WORK SCHEDULE

Project: Bonda/Arbale Micro Earthen Dam With SSF Treatement RWS Project

Employer: Borena Zone Finance Office

Contractor: Reach The Source General Water Works

TIME LIMIT OF WORK TO EXICUTE


MONTH ONE MONTH TWO
MONTH THREE

WEEK WEEK WEEK WEEK


WEEK ONE WEEK TWO WEEK THREE WEEK FOUR WEEK FIVE WEEK SIX WEEK NIN WEEK TEN
SEVEN EIGHT ELEVEN TWELVE
No. Works

TYPES OF WORK

Mobilization And Construction


Of Camp
1

Site clearing allong the Project


lines and structure not exceeding
2 20cm

Excavation and earth work


3

Rehabilitation of existing 50m3


sandwich massonary reservor
4
Rehabilitation of existing 25m3
collection chamber that carry
clean water
5

Rehabilitation of existing public


Fountains
6

Rehabilitation of existing Cattle


trough
7

Construction of Micro Earthen


Dam
8
Construction of Slow sand filiter
(SSF)
9

Construction of generator house with


Guard & mini store
10

Supply and Inistallation of HDPE


Pipe and its necessary fitting
11

Supply complete set Surface


/Dewatering Pumpof power
12

Supply set of surface/


Submersible pump of power
13

Finishing Of Remaining Works


And Provisional Acceptance

14

REMARK;-

______________________
CASH FLOW SCHEDULE
Project: Bonda/Arbale Micro Earthen Dam With SSF Treatement RWS Project

Employer: Borena Zone Finance Office

Contractor: Reach The Source General Water Works

TIME LIMIT OF CASH FLOW SCHEDULE


MONTH ONE MONTH TWO
MONTH THREE

WEEK WEEK WEEK WEEK


WEEK ONE WEEK TWO WEEK THREE WEEK FOUR WEEK FIVE WEEK SIX WEEK NIN WEEK TEN
SEVEN EIGHT ELEVEN TWELVE
No. MAN POWER

1 POSITION

ADVANCE PAYMENT
1

FIRST PAYMENT

1.1

SECOND PAYMENT

1.2

THIRD PAYMENT
1.3

FINAL PAYMENT

1.4

REMARK;-

______________________
MAN POWER SCHEDULE
Project: Bonda/Arbale Micro Earthen Dam With SSF Treatement RWS Project

Employer: Borena Zone Finance Office

Contractor: Reach The Source General Water Works

TIME LIMIT OF MAN POWER SCHEDULE


MONTH ONE MONTH TWO
MONTH THREE

WEEK WEEK WEEK WEEK


WEEK ONE WEEK TWO WEEK THREE WEEK FOUR WEEK FIVE WEEK SIX WEEK NIN WEEK TEN
SEVEN EIGHT ELEVEN TWELVE
No. MAN POWER

1 POSITION

General Manager

Project Manager

Project Engineer

1.1

Structural Engineer

1.2

Material Engineer

1.3

Construction Superintendent

1.4

Chief Surveyor

1.5

REMARK;-

______________________
MATERIAL SCHEDULE
Project:
Employer:
Contractor: MMT TRADING PLC

TIME LIMIT OF MATERIAL SCHEDULE


MONTH ONE MONTH TWO
MONTH THREE

WEEK WEEK WEEK WEEK


WEEK ONE WEEK TWO WEEK THREE WEEK FOUR WEEK FIVE WEEK SIX WEEK NIN WEEK TEN
SEVEN EIGHT ELEVEN TWELVE
No. MATERIAL

1 TYPES OF MATERIAL

Cement(OPC)
1

Supply of stone for masonary


2

Supply of Select materials


3

SUPPLY OF ANGE IRON

Reinforcement Bars

Natural Sand

SUPPLY OF BERBED WIRE

Timber

Carpentery Or MODINO

REMARK;-
______________________
EQUIPMENT SCHEDULE
Project: Bonda/Arbale Micro Earthen Dam With SSF Treatement RWS Project

Employer: Borena Zone Finance Office

Contractor: Reach The Source General Water Works

TIME LIMIT OF EQIUPMENT


MONTH ONE MONTH TWO
MONTH THREE

WEEK WEEK WEEK WEEK


WEEK ONE WEEK TWO WEEK THREE WEEK FOUR WEEK FIVE WEEK SIX WEEK NIN WEEK TEN
SEVEN EIGHT ELEVEN TWELVE
No. EQUIPMENT

1 TYPES OF EQUIPMENT

Dump Truck

GRADER

ROLLER

LOADER

PICK UP

1.1

Vibrator

1.2

Concrete mixer

1.3

Hand Compactor

1.4

Total Station

1.6

Rolled Measuring Tap

1.7

1.8 Hand Tools

1.9 Leveling Instrument

10.1 Garmin GPS

REMARK;-

______________________