TMS Reports WELD REGISTER

KM DATE OF PORTION LAST USFD LAST USFD TESTING LAST USFD DATE OF
LINE FROM MET FROM weld no. WELDING WELDER NAME SUPERVISOR NAME PORTION AGENCY BATCH NO INSP. RESULT DATE(RAIL/WELD) TESTING PORTION NO MANUFACTURE
DATE(WELD)

UP/M/LINE LR 15 245.90 91 9.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 6/18/2021 75808 12/10/2020
UP/M/LINE LR 15 505.15 89 9.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 6/18/2021 76149 12/10/2020
UP/M/LINE LR 15 765.80 631 28.6.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 9/16/2021 76151 12/10/2020
UP/M/LINE RR 15 245.90 92 9.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 6/18/2021 75800 12/10/2020
UP/M/LINE RR 15 505.75 90 9.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 6/18/2021 75999 12/10/2020
UP/M/LINE RR 15 765.80 630 28.6.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 9/16/2021 76105 12/10/2020
UP/M/LINE LR 16 39.60 1313/8-21/147H 1.10.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120141 GW 10/9/2021 74221 12/6/2020
UP/M/LINE LR 16 299.50 98/8-21/147H 10.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 6/18/2021 75776 12/10/2020
UP/M/LINE LR 16 394.40 1331/8-21/147H 30.9.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120141 GW 10/9/2021 74126 12/6/2020
UP/M/LINE LR 16 558.40 106/2-21/136H 11.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 6/14/2021 76119 12/10/2020
UP/M/LINE LR 16 817.40 646/6-21/147H 6.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20110134 GW 9/17/2021 70367 11/18/2020
6/6-21/147H

UP/M/LINE LR 16 983.2 648/6-21/147H 6.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20110134 GW 2/8/2021 70480 11/18/2020
UP/M/LINE RR 16 26.60 96 10.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 6/18/2021 75835 12/10/2020
UP/M/LINE RR 16 39.60 1332/9-21/17 H 29.9.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120141 GW 10/9/2021 74122 12/6/2020
UP/M/LINE RR 16 299.50 97/2-21/147H 10.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 6/18/2021 75834 12/10/2020
UP/M/LINE RR 16 394.40 125/2-21/136H 13.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 6/18/2021 76177 12/10/2020
UP/M/LINE RR 16 558.40 105/2-21/147H 11.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 6/14/2021 72218 12/10/2020
UP/M/LINE RR 16 817.40 647/2-21/147 5.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO GW 2/8/2021
20110134 70284 11/18/2020
UP/M/LINE RR 16 983.20 649/2-21/147 5.2.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO GW 2/8/2021
20120145 76183 12/10/2020
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 9.40 107/2-21/147H 11.2.21 CHHOTE LAL RATNAKER 20120145 14.6.21 76214 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 368.00 109/2-21/147H 11.2.21 CHHOTE LAL RATNAKER 20120145 14.6.21 75797 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 598.00 662/2-21/147H 7.2.21 CHHOTE LAL RATNAKER 20110134 8.2.21 70469 18.10.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 689.00 127/2-21/147H 14.2.21 CHHOTE LAL RATNAKER 20110134 14.6.21 76157 18.10.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 824.00 903/8-21/147H 29.8.21 CHHOTE LAL RATNAKER 20120142 16.9.21 74171 6.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 837.40 906/8-21/147H 30.8.21 CHHOTE LAL RATNAKER 20120142 16.9.21 74437 6.12.20

Page 1 of 327
TMS Reports WELD REGISTER

KM DATE OF PORTION LAST USFD LAST USFD TESTING LAST USFD DATE OF
LINE FROM MET FROM weld no. WELDING WELDER NAME SUPERVISOR NAME PORTION AGENCY BATCH NO INSP. RESULT DATE(RAIL/WELD) TESTING PORTION NO MANUFACTURE
DATE(WELD)

UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW


LR 17 843.50 904/8/21-147H 30.8.21 CHHOTE LAL RATNAKER 20120142 16.9.21 74101 6.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 863.60 242/2-21/139H 27.2.21 CHHOTE LAL RATNAKER 20110134 14.6.21 70244 18.11.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 902.60 130/8-21/124H 14.2.21 CHHOTE LAL RATNAKER 20120145 14.6.21 76109 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 915.15 143/2-21/31H 15.2.21 CHHOTE LAL RATNAKER 20120145 14.6.21 75771 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 923.00 133/2-21/136H 14.2.21 CHHOTE LAL RATNAKER 20120145 14.6.21 75958 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 936.70 144/2-21/136H 15.2.21 CHHOTE LAL RATNAKER 20120145 14.6.21 70568 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 949.20 146/2-21/136H 15.2.21 CHHOTE LAL RATNAKER 20120145 14.6.21 75773 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 962.20 148/2-21/148H 15.2.21 CHHOTE LAL RATNAKER 20120145 14.6.21 75787 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 975.20 192/2-21/136H 22.2.21 CHHOTE LAL RATNAKER 20120145 14.6.21 75938 10.12.20
UP/M/LINE
LR 987.50 202/2-21/139H 23.2.21 CHHOTE LAL RATNAKER RAMESH KUMAR RAIL TECH LKO 20120145 GW 14.6.21 70563 10.12.20
17
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 994.10 194/2-21/139H 22.2.21 CHHOTE LAL RATNAKER 20120145 14.6.21 76067 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 9.4 984/9-21/147H 11.9.81 CHHOTE LAL RATNAKER 20120141 14.6.21 73917 6.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 38.00 108/2-21/136H 11.2.21 ANIL KUMAR YADAV 20120145 14.9.21 75790 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 338.00 110 11.2.21 ANIL KUMAR YADAV 20120145 14.9.21 76137 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 590.00 663/7-21/147H 7.2.21 ANIL KUMAR YADAV 20120145 8.2.21 75807 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 689.00 128/2-21/147H 14.2.21 ANIL KUMAR YADAV 20120145 14.6..21 75883 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 824.35 902/8-21/147H 29.8.21 ANIL KUMAR YADAV 20120141 16.9.21 74296 6.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 837.40 905/8-21/147H 30.8.21 ANIL KUMAR YADAV 20120141 16.9.21 74342 6.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 863.60 243/2-21/139H 27.2.21 ANIL KUMAR YADAV 20110134 14.9.21 70497 18.11.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 923.20 142/2-21/39H 15.2.21 ANIL KUMAR YADAV 20120145 14.9.21 76178 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 936.20 145/8-21/124H 15.2.21 ANIL KUMAR YADAV 20120145 14.9.21 76791 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 943.20 147/2-21/136H 15.2.21 ANIL KUMAR YADAV 20120145 14.9.21 75768 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 975.20 255/2-21/136H 28.2.21 ANIL KUMAR YADAV 20110134 14.9.21 70611 18.11.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 987.50 201/2-21/136H 23.2.21 ANIL KUMAR YADAV 20120145 14.9.21 75923 10.12.20
UP/M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 994.10 193/2-21/139H 22.2.21 ANIL KUMAR YADAV 20120145 14.9.21 70591 10.12.20
X-over 41AB RAMESH KUMAR RAIL TECH LKO GW
LR 17 855.20 131/2-21/136H 14.2.21 ANIL KUMAR YADAV 20120145 14.9.21 76210 10.12.20

Page 2 of 327
TMS Reports WELD REGISTER

KM DATE OF PORTION LAST USFD LAST USFD TESTING LAST USFD DATE OF
LINE FROM MET FROM weld no. WELDING WELDER NAME SUPERVISOR NAME PORTION AGENCY BATCH NO INSP. RESULT DATE(RAIL/WELD) TESTING PORTION NO MANUFACTURE
DATE(WELD)

X-over 41AB RAMESH KUMAR RAIL TECH LKO GW


LR 17 882.30 975/9-21/124H 9.9.21 ANIL KUMAR YADAV 20120141 14.9.21 74240 6.12.20
X-over 41AB RAMESH KUMAR RAIL TECH LKO GW
LR 17 922.30 971/9-21/124H 9.9.21 ANIL KUMAR YADAV 20120141 14.9.21 74324 6.12.20
X-over 41AB RAMESH KUMAR RAIL TECH LKO GW
LR 17 896.2 973/9-21/124H 9.9.21 ANIL KUMAR YADAV 20110134 14.9.21 70260 18.11.20
X-over 41AB RAMESH KUMAR RAIL TECH LKO GW
LR 17 929 970/9-21/124H 9.9.21 ANIL KUMAR YADAV 20120141 14.9.21 74085 6.12.20
X-over 41AB RAMESH KUMAR RAIL TECH LKO GW
RR 17 855.20 129/2-21/136H 14.2.21 RAJ KUMAR 20120145 14.9.21 76155 10.12.20
X-over 41AB RAMESH KUMAR RAIL TECH LKO GW
RR 17 863.00 132/2-21/136H 14.2.21 RAJ KUMAR 20120145 14.9.21 75897 10.12.20
X-over 41AB RAMESH KUMAR RAIL TECH LKO GW
RR 17 882.30 1166/2-21/135H 7.9.21 RAJ KUMAR 20120141 14.9.21 74303 6.12.20
X-over 41AB RAMESH KUMAR RAIL TECH LKO GW
RR 17 888.3 1167/12-21/135H 7.9.21 RAJ KUMAR 20120141 14.9.21 73925 6.12.20
X-over 41AB RAMESH KUMAR RAIL TECH LKO GW
RR 17 902.3 972/9-21/124H 9.9.21 RAJ KUMAR 20120141 14.9.21 74458 6.12.20
X-over 41AB
RR 929 969/9-21/147H 9.9.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120141 GW 14.9.21 74393 6.12.20
17
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 908.00 1077/9-21/124H 9.9.21 RAJ KUMAR 20120141 14.9.21 74954 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 962.00 946/9-21/124H 9.9.21 RAJ KUMAR 20120141 14.9.21 74119 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 861.00 1049/9-21/124H 9.9.21 RAJ KUMAR 20120141 14.9.21 74015 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 863.00 1047/9-21/124H 9.9.21 RAJ KUMAR 20120141 14.9.21 74483 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 881.40 1045/9-21/124H 9.9.21 RAJ KUMAR 20120141 14.9.21 74025 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 891.00 1043/9-21/124H 12.6.21 RAJ KUMAR 20120146 14.6.21 76306 11.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 895.00 1041/9-21/124H 9.8.21 RAJ KUMAR 20120141 14.6.21 74078 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 927.00 987/9-21/124H 12.9.21 RAJ KUMAR 20120141 14.9.21 74071 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
LR 17 926.00 993/9-21/124H 18.7.21 RAJ KUMAR 20120134 30.7.21 70236 18.11.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 861 1048/9-21/124H 9.9.21 RAJ KUMAR 20120141 14.9.21 73973 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 869.2 1046/9-21/124H 9.9.21 RAJ KUMAR 20120141 14.9.21 74059 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 881 1165/11-21/135H 12.6.21 RAJ KUMAR 20120141 14.6.21 74399 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 895 1040/9-21/124H 12.6.21 RAJ KUMAR 20120141 14.6.21 74385 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 891.2 1164/9-21/135H 9.9.21 RAJ KUMAR 20120141 14.9.21 74268 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 922.10 966/9-21/124H 9.9.21 RAJ KUMAR 20120141 14.9.21 73966 6.12.20

Page 3 of 327
TMS Reports WELD REGISTER

KM DATE OF PORTION LAST USFD LAST USFD TESTING LAST USFD DATE OF
LINE FROM MET FROM weld no. WELDING WELDER NAME SUPERVISOR NAME PORTION AGENCY BATCH NO INSP. RESULT DATE(RAIL/WELD) TESTING PORTION NO MANUFACTURE
DATE(WELD)

DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW


RR 17 927.00 968/9-21/124H 9.9.21 RAJ KUMAR 20120141 14.9.21 74208 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 955.3 986/9-21/124H 11.9.21 RAJ KUMAR 20120141 14.9.21 74126 6.12.20
DN /M/LINE RAMESH KUMAR RAIL TECH LKO GW
RR 17 962.4 794/9-21/124H 15.7.21 RAJ KUMAR 20110134 30.7.21 70318 18.11.20
P-57A&B X-over RAMESH KUMAR RAIL TECH LKO GW
LR 18 841.00 783/6-21/147H 29.6.21 CHHOTE LAL RATNAKER 20110134 30.7.21 70397 18.11.20
P-57A&B X-over RAMESH KUMAR RAIL TECH LKO GW
LR 18 847.00 636/6-21/147H 29.6.21 CHHOTE LAL RATNAKER 20110134 30.7.21 70397 18.11.20
P-57A&B X-over RAMESH KUMAR RAIL TECH LKO GW
LR 18 880.00 994/9/21/147H 13.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74002 6.12.20
P-57A&B X-over RAMESH KUMAR RAIL TECH LKO GW
RR 18 873.30 996/9-21/147H 13.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74162 6.12.20
P-57A&B X-over RAMESH KUMAR RAIL TECH LKO GW
RR 18 881.00 993/9-21/147H 12.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74338 6.12.20
X-over 59AB RAMESH KUMAR RAIL TECH LKO GW
LR 18 984.05 892/ 8-21/147H 23.8.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74287 6.12.20
X-over 59AB
RR 9.7.21 CHHOTE LAL RATNAKER RAMESH KUMAR RAIL TECH LKO 20110134 GW 16.9.21 70269 18.11.20
18 959.65 745/ 7-21/147H
RAMESH KUMAR RAIL TECH LKO GW
LR 18 863.20 783/ 7-21/147H 16.7.21 CHHOTE LAL RATNAKER 20110134 30.7.21 70465 18.11.20
OVER RUN 57A to
RAMESH KUMAR RAIL TECH LKO GW
DEAD END RR 18 871.50 748/ 7-21/147H 9.7.21 CHHOTE LAL RATNAKER 20110134 30.7.21 70468 18.11.20
RAMESH KUMAR RAIL TECH LKO GW
RR 18 883.95 782/7-21/147H 16.7.21 CHHOTE LAL RATNAKER 20110134 30.7.21 70256 18.11.20
DN /M/LINE-2 RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.18 1037/9-21/147H 12.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 73919 6.12.20
DN /M/LINE-2 RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.56 1035/9-2/147H 12.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74013 6.12.20
DN /M/LINE-2 RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.63 1033/9-21/147H 12.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74424 6.12.20
DN /M/LINE-2 RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.75 1031/9-21/24H 12.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74057 6.12.20
DN /M/LINE-2 RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.32 1029/9-21/149H 12.9.21 CHHOTE LAL RATNAKER 20120141 16.9.21 74093 6.12.20
DN /M/LINE-2 RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.40 1078/9-21/124H 7.10.21 CHHOTE LAL RATNAKER 20120146 9.10.21 76239 11.12.20
DN /M/LINE-2 RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.56 1034/9-21/124H 12.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74096 6.12.20
DN /M/LINE-2 RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.63 1032/9-21/124H 12.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74469 6.12.20
DN /M/LINE-2 RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.75 1030/9-21/147H 12.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74164 6.12.20
DN /M/LINE-2 RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.85 1036/9-21/124H 12.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74444 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
LR 18 810.30 1018/9-21/147H 11.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74215 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
RR 18 804.20 1019/9-21/147 11.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74503 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
LR 18 830.00 1021/9-21/147H 11.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74451 6.12.20

Page 4 of 327
TMS Reports WELD REGISTER

KM DATE OF PORTION LAST USFD LAST USFD TESTING LAST USFD DATE OF
LINE FROM MET FROM weld no. WELDING WELDER NAME SUPERVISOR NAME PORTION AGENCY BATCH NO INSP. RESULT DATE(RAIL/WELD) TESTING PORTION NO MANUFACTURE
DATE(WELD)

Point. 56B RAMESH KUMAR RAIL TECH LKO GW


LR 18 840.00 1027/9-21/147H 11.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74380 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
LR 18 855.40 1025/9-21/124H 11.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74292 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
LR 18 865.10 997/9-21/147H 13.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74110 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
LR 18 874.30 995/9-21/147H 13.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 73983 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
LR 18 880.30 992/9-21/147H 12.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 73984 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
LR 18 905.10 1081/7-21/124H 28.7.21 CHHOTE LAL RATNAKER 20120146 30.7.21 76230 11.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
LR 18 913.00 1016/9-21/147H 13.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74254 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
LR 18 920.30 1082/9-21/147H 28.7.21 CHHOTE LAL RATNAKER 20120146 30.7.21 76253 11.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
LR 18 925.00 1003/9-21/124H 13.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74143 6.12.20
Point. 56B
LR 14.9.21 CHHOTE LAL RATNAKER RAMESH KUMAR RAIL TECH LKO 20120141 GW 15.9.21 74098 6.12.20
18 934.00 1014/9-21/124H
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
LR 18 945.00 1020/9-21/147H 12.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74434 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
LR 18 955.30 781/7-21/124H 16.7.21 CHHOTE LAL RATNAKER 20110134 30.7.21 70272 18.11..20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
RR 18 810.30 1017/9-21/147H 13.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74300 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
RR 18 818.00 638/6/21/147H 29.6.21 CHHOTE LAL RATNAKER 20110134 30.7.21 70485 18.11.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
RR 18 830.30 1022/9/21/147H 12.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74479 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
RR 18 840.00 1026/9/21-124H 12.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74335 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
RR 18 855.40 1024/9-21/124H 12.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74132 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
RR 18 880.00 998/9-21/124H 13.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74489 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
RR 18 905.10 1023/7-21/124H 13.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74317 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
RR 18 913.00 1015/9-21/124H 13.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74281 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
RR 18 925.10 1004/9-21/124H 13.9.21 CHHOTE LAL RATNAKER 20120141 14.9.21 74313 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
RR 18 934.00 1013/9/21/124H 13.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74926 6.12.20
Point. 56B RAMESH KUMAR RAIL TECH LKO GW
RR 18 955.00 1012/9-21/124H 13.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74066 6.12.20
RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.15 1038/9-21/147H 10.9.21 ANIL KUMAR YADAV 20120141 14.9.21 74205 6.12.20
RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.50 960/9-21/147H 8.9.251 ANIL KUMAR YADAV 20120141 16.9.21 74102 6.12.20
RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.55 963/9-21/147H 9.9.21 ANIL KUMAR YADAV 20120141 16.9.21 74139 6.12.20
PONIT NO.41 A&B
X-over

Page 5 of 327
TMS Reports WELD REGISTER

KM DATE OF PORTION LAST USFD LAST USFD TESTING LAST USFD DATE OF
LINE FROM MET FROM weld no. WELDING WELDER NAME SUPERVISOR NAME PORTION AGENCY BATCH NO INSP. RESULT DATE(RAIL/WELD) TESTING PORTION NO MANUFACTURE
DATE(WELD)

PONIT NO.41 A&B


RAMESH KUMAR RAIL TECH LKO GW
X-over LR 18 0.78 709 /7-21/081 5.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70499 18.11.20
RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.53 1009/7-21/147H 16.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70490 18.11.20
RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.20 1039/9-21/147H 10.9.21 ANIL KUMAR YADAV 20120141 14.9.21 74167 6.12.20
RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.52 961/9-21147H 8.9.21 ANIL KUMAR YADAV 20120141 16.9.21 74301 6.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.40 518/6-21/147H 10.6.21 ANIL KUMAR YADAV 20120145 30.7.21 76017 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.54 232/ 2-21/139H 01.6.21 ANIL KUMAR YADAV 20110134 13.6.21 70215 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.60 205/2-21/139H 23.2.21 ANIL KUMAR YADAV 20120145 13.6.21 70532 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.65 517/6-21/147H 10.6.21. ANIL KUMAR YADAV 20120145 30.7.21 75917 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.86 210/2-21/124H 24.2.21 ANIL KUMAR YADAV 20120145 13.6.21 76021 10.12.20
LOOP LINE-4
LR 18.7.21 ANIL KUMAR YADAV RAMESH KUMAR RAIL TECH LKO 20120134 GW 30.7.21 70218 18.11.20
18 119.00 792/7-21/124H
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 132.00 520/7/21-124H 20.7.21 ANIL KUMAR YADAV 20120145 30.7.21 76040 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 123.00 521/6-21/24H 20.7.21 ANIL KUMAR YADAV 20120145 30.7.21 76059 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.99 703/6-21/147H 5.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70399 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 0.54 1028/6-21/147H 10.9.21 ANIL KUMAR YADAV 20120141 14.9.21 74070 6.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO 20120134 GW 70579 18.11.20
LR 18 139 119012-21/137H 25.7.21 ANIL KUMAR YADAV 30.7.21
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 360.3 500/6-21/147H 7.6.21 ANIL KUMAR YADAV 20120145 13.6.21 75919 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 377.2 498/6-21/147H 7.6.21 ANIL KUMAR YADAV 20120145 13.6.21 76003 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 385.1 496/6-21/147H 7.6.21 ANIL KUMAR YADAV 20120145 13.6.21 75973 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 398.3 494/6-21/147H 7.6.21 ANIL KUMAR YADAV 20120145 13.6.21 76975 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 412.1 492/6-21/147H 7.6.21 ANIL KUMAR YADAV 20120145 13.6.21 76103 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 424.2 490/6-21/147H 5.6.21 ANIL KUMAR YADAV 20120145 13.6.21 75878 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 436 488/ 6-21/147H 5.6.21 ANIL KUMAR YADAV 20120145 13.6.21 76954 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 450.2 486/6-21/147H 5.6.21 ANIL KUMAR YADAV 20120145 13.6.21 76018 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 476 505/6-21/147H 8.6.21 ANIL KUMAR YADAV 20120145 13.6.21 76047 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 490 480/6-21/147H 3.6.21 ANIL KUMAR YADAV 20120145 13.6.21 75852 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 509.1 1168/6-21/138H 10.6.21 ANIL KUMAR YADAV 20120141 13.6.21 74163 6.12.20

Page 6 of 327
TMS Reports WELD REGISTER

KM DATE OF PORTION LAST USFD LAST USFD TESTING LAST USFD DATE OF
LINE FROM MET FROM weld no. WELDING WELDER NAME SUPERVISOR NAME PORTION AGENCY BATCH NO INSP. RESULT DATE(RAIL/WELD) TESTING PORTION NO MANUFACTURE
DATE(WELD)

LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW


LR 18 554.30 470/6-21/147H 1.6.21 ANIL KUMAR YADAV 20120145 13.6.21 75909 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 528.30 474/542.20 2.6.21 ANIL KUMAR YADAV 20120145 13.6.21 75983 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 540.00 472/6-21/147H 2.6.21 ANIL KUMAR YADAV 20120145 13.6.21 76093 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 736.00 449/5-21/147H 20.5.21 ANIL KUMAR YADAV 20120145 12.6.21 75822 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 568.00 468/6-21/147 H 1.6.21 ANIL KUMAR YADAV 20120145 13.6.21 70258 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 581.20 506/ 6-21/147H 8.6.21 ANIL KUMAR YADAV 20120145 13.6.21 76172 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 594.40 508/ 6-21/147H 8.6.21 ANIL KUMAR YADAV 20120145 12.6.21 70428 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 606.20 466/ 6-21/147H 1.6.21 ANIL KUMAR YADAV 20120145 12.6.21 75931 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 620.20 465/ 6-21/147H 1.6.21 ANIL KUMAR YADAV 20120145 12.6.21 76982 10.12.20
LOOP LINE-4
LR 5.7.21 ANIL KUMAR YADAV RAMESH KUMAR RAIL TECH LKO 20110134 GW 30.7.21 70223 18.11.20
18 633.20 707/ 7-21/124H
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 646.20 462/5-21/147H 31.5.21 ANIL KUMAR YADAV 20120145 12.6.21 75988 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 659.30 460/5-21/147H 31.5.21 ANIL KUMAR YADAV 20120145 12.6.21 75957 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 672.30 459/5-21/147H 31.5.21 ANIL KUMAR YADAV 20120145 12.6.21 75930 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 672.30 458/5-21/147H 31.5.21 ANIL KUMAR YADAV 20120145 12.6.21 75982 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 736.00 795/ 5-21/147H 18.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70602 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 698.30 454/ 5-21/147H 31.5.21 ANIL KUMAR YADAV 20110134 12.6.21 70314 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 698.30 452/5-21/147H 29.5.21 ANIL KUMAR YADAV 20120145 12.6.21 76041 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 711.00 450/5-21/147 H 29.5.21 ANIL KUMAR YADAV 20120145 12.6.21 76160 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 723.00 448/5-21/147H 29.5.21 ANIL KUMAR YADAV 20120145 12.6.21 76156 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 775.00 444/5/21/124 H 29.5.21 ANIL KUMAR YADAV 20120146 12.6.21 76242 11.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
LR 18 770.30 644/6-21/147 H 30.6.21 ANIL KUMAR YADAV 20120145 30.7.21 76058 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO 20110134 GW 70301 18.11.20
LR 18 795.20 1191/12-21/137H 5.6.21 ANIL KUMAR YADAV 12.6.21
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO 20110134 GW 70416 18.11.20
LR 18 802.10 1192/12-21/137H 5.6.21 ANIL KUMAR YADAV 12.6.21
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO 20110134 GW 18.11.20
LR 18 490.00 705/6-21/147H 5.7.21 ANIL KUMAR YADAV 30.7.21 70435
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.40 118/2-21/147H 17.2.21 ANIL KUMAR YADAV 20120145 30.7.21 76128 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.65 519/6-21/147H 10.6.21 ANIL KUMAR YADAV 20120145 30.7.21 75990 10.12.20

Page 7 of 327
TMS Reports WELD REGISTER

KM DATE OF PORTION LAST USFD LAST USFD TESTING LAST USFD DATE OF
LINE FROM MET FROM weld no. WELDING WELDER NAME SUPERVISOR NAME PORTION AGENCY BATCH NO INSP. RESULT DATE(RAIL/WELD) TESTING PORTION NO MANUFACTURE
DATE(WELD)

LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW


RR 18 0.75 317/2-21/147 H 14.3.21 ANIL KUMAR YADAV 20110134 30.7.21 70592 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.86 791/6-21/147H 18.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70247 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.99 710/7-21/124H 5.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70251 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 0.99 719/6-21/147H 6.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70361 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 119.00 721/7-21/124H 6.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70606 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 139.00 1189/7-21/137H 20.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70484 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 347.20 501/ 6-21/147H 7.6.21 ANIL KUMAR YADAV 20120145 13.6.21 75946 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 377.20 497/6-21/147H 7.6.21 ANIL KUMAR YADAV 20120145 13.6.21 76944 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 385.00 493/ 6-21/147H 7.6.21 ANIL KUMAR YADAV 20120145 13.6.21 76168 10.12.20
LOOP LINE-4
RR 7.6.21 ANIL KUMAR YADAV RAMESH KUMAR RAIL TECH LKO 20120145 GW 13.6.21 75889 10.12.20
18 398.30 495/ 6-21/147H
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 412.10 491/6/21-147H 7.6.21 RAJ KUMAR 20120145 13.6.21 70856 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 360.30 639/6-21/147 H 29.6.21 RAJ KUMAR 20110134 30.7.21 70456 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 424.20 489/ 6-21/147H 2.6.21 RAJ KUMAR 20120145 13.6.21 76876 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 436.20 487/6-21/147 H 5.6.21 RAJ KUMAR 20120145 13.6.21 76120 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 450.20 485/ 6-21/147 H 5.6.21 RAJ KUMAR 20120145 13.6.21 76170 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 464.20 484/-6-21/147H 5.6.21 RAJ KUMAR 20120145 13.6.21 76141 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 476.00 481/6-21/147 H 3.6.21 RAJ KUMAR 20120145 13.6.21 75978 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 490.10 504/6-21/147 H 8.3.21 RAJ KUMAR 20120145 13.6.21 76164 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 495.2 502/ 6-21/147H 8.3.21 RAJ KUMAR 20120145 13.6.21 75801 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 502 479/6-21/147 H 2.6.21 RAJ KUMAR 20120145 13.6.21 75974 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 509.30 477/6-21/147 H 2.6.21 RAJ KUMAR 20120145 13.6.21 76194 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 515.20 475/ 6-21/147 H 2.6.21 RAJ KUMAR 20120145 13.6.21 75940 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 528.10 473/6-21/147 H 2.6.21 RAJ KUMAR 20110134 13.6.21 76235 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 542.10 471/ 6-21/147H 1.6.21 RAJ KUMAR 20120145 13.6.21 75965 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 554.30 469/6-21/147H 1.6.21 RAJ KUMAR 20120145 13.6.21 75927 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 568.30 152/ 6-21/147H 16.2.21 RAJ KUMAR 20120145 30.7.21 75938 10.12.20

Page 8 of 327
TMS Reports WELD REGISTER

KM DATE OF PORTION LAST USFD LAST USFD TESTING LAST USFD DATE OF
LINE FROM MET FROM weld no. WELDING WELDER NAME SUPERVISOR NAME PORTION AGENCY BATCH NO INSP. RESULT DATE(RAIL/WELD) TESTING PORTION NO MANUFACTURE
DATE(WELD)

LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW


RR 18 594.30 482/ 6-21/147H 3.6.21 RAJ KUMAR 20120145 12.6.21 76000 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 606.20 467/ 6-21/147H 1.6.21 RAJ KUMAR 20120145 12.6.21 75826 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 620.10 465/ 6-21/147H 1.6.21 RAJ KUMAR 20120145 12.6.21 76908 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 633.20 708/ 7-21/147H 5.7.21 RAJ KUMAR 20110134 30.7.21 70491 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 646.00 463/ 5/21-147 H 31.5.21 RAJ KUMAR 20120145 12.6.21 76139 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 659.10 461/5-21/147 H 31.5.21 RAJ KUMAR 20120145 12.6.21 75921 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 672.30 459/2-21/147H 1.4.21 RAJ KUMAR 20120145 12.6.21 75915 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 685.10 457/ 5-21/147H 31.5.21 RAJ KUMAR 20120145 12.6.21 75948 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 698.30 454/5-21/147H 31.5.21 RAJ KUMAR 20120145 12.6.21 75998 10.12.20
LOOP LINE-4
RR 29.5.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120145 GW 12.6.21 76997 10.12.20
18 711.00 453/ 5-21/147
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 723.00 451/ 5-21/147H 29.5.21 RAJ KUMAR 20120145 12.6.21 76087 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 748.00 447/5-/21/147H 29.5.21 RAJ KUMAR 20120145 12.6.21 76181 10.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 783.53 445/5-21/147H 29.5.21 RAJ KUMAR 20120146 12.6.21 76223 11.12.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 793.55 645/ 6-21/147H 30.6.21 RAJ KUMAR 20110134 30.7.21 70285 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 800.05 706/7-21/147H 5.7.21 RAJ KUMAR 20110134 30.7.21 70389 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 813.1 639/6-21/147H 29.6.21 RAJ KUMAR 20110134 30.7.21 70456 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 820 1193/7-21/137H 25.7.21 RAJ KUMAR 20110134 30.7.21 70246 18.11.20
LOOP LINE-4 RAMESH KUMAR RAIL TECH LKO GW
RR 18 825.55 1194/7-21147H 25.7.21 RAJ KUMAR 20110134 30.7.21 70359 18.11.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 36.75 201/2-21/139H 23.2.21 ANIL KUMAR YADAV 20120145 30.7.21 75923 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 63.45 206/2-21/139H 24.2.21 ANIL KUMAR YADAV 20120145 13.6.21 70248 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW 75938 10.12.20
LR 18 69.75 1187/7-21/137H 26.7.21 ANIL KUMAR YADAV 20120145 30.7.21
UP M/Line RAMESH KUMAR RAIL TECH LKO GW 10.12.20
LR 18 75.85 209/2-21/137H 24.2.21 ANIL KUMAR YADAV 20120145 13.6.21 70509
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 82.65 722 7-21/124H 6.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70225 18.11.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 95.7 572/6-21/147H 22.6.21 ANIL KUMAR YADAV 20120145 30.7.21 70390 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 108.5 790/7-21/147H 18.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70276 18.11.20

Page 9 of 327
TMS Reports WELD REGISTER

KM DATE OF PORTION LAST USFD LAST USFD TESTING LAST USFD DATE OF
LINE FROM MET FROM weld no. WELDING WELDER NAME SUPERVISOR NAME PORTION AGENCY BATCH NO INSP. RESULT DATE(RAIL/WELD) TESTING PORTION NO MANUFACTURE
DATE(WELD)

UP M/Line RAMESH KUMAR RAIL TECH LKO GW


LR 18 358.15 913/8-21/124H 31.8.21 ANIL KUMAR YADAV 20120145 16.9.21 73970 6.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 364.5 912/8-21/124H 31.8.21 ANIL KUMAR YADAV 20120145 16.9.21 74403 6.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 605.6 540/6-21/124H 17.6.21 ANIL KUMAR YADAV 20120145 30.7.21 75928 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 618.35 539/ 1-21/124H 9.1.21 ANIL KUMAR YADAV 20120145 30.7.21 75316 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 857 510/ 6-21/147H 30.8.21 ANIL KUMAR YADAV 20120145 8.2.21 75831 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 870 910/2-21/147H 1.4.21 ANIL KUMAR YADAV 20120141 15.9.21 74291 6.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 881.5 379/4/21-136H 1.4.21 ANIL KUMAR YADAV 20120145 12.6.21 76097 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 942.8 381/2-21/136H 25.2.21 ANIL KUMAR YADAV 20120145 12.6.21 75980 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
LR 18 955.75 219/2/21/139H 10.3.21 ANIL KUMAR YADAV 20120145 12.6.21 76074 10.12.20
UP M/Line
RR 10.3.21 ANIL KUMAR YADAV RAMESH KUMAR RAIL TECH LKO 20110134 GW 30.5.21 70214 18.11.20
18 36.2 308/6-21/124H
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 42.75 207/ 2/21-139H 24.2.21 ANIL KUMAR YADAV 20120145 13.6.21 70322 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 55.5 250/ 2-21/139H 24.2.21 ANIL KUMAR YADAV 20110134 30.5.21 70355 18.11.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 75.85 711/ 7-21/147H 5.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70333 18.11.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 82.65 796/ 7-21/147H 18.7.21 ANIL KUMAR YADAV 20110134 30.7.21 70493 18.11.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 88.88 253/ 2-21/ 147H 28.2.21 ANIL KUMAR YADAV 20110134 14.6.21 70513 18.11.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 95.7 254/2-21/147 H 28.2.21 ANIL KUMAR YADAV 20110134 14.6.21 76033 18.11.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 101.8 203/ 2-21/139H 23.2.21 ANIL KUMAR YADAV 20120145 13.6.21 70419 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 108.5 204/2-21/139H 23.2.21 ANIL KUMAR YADAV 20120145 13.6.21 76015 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 115 516/6-21/147H 10.6.21 ANIL KUMAR YADAV 20120145 30.7.21 70566 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 501.3 513/6-21/147H 9.6.21 ANIL KUMAR YADAV 20120145 30.7.21 75993 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW 75985 10.12.20
RR 18 618.35 1186/7-21/138H 19.7.21 ANIL KUMAR YADAV 20120145 30.7.21
UP M/Line RAMESH KUMAR RAIL TECH LKO GW 10.12.20
RR 18 748.3 511/6-21/147 H 9.6.21 ANIL KUMAR YADAV 20120145 30.7.21 76649
UP M/Line RAMESH KUMAR RAIL TECH LKO GW 70390 10.12.20
RR 18 857 1188/7-21/138H 19.7.21 ANIL KUMAR YADAV 20120145 30.7.21
UP M/Line RAMESH KUMAR RAIL TECH LKO GW 10.12.20
RR 18 863.2 542/ 6-21/124H 18.7.21 CHHOTE LAL RATNAKER 20120145 30.7.21 75812
UP M/Line RAMESH KUMAR RAIL TECH LKO GW 18.11.20
RR 18 881.5 574/7-21/124H 22.7.21 CHHOTE LAL RATNAKER 20110134 30.7.21 70382
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 929.75 509/6-21/147H 9.6.21 CHHOTE LAL RATNAKER 20120145 8.2.21 76060 10.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 946 904/8-21/147H 30.8.21 CHHOTE LAL RATNAKER 20120141 16.9.21 74101 6.12.20
UP M/Line RAMESH KUMAR RAIL TECH LKO GW
RR 18 955.75 380/ 4-21/136H 1.4.21 CHHOTE LAL RATNAKER 20110134 12.6.21 70549 18.11.20

Page 10 of 327
TMS Reports WELD REGISTER

KM DATE OF PORTION LAST USFD LAST USFD TESTING LAST USFD DATE OF
LINE FROM MET FROM weld no. WELDING WELDER NAME SUPERVISOR NAME PORTION AGENCY BATCH NO INSP. RESULT DATE(RAIL/WELD) TESTING PORTION NO MANUFACTURE
DATE(WELD)

RAMESH KUMAR RAIL TECH LKO GW


LR 18 873 1170/4-21/136 H 1.10.21 CHHOTE LAL RATNAKER 20120141 9.10.21 74323 6.12.20
RAMESH KUMAR RAIL TECH LKO GW
LR 18 894.35 220/ 2-21/139H 25.2.21 CHHOTE LAL RATNAKER 20110134 13.6.21 70336 18.11.20
X-OVER 56A L-4 TO
RAMESH KUMAR RAIL TECH LKO GW
UP M/L 56B LR 18 907 273/ 2-21/124H 3.3.21 CHHOTE LAL RATNAKER 20110134 30.7.21 70340 18.11.20
RAMESH KUMAR RAIL TECH LKO GW
RR 18 835.25 372/-2-21/ 124 H 31.3.21 CHHOTE LAL RATNAKER 20120145 12.6.21 75981 10.12.20
RAMESH KUMAR RAIL TECH LKO GW
RR 18 867.25 229/ 2-21/139 H 26.2.21 CHHOTE LAL RATNAKER 20110134 12.6.21 70528 18.11.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
LR 19 28.4 750/ 7-21/124H 10.7.21 CHHOTE LAL RATNAKER 20110134 15.9.21 70462 18.11.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
LR 19 52.1 752/ 7-21/124H 10.7.21 CHHOTE LAL RATNAKER 20110134 15.9.21 70286 18.11.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
LR 19 65.11 765/ 7-21/124H 12.7.21 CHHOTE LAL RATNAKER 20110134 15.9.21 70559 18.11.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
LR 19 104.25 864/ 8-21/124H 18.8.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74391 6.12.20
PONIT 57B
LR 3.6.21 CHHOTE LAL RATNAKER RAMESH KUMAR RAIL TECH LKO 20110134 GW 12.6.21 70436 18.11.20
19 130.3 371/ 6-21/124h
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
LR 19 159.32 871/ 8-21/147 H 18.8.21 CHHOTE LAL RATNAKER 20120141 16.9.21 74340 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
LR 19 201.1 1080/ 6-21/147H 3.6.21 CHHOTE LAL RATNAKER 20120146 12.6.21 76226 11.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
LR 19 238.78 1009/ 9-21/147H 14.9.21 CHHOTE LAL RATNAKER 20120141 16.9.21 73932 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
LR 19 251.8 989/ 9-21/147H 12.9.21 CHHOTE LAL RATNAKER 20120141 16.9.21 74357 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
LR 19 258.30 990/ 9-21/147H 12.9.21 CHHOTE LAL RATNAKER 20120141 16.9.21 74055 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
LR 19 270.35 1007/ 9-21/147H 13.9.21 CHHOTE LAL RATNAKER 20120141 16.9.21 73975 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
LR 19 278.15 1006/ 9-21/124 H 13.9.21 CHHOTE LAL RATNAKER 20120141 16.9.21 73976 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 1.7 1011/9-21/124 H 14.9.21 CHHOTE LAL RATNAKER 20120141 15.9.21 74386 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 52.10 762/- 7-21/124 H 12.7.21 CHHOTE LAL RATNAKER 20110134 15.9.21 70228 18.11.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 65.11 764/ 7-21/124H 12.7.21 CHHOTE LAL RATNAKER 20110134 12.6.21 70283 18.11.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 91.20 751/ 6-21/124H 10.7.21 CHHOTE LAL RATNAKER 20110134 12.6.21 70395 18.11.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 104.25 753/ 8-21/124H 10.7.21 CHHOTE LAL RATNAKER 20110134 15.9.21 70467 18.11.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 130.30 865/ 8-21/124H 18.8.21 RAJ KUMAR 20120141 15.9.21 73918 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 168.35 959/7-21/124H 8.7.21 RAJ KUMAR 20120141 15.9.21 74136 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 193.44 869/ 8-21/147H 18.8.21 RAJ KUMAR 20120141 15.9.21 73951 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 199.90 958/ 8-21/147H 8.8.21 RAJ KUMAR 20120141 16.9.21 74289 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 225.75 1079/6-21/147H 8.6.21 RAJ KUMAR 20120146 12.6.21 76220 11.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 278.78 1010/ 9-21/147H 13.9.21 RAJ KUMAR 20120141 16.9.21 74452 6.12.20

Page 11 of 327
TMS Reports WELD REGISTER

KM DATE OF PORTION LAST USFD LAST USFD TESTING LAST USFD DATE OF
LINE FROM MET FROM weld no. WELDING WELDER NAME SUPERVISOR NAME PORTION AGENCY BATCH NO INSP. RESULT DATE(RAIL/WELD) TESTING PORTION NO MANUFACTURE
DATE(WELD)

PONIT 57B RAMESH KUMAR RAIL TECH LKO GW


RR 19 251.80 988/ 9-21/147H 12.9.21 RAJ KUMAR 20120141 16.9.21 74339 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 218.30 991/ 9-21/147 H 12.9.21 RAJ KUMAR 20120141 16.9.21 74072 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 270.33 1008/ 9-21/147H 13.9.21 RAJ KUMAR 20120141 16.9.21 74429 6.12.20
PONIT 57B RAMESH KUMAR RAIL TECH LKO GW
RR 19 276.15 1005/ 9-21/124H 13.9.21 RAJ KUMAR 20120141 16.9.21 74411 6.12.20
X-OVER 60AB RAMESH KUMAR RAIL TECH LKO GW
LR 19 157.40 978/ 7-21/147H 10.7.21 RAJ KUMAR 20120141 15.9.21 74400 6.12.20
X-OVER 60AB RAMESH KUMAR RAIL TECH LKO GW
LR 19 170.45 976/9-21/147H 9.9.21 RAJ KUMAR 20120141 15.9.21 74078 6.12.20
X-OVER 60AB RAMESH KUMAR RAIL TECH LKO GW
LR 19 194.00 868/ 7-21/147H 18.8.21 RAJ KUMAR 20120141 15.9.21 73978 6.12.20
X-OVER 60AB RAMESH KUMAR RAIL TECH LKO GW
RR 19 117.45 770/ 7-21/24H 15.7.21 RAJ KUMAR 20110134 30.7.21 70300 18.11.20
X-OVER 60AB RAMESH KUMAR RAIL TECH LKO GW
RR 19 159.85 979/9-21/147H 10.9.21 RAJ KUMAR 20120141 15.9.21 74130 6.12.20
X-OVER 60AB
RR 10.9.21 RAJ KUMAR RAMESH KUMAR RAIL TECH LKO 20120141 GW 15.9.21 74385 6.12.20
19 170.65 977/ 9-21/147H
X-OVER 59AB RAMESH KUMAR RAIL TECH LKO GW
LR 19 1.80 909/7-21/124H 13.7.21 RAJ KUMAR 20120141 30.7.21 74276 6.12.20
X-OVER 59AB RAMESH KUMAR RAIL TECH LKO GW
LR 19 16.00 309/ 2-21/147H 10.3.21 RAJ KUMAR 20110134 12.6.21 70533 18.11.20
X-OVER 59AB RAMESH KUMAR RAIL TECH LKO GW
LR 19 38.60 982/ 9-21/147 H 11.9.21 RAJ KUMAR 20120141 15.9.21 74318 6.12.20
X-OVER 59AB RAMESH KUMAR RAIL TECH LKO GW
RR 19 22.35 980/9-21/147H 11.9.21 RAJ KUMAR 20120141 16.9.21 74002 6.12.20
X-OVER 59AB RAMESH KUMAR RAIL TECH LKO GW
RR 19 29.65 981/9-21/147H 11.9.21 RAJ KUMAR 20120141 16.9.21 74468 6.12.20
X-OVER 59AB RAMESH KUMAR RAIL TECH LKO GW
LR 19 78.50 768/7-21/124H 12.7.21 RAJ KUMAR 20110134 16.9.21 70234 18.11.20

Page 12 of 327
XOVE KM MET weld DATE OF
STATION LINE LR OR RR
R FROM FROM no. WELDING

SL LR 0 649.5
SL LR 0 654.1
SL LR 0 661
SL LR 0 789.1 9/8/2021
SL LR 0 813 9/8/2021
SL LR 0 825 9/8/2021

DN Line LR 1 704.25 1143


LR 1 717.25 1141
LR 1 730.25 302 10.3.21
LR 1 743.40 314 14.3.21
LR 1 756.30 317 14.3.21
LR 1 769.30 316 14.3.21
LR 1 782.40 305 10.3.21
LR 1 810.75 312 14.3.21
LR 1 841.75 320 15.3.21
LR 1 848.35 313 14.3.21
LR 1 861.35 322 15.3.21
LR 1 874.55 304 10.3.21
LR 1 881.85 402 21.5.21
LR 1 887.45 618 26.6.21
LR 1 900.30 616 26.6.21
LR 1 913.35 308 10.3.21
LR 1 926.35 886 20.8.21
RR 1 704.25 1144
RR 1 717.25 1142
RR 1 730.25 319 14.3.21

UP LINE LR 13 45.95 54 2.2.21


UP LINE LR 13 305.90 56 3.2.21
UP LINE LR 13 569.80 1320
UP LINE LR 13 556.35 1321
UP LINE LR 13 812.30 613 3.2.21
UP LINE LR 13 826.15 615 3.2.21
UP LINE RR 13 45.95 53 2.2.21
UP LINE RR 13 305.90 55 2.2.21
UP LINE RR 13 555.80 58 3.2.21
UP LINE RR 13 812.30 612 3.2.21
UP LINE RR 13 825.95 614 3.2.21
UP LINE LR 14 79.95 60 3.2.21
UP LINE LR 14 339.75 62 5.2.21
UP LINE LR 14 479.65 72 6.2.21
UP LINE LR 14 599.70 94 9.2.21
UP LINE LR 14 606.20 71 6.2.21
UP LINE LR 14 619.20 80 7.2.21
UP LINE LR 14 632.25 1322
UP LINE LR 14 645.25 82 7.2.21
UP LINE LR 14 658.25 84 7.2.21
UP LINE LR 14 671.30 66 5.2.21
UP LINE LR 14 679.10 78 6.2.21
UP LINE LR 14 692.15 76 6.2.21
UP LINE LR 14 705.15 74 6.2.21
UP LINE LR 14 718.15 65 5.2.21
UP LINE LR 14 724.70 622 26.6.21
UP LINE LR 14 864.40 85 8.2.21
UP LINE LR 14 984.45 88 8.2.21
UP LINE RR 14 79.70 59 3.2.21
UP LINE RR 14 339.25 61 5.2.21
UP LINE RR 14 479.65 69 6.2.21
UP LINE RR 14 599.70 70 6.2.21
UP LINE RR 14 606.20 73 6.2.21
UP LINE RR 14 619.20 127 14.2.21
UP LINE RR 14 632.25 81 7.2.21
UP LINE RR 14 645.25 83 7.2.21
UP LINE RR 14 658.25 93 9.2.21
UP LINE RR 14 671.30 79 6.2.21
UP LINE RR 14 679.10 77 6.2.21
UP LINE RR 14 692.15 75 6.2.21
UP LINE RR 14 705.15 611 24.5.21
UP LINE RR 14 718.15 67 5.2.21
UP LINE RR 14 724.70 623 26.6.21
UP LINE RR 14 864.40 86 8.2.21
UP LINE RR 14 984.45 87 8.2.21
UP LINE LR 15 245.90 91 9.2.21
UP LINE LR 15 505.15 89 9.2.21
UP LINE LR 15 765.80 631 28.6.21
UP LINE RR 15 245.90 92 9.2.21
UP LINE RR 15 505.75 90 9.2.21
UP LINE RR 15 765.80 630 28.6.21
UP LINE LR 16 39.60 1330
UP LINE LR 16 299.50 98 10.2.21
UP LINE LR 16 394.40 1331
UP LINE LR 16 558.40 106 11.2.21
UP LINE LR 16 817.40 646 6.2.21
UP LINE LR 16 983.2 648 6.2.21
UP LINE RR 16 26.60 96 10.2.21
UP LINE RR 16 39.60 1332
UP LINE RR 16 299.50 97 10.2.21
UP LINE RR 16 394.40 125 13.2.21
UP LINE RR 16 558.40 105 11.2.21
UP LINE RR 16 817.40 647 5.2.21
UP LINE RR 16 983.20 649 5.2.21
PORTION
WELDER NAME SUPERVISOR NAME
AGENCY

RAKESH KUMAR VERMA (UMB) MAHENDRA KUMAR PASWAN (UMB) TPP Lucknow
RAKESH KUMAR VERMA (UMB) MAHENDRA KUMAR PASWAN (UMB) TPP Lucknow
RAKESH KUMAR VERMA (UMB) MAHENDRA KUMAR PASWAN (UMB) TPP Lucknow

RAJ KUMAR RAMESH KUMAR RAIL TECH LKO


RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO

RAJ KUMAR RAMESH KUMAR RAIL TECH LKO


RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
RAJ KUMAR RAMESH KUMAR RAIL TECH LKO
LAST
LAST LAST USFD
PORTION USFD DATE OF
USFD TESTING PORTI
BATCH TESTING MANUFACTU
INSP. DATE(RAIL/W ON NO
NO DATE(WE RE
RESULT ELD)
LD)
DFWO(JP) 4/30/2022 4/8/2021
DFWO(JP) 4/30/2022 4/8/2021
GW 4/30/2022 10/21/2019
200265 GW 4/30/2022 4/23/2022 072879 12/23/2020
200265 GW 4/30/2022 4/23/2022 072943 12/23/2020
200265 GW 4/30/2022 4/23/2022 072844 12/23/2020

20120141 GW 6/19/2021 74037 6.12.20


20120141 GW 6/19/2021 73980 6.12.20
20110134 GW 6/19/2021 70301 18.11.2020
20110134 GW 6/19/2021 70416 18.11.20
20110134 GW 6/19/2021 70592 18.11.20
20110134 GW 6/19/2021 70471 18.11.20
20110134 GW 6/19/2021 70349 18.11.20
20110134 GW 6/19/2021 70344 18.11.20
20110134 GW 6/19/2021 70433 18.11.20
20110134 GW 6/19/2021 70444 18.11.20
20110134 GW 6/19/2021 70337 18.11.20
20110134 GW 6/19/2021 70359 18.11.20
20120146 GW 6/19/2021 76225 11.12.20
20110134 GW 9/17/2021 76026 18.11.20
20110134 GW 9/17/2021 70377 18.11.20
2010134 GW 9/17/2021 70216 18.11.20
20120141 GW 9/17/2021 74461 6.12.20
20120141 GW 6/19/2021 74505 6.12.20
20120141 GW 6/19/2021 74234 6.12.20
20110134 GW 6/19/2021 70517 18.11.20

20120145 GW 6/18/2021 75779 12/10/2020


20120145 GW 6/18/2021 76198 12/10/2020
GW 9/17/2021
GW 9/17/2021
20120145 GW 6/18/2021 76072 12/10/2020
20110134 GW 6/18/2021 70446 11/18/2020
20120145 GW 6/18/2021 75793 12/10/2020
20120145 GW 6/18/2021 76205 12/10/2020
20120145 GW 6/18/2021 75785 12/10/2020
20120145 GW 6/18/2021 75972 12/10/2020
20110134 GW 6/18/2021 70268 11/18/2020
GW 6/17/2021
GW 6/17/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 9/17/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 6/17/2021
GW 9/17/2021
GW 6/18/2021
GW 6/18/2021
GW 6/17/2021
GW 6/17/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 9/17/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 9/17/2021
GW 9/17/2021
GW 9/17/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 6/18/2021
GW 9/16/2021
GW 6/18/2021
GW 6/18/2021
GW 9/16/2021
GW 9/17/2021
GW 6/18/2021
GW 9/17/2021
GW 6/14/2021
GW 9/17/2021
GW 2/8/2021
GW 6/18/2021
GW 9/17/2021
GW 6/18/2021
GW 6/18/2021
GW 6/14/2021
GW 2/8/2021
GW 2/8/2021
DN /M/LINE LR 17 1049
DN /M/LINE LR 17 1047
DN /M/LINE LR 17 1045
DN /M/LINE LR 17 1043
DN /M/LINE LR 17 1041
DN /M/LINE LR 17 1077
DN /M/LINE LR 17 976
DN /M/LINE LR 17 987
DN /M/LINE LR 17 793
DN /M/LINE RR 17 1048
DN /M/LINE RR 17 1046
DN /M/LINE RR 17 1165
DN /M/LINE RR 17 1164
DN /M/LINE RR 17 1040
DN /M/LINE RR 17 966
DN /M/LINE RR 17 968
DN /M/LINE RR 17 986
DN /M/LINE RR 17 794
KM MET DATE OF SUPERVISOR
FROM FROM weld no. WELDING
WELDER NAME
NAME

LR 12 49.20 284/3-21/147H 4.3.21 CHHOTE LAL RATNAKER 11/4/2092


LR 12 62.20 589/6-21/147H 23.6.21 CHHOTE LAL RATNAKER 11/4/2092
LR 12 75.25 282/3-21/136H 4.3.21 CHHOTE LAL RATNAKER 11/4/2092
LR 12 88.30 268/3-21/139H 3.3.21 CHHOTE LAL RATNAKER 11/4/2092
LR 12 101.35 281/3-21/136H 4.3.21 CHHOTE LAL RATNAKER 11/4/2092
LR 12 114.35 669/7-21/136H 2.7.21 CHHOTE LAL RATNAKER 11/4/2092
LR 12 127.40 657/7-21/147H 1.7.21 CHHOTE LAL RATNAKER 11/4/2092
LR 12 135.30 655/7-21/147H 1.7.21 CHHOTE LAL RATNAKER 11/4/2092
LR 12 148.35 653/7-21/147H 1.7.21 CHHOTE LAL RATNAKER 11/4/2092
LR 12 161.40 651/7-21/147H 1.7.21 CHHOTE LAL RATNAKER 11/4/2092
LR 12 174.40 658/7-21/147H 1.7.21 CHHOTE LAL RATNAKER 11/4/2092
LAST
LAST USFD
USFD DATE OF
PORTION PORTION LAST USFD TESTING TESTING PORTION MANUFACT
AGENCY BATCH NO INSP. RESULT DATE(RAIL/WE NO
DATE(WE URE
LD) LD)

26.7.21 20110134 11/4/2092 26.7.21 70517 18.11.20


26.7.21 20110134 11/4/2092 26.7.21 70437 18.11.20
26.7.21 20110134 11/4/2092 26.7.21 70583 18.11.20
26.7.21 20110134 11/4/2092 26.7.21 70539 18.11.20
26.7.21 20110134 11/4/2092 26.7.21 70538 18.11.20
26.7.21 20110134 11/4/2092 26.7.21 70365 18.11.20
26.7.21 20110134 11/4/2092 26.7.21 70492 18.11.20
26.7.21 20120145 11/4/2092 26.7.21 75949 10.12.20
26.7.21 20120145 11/4/2092 26.7.21 76039 10.12.20
26.7.21 20120145 11/4/2092 26.7.21 70466 10.12.20
26.7.21 20120145 11/4/2092 26.7.21 76100 10.12.20