TUTORIAL 2
Formula:
Load Factor: Shrinkage Factor: Swell %:
BCM to LCM using load factor: BCM to LCM using swell %: Shrinkage %:
Soil Load
L1 L2 W1 W2 H1 H2 Blade Load
Type factor
Sand &
4.06 3.98 1.06 1.98 2.06 2.36 0.89
gravel
2. Find the cycle time for a dozer if the pushing distance is 89m, dozing speed is 3.7km/hr and return
speed is 7.5km/hr. With reference to Q1, find the production per hour in BCM, job efficiency is 55
min/hr.
1
NAME: NUR AZLIN IDAYU BINTI MD ADAM @ MOHD ADNAN
DATE: 28 APRIL 2021
3. Find the cycle time for a dozer if the pushing distance is 63m, dozing speed is 2.3km/hr, return
speed is 9.5km/hr and acceleration time of 0.06 min. With reference to Q1, find the production per
hour in BCM, job efficiency is 45 min/hr.
4. Based on following table, find the production per hour in BCM for a dozer.
Clay 5.56 4.97 1.53 1.89 2.55 2.97 0.79 55 79 2.5 5.5
Sand 4.06 3.98 1.06 1.98 2.06 3.36 0.89 45 77 3.6 6.7
Peat 3.02 3.98 2.03 2.89 3.33 2.89 0.90 50 55 4.1 4.5
2
NAME: NUR AZLIN IDAYU BINTI MD ADAM @ MOHD ADNAN
Soil: Clay
Soil: Sand
Soil: Peat
3
NAME: NUR AZLIN IDAYU BINTI MD ADAM @ MOHD ADNAN
5. With reference to below table, plot Mass Haul Diagram (MHD) if the formation level is
20.2. Calculate the haul volume in stn.m and the cost involved if no free haul is
RM2.54/m3, and if there is free haul of 300m with RM1.70/m3 for free haul and
RM0.80/stn.m for overhaul. The swell factor is 0.8 and the shrinkage factor is 0.88.
11 29.5 0
12 34.8 1500
13 31.7 1300
14 26.2 487
15 21.1 -330
16 19.5 -1020
17 18 -1856
18 19 -1300
19 20 -1123
20 23.6 -300
21 36.7 1000
22 42.8 1200
23 49 442