERS

LI
NEARSLOTDI
FFUSER(
SLSD-
B &RLSD-
B)

45oS
uppl
yLi
nea
rSl
otDi
f
fus
ers(
SLS
D-B) 90oL
ine
arS
lotDi
f
fus
ers(
SLS
D-B)

Pr
oduc
tsF
eat
ure
s:

Fr
ameandcur
veddef
l
ect
i
onbl
ade
sarema
deof F
orma x
imumrig
idi
ty,
prof
il
esa
ref
ix
edatequal
l
y
extr
udedal
umini
um al
l
oy6063toT6Heat s
pace
dinte
rva
lsusi
ngScre
wRodsandCyl
i
n dr
ic
al
Tre
atmen
t. s
himsof6mm di ameter,madeofext
ruded
a
lumi
niu
m.
Avai
l
abl
einHita
ndMissDamperofGIsh
eett
o
cont
rolai
rfl
ow r
atewit
houta
ffect
ingt
heai
r Maximu m ofonepiec
eleng
this3000mm.Lar
ger
f
lowpatt
ern
s. pi
ece sarejoi
ntedusi
nghai
rl
inebuttj
oint
shel
d
byspe c
ialal
ig
ntmentst
ri
pstoensur
ec ont
i
nuous
Hi
t&Mi
ssDa mpera
repowde
rcoa
ted unbrokenru ns
.
wi
t
hbl
ackc
olor.
Curv
e dSeg
me nt
sareavai
l
abl
eforbot
hsi
dewa
ll
Av
ail
abl
ein1t
o8s
lot
s. cu
rves(CS
)andceil
i
ngcurv
es(
CP )
,wi
thmi
ni
mum
r
adiu
sofcurva
tureof1000mm.
St
andar
dsl
otwi
dthi
s1/2”(
16mm)
,
3/
4”(20mm)an
d1”(25mm). S
urf
acemou
ntde
sig
n.

Al
soa
vai
l
abl
ewi
t
ha90°e
ndc
ap

B
S
LSD-
Bwi
thHi
t&Mi
ssDa
mpe
rs

E
-5
LI
NEARSLOTDI
FFUSERS

DI
MENSI
ONS(
FIXED 45°ENDCAP)-SLSD-
B&RLSD-
B

B
S
LSD-
Bwi
thHi
t&Mi
ssDa
mpe
rs

E
-6
LI
NEARSLOTDI
FFUSERS

DI
MENSI
ONS(
REMOVABLE90°END CAPMODEL)-SLSD-
B&RLSD-
B

45 89 133 177 221 265 309 355

81 125 170 215 260 304 347 393

40 79 118 157 198 235 274 315

76 115 154 193 235 272 312 354

36 70 104 138 172 206 240 274

72 106 140 174 208 244 276 313

A
30

S
LSD-
Bwi
thHi
t&Mi
ssDa
mpe
rs(
90O EndCa
pMode
l)

E
-7
LI
NEARSLOTDI
FFUSERS

MOUNTI
NG /FI
NISH OPTI
ONS
Def
lec
torsa
ndHit&MissDampera
repowde
r
coa
tedinbl
ackc
olora
ssta
ndar
d.

Gy
psu
m Boa
rd

Re
comme
nde
dMount
ingofL
ine
arS
lotDi
f
fus
erwi
thaPl
enum Box

Mount
ingofL
ine
arS
lotDi
f
fus
erwi
thaPl
enum Box

E
-8
LI
NEARSLOTDI
FFUSERS

ACCESSORI
ES(
90°END CAPMODEL)

END CAP(
EC) Cur
vedS
lotDi
f
fus
ers(
CSD)

S
lotDi
f
fus
erwi
thEndCa
p(EC) Cur
vedS
lotDi
f
fus
er(
CSD)

Cor
nerPi
ece-Wa
ll(
CPW)/Ce
il
ing(
CPC)

90O

Ce
il
ingTy
peCor
ner>90O(
CPC) Ce
il
ingTy
peCor
ner90O(
CPC)

90O

Ce
il
ingTy
peCor
ner<90O(
CPC) Wa
llTy
peCor
ner90O (
WC)

E
-9
LI
NEARSLOTDI
FFUSERS

HI
DDEN FRAMELI
NEARSLOTDI
FFUSER(
SLSD-
HF&RLSD)
-HF

45oHi
dde
nFr
ameS
uppl
yLi
nea
rSl
otDi
f
fus
ers(
SLS
D-HF
) 90oHi
dde
nFr
ameS
uppl
yLi
nea
rSl
otDi
f
fus
ers(
SLS
D-HF
)

Pr
oduc
tsF
eat
ure
s:

Fr
ameandcur
veddef
l
ect
i
onbl
ade
sarema
deof F
orma x
imumrig
idi
ty,
prof
il
esa
ref
ix
edatequal
l
y
extr
udedal
umini
um al
l
oy6063toT6Heat s
pace
dinte
rva
lsusi
ngScre
wRodsandCyl
i
n dr
ic
al
Tre
atmen
t. s
himsof6mm di ameter,madeofext
ruded
a
lumi
niu
m.
Avai
l
abl
einHita
ndMissDamperofGIsh
eett
o
cont
rolai
rfl
ow r
atewit
houta
ffect
ingt
heai
r Maximu m ofonepiec
eleng
this3000mm.Lar
ger
f
lowpatt
ern
s. pi
ece sarejoi
ntedusi
nghai
rl
inebuttj
oint
shel
d
byspe c
ialal
ig
ntmentst
ri
pstoensur
ec ont
i
nuous
180°f
ul
lyadj
ust
abl
eairf
lowpa
tte
rnsbyme
ans unbrokenru ns
.
oftwoai
rdef
le
ctorbl
ade
spers
lot
.
Hi
dde
nFr
ameDe
sig
n
Bot
hDefl
ect
orBl
ade
sandHit&MissDa
mpe
r
ar
epowderc
oat
edwit
hbl
ackcol
or. Av
ail
abl
eon
lywi
t
h45
o
E
ndCa
p

St
andar
dsl
otwi
dthi
s1/2”(
16mm)
, Av
ail
abl
ein1t
o8s
lot
s.
3/
4”(20mm)an
d1”(25mm).

60

14 6 25 14 25 6 14
B
S
LSD-
HFwi
thDe
fl
ect
ora
ndHi
t&Mi
ssDa
mpe
rs

E
-10
LI
NEARSLOTDI
FFUSERS

DI
MENSI
ONS(
FIXED 45°ENDCAP)-SLSD-
HF&RLSD-
HF

60

14 6 25 14 25 6 14

B
S
LSD-
HFwi
thDe
fl
ect
ora
ndHi
t&Mi
ssDa
mpe
rs

E
-11
LI
NEARSLOTDI
FFUSERS

MOUNTI
NG /FI
NISH OPTI
ONS(
SLSD-
HF&RLSD-
HF)
Hit&Mis
sDamperar
epowde
rcoate
dinbl
ack
col
ora
sstan
dar
dforLi
ghtWei
ghtTy
pe

Gy
psu
m Boa
rd

Re
comme
nde
dMount
ingofL
ine
arS
lotDi
f
fus
erwi
thaPl
enum Box

Mount
ingofL
ine
arS
lotDi
f
fus
erwi
thaPl
enum Box

E
-12
LI
NEARSLOTDI
FFUSERS

ACCESSORI
ES
Pl
enum Boxe
s:
S
uit
abl
efors
upp
lyandexh
aus
tli
nea
rsl
otd
if
fu
ser
.
(
SLSD/RL S
D,SLS
D- B/RLS
D-B,SLS
D-HF/RLSD-
HF)

Ga
lv
ani
zeds
tee
lcon
str
uct
i
on.

S
uppl
yass
tan
dar
dwi
t
hon
esi
dei
nl
etp
erme
tre
l
eng
th.

S
pec
ia
lcon
str
uct
i
onsa
vai
l
abl
eonr
equ
est
.
Opt
ions
:

S
ize
s:

Pl
enum Boxe
s,or45oe
f ndc
ap

25mm S
l s-45oe
ot ndc
ap

20mm S
l s-45oe
ot ndc
ap

16mm S
l s-45oe
ot ndc
ap

E
-13
LI
NEARSLOTDI
FFUSERS

ACCESSORI
ES
Pl
enum Boxe
s:
S
uit
abl
efors
upp
lyandexh
aus
tli
nea
rsl
otd
if
fu
ser
.
(
SLSD/RL S
D,SLS
D- B/RLS
D-B,SLS
D-HF/RLSD-
HF)

Ga
lv
ani
zeds
tee
lcon
str
uct
i
on.

S
uppl
yass
tan
dar
dwi
t
hon
esi
dei
nl
etp
erme
tre
l
eng
th.

S
pec
ia
lcon
str
uct
i
onsa
vai
l
abl
eonr
equ
est
.
Opt
ions
:

S
ize
s:
Ma
ximu
mle
ngt
hav
ai
la
ble2
400
mm.
Pl
enum Boxe
sfor90oe
ndc
ap
Ot
herØ Da
vai
l
abl
eonr
equ
est
.

25mm S
l s-90oe
ot ndc
ap

20mm S
l s-90oe
ot ndc
ap

16mm S
l s-90oe
ot ndc
ap

NOTE
S:
*Th
ea bovepar
amet
ersf
or1mleng
th.
*Maxi
mu mle
ngtha
sas i
ngl
epi
ecei
s2.
4m.

E
14
LI
NEARSLOTDI
FFUSERS

PLASTERLI
NEARSLOTDI
FFUSER(
SLSD-
P&RLSD-
P)

Pl
ast
erRe
tur
nLi
nea
rSl
otDi
f
fus
er(
RLS
D-P)

FRONTVI
EW
Pl
ast
erS
uppl
yLi
nea
rSl
otDi
f
fus
er(S
LSD-P)

Pr
oduc
tsF
eat
ure
s:
• •

• •


• •

E
-15
LI
NEARSLOTDI
FFUSERS

DI
MENSI
ONS

Ty
peS
LSD-
Pwi
thDe
fl
ect
orsa
ndHi
t&Mi
ssDa
mpe
rs

E
-16
LI
NEARSLOTDI
FFUSERS

ORDERI
NG SYSTEM

SL
SD :
S u
pplyLi
nearSl
otDi f
f
user
RLSD :Retur
nLinearS
lotDif
fuse
r
SL
SD-B : Suppl
yLinea
rSlotDif
fus
er-Ty peB
RLSD-B :Retur
nL i
nearS
lotDif
fuse
r-TypeB
SL
SD-HF: Suppl
yLinea
rSlotDif
fus
er-Hi ddenF
rame
RLSD-HF:ReturnLi
nearSl
otDiff
user-HiddenFr
ame
SL
SD-P : Pl
asterS
upplyLin
earSl
otDi f
f
u ser
RLSD-P :Pl
aste
rReturnLi
nearSl
otDi f
f
u ser

Or
der
ingS
yst
em

ORDERI
NG EXAMPLE

SLSD-
3S-
1200-
9016

E
-17
LI
NEARSLOTDI
FFUSERS

GENERALNOTES

TESTREPORTS

E
-18
LI
NEARSLOTDI
FFUSERS

PERFORMANCEDATA -SIUNI
TS

S
YMBOL
S NOTES

CONDI
TIONS

Not
es:

E
-19
SUPPLYAI FFUSER-SLSD ,SLSD-
RSLOTDI B,SLSD-
HF SI
-UNI
TS
HORIZONTAL

-
18

E
-20
SUPPLYAI FFUSER-SLSD,SLSD-
RSLOTDI B,SLSD -HF SI
-UNI
TS
VERTI
CAL

18

E
-21
LI
NEARSLOTDI
FFUSERS

PLASTERSUPPLYAI
RSLOTDI
FFUSER SI
-UNI
TS
SLSD -P

18

E
-22
LI
NEARSLOTDI
FFUSERS

RETURN AI
RSLOTDI
FFUSER-RLSD,RLSD-
B,RLSD-
HF SI
-UNI
TS

18

E
-23
LI
NEARSLOTDI
FFUSERS

PLASTERRETURN AI
RSLOTDI
FFUSER SI
-UNI
TS
RLSD -P

18

E
-24
LI
NEARSLOTDI
FFUSERS

PERFORMANCEDATA -I
PUNI
TS

S
YMBOL
S NOTES

CONDI
TIONS

Not
es:

E
-25
SUPPLYAI FFUSER-SLSD,SLSD-
RSLOTDI B,SLSD-
HF I
P-UNI
TS
HORIZONTAL

2
5

E
-26
SUPPLYAIRSLOTDI
FFUSER-SLSD,SLSD-
B,SLSD-
HF I
P-UNI
TS
VERTI
CAL

25

E
-27
LI
NEARSLOTDI
FFUSERS

RETURN AI
RSLOTDI
FFUSER-RLSD,RLSD-
B,RLSD-
HF I
P-UNI
TS

E
-25

E
28
CEI
LING DI
FFUSERS

SCD Suppl
yCei
li
ngDi f
fus
er
RCD Ret
urnCeil
ingDiff
user
SPCD Suppl
yPe
rforat
edCe i
li
ngDif
fus
er
RPCD Ret
urnPerf
orat
edCe il
ingDi
f
fuser
SDCD Suppl
yDecorat
iveCeil
ingDi
f
fuser
RDCD Ret
urnDecorati
veCe i
li
ngDi
ff
user

F
AIS ALJASSI
MINDUS TRIES(L.
L.C.
)
P.O.Box1 87
1Plot#5 98-1152
Du baiI
nvest
mentPar
k-Du bai
,UAE
Tel.
#0 4810-5105
Fax.#04810-5106
Email
:f
jt
rdg
@emirat
es.n
e t
.
ae
Websit
e:www.f
ais
al
jass
im.a
e
CEI
LINGDI
FFUSERS

APPLI
CATI
ONS

F
LOWTECH pr
ovi
desawi
der
ang
eofCei
l
ing
Di
f
fus
erst
osui
tthev
ari
ousr
equi
reme
ntsofc
eil
i
ng
a
irdi
st
ri
but
i
on.

Suppl
yai
rcei
l
ingdi
ff
user
s(SCD)a
ndr
etur
nai
r
c
eil
i
ngdi
f
fus
ers(RCD)canbeSqu
areorRect
angl
ein
s
hapewi
thOn e
, Two,
ThreeorF
ourWa yPat
ter
ns.
Th
edi
f
fer
entdi
f
fus
erpa
tte
rnsa
reu
sedt
ocon
trol
the
s
uppl
yai
rdir
ect
i
on.Ty
pic
ale
xampl
esofsu
chappl
i
cat
i
on
S
uppl
yAi
r4Wa
yCe
il
ingDi
f
fus
er(
SCD-
4S)
a
resuppl
ydif
fus
ersn
eargl
assa
reas
,incor
ri
dorsa
nd
i
ncor
n er
s.

FLOWTE CHS CDissuppl


iedwithOppos edBlades
Da mpe r(OBD)tofa
cil
it
atethepreci
seairvolume
control.(
Note:OBD i
susedf or netuni
ngthea ir
volume owr at
eandshouldnotbeu sedtoreplac
e
t
h ebranchVol
umeControlDamper).
RCDi ssuppli
ed
wit
hou tOBDandusu
all
yusedf
orretur
naira
ppli
cati
ons
.
I
nc ert
ainappl
i
cat
ions
,SCDmu stbeu s
e dasretur
na i
r
diff
user;t
hatis
,wherer eturnairvolumer equires S
uppl
yAi
r3Wa
yCe
il
ingDi
f
fus
er(
SCD-
3S)
preci
secont
rol
,su
chasroomp ress
uri
zat
ionap p
li
cat
ions
.
Th i
si
sfreque
ntl
yrequi
r
e dforCleanRoomE ngi
neeri
ng
appli
cati
onssuc
ha sHospita
ls
,Ph ar
mac eu
ticalPl
ants
,
BiotechLabora
tori
es,Comput erRoomsa ndS i
l
icon
I
ndus
try
.

SCD andRCD a recommonl yus edforHeati


ng,
Cooli
nga ndIsothermalVenti
lati
ona ppl
i
cat
ions.
Howe ve
r,suc
ha ppli
cat
ionsa
relimite
dt o4meter
s
cei
l
inghei
ght.F
orCe i
l
ingHei
ghtsabove4.0Meter
s, Re
tur
nAi
rRe
cta
ngul
ar4Wa
yCe
il
ingDi
f
fus
er(
RCD-
4R)
re
fertospeci
al
lytermi
naldev
icessuchasJe
tNozzl
e
Di
f
fus
ersa
ndDr
opCe
il
ingDi
f
fus
ers
.

S
CDa ndRCDaret
es
te
dbyIn
ter
te
ktoASHRAE70-1
991
s
tanda
rdme t
hodoftes
ti
ngforrat
ingper
for
mance
ofa
irout
let
sandi
nl
ets
.

Perf
orat
edc ei
li
ngdif
fus
er(PCD)isofthesame
cons
tr
uct
ionasSCDbutwitharemov
abl
eperf
ora
ted
f
aceofGI s
heetpowderc
oated,
oral
umi
niumsheet
4Wa
ySuppl
yCe
il
ingDi
f
fus
erwi
thPe
rfor
ate
dFa
ce(
PCD)
asopt
ion
a l
.

F
-1
CEI
LINGDI
FFUSERS

FEATURES
MATERI
AL: Oppos
edBl
ade
sDa
mpe
r(OBD)
:
F
rameandCor
earemadeofex
tru
deda
lumi
ni
um F
LOWTECH OBD isx edtother
earfr
ameof
a
ll
oy6063toT6HeatTre
atment S
CD modelbymeansof“S”cl
ampforeas
eof
r
emov
ala
ndr i
gi
dcons
tr
uct
i
on .
TheOppos
edBladesDa
mperi
sext
ruded
al
umi
ni
umal
l
oy6063/
T6 Toa dj
ustth
eOBDope ni
ng,
removeth
ec or
ea nd
turntheadjus
tmentscr
ewa va
il
abl
eatthefront
Mi
t
redCor
ner f
a c
eofth edamper(Cl
ockwi
setoopen/Coun t
er
Clockwi
setoc l
ose
).
S
pri
ngl
oade
dcor
e
DI
MENSI
ONS

Mul
tiPa
tte
rnCe
il
ingDi
f
fus
erS
ect
ionWi
thoutDa
mpe
r(RCD)

Mul
tiPa
tte
rnCe
il
ingDi
f
fus
erS
ect
ionWi
thDa
mpe
r(S
CD)

STANDARD SI
ZES

S
qua
reCe
il
ingDi
f
fus
ers Re
cta
ngul
arCe
il
ingDi
f
fus
ers
Ne
ckS
ize F
aceS
ize A&BS
ize(
mm)

F
-2
CEI
LINGDI
FFUSERS

FI
NISH OPTI
ONS/FI
XING

Ava
il
ablei
nPowde
rCoa
tedRAL9010or9016
ass
tandar
d.
Byse
lft
appi
ngs
cre
wt h
rought
hen
eck
Oth
erpowderc
oat
edc
olor n
ish
esa
rea
vai
l
abl
e ofdi
f
fus
erin
tos
heetmeta
lduc
t

onre
ques
t.

F
ixi
ngopt
i
onsa
reCon
cea
ledS
cre
wFi
xi
ng.

S
tanda
rdF
ixi
ng(
CSF
)
ACCESSORI
ES

Oppos
edbl
adeda
mpe
rfors
uppl
y(opt
iona
l)
Thespeci
al
lydesi
gne
dbladeshav
ea nover
la
ppi
ng
l
ipwhic
ha ss
uresati
ghtcl
osur
e.
Contr
olisdonebyadjus
tmentsc
rewthroug
hthe
f
aceofdif
fuse
r.
Mate
ria
l:Ext
rudedal
umini
umc ons
tr
u c
ti
on.

Oppos
edBl
adeDa
mpe
rForS
uppl
y(OBD)

Equa
li
zi
ngg
rid(
opt
iona
l)
I
ndi
vidua
ll
ya dj
ust
abl
ebl
ades,t
oprovi
depreci
se
di
rec
tion
alcontr
olofai
rthr
ought
h edi
ff
use
r.
Nyl
ont en
sionbushe
s.
Ext
rudedalumi
niumconst
ruc
ti
on.
Equa
li
zi
ngGr
id-Opt
iona
l(EG)

Ci
rcul
arduc
tconne
cti
ona
dapt
ors
(
opti
onal
)
Sui
ta
bleforsuppl
yandexhaus
tce
il
in
g
di
ff
user
s.
Roundinl
et.
Gal
vani
zedsteelcon
str
uct
ion.
Spec
ialc
onstr
u c
ti
onavai
la
bleonr
eques
t.
NOMINAL TYPERS TYPERT
ØD
SI
ZES H1 H2 H3 H4 RT RS
150X150 100 240 285150195 Squ
aret
orou
nda
dapt
or.
Topi
nl
et Squ
a r
etorounda
dapt
orwi
th
out
per
fora
tedpl
at
e.Si
dei
nl
et
.
225X225 150 290 335175220
300X300 200 340 385 200 245
375X375 250 390 435 225270
450X450 300 440 485 250 295
525X525 350 490 535 275 320
600X600 400 540 585 300 345

F
ixi
ng
4hol
es8mm di
ame
terf
ors
tr
apsor
dr
oprods
.
RSP RSI
Squ
aretorou
nda
dapt
orwi
t
hpe
rfor
ate
dpl
at
e. I
nsul
at
edsquar
etorou
ndadaptor
Si
dein
let
. wit
hperf
ora
tedpl
at
e.Si
dein
let
.
Ci
rcul
arDuctConne
cti
onAda pt
ors

F
-3
CEI
LINGDI
FFUSERS

MULTIPATTERN CEI
LING DI
FFUSERS

4WAYDI
SCHARGE 3WAYDI
SCHARGE

S
qua
re(
SCD-
4S) Re
cta
ngu
lar(
SCD-
4R) S
qua
re(
SCD-
3S) Re
cta
ngu
lar(
SCD-
3R)

2WAYDI
SCHARGE

S
qua
re(
SCD-
2S) Cor
ner(
SCD-
2SC) Rect
angu
lar Rec
tan
gul
ar
Ve
rti
cal
(SCD-2RV) Hor
iz
ont
al(
SCD-2RH)

1WAYDI
SCHARGE

S
qua
re(
S 1S
CD- ) Recta
ngul
ar Rec
tan
gul
ar
Ve
rti
cal
(SCD-1RV) Hor
iz
ont
al(
SCD-1RH)

F
-4
CEI
LINGDI
FFUSERS

PERFORATED CEI
LING DI
FFUSERS(
SPCD /RPCD)

Pe
rfor
ate
dCe
il
ingDi
f
fus
er(
PCD)

Pr
oduc
tFe
atur
es: Acce
ssori
es:
Thi
sproduc
tisdesi
gne
dtopr ov
idelamin
ar ow Opposedbl
adeda
mpe
rfors
uppl
y(opt
iona
l)
wit
hlow veloc
iti
esbyev enl
ydistr
ibuti
ngthe Thespeci
all
ydesi
gnedbladeshaveanoverl
appi
ng
downwardmovingcondi
t
ionedair
. l
ipwhichass
uresati
ghtcl
osure
.Controli
sdoneby
adj
ust
me n
tscre
wt hr
ou g
ht h
efaceofdif
f
user
.
Theperf
ora
tedcei
l
in
gdif
fu
seri
sef
fec
ti
veesp
eci
al
l
y
i
na r
easwit
hh e
avyloc
ali
zedi
nte
rnall
oads
,asi
n Ma
ter
ia
l:E
xtr
ude
dal
umi
ni
umc
ons
tr
uct
i
on.
computerr
ooms.
Equa
li
zi
ngg
rid(
opt
iona
l)-EG
Thecolumnofa i
rdeli
ver
edbytheper
forat
ed I
ndiv
idua
ll
ya dj
ust
abl
eblades
,topr
ovi
depreci
se
cei
li
ngdif
fusercool
stheloadsour
cedir
ectl
y di
rec
ti
onalc
on t
rol
ofai
rth
rought
hedi
ff
use
r.Ny
lon
wit
houtgene
rati
nghi
ghvel
oci
t
iesi
nth
eoccupi
ed te
nsi
onbushes.
spa
ce.
Ma
ter
ia
l:E
xtr
ude
dal
umi
ni
umc
ons
tr
uct
i
on.

GIAda
ptor
s(opt
iona
l)
Pl
enu
m boxeswit
hri
ngc
anbepr
ovi
dedt
osu
itt
he
si
t
erequ
ire
me n
t.

F
-5
DECORATI
VEDI
FFUSER

DECORATI
VEDI
FFUSER(SDCSD /RDCD )

Withhi
ghdemandfora
est
heti
cst
he s
edays
,more Decor
ati
vedif
f
use
rsc
anh
avet
hec
orea
ndda
mpe
r
andmor ec
ustomersareenqui
ringaboutt
he asr
equi
red.
dec
orat
i
vedi
ff
user
s.
Av
ai
la
blei
nPowder
edCoat
edRAL9016asst
anda
rd.
Fl
owtec
hdecor
ati
vedi
f
fus
erscomesi
nav ar
iet
yof Ot
herpowderc
oat
edn i
sh
esa
reav
ai
la
bleasopt
i
ons.
des
ig
nsanda
recommonl
yusedinMaj
l
is
,at
ri
um,etc
.

De
cor
ati
veDi
f
fus
er

De
cor
ati
veDi
f
fus
er

F
-6
CEI
LINGDI
FFUSERS

ORDERI
NG SYSTEM

RALCode
Col
or

Wi
dt
hinmm
orin
ch

L
engt
hinmm
ori
nch

S
CDorRCD-4S :
4Wa ySqua
reDiff
use
r
S
CDorRCD-4R :
4Wa yRect
ang
ularDif
fuser
S
CDorRCD-3S :
3Wa ySqua
reDiff
use
r
S
CDorRCD-3R :
3Wa yRect
ang
ularDif
fuser
S
CDorRCD-2S :
2Wa ySqua
reDiff
use
r
S
CDorRCD-2RV :
2Wa yRect
ang
ularVerti
cal
S
CDorRCD-2RH :
2Wa yRect
ang
ularHoriz
ontal
CDorRCD-1S
S 1Wa
: ySqua
reDiff
user
CDorRCD-1RV
S 1Wa
: yRect
angul
arVerti
cal
CDorRCD-1RH
S 1Wa
: yRect
angul
arHorizont
al
S
PCDorRPCD :
Per
for
ate
dCe i
l
ingDif
fuser
S
DCDorRDCD :
Decor
ati
veCei
li
ngDiff
user

Or
der
ingS
yst
em

ORDERI
NG EXAMPLE

SCD-
4S-
300mm x300mm-
9010
S
tandsf
orSuppl
yCe
il
in
gDi
f
fus
er,
4Wa
y,300x
300c
oat
i
ng
c
olorRAL9010.

F
-7
CEI
LINGDI
FFUSERS

GENERALNOTES

Pag
esonwardsg
ivepe
rfor
man
ceda
taf
ora
llmode
lsa
ndv
ari
ant
s,a
ndu
nle
ssot
her
wis
est
ate
dth
efol
l
owi
ngg
ene
ral
not
esappl
y:
1.Throwsshowna retot
hreeterminalv
eloci
tyof 7.NCa ndPr e s
sureval
ue sshown, areba s
edona
0.25m/s
, 0.5m/ s
, 0.
75m/ s
,(50fpm,100fpm, dif
fuserc ompl et
euni twitha noppos edbl ade
150f
pm)wi t
hc oandaef
fe
c ta
crossa atc e
il
in
g, dampe ri
nt hefull
yope nposit
ionf orthes upply
andwiths upplyaira
tc ondit
ionswi thma x dif
fuserandwi thoutforther eturndif
fuser.The
∆T=10Kcooli
ng. dampers houldonlybeus edf or neba lancing,
asf orev erydoubl i
ngofpr es s
uret herei sa
2.Forst
andar
droomheigh
tof2.75metr
es,t
hrows result
ingincreaseinthenoisel evelof+9dBf or
shoul
dbetakenasthedis
tanc
etothen eare
st supply
, or+5dBf orexhaust.
wall
(mini
mumplandi
me nsi
on,MPD),ort
oh al
f
t
h edi
sta
ncebetwee
ndiff
usercent
res
. 8.Mode
lsWi
t
hRe
duc
edNe
cks
.

3.Whe nmountedwit
houtasurr
oundi
ngcl
osed Thereisa‘dil
utionef f
ect’onperforma nc
ef or
cei
l
ing
,thethr
owwillbereduc
edbyapprox
. thesemodels
,a sthea i
rtendst
os preadbe hi
nd
40%,i
ethrow=tabl
ethrowx0.6 thecor e,reduci ngt hrowsbyupt o20%
dependi
ngont her el
ati
onshi
pbetwe enthenec k
Howe ver
,i
nor de
rt oavoi
dtheai
row‘dumping’ sizeandt hebas edi ff
usersize.Formor e
i
ntot hespa
cewhe nonc ooli
ngmode,giv
ing i
n f
ormat
ion,
pleasec h
eckwi t
hth
efa ct
ory.
excessi
veveloci
ties,i
tma ybenecess
aryfor
coa
n dapl
ate
st obe t t
edtothedi
ff
use
r.Pl
ease 9.Forrect
angu
lardif
fu
ser
s,t
hrowval
uestes
tedare
che
c kwit
hfactoryfordet
ail
s. onthel ongersideofthediff
users
.Fort he
shor
tersi
det hr
ows,val
uesar
etobemul ti
pl
ied
4.An ot
h erf
aultt
hatca
ng i
veriseto‘dumping’on by0.
72.
cooli
ngc y
cle
sislowjetvel
ocit
ie
sa tth
edi f
f
user
core.Inordertoa v
oidthis,i
tisa dvi
sabl
et o 10.
Corr
ect
i
onsfor1,2a
nd3wa
ydi
f
fus
ers
ensurethatneckvel
ocit
i
esdon otdropbe l
ow 3wa
ypatt
ernthr
ow: Mul
ti
pl
yby1.
15
0.
75m/ s,(
150fpm). 2wa
ypatt
ernthr
ow: Mul
ti
pl
yby1.
25
1wa
ypatt
ernthr
ow: Mul
ti
pl
yby1.
45
5.Th eacous
ti
cdataweretestedinac
c or
danceto
AS HRAE70-1991s t
anda r
d.Theoc t
aveband 11.
Thef oll
owi ngtabl
esincl
udet heresul
tsoftest
s
soundpowe rl
e vel
sobtainedwe r
epl ott
edto conductedons amplesofairter
minals
.Thet e
st
deter
minethepoin
tof t
angencywit
ht hehi
ghes
t resul
tsinc ludeNoi seCr i
teria(NC) ,stat
ic
r
a nk.
NoiseCri
teri
acurve( NC)toe st
abli
sht
he pres
sureversesai
r ow, t
hrowa ndeff
ecti
vearea
.
NC. NoiseCri
teri
arat
ingswe r
ede ter
minedby Extr
apola
ti
onwa su s
edtoobt a
intheperf
ormance
subst
ract
i
ngroom absorpti
onof1 0dBfrom t
he forothersizesandotherparameterswithi
nthe
soundpowe rl
eveldat
a. rang
eofpr oduct
sme nti
onedabove.

F
-8
CEI
LINGDI
FFUSERS

ORDERI
NG SYSTEM

S
YMBOL
S CONDI
TIONS
L/
Sec:
AirVolumei nli
tr
espe rsecond. Suppl
yorRetur
nasindi
cat
ed.
Af :Eff
ecti
vefreeareainsquareme ter
s. NoiseCri
te
ri
aval
uesarebase
don(
10dB)r
oom
Vf :FaceVeloci
tyinme te
rspe rsecond. at
tenua
ti
on.
Ak :Ne ckAreainsquareme ters. Damperisf
ull
yopen.
Vk :Ne ckVeloci
tyinme t
erspe rsecond. Maximumroom he
ight=4.0m
Pt :Totalpr
e ss
ureinPascal. Cooli
ng@ ∆T=10K
Th :Throwinme te
rs.
NC :NoiseCr i
ter
ia.

NOTES CORRECTI
ON F
OR1,
2AND3WAY
Th
elargethrowvalue
sa rebas
edont h
e Noi
seCri
te
ri
a :
Nocor
rec
ti
onrequ
ire
d.
mi
nimumt ermi
nalvel
ocit
yof0.25m/S
ec. Pr
ess
ure :
Nocor
rec
ti
onrequ
ire
d.
Th
emi ddl
et hr
owv al
uesa r
ebasedonthe Thr
ow :
3wa
y-incr
eas
efor15%
medi
umt ermina
lvel
oc i
t
yof0.50m/Se
c. :
2wa
y-incr
eas
efor25%
Th
es mall
throwv a
luesarebas
edont he :
1wa
y-incr
eas
efor45%
maxi
mu mterminalv
eloci
tyof0.
75m/Sec. Dr
op :
Nocor
rec
ti
onrequi
red.

TESTREPORTS

F
-9
SUPPLYAI
RCEI
LING DI
FFUSER,4W AY-(
SCD -4S) SI
-UNI
TS
NECK FREE NECK
S
IZE
AREA AREA VELOCITY
(
mm xmm)
(
m2) (
m2) (m/s
)
Q(
L/s
)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(
L/s
)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
S
een
ote
sonpa
geF
-8 Con
td.
.
.

F
-10
SUPPLYAI
RCEI
LING DI
FFUSER,4W AY-(
SCD -4R) SI
-UNI
TS

NECK FREE NECK


S
IZE
AREA AREA VELOCITY
(
mm xmm)
(
m2) (
m2) (m/s
)
Q(
L/s
)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
S
een
ote
sonpa
geF
-8 Con
td.
.
.

F
-11
SUPPLYAI
RCEI
LING DI
FFUSER,4W AY-(
SCD -4R) SI
-UNI
TS

NECK FREE NECK


S
IZE
AREA AREA VELOCITY
(
mm xmm)
(
m2) (
m2) (m/s
)
Q(
L/s
)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
S
een
ote
sonpa
geF
-8 Con
td.
.
.

F
-12
SUPPLYAI
RCEI
LING DI
FFUSER,4W AY-(
SCD -4R) SI
-UNI
TS

NECK FREE NECK


S
IZE
AREA AREA VELOCITY
(
mm xmm)
(
m2) (
m2) (m/s
)
Q(
L/s
)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
Q(L/
s)
Vf(
m/s
)
Pt(
Pa)
Th
row(
m)
NC
S
een
ote
sonpa
geF
-8

F
-13
CEI
LINGDI
FFUSERS

APPLI
CATI
ONS
RETURN AI
RCEI
LI FFUSER,4W AY-(
NG DI RCD -4S) SI
-UNI
TS

NECK NECK
S
IZE
AREA VELOCITY
(
mm xmm)
(
m2) (m/s
)

Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
S
een
ote
sonpa
geF
-8 Cont
d..
.

F
-14
CEI
LINGDI
FFUSERS

R
FE
ET
AUR
TN
URAI
R
ESCEI
LI FFUSER,4W AY-(
NG DI RCD -4R) SI
-UNI
TS

NECK NECK
S
IZE
AREA VELOCITY
(
mm xmm)
(
m2) (m/s
)

Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
S
een
ote
sonpa
geF
-8 Cont
d..
.

F
-15
RETURN AI
RCEI
LI FFUSER,4W AY-(
NG DI RCD -4R) SI
-UNI
TS

NECK NECK
S
IZE
AREA VELOCITY
(
mm xmm)
(
m2) (m/s
)

Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
Q(
L/s
)
Pt(
Pa)
NC
S
een
ote
sonpa
geF
-8

F
-16
CEI
LINGDI
FFUSERS

PERFORMANCEDATA -I
PUNI
TS

S
YMBOL
S CONDI
TIONS
CFM :
AirVolumei ncubi
cf eetperminut
e. Suppl
yorRetur
nasindi
cat
ed.
Af :
Eff
ecti
vefreeareainsqu a
refeet
. NoiseCri
te
ri
aval
uesarebase
don(
10dB)r
oom
Vf :
FaceVeloci
tyinfeetpermi nut
e. at
tenua
ti
on.
Ak :
Ne ckAreainsquarefee t
. Damperisf
ull
yopen.
Vk :
Ne ckVeloci
tyi
nf e
e tperminute. Maximumroom he
ight=4.0m
Pt :
Totalpr
e ss
ureinincheswa t
ergauge
. Cooli
ng@ ∆T=10K
Th :
Throwinf eet
.
NC :
NoiseCr i
ter
ia.

NOTES CORRECTI
ON F
OR1,
2AND3WAY
Th
elargethrowvalue
sa rebas
edonthe Noi
seCri
te
ri
a :
Nocor
rec
ti
onrequ
ire
d.
mi
nimumt ermi
nalvel
ocit
yof50fpm. Pr
ess
ure :
Nocor
rec
ti
onrequ
ire
d.
Th
emi ddl
et hr
owv al
uesa r
ebasedont
he Thr
ow :
3wa
y-incr
eas
efor15%
medi
umt ermina
lvel
oc i
t
yof100fpm. :
2wa
y-incr
eas
efor25%
Th
es mall
throwv a
luesarebas
edonthe :
1wa
y-incr
eas
efor45%
maxi
mu mterminalv
eloci
tyof150f
pm. Dr
op :
Nocor
rec
ti
onrequ
ire
d.

Not
es:

F
-17
SUPPLYAI
RCEI
LING DI
FFUSER,4W AY-(
SCD -4S) I
P-UNI
TS

NECK F REE NECK


SI
ZE
AREA ARE A VELOCI
TY
(
inxin
)
(
SQ.F
T.)(
SQ.FT.) (f
pm)
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
S
een
ote
sonpa
geF
-17 Cont
d..
.

F
-18
SUPPLYAI
RCEI
LING DI
FFUSER,4W AY-(
SCD -4R) I
P-UNI
TS

NECK F REE NECK


SI
ZE
AREA ARE A VELOCI
TY
(
inxin
)
(
SQ.F
T.)(
SQ.FT.) (f
pm)
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
S
een
ote
sonpa
geF
-17 Con
td.
.
.

F
-19
SUPPLYAI
RCEI
LING DI
FFUSER,4W AY-(
SCD -4R) I
P-UNI
TS

NECK F REE NECK


SI
ZE
AREA ARE A VELOCI
TY
(
inxin)
(
SQ.F
T.)(
SQ.FT.) (f
pm)
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
S
een
ote
sonpa
geF
-17 Con
td.
.
.

F
-20
SUPPLYAI
RCEI
LING DI
FFUSER,4W AY-(
SCD -4R) I
P-UNI
TS

NECK F REE NECK


SI
ZE
AREA ARE A VELOCI
TY
(
inxin
)
(
SQ.F
T.)(
SQ.FT.) (f
pm)
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Q( CF M)
Vf(f
pm)
Pt(in-
wg)
Throw( f
t)
NC
Cont
d..
.
S
een
ote
sonpa
geF
-17

F
-21
CEI
LINGDI
FFUSERS

RETURN AI
RCEI
LI FFUSER,4W AY-(
NG DI RCD -4S) I
P-UNI
TS

NECK NECK
SI
ZE
AREA VELOCI
TY
(
inxin)
(
SQ.F
T.) (f
pm)

Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC

S
een
ote
sonpa
geF
-17 Cont
d..
.

F
-22
CEI
LINGDI
FFUSERS

RETURN AI
RCEI
LI FFUSER,4W AY-(
NG DI RCD -4R) I
P-UNI
TS

NECK NECK
SI
ZE
AREA VELOCI
TY
(
inxin)
(
SQ.F
T.) (f
pm)

Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
S
een
ote
sonpa
geF
-17
Cont
d..
.

F
-23
RETURN AI
RCEI
LI FFUSER,4W AY-(
NG DI RCD -4R) I
P-UNI
TS

NECK NECK
SI
ZE
AREA VELOCI
TY
(
inxin)
(
SQ.F
T.) (f
pm)

Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
Q(
CFM)
Pt(
in-
wg)
NC
S
een
ote
sonpa
geF
-17

F
-24
ROUNDCEI
LING DI
FFUSERS

SRD Suppl
yRou
ndDif
fus
er
RRD Ret
urnRoundDi
f
fuser

F
AIS ALJASSI
MINDUS TRIES(L.
L.C.
)
P.O.Box1 871Plot#5 98-1152
Du baiI
nvest
men tPar
k-Du bai
,UAE
Tel.
#0 48 10-5105
Fax.#048 10-5106
Email
:f
jt
rdg
@e mirat
es.n
e t
.
ae
Websit
e:www. f
ais
al
jass
im.a
e
ROUNDCEI
LINGDI
FFUSERS

ROUND DI
FFUSERS(
SRD /RRD)

Rou
ndDi
f
fus
er(
RD)wi
thBu
tte
rfl
yTy
peDa
mpe
rFr
ontVi
ew Rou
ndDi
f
fus
er(
RD)wi
thBu
tte
rfl
yTy
peDa
mpe
rBa
ckVi
ew

Pr
oduc
tsF
eat
ure
s:
•S
upplyore xhaustr
oundc
eil
i
ngdi
ff
user
swith
f
ul
lyadj
ustabl
ec ore
stopr
ovi
dehor
izon
tal
or Damper(opt
iona
l)f
orvol
umecont
rol
inr
ound
v
erti
cal
airpatt
ern. nec
kdiff
user
sisavai
l
ablewi
thBut
teryType
Dampe
r
•Removabl
ein
nerc
ore
spe
rmi
tea
syi
nst
al
la
ti
on
an
da c
cesst
oduct
.
•S
pon
geg
ask
eta
dde
dtopr
eve
nts
tr
eak
ing
. ØD
•Con
str
uct
i
on:
Alu
min
ium
•S
tandar
dFi
ni
sh:
Wh i
tepowdercoat
ed.
Oth
er
c
olorsa
rea
vai
l
abl
euponrequ
e s
t.

0
5
Appl
i
cat
ion:
•Heat
in
g,Cool
in
gorVent
il
at
ionr
equi
ri
ngwide ØA
di
ff
usi
oneff
ect
.Forc
eil
i
ngorexposedduct But
ter
fl
yTy
peDa
mpe
r
i
nst
al
la
ti
on.
Di
mens
ioni
nMM

ØD
0
5

ØA

But
ter
fl
yTy
peDa
mpe
r

G-
1
ROUNDCEI
LINGDI
FFUSERS

ROUND DI
FFUSERS(
SRD /RRD)

Rou
ndDi
f
fus
er(
RD)wi
thRot
ati
ngTy
peDa
mpe
rFr
ontVi
ew Rou
ndDi
f
fus
er(
RD)wi
thRot
ati
ngTy
peDa
mpe
rBa
ckVi
ew

Pr
oduc
tsF
eat
ure
s:
•S
upplyore xhaustr
oundc
eil
i
ngdi
ff
user
swith
f
ul
lyadj
ustabl
ec ore
stopr
ovi
dehor
izon
tal
or Damper(opt
iona
l)f
orvol
umecont
rolinr
ound
v
erti
cal
airpatt
ern. nec
kdiff
user
sisavai
l
ablewi
thRotat
ingType
Dampe
r
•Removabl
ein
nerc
ore
spe
rmi
tea
syi
nst
al
la
ti
on
an
da c
cesst
oduct
.
•S
pon
geg
ask
eta
dde
dtopr
eve
nts
tr
eak
ing
.
•Con
str
uct
i
on:
Alu
min
ium
•S
tandar
dFi
ni
sh:
Wh i
tepowdercoat
ed.
Oth
er
c
olorsa
rea
vai
l
abl
euponrequ
e s
t.
Appl
i
cat
ion:
•Heat
in
g,Cool
in
gorVent
il
at
ionr
equi
ri
ngwide
di
ff
usi
oneff
ect
.Forc
eil
i
ngorexposedduct
i
nst
al
la
ti
on. Rot
ati
ngTy
peDa
mpe
r

Di
mens
ioni
nMM

ØD
0
5

ØA

Rot
ati
ngTy
peDa
mpe
r

G-
2
ROUNDCE
ILI
NGDI
FFUS
ERS

PERFORMANCEDATA -RD

m3/
h

Ve
l =Ne
ckVe
loc
it
ym/
s) NOTES
P =Pr
ess
ureDr
op,
mm H2O 1.
Thr
owi
sba
sedona0ot
empe
rat
uredi
f
fer
ent
ia
T =Th
row,
m
dB(
A)=Noi
seL
eve
l 2.
ThedB(A)val
uesa
reba
sedona10dbr
oom
a
tte
nua
ti
on.

3.
Pe r
formanc
eDa t
aaresu
bjec
ttoch
ang
ewi
t
hou
t
not
iceforf
urt
heri
mprovement

4.
Perfor
manceDa
taof400a
nda
bov
ear
enot
ava
il
abl
enow

G-
3
ROUNDCEI
LINGDI
FFUSERS

I
NSTALLATI
ON DETAI
LS

I
nst
al
la
ti
onDe
tai
l
s

1.I
nst
al
lout
ercor
eoftheci
rc
ulardi
ff
use
rbymeansofcei
l
ingh
ang
ersorwi
t
hth
ehe
lpofs
elft
appi
ng
s
cre
ws.Ductj
oi
ntsa
reth
ens e
a l
edwit
hadh
esi
vetape
.

2.Ce
nte
rcor
eas
sembl
yca
nbede
tac
hedora
tta
che
dbyr
ota
ti
nga
nti
-c
loc
kwi
seorc
loc
kwi
sedi
re
cti
on.

3.Hor
izon
tal
orve
rti
cal
dis
cha
rgepa
tte
rnc
oul
dbea
chi
eve
dbyr
ota
ti
ngt
hec
ent
erc
orec
loc
kwi
seor
a
nti
-c
loc
kwis
edi
rec
ti
on.

a
.Rot
atet
hec
ent
erc
orec
loc
kwi
seu
nti
lyoug
etr
equ
ire
dhor
iz
ont
aldi
sc
har
gepa
tte
rn.

b.
Rot
atea
nti
-c
loc
kwi
set
oge
tre
qui
re
dve
rti
cal
dis
cha
rgepa
tte
rn.

4.Da
mpe
risa
tta
che
dtot
heou
terc
orec
oll
aroft
hedi
f
fus
er.
(Fa
ctor
yas
sembl
edf
ors
uppl
ydi
f
fus
eron
ly.
)

G-
4
ROUNDCEI
LINGDI
FFUSERS

ORDERI
NG SYSTEM

RD Rot
ati
ngDa
mpe
r

SRD Su
pplyRou
ndDif
fus
er
RRD Ret
urnRoundDi
f
fus
er
Or
der
ingS
yst
ems

ORDERI
NG SYSTEM

SRD -BD -500mm -9016


Sta
ndsf
orRoundCei
li
ngDif
f
userwi
tha
djus
tabl
ecor
es,
wit
hButt
eryDa mpe
r,ne
cksi
ze500mm Di
a,powder
coat
edRAL9016.

G-
5
L
OUVERS

GL Gr
avi
tyL
ouv
ers
EAL Exh
aus
tAi
rLouv
ers I
F
AL F
res
hAi
rLouv
ers
F
L F
il
terL
ouv
ers
S
TLW Wa
llMount
edS
andT
rapL
ouv
ers
S
TLF F
lus
hMount
edS
andT
rapL
ouv
ers

F
AIS
ALJ ASSI
MI NDUSTRIES(L.
L.C.)
P
.O.Box1 871Pl
ot#5 98-1152
DubaiI
n v
estmentP
ark-Du bai
,UAE
Tel
.#04810-5105
Fax.#0 4810
-5106
Email
:f
jt
rdg@emir
ates
.net
.a
e
We bsi
te:www.
fa
isa
lj
ass
im.
ae
LOUVERS

GRAVI
TYLOUVERS(
GL)

Gr
avi
tyL
ouv
ers(
GL)

TheGLisawa llmounte
ddevi
cethati
sc omposed
ofasetofhor i
zont
all
ymountedbladesthatare
nor
ma l
l
yclosedandarefr
eet
or ot
atearoundth
eir
hor
iz
ontal
a x
is.

Thi
slouv
ers
erv
esasanon-
ret
urnda
mperandca
n
beusedatt
heexi
tter
mina
lofexha
ustduc
tsa
nd
f
ans
.

Acert
ainpr
essureisus
ual
lyrequi
redbef
oret
he
damperopenstoexpeltheexhaustair
,whi
ch
en
sure
stheel
imin
ati
onofbac
k ow.

Thebladesarema defr
om l
ig
htwei
g htalumi
nium
sheet
swhi l
et heframeismadefrom ext r
uded
al
umini
um. 30mm frameasasta
nda
rd. 20mm and
25mm areavai
labl
e,i
fre
qui
re
d.

Wa
llMount
edGr
avi
tyL
ouv
ers(
GL)

I
-1
LOUVERS

Fr
eear
earati
o=0.81for100%ope
nbl
ade
s.
Toca
lcu
lat
ethepr
essu
redrop:

FaceVel
oci
ty=Ai
rFl
ow /Ar
eaoft
heLouver
n
iwg
-
e
Prsu
sr op
eDr

F
aceVe
loc
it
y
Pe
rfor
manc
eCha
rtofGr
avi
tyL
ouv
er(
GL)

I
-2
LOUVERS

EXHAUSTAI
RLOUVERS(
EAL)

Exha
ustAi
rLouv
ers(
EAL
)

TheExhaus tAirLouverisaweat herproof


externalcoverf orairi
nletsanddischarge
openings,suit
ableformostext
ernalwal
lsand
sc
reeningappli
cati
ons.

TheEALwi thafr
eeareaof41% i sc omposedof
frameand hor izont albl adeassembl y,
manuf act
uredf
rom 0.90mm t hickhighquality
extrudedalumi
nium pr ol es.Bladesare xed
ri
gidlytothemainfra
mebyr i
vetsandsetata n
angleof45°t
othehorizontalwit
h40mms pac
ing
i
nc l
ineddownwardtopr ot
ectagainstr
ainwater.

30mm f
ramea sasta
nda
rd.
20mm a
nd25mm a
re
avai
l
abl
e,i
frequir
ed. Exha
ustAi
rLouv
er(
EAL
)

AnEAL(EAL-
100)wti
ha nave
ragef
reear
eaabove
50%isa
va i
l
ableuponrequest
.Wit
h100m dept
h.

Aheavydutyopt
ion(EAL
-H) a
lsoi
sav
ail
abl
ewit
h
1.
80mm thickextr
udedAl umini
um fr
ameand
bl
ade
s.With40mm fra
mea nd50mm depth

Anothe
ropti
onav
ail
abl
eisaLouver(
I
L)s
pec
ica
ll
y
desi
gnedfort
hei
ndoorpurpose.

I
ndoorL
ouv
er(
IL)
LOUVERS

T
oca
lcul
atet
hepr
ess
uredr
op:
-ast
est
edi
nac
cor
danc
ewi
thAMCA500-
L

F
aceVel
oci
ty=Ai
row/Ar
eaoft
heL
ouv
er

Pe
rfor
manc
eCha
rtofExha
ustAi
rLouv
er(
EAL
)

I
-4
LOUVERS

FRESH AI
RLOUVERS(
FAL)&FI
LTERLOUVERS(
FL)

F
res
hAi
rLouv
er(
FAL
)

TheFres
hAi rLouverisas
impleform of lt
er
l
ouver
s.I
tiscomposedofanex
ha ustl
ouverwit
h
anal
uminium lter x
edatt
hebac k
.

Thef res
hai rl
ouverwithaf r
eeareaof38% i
s
suita
bleforuseinai
rinl
etsoff
res
ha i
rduct
sand
airhandl
ingunit
s.I
tisal
sosui
tabl
eforus
eatdi
rt
y
a i
rexhaustdisc
harge.

30mm f
ramea sasta
nda
rd.
20mm a
nd25mm a
re
avai
l
abl
e,i
frequir
ed

AnFAL(FAL-
100)wti
hana ve
ragef
reear
eaabove
50%isa
va i
l
ableuponrequest
.Wit
h100m dept
h.

Aheav
ydutyopt
ion(F
AL-
H)al
soi
savai
labl
ewi
th
1.
80mm thi
ckextr
udedAlumi
nium f
rameand
bl
ades
.Wi
th40mm fr
ameand50mm depth

Anothe
ropti
onav
ail
abl
eisaLouver(
I
L)s
pec
ica
ll
y F
res
hAi
rLouv
er(
FAL
)
desi
gnedfort
hei
ndoorpurpose.

TheFi
lteri
smadeofwasha
blealumini
um medi
a
andisx edonthebac
kofgril
le.Fi
l
teri
s25mm
thi
ck.

Alsoavail
ableasFilt
erLouver( FL)whichis
compos edofanexhaus tai
rlouver xedtoa
f
ramet hatcont
ainsa l
terbymeansofsta
inles
s
st
eelhi
nges.

30mm f
ramea sas
tandar
d.20mm a
nd25mm a
re
avai
l
abl
e,i
freques
ted.

F
il
terL
ouv
er(
FL)
LOUVERS

T
oca
lcul
atet
hepr
ess
uredr
op-a
stes
tedi
nac
cor
danc
ewi
thAMCA500-
L

F
aceVel
oci
ty=Ai
row/Ar
eaoft
heL
ouv
er

Pe
rfor
manc
eCha
rtofF
res
hAi
rLouv
er(
FAL
),a
ndF
il
terL
ouv
er(
FL)

I
-6
LOUVERS

W ALLMOUNTED SAND TRAPLOUVERS(


STLW )

Wa
llMount
edS
andTr
apL
ouv
ers(
STL
W)

TheSTLi susedt olowert hedus tloadingof S


tanda
rdDi
mens
ions
convent
ionallte
rati
onasitisdesi
gnedtos e
parat
e An
ycombi
nat
i
onofAxB.
l
argesi
zes an
dpa r
ti
cl
esatlowt ome di
ums peeds
.It
i
sa l
so t tedwithabi rdsc r
eenmes hma deof A B
gal
vani
zedsteel
toprotec
ta g
a i
nstunde
sir
edobject
s. 450 450
I
nsectscreenofstai
nles
ss t
eelc a
nbei nst
all
edas 600 500
opti
onal
. 750 600
900 800
TheSTLi
sas e
lfemp
tyi
ngs
yst
em,i
thasas
etofh
oles 1050 1000
att
hebot
tomfaceoft
heca
si
ngtodi
s
char
gese
par
ate
d 1200 1200
san
dpart
i
c l
es. 1350
1500
TheS TLi
sma d
eof al
umi
niu
ms ecti
ons
.I
ti
scomposed 1650
oftwos e
tsofi
nvert
edUc ha
nnel
s,mount
edvert
i
cal
ly 1800
ont wooppositerows.Al
uminium was
habl
el ter 1950
(opti
onal
)canbeinst
al
le
dont hen e
ckoft
helouve
r.
Fil
t
eris25mm thic
k. Ot
hers
iz
eB,
ava
il
abl
eonr
equ
estbys
tepof50mm.

(
A)-10mm

Wa
llMount
edS
andTr
apL
ouv
ers(
STL
W)

I
-7
LOUVERS

FLUSH MOUNTED SAND TRAPLOUVER(


STLF)

F
lus
hMount
edS
andTr
apL
ouv
er(
STL
F)

De
scr
ipt
ion
Desi
gnedtosepar
a t
esandanddustf
rom t
hea i
r
s
trea
m. Ge
neral
lyusedforv
enti
l
ati
onappl
i
cati
ons
an
da tt
heinl
etductofa
irha
ndl
inguni
t
.

Su
rfa
ceofthelou
veri
sxedu s
hwiththepla
neof
t
hewall
.Compose
doft
wose
tsofi
nve
rte
dU- c
hann
els
mounte
dv er
ti
cal
l
yint
wooppos
it
erows .

The l t
eredsandwil
lbedrai
nedthroughas a
nd
chute.Sandchut
eisaninc
li
nedtray xeda tthe
bott
omof t
hel
ouve
rfort
hepur
poseofdra
ini
ngsa
n d
.

50 100

F
lus
hMount
edS
andTr
apL
ouv
er(
STL
F) F
lus
hMount
edS
andTr
apL
ouv
er(
STL
F)

I
-8
LOUVERS

Tes
tedi
na c
cor
danc
ewithBSEN 13181:2001at S
tanda
rdF
ini
she
s
di
f
fer
entcor
evel
oci
ti
esvar
yi
ngf
rom 0.5t
o3. 5m/
s Ava
il
abl
eonRAL9010or9016.
wi
thgra
deofsandr
angi
ngfr
om 76-
700micron. Othe
rpowderc
oat
edcol
or n i
she
sar
eav
ail
abl
e
onrequ
est
.
S
tan
dar
dFr
eea
rea=33%

Pr
ess
ureL
ossVs
.Fr
eeAr
eaVe
loc
it
yGr
aph
e
Prsu
sr Pa
op(
eDr )

F
reeAr
eaVe
loc
it
y(m/
s)
Pr
ess
ureL
ossVs
.Fr
eeAr
eaVe
loc
it
y

Ef
f
ici
enc
yVsF
aceVe
loc
it
yGr
aph
f
Ee
fci
te
vns
e %)
s(

F
aceVe
loc
it
y(m/
s)
Ef
fe
cti
vene
ssv
sFa
ceVe
loc
it
y

I
-9
LOUVERS

ORDERI
NG SYSTEM

GL :
Gr avi
tyLouver
s
EAL :
E xh
a u
stAirLouver
s
EAL
-H :
E xh
a u
stAirLouver
s
-He avyDu t
y
E
AL-
100 :
E xh
a u
stAirLouver
s
wit
h100mm de pth
F
AL :
FreshAirLouvers
F
AL-
H :
FreshAirLouvers
-He avyDu t
y
F
AL-
100 :
FreshAirLouvers
wit
h100mm de pth
I
L :
IndoorLouvers
F
L :
Fil
terLouvers
S
TLW :
Wa llMou n
ted
SandTrapLouvers
S
TLF :
FlushMou nt
ed
SandTrapLouvers
Or
der
ingS
yst
em

ORDERI
NG EXAMPLE

STL-1200x600-9010
St
andsforS
andTr
apL
ouver,
1200mm Wi
dt
hx600mm He
igh
t,
powdercoat
edt
oRAL9010.

I
-10
J
ETANDDRUM J
ETDI
FFUSERS

J
D-A J
etDif
fus
er
J
D-C Ri
ngJetDif
f
u s
er
DJD Drum J
etDif
fuse
r

F
AIS ALJASSI
MINDUS TRIES(L.
L.C.
)
P.O.Box1 87
1Plot#5 98-1152
Du baiI
nvest
mentPar
k-Du bai
,UAE
Tel.
#0 4810-5105
Fax.#04810-5106
Email
:f
jt
rdg
@emirat
es.n
e t
.
ae
Websit
e:www.f
ais
al
jass
im.a
e
J
ETANDDRUM J
ETDI
FFUS
ERS

J
ETDI
FFUSER

J
etDi
f
fus
er

Cha
rac
ter
is
ti
cs: Pr
oduc
tsF
eat
ure
s:

J
etDi f
f
usersar
es ui
tabl
eforl
ongthrowdis
tanc
es, J
etDiff
user
sar eusedi
nlar
geareases
pecial
l
y
haveoptimuma cousti
cspr
operti
esandareeas
y whenthedi
str
ibut
ionofa
irv
iac
eil
in
gdif
fus
ersi
s
toinst
allandadjust
.S i
ncethedirec
ti
onofthe notpos
si
ble
.
suppl
yair owisv e
ryimport
ant,wedesi
gnedth
e
revol
vi
ngtypejetdif
f
u s
erswherethedi
rec
ti
onof I
nsummer,t
hesuppl
yairi
sdee ct
edupwards
di
ffus
erscanbea dj
ustedmanual
ly. (
col
dai
r)andinwint
er,
downwards(war
ma i
r)
t
omixwit
htheexi
sti
ngai
rst
rea
mu ni
for
mly.
J
etnozz
lecon
si
st
sofdi
scha
rgenoz
zlewit
hsphe
ri
cal
out
l
etmou nt
edi
nah ous
ing
,amou nt
i
nga ng
eand Thewel
l-
desi
gne
da er
odynamics
hapeofFl
owtec
h
aci
rcul
arductr
earconnecti
onspig
otfordi
rec
t J
etDif
f
user
sresu
lt
sinlown oi
secha
rac
ter
i
sti
csan
d
con
n ec
ti
ontoacir
cul
arduct. ca
nbeu sedi
na r
easwh ic
hn ee
dh i
ghqual
it
yair
su
chasconcer
thal
ls,th
eater
,mu s
eum,etc
.

Ma
ter
ia
l:Al
umi
ni
um

Fi
ni
sh
: S
tand
a r
dc ol
orsar
eRAL90
10orRAL9
016
.
Othercol
orsareavai
la
bleu
ponrequ
est
.

J
-1
J
ETANDDRUM J
ETDI
FFUS
ERS

DI
MENSI
ONS

NECK

HEGHT
I
F
ACE
Di
mens
ion

S
IZE(
mm) NECK F
ACE HEI
GHT

J
-2
J
ETANDDRUM J
ETDI
FFUS
ERS

TECHNI
CALPARAMETER

EF
F ECTIVE AIR L
ENGTHOFAAI R
PRESS
URE E
NDAI R
AREA VOLUME NOI
SEDb STREAM FOR
S
IZE L
OS S VELOCI
TY
OFSUPPL Y (m3/
h) (
A) I
SOTHE RMAL
(Pa) (m/
s)
(
m)2 CONDI TI
ONSL n(m)
(
m3/
h)

J
-3
J
ETANDDRUM J
ETDI
FFUS
ERS

EF
F ECTI
VE AIR L
ENGTHOFAAI R
PRESS
URE E
NDAI R
AREA VOLUME NOI
SEDb STREAM FOR
S
IZE L
OS S VELOCI
TY
OFSUPPLY (m3/
h) (
A) I
SOTHE RMAL
(Pa) (m/
s)
(
m2) CONDI TI
ONSL n(m)

J
-4
J
ETANDDRUM J
ETDI
FFUS
ERS

I
NSTALLATI
ON

F
lowt
echJ
etDi
f
fus
era
res
uit
abl
eformount
ingon
r
ect
ang
ula
rorc
ir
cul
arduc
ts.
Wit
hbot
hty
pesof
c
onn
ect
i
on,
the
rei
sac
ir
cul
aru
ndr
il
l
eda
ngewh
ich
c
anbeus
edf
ore
ithe
rsc
rewi
ngorr
ive
txi
ngby
ot
her
sbu
tas
eal
i
ngs
tr
ips
hou
ldpr
efe
rabl
ybe t
ted
r
st
.

I
nst
al
la
ti
onDe
tai
l
s
As
pig
oti
spr
ovi
dedf
ordi
re
ctc
onn
ect
i
ont
ospi
ra
l
or e
xib
lec
ir
cul
ard
uct
s.Th
esp
igotd
iame
tera
cce
pts
s
tan
dar
dci
r
cul
ard
ucts
iz
e.

J
etd
if
fu
serc
anb
ein
ser
tedi
nt
oanc
onn
ect
i
ons
pig
ot
a
ndc
anb
esc
rewe
dtot
hea
ird
uct
.Toh
idet
hes
cr
ews
,
ac
ove
ri
ngwi
t
haba
yon
etx
ingc
anbe x
ed,
whi
ch
i
sea
syt
okn
ockdownl
at
er.
I
nst
al
la
ti
onDe
tai
l
s

J
etDi
f
fus
eri
nPa
nel

J
-5
J
ETANDDRUM J
ETDI
FFUS
ERS

RI
NG J
ETDI
FFUSER

Ri
ngJ
etDi
f
fus
er(
JD-
C)

Cha
rac
ter
ist
ic
s: S
tanda
rdS
ize
s
•360o
-4wa yadj
ust
able ØB
•Metalsl
i
dedampe rasopt
i
onal
•RAL9016/9010wh i
teasst
anda
rd

0
0
5
4
•Alu
mi n
ium

ØA
PERFORMANCEDATA

J
-6
J
ETANDDRUM J
ETDI
FFUS
ERS

DRUM J
ETDI
FFUSER

Dr
um J
etDi
f
fus
er

Pr
oduc
tsF
eat
ure
s: Cha
rac
ter
ist
ic
s:

DrumJetDif
fu
sersareusedinla
rgeindoorarea
s Tobeusedf
orlongdi
st
anc
eh ot/
col
dairsu
pply.
l
ik
ea i
r
portl
oung
es,f
a c
tor
ies
,th
eater
s,gymna
siu
ms , Thea
irsu
pplya
n g
leca
nbea dj
ust
edasperthe
museums,meet
i
ngr ooms,et
c.Theyarearr
anged re
qui
rement
.
onthesi
dewall
s.Theyaredesi
gnedforhandl
ing
l
argeai
rvol
umesa n
dl on
gthrows. Theai
r-
gui
di
ngbl
ade
sc a
nma k
eun
if
orma
irow
di
st
ri
but
ioni
nal
ldi
rec
ti
ons.
I
nsummer
,thes
uppl
ya i
risdeect
edu pwar
ds
(
col
dai
r)andi
nwint
er,downwar
ds(wa r
ma i
r) Theexter
iorfr
amea ndbla
desa
remadefr
om
t
omixwit
htheexi
st
in
ga i
rstr
eamuni
formly
. al
umini
um. Var
iouscol
orsar
eav
ail
abl
etos
uit
cu
stomer’
sr e
qu i
re
me n
ts.
Thea
djus
tabl
ebl
adeinth
edru
m bodyf
aci
l
it
ate
s
i
nrot
ati
ngthedr
um bas
edonourr
equi
re
me nt
. Ther
eisase
ala
ntinbet
weent
hefr
amea n
ddr u
m
topr
eventt
hesuppl
yai
rfr
om l
eak
inga
nda l
soto
DrumJetDiff
use
rscanals
obesu
ppl
iedwit
h makethedr
uml oc
kedina
nyangl
e.
opposedbl
adesdamper(OBD)tof
aci
li
t
ateth
e
prec
is
ea i
rvol
umec ont
rol
.

J
-7
J
ETANDDRUM J
ETDI
FFUS
ERS

OPERATI
NG CONDI
TIONSOFAI
RSUPPLY

S
umme
rWor
ki
ngCon
dit
i
on L
eve
lSu
ppl
yAi
r Wi
nt
erWor
ki
ngCon
dit
i
on

DI
MENSI
ON TABLE

S
IZE

J
-8
J
ETANDDRUM J
ETDI
FFUS
ERS

Te
rminalAi
r
Vel
oci
ty
(m/s
)

Air Th r
ow
Vol
ume (
m)
(m³/
h)

J
-9
J
ETANDDRUM J
ETDI
FFUS
ERS

Te
rmi
nalAi
r
Ve
loci
ty
(
m/s
)

Air Th r
ow
Vol
ume (
m)
(m³/
h)

J
-10
J
ETANDDRUM J
ETDI
FFUS
ERS

J
-11
CATALOGUE, (OPERATION &
MAINTENANCE MANUAL (IF REQUIRE)
N/A
PRODUCT APPROVAL
1. Fans handling smoke or car park ventilation must be smoke rated for 400C for 2 hours (refer to the project spec 233413 part 2.1 clause
C, commented on previous revision.
2. Attach all related test certificate along with factory test certificate, commented on previous revision.
3. Motor must be TEFC as specified.
4. Submit the electrical load calculation for the electrical engineer review and approval.
5. Final selection will be advised after obtaining the approval for the proposed fans.
Estidama :
No Objection “C” REVISE AND R

Refer next page for AECOM review & comments

B APPROVED AS NOTED

1. The proposed material is acceptable. However, final approval of


RAL Colour should be coordinated with Ceiling Finishes Schedule
and subject to clients acceptance.
2. Submit Detail and Fixation shop drawing.
3. Submit Method Statement and ITP.
4. Provide Latest Test Report and Product Warranty Certifacte.
5. Final RAL Color / Finish subject to false ceiling finish & Employer
Approval
6. Please provide fixing (POD) details.
7. Please provide PQP signed / stamped review comments.
Date: 16 Sep 2017

Project Name : Masdar Institute Neighbourhood

Subject : Material Submittal for Exhaust Grill ,size 150mm (Disc Valve)

Acontex Ref. No. : MIN-UNP-PW-AX-MT-06016

Transmittal No : SIX-TRANSMIT-001524

Status: “B” APPROVED WITH COMMENTS.

Review Comments:

Mechanical:

1. Submit all related test certificate.


2. Acceptance only for the exhaust disc valves other air outlets need to be submitted separately.
3. Warrantee duration must be effected from the TOC.
4. Subject to the final architectural engineer approval.
5. Subject to the final sample approval.
6. Manufacturer to confirm that the noise level along with other parameter (pressure drop, velocity,
etc.) is in line with project spec and standards.

Estidama:

No Objection
Scanned with CamScanner
Scanned with CamScanner
LOCAL SUPPLIES WITH
REGISTRATION CERTIFICATE
TEST CERTIFICATE
REPORT
3933 US ROUTE 11 CORTLAND, NEW YORK 13045

Order No. 104559155 Date: January 18, 2021

REPORT NO. 104559155CRT-001b

STATIC PRESSURE AND


SOUND POWER LEVEL TESTS ON A
SINGLE DEFLECTION LINEAR BAR REGISTER
(15° RETURN AIR)

RENDERED TO

FAISAL JASSIM TRADING CO LLC


PO BOX 1871, ABU HAIL
DUBAI, UNITED ARAB EMIRATES

INTRODUCTION

This report gives the results of tests conducted on a Single Deflection Linear Bar
Register. The test results include Static Pressure and Sound Power Level. The sample
was selected and supplied by the client and was received at the laboratories on January
4, 2021. The sample appeared to be in new unused condition upon receipt.

AUTHORIZATION

Signed Intertek Quotation Qu-01137128-1

TEST METHOD

The register was tested in accordance with the ASHRAE 70-2006 Standard “Method of
Testing for Rating the Performance of Air Outlets and Inlets. Acoustical data was
obtained employing a Bruel & Kjaer Pulse Digital Frequency Analyzer. The reference
sound source used for this test was a calibrated Bruel & Kjaer Type 4204, which
conforms to the above standard. The octave band sound power levels were plotted on
graph of Noise Criteria Curves. These curves are reprinted with permission from the
ASHRAE Handbook and Product Directory, 2017. The register was installed in the
facility and supplied with measured volumes of air. The testing was done with
isothermal air.

This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited
to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or
damage occasioned by the use of this report. Only the Client is authorized to copy or distribute this report and then only in its entirety. Any use of the Intertek name or one of its
marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test results in this report are
relevant only to the sample tested. This report by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program.
Measurement uncertainty budgets have been determined for applicable test methods and are available upon request.
REPORT
3933 US ROUTE 11 CORTLAND, NEW YORK 13045

Order No. 104559155 Date: January 18, 2021

REPORT NO. 104559155CRT-001a

STATIC PRESSURE, SOUND POWER LEVEL,


AREA FACTOR AND THROW TESTS ON A
SINGLE DEFLECTION LINEAR BAR REGISTER
(15° SUPPLY AIR)

RENDERED TO

FAISAL JASSIM TRADING CO LLC


PO BOX 1871, ABU HAIL
DUBAI, UNITED ARAB EMIRATES

INTRODUCTION

This report gives the results of tests conducted on a Single Deflection Linear Bar
Register. The test results include Static Pressure, Area Factor, Throw and Sound
Power Level. The sample was selected and supplied by the client and was received at
the laboratories on January 4, 2021. The sample appeared to be in new unused
condition upon receipt.

AUTHORIZATION

Signed Intertek Quotation Qu-01137128-1

TEST METHOD

The register was tested in accordance with the ASHRAE 70-2006 Standard “Method of
Testing for Rating the Performance of Air Outlets and Inlets. Acoustical data was
obtained employing a Bruel & Kjaer Pulse Digital Frequency Analyzer. The reference
sound source used for this test was a calibrated Bruel & Kjaer Type 4204, which
conforms to the above standard. The octave band sound power levels were plotted on
graph of Noise Criteria Curves. These curves are reprinted with permission from the
ASHRAE Handbook and Product Directory, 2017. The register was installed in the
facility and supplied with measured volumes of air. The static pressure was measured
upstream of the sample. The testing was done with isothermal air.

This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited
to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or
damage occasioned by the use of this report. Only the Client is authorized to copy or distribute this report and then only in its entirety. Any use of the Intertek name or one of its
marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test results in this report are
relevant only to the sample tested. This report by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program.
Measurement uncertainty budgets have been determined for applicable test methods and are available upon request.
Performance Test Certificate
Issued To

FLOWTECH
PO BOX 1871
DUBAI, U.A.E.

Intertek has tested a representative sample of


Flowtech Double Deflection Return Air Grille

A Double Deflection Return Air Grille


was tested in accordance with the standards listed below and was found
to perform in a manner appropriate to the dictates of the standards.

STANDARDS

ASHRAE 70-1991 Standard “Method of Testing for Rating the Performance of Air Outlets and Inlets”

ADC1062: GRD-84 “Test Code for Grilles, Registers and Diffusers”

ISO 5219:1984 “Air distribution and air diffusion –


Laboratory aerodynamic testing and rating of air terminal devices”

ISO 3741:1999 “Acoustics — Determination of sound power levels of noise sources


using sound pressure — Precision methods for reverberation rooms”

SCOPE OF TESTING

The double deflection return air grille was tested for the following performance characteristics:
"Reference Intertek Report Number 3063712-005 dated September 15, 2004”

A) Sound Power Level ((NC)


B) Air Volume versus Static Pressure

Date: September 24, 2020

James R. Kline
Intertek
Engineer / Quality Supervisor

This Verification is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's
responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in
accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to copy or
distribute this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service
must first be approved in writing by Intertek. The observations and test results referenced from this Verification are relevant only to the sample tested.
This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program.
Performance Test Certificate
Issued To

FLOWTECH
PO BOX 1871
DUBAI, U.A.E.

Intertek has tested representative samples of


Flowtech Double Deflection Supply Air Registers

Double Deflection Registers sizes 350 by 150 mm and 750 by 200 mm


were tested in accordance with the standards listed below and were found
to perform in a manner appropriate to the dictates of the standards.

STANDARDS

ASHRAE 70-1991 Standard “Method of Testing for Rating the Performance of Air Outlets and Inlets”

ADC1062: GRD-84 “Test Code for Grilles, Registers and Diffusers”

ISO 5219:1984 “Air distribution and air diffusion –


Laboratory aerodynamic testing and rating of air terminal devices”

ISO 3741:1999 “Acoustics — Determination of sound power levels of noise sources


using sound pressure — Precision methods for reverberation rooms”

SCOPE OF TESTING

The double deflection registers were tested for the following performance characteristics:
"Reference Intertek Report Numbers 3063712-001 and 3063712-002 dated September 13, 2004”

A) Sound Power Level ((NC)


B) Air Volume versus Static Pressure
C) Area Factor
D) Throw Pattern

Date: September 23, 2020

James R. Kline
Intertek
Engineer / Quality Supervisor

This Verification is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's
responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in
accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to copy or
distribute this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service
must first be approved in writing by Intertek. The observations and test results referenced from this Verification are relevant only to the sample tested.
This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program.
Performance Test Certificate
Issued To

FLOWTECH
PO BOX 1871
DUBAI, U.A.E.

Intertek has tested representative samples of


Flowtech Double Deflection Supply Linear Bar Grilles

Double Deflection Linear Bar Grilles sizes 1000 by 150 mm and 1000 by 250 mm
were tested in accordance with the standards listed below and were found
to perform in a manner appropriate to the dictates of the standards.

STANDARDS

ASHRAE 70-1991 Standard “Method of Testing for Rating the Performance of Air Outlets and Inlets”

ADC1062: GRD-84 “Test Code for Grilles, Registers and Diffusers”

ISO 5219:1984 “Air distribution and air diffusion –


Laboratory aerodynamic testing and rating of air terminal devices”

ISO 3741:1999 “Acoustics — Determination of sound power levels of noise sources


using sound pressure — Precision methods for reverberation rooms”

SCOPE OF TESTING

The double deflection linear bar grilles were tested for the following performance characteristics:
"Reference Intertek Report Numbers 3063712-003 and 3063712-004 dated September 15 & 20, 2004”

A) Sound Power Level ((NC)


B) Air Volume versus Static Pressure
C) Area Factor
D) Throw Pattern

Date: September 24, 2020

James R. Kline
Intertek
Engineer / Quality Supervisor

This Verification is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's
responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in
accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to copy or
distribute this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service
must first be approved in writing by Intertek. The observations and test results referenced from this Verification are relevant only to the sample tested.
This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program.
Performance Test Certificate
Issued To

FLOWTECH
PO BOX 1871
DUBAI, U.A.E.

Intertek has tested representative samples of


Flowtech Linear Slot Diffusers

Linear Slot Diffusers (two slot and three slot)


were tested in accordance with the standards listed below and were found
to perform in a manner appropriate to the dictates of the standards.

STANDARDS

ASHRAE 70-1991 Standard “Method of Testing for Rating the Performance of Air Outlets and Inlets”

ADC1062: GRD-84 “Test Code for Grilles, Registers and Diffusers”

ISO 5219:1984 “Air distribution and air diffusion –


Laboratory aerodynamic testing and rating of air terminal devices”

ISO 3741:1999 “Acoustics — Determination of sound power levels of noise sources


using sound pressure — Precision methods for reverberation rooms”

SCOPE OF TESTING

The linear slot diffusers were tested for the following performance characteristics:
"Reference Intertek Report Numbers 3063712-006 and 3063712-007 dated September 16 and 21, 2004”

A) Sound Power Level ((NC)


B) Air Volume versus Static Pressure
C) Area Factor
D) Throw Pattern

Date: September 24, 2020

James R. Kline
Intertek
Engineer / Quality Supervisor

This Verification is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's
responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in
accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to copy or
distribute this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service
must first be approved in writing by Intertek. The observations and test results referenced from this Verification are relevant only to the sample tested.
This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program.
Performance Test Certificate
Issued To

FLOWTECH
PO BOX 1871
DUBAI, U.A.E.

Intertek has tested a representative sample of


Flowtech Square Four-Way Ceiling Diffuser.

A Square Four-Way Ceiling Diffuser


was tested in accordance with the standards listed below and was found
to perform in a manner appropriate to the dictates of the standards.

STANDARDS

ASHRAE 70-1991 Standard “Method of Testing for Rating the Performance of Air Outlets and Inlets”

ADC1062: GRD-84 “Test Code for Grilles, Registers and Diffusers”

ISO 5219:1984 “Air distribution and air diffusion –


Laboratory aerodynamic testing and rating of air terminal devices”

ISO 3741:1999 “Acoustics — Determination of sound power levels of noise sources


using sound pressure — Precision methods for reverberation rooms”

SCOPE OF TESTING

The square four-way ceiling diffuser was tested for the following performance characteristics:
"Reference Intertek Report Number 3063712-009 dated September 23, 2004”

A) Sound Power Level ((NC)


B) Air Volume versus Static Pressure
C) Area Factor
D) Throw Pattern

Date: September 24, 2020

James R. Kline
Intertek
Engineer / Quality Supervisor

This Verification is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's
responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in
accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to copy or
distribute this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service
must first be approved in writing by Intertek. The observations and test results referenced from this Verification are relevant only to the sample tested.
This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program.
Performance Test Certificate
Issued To

FLOWTECH
PO BOX 1871
DUBAI, U.A.E.

Intertek has tested a representative sample of


Flowtech Return Air Square Four-Way Ceiling Diffuser.

A Return Air Square Four-Way Ceiling Diffuser


was tested in accordance with the standards listed below and was found
to perform in a manner appropriate to the dictates of the standards.

STANDARDS

ASHRAE 70-1991 Standard “Method of Testing for Rating the Performance of Air Outlets and Inlets”

ADC1062: GRD-84 “Test Code for Grilles, Registers and Diffusers”

ISO 5219:1984 “Air distribution and air diffusion –


Laboratory aerodynamic testing and rating of air terminal devices”

ISO 3741:1999 “Acoustics — Determination of sound power levels of noise sources


using sound pressure — Precision methods for reverberation rooms”

SCOPE OF TESTING

The square four-way ceiling diffuser was tested for the following performance characteristics:
"Reference Intertek Report Number 3063712-008 dated September 15, 2004”

A) Sound Power Level ((NC)


B) Air Volume versus Static Pressure

Date: September 24, 2020

James R. Kline
Intertek
Engineer / Quality Supervisor

This Verification is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's
responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in
accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to copy or
distribute this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service
must first be approved in writing by Intertek. The observations and test results referenced from this Verification are relevant only to the sample tested.
This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program.
Performance Test Certificate
Issued To

FAISAL JASSIM TRADING CO LLC


PO BOX 1871, ABU HAIL
DUBAI, UNITED ARAB EMIRATES

Intertek has tested a representative sample of


Faisal Jassim Round Ceiling Diffuser.

A Round Ceiling Diffuser (300 mm diameter inlet)


was tested in accordance with the standards listed below and was found
to perform in a manner appropriate to the dictates of the standards.

STANDARDS

ASHRAE 70-2006 Standard “Method of Testing for Rating the Performance of Air Outlets and Inlets”

ADC1062: GRD-84 “Test Code for Grilles, Registers and Diffusers”

ISO 5219:1984 “Air distribution and air diffusion –


Laboratory aerodynamic testing and rating of air terminal devices”

ISO 3741:2010 “Acoustics - Determination of Sound Power Levels and Sound Energy Levels of Noise Sources
Using Sound Pressure - Precision Methods for Reverberation Test Rooms”

SCOPE OF TESTING

The Round Ceiling Diffuser (300 mm diameter inlet)


was tested for the following performance characteristics:
"Reference Intertek Report Number 104370654CRT-001a dated July 23, 2020”

A) Sound Power Level ((NC)


B) Air Volume versus Static Pressure
C) Area Factor
D) Throw Pattern

Date: October 2, 2020

James R. Kline
Intertek
Engineer / Quality Supervisor

This Verification is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's
responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in
accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to copy or
distribute this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service
must first be approved in writing by Intertek. The observations and test results referenced from this Verification are relevant only to the sample tested.
This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program.
Performance Test Certificate
Issued To

FAISAL JASSIM TRADING CO LLC


PO BOX 1871, ABU HAIL
DUBAI, UNITED ARAB EMIRATES

Intertek has tested a representative sample of


Faisal Jassim 610mm X 610mm Louver.

A 610mm X 610mm Louver (with and without filter)(Fresh Air and Extract Air)
was tested in accordance with the standard listed below and was found
to perform in a manner appropriate to the dictates of the standard.

STANDARD

AMCA Standard 500-L-2012 entitled, “Laboratory Methods of Testing Louvers for Rating”

SCOPE OF TESTING

The 610mm X 610mm Louver (with and without filter) (Fresh Air and Extract Air)
was tested for the following performance characteristics:
"Reference Intertek Report Number 102735392CRT-001b dated February 16, 2017”

A) Air Performance-Pressure Drop

Date: October 6, 2020

James R. Kline
Intertek
Engineer / Quality Supervisor

This Verification is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's
responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in
accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to copy or
distribute this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service
must first be approved in writing by Intertek. The observations and test results referenced from this Verification are relevant only to the sample tested.
This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program.
Performance Test Certificate
Issued To

FAISAL JASSIM TRADING CO LLC


PO BOX 1871, ABU HAIL
DUBAI, UNITED ARAB EMIRATES

Intertek has tested a representative sample of


Faisal Jassim 610mm X 610mm Louver.

A 610mm X 610mm Louver (with and without filter)(Fresh Air and Exhaust Air)
was tested in accordance with the standard listed below and was found
to perform in a manner appropriate to the dictates of the standard.

STANDARD

AMCA Standard 500-L-2012 entitled, “Laboratory Methods of Testing Louvers for Rating”

SCOPE OF TESTING

The 610mm X 610mm Louver (with and without filter) (Fresh Air and Extract Air)
was tested for the following performance characteristics:
"Reference Intertek Report Number 104216186CRT-001b dated March 2, 2020”

A) Air Performance-Pressure Drop

Date: November 30, 2020

James R. Kline
Intertek
Engineer / Quality Supervisor

This Verification is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's
responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in
accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to copy or
distribute this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service
must first be approved in writing by Intertek. The observations and test results referenced from this Verification are relevant only to the sample tested.
This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program.

You might also like