You are on page 1of 38

FACULTY OF CIVIL ENGINEERING AND BUILT ENVIRONMENT

PRELIMINARY REPORT

(1/20222023)

COURSE CODE BFC43303

COURSE NAME INTEGRATED DESIGN PROJECT

STUDENT NAME MOHD SYAWAL ASNAWI BIN SUKRI CF190130


AMIRUL ADAM BIN MOHD ABDUL RAHMAN CF190126
MUHAMMAD SHAHRUL NIEZAM BIN MOHD
JAAFAR DF190137
NUR SABRINA BINTI MOHD DAUD CF190059
SITI HAJAR BINTI RADUAN CF190058

GROUP :5

SECTION :5

LECTURER NAME : Ir. Dr. MOHAMMAD SOFFI BIN MD NOH

DATE OF SUBMISSION: 6 NOVEMBER 2023


TABLE OF CONTENT

NO. CONTENT PAGE


1.0 Introduction 1
2.0 COMPANY PROFILE
2.1 Company Background
2.2 Vision And Mission Of Company 2–5
2.3 Company Organisation
2.4 Services Offered
2.5 Product Services
3.0 PROJECT BRIEF
3.1 Project Introduction
3.2 Location of Project 6–8
3.3 Scope of Project
4.0 PROJECT PLANNING AND SCHEDULING 9 – 13
5.0 DESIGN PROCESS AND PARAMETER 14 – 16
5.1 Code of Practice
5.2 Design Parameters
5.3 Materials Properties
6.0 ARCHITECTURAL DRAWING 17 – 26
7.0 PROPOSAL STRUCTURAL LAYOUT PLAN AND 27 – 30
STRUCTURAL ARRANGEMENT
8.0 GROUP MEETING MINUTES AND PROGRESS 31 - 36
REPORT
1.0 INTRODUCTION

Civil engineers deal with design, construction management, project implementation,


handover, laboratory testing and many other parts of the job that involve construction,
management and planning. Generally, civil engineers are involved in the design process. The
process starts with the construction plans submitted by the architect, working together to
establish the client's requirements for the materials and use of the building project, and then
continues with the process of structural design and infrastructure. Civil engineers are
responsible for ensuring that the design is economical, safe and environmentally sound.

An integrated design project (IDP) is a multidisciplinary project that includes civil engineering
disciplines such as surveying, geotechnical, hydraulic, structural, infrastructure and
environmental engineering. It is a first insight into the design of construction projects for
students before they are confronted with the real work situation after graduation. Students have
to demonstrate their knowledge and technical competence in planning the construction project,
while also demonstrating the soft skills required for efficient and problem-solving teamwork.
In this project, we have to propose, design, review and fabricate the structural and
infrastructural components of the building design based on the drawing prepared by the
architect. Firstly, for the structural aspect, a comprehensive proposal of structural drawing
layout with the design of structural elements, the use of ESTEEM software for structural
design, and review the design output of manual and software design. Secondly, the
infrastructural aspect of the project includes earthworks, drainage system, sewerage, water
supply, and other components.

In addition, this design practise also includes project management, which encompasses the
theory, tools, and techniques of engineering design and creative problem solving, as well as
design issues in civil engineering. Apart from this, the knowledge and technical aspects of this
integrated design project are tremendously helpful in enabling students to apply the civil
engineering knowledge acquired during their studies in a real-life application and
comprehensive learning.

1
2.0 COMPANY PROFILE

2.1 Company Background

Inspire Consultant Sdn Bhd was established in 2009 and has grown over the years providing
consulting services in the field of geotechnical, civil infrastructural, structural, mechanical and
electrical engineering. This company’s construction service business is further strengthened
using Virtual Design and Construction (VDC) technology which enables a greater competitive
edge in the projects that has been undertake. With a track record spanning over 12 years, this
company is capable of tailoring fully integrated and cost-effective solutions for our clients,
delivering effective end-to-end solutions as well as control over timely delivery and quality.

Inspire Consultant has a team of experts, resources and technical capabilities to undertake or
support any major engineering consultancy works. In order to improve our services and provide
quick action to our valued clients, we have established our offices in the following locations:

2
COMPANY NAME : Inspire Consultant Sdn Bhd

ADDRESS : No.9, Jalan Universiti 14, 86400, Parit Raja, Batu Pahat,
Johor
Tel: 07 - 351 7491
Fax: 07 – 351 7492

EMAIL ADDRESS : Inspireconsultant@gmail.com

DATE OF ESTABLISHED : 25th April 2009

COMPANY : 323456-M
REGISTRATION
NUMBER

CIDB REGISTRATION : G6 (Category B)


GRADE G6 (Category CE)
G6 (Category ME)

PRINCIPLE ACTIVITY : Civil, Structural & Related Activity

BANKERS Bank Muamalat Sdn. Bhd.

3
2.2 Vision And Mission Of Company

2.2.1 Vision

We aim to be a renowned and respected consultancy in the field of industrial buildings.


2.2.2 Mission

✓ To provide convenient one-stop consultancy services to reduce hassle and make it easy
for clients to own their premises.
✓ To provide advanced construction technology to save clients time and money.
✓ To ensure that our clients' premises meet the latest international standards.
✓ Promoting professionalism and technical progress in the construction industry.

2.3 Company Organisation

MOHD SYAWAL ASNAWI BIN


SUKRI
PROJECT MANAGER

NUR SABRINA BINTI MOHD


DAUD
SOFTWARE MANAGER

SITI HAJAR BINTI RADUAN


DRAWING MANAGER

MUHAMMAD SHAHRUL NIEZAM


BIN MOHD JAAFAR
DESIGN MANAGER

AMIRUL ADAM BIN MOHD


ABDUL RAHMAN
SUBMISSION MANAGER

4
2.4 Services Offered

Inspire Consultant Sdn. Bhd. offers a full spectrum of civil and structural engineering solutions
to meet the needs each of our client. The services offered includes: -
1. Preliminary Study
2. Engineering Design
3. Supervision
4. Project Management
5. Management Consultancy
6. Road Safety
7. Traffic Studies
8. Computer Aided Design and Drafting

2.5 Product Services

The principal and staff of Inspire Consultant have worked in both the public and private sectors
and have a wealth of experience in the construction industry. Based on this capital, Inspire
Consultant Sdn. Bhd. has provided professional services in the following areas: Engineering:
1. High Rise Building
2. Domestic Housing Schemes and Townships
3. Designing and Consulting
4. Water Reticulations Systems
5. Sewerage System
6. Drainage, Irrigation & Spillway
7. Roadwork

5
3.0 PROJECT BRIEF

3.1 Project Introduction

Inspire Consulting SDN BHD is needed to conduct a consultancy service for substation
building construction projects which is located at Sepang, Selangor. This building consists of
3-storeys. This construction is proposed as to provides accommodation for the staff which it
can accommodate minimum up to 10 staffs. The quarters are also equipped with basic facilities
such as 2 master bedrooms, 5 bedrooms, 1 living room, 1 kitchen area, 5 bathrooms. It is very
conducive and suitable for family to stay in this quarters. In terms of the design of building,
these quarters involve the common structure building such as beam, slab, column, pile, and
foundation. Below are the details of this project:

Project Name Cadangan Pembinaan Sekolah Berasrama Penuh Baru Yang Mengandungi 24
Bilik Darjah, Asrama 750 Murid, Rumah Guru Dan Lain-Lain Kemudahan
Berkaitan Di Bandar Baru Salak Tinggi, Sepang, Selangor.
Developer Paramount Property
Client Kementerian Pendidikan Malaysia
Architecture Siti Hajar Raduan
C&S Consultant Inspire Consultant Sdn Bhd
M&E Consutant Inspire Consultant Sdn Bhd
QS Consultant Inspire Consultant Sdn Bhd
Town Planner Inspire Consultant Sdn Bhd
Company Inspire Consultant Sdn Bhd, No.9, Jalan Universiti 14, 86400, Parit Raja,
Adddress Batu Pahat, Johor
Project Address Lot 2014, Mukim Labu, Bandar Baru Salak Tinggi, 43900 Sepang, Selangor
Project Duration 10 months

3.2 Location of Project

The proposed building will be constructing under region of Sepang, Selangor. Located at
address Lot 2014, Mukim Labu, Bandar Baru Salak Tinggi, 43900 Sepang, Selangor. The
project is estimated finished within 10 months from the contract agreement.

6
• Key plan

Figure 2.1: Key plan of the site from Google Map

• Plan Location

Figure 2.2: Location plan of the site from Google Map

3.3 Scope of Project

This project of three-storey quarters buildings situated at Lot 2014, Mukim Labu, Bandar Baru
Salak Tinggi, 43900 Sepang, Selangor. The development of 3-storeys quarters building which
intended to develop Sepang, Selangor to increase the current supply around the area as well as
creating more job opportunity. Sepang is one of the towns which is packed with people and the
construction purpose is to served that. It is located only a few km from Sepang District Police
Headquarters.

7
If look at the architecture and structural drawing Level 1 until Level 3. Moreover, in
terms of the design of buildings, these quarters building involving the common building
structure such as beam, slab, column, pile, and foundation. Before starting the construction, all
the details need to be prepared beforehand such as the bill of quantity (BQ) and the drawings
that included the architecture drawing (ARC), civil and structure drawing (C&S) and
mechanical and electrical drawing (M&E). The process of design the structure is based on the
standard specification as stated in the Eurocode 1 (EC1) and Eurocode 2 (EC2).

8
4.0 PROJECT PLANNING AND SCHEDULING

Project planning & scheduling are an important aspect of the project management to assure the
project time, quality and task planning are meet accordingly. Moreover, the process of
monitoring and controlling the project processes will be easier and extensive with the project
planning and scheduling form. In this project, Gantt chart is the form of planning and
scheduling we selected to ensure the project progress are controlled appropriately.

9
ID WBS Task Name Duration Start Finish Qtr 4, 2022 Qtr 1, 2023 Qtr 2, 2023 Qtr 3, 2023 Qtr 4, 2023
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
1 1 CADANGAN MEMBINA SEBUAH RUMAH BANGLO 3 276 days Mon 17/10/22 Thu 21/9/23
TINGKAT DI ATAS LOT 49047, BAYU SURIA, SELANGOR
2 1.1 Project Start 0 days Mon 17/10/22 Mon 17/10/22 17/10
3 1.2 General Preliminaries 5 days Mon 17/10/22 Fri 21/10/22
4 1.2.1 Constractual Requirements 5 days Mon 17/10/22 Fri 21/10/22
5 1.2.1.1 Performance Bond 1 day Mon 17/10/22 Mon 17/10/22
6 1.2.1.2 Insurance Of Work and Injuries and Properties 4 days Tue 18/10/22 Fri 21/10/22
7 1.2.1.3 Insurance Of Contractor's All Risk 4 days Tue 18/10/22 Fri 21/10/22
8 1.3 Contract Administration 176 days Sat 22/10/22 Sat 27/5/23
9 1.3.1 Project Safety Plan 1 day Sat 22/10/22 Sat 22/10/22
10 1.3.2 Setting Out 1 day Tue 25/10/22 Tue 25/10/22
11 1.3.3 Work Programme 1 day Wed 26/10/22 Wed 26/10/22
12 1.3.4 Monthly Report 176 days Sat 22/10/22 Sat 27/5/23
13 1.3.4.1 Monthly Report 1 1 day Sat 22/10/22 Sat 22/10/22
14 1.3.4.2 Monthly Report 2 1 day Sat 26/11/22 Sat 26/11/22
15 1.3.4.3 Monthly Report 3 1 day Sat 24/12/22 Sat 24/12/22
16 1.3.4.4 Monthly Report 4 1 day Sat 28/1/23 Sat 28/1/23
17 1.3.4.5 Monthly Report 5 1 day Sat 25/2/23 Sat 25/2/23
18 1.3.4.6 Monthly Report 6 1 day Sat 25/3/23 Sat 25/3/23
19 1.3.4.7 Monthly Report 7 1 day Tue 25/4/23 Tue 25/4/23
20 1.3.4.8 Monthly Report 8 1 day Sat 27/5/23 Sat 27/5/23
21 1.3.5 Office Drawing 1 day Tue 25/10/22 Tue 25/10/22
22 1.4 Materials and Samples 1 day Mon 17/10/22 Mon 17/10/22
23 1.4.1 Sample 1 day Mon 17/10/22 Mon 17/10/22
24 1.4.2 Testing 1 day Mon 17/10/22 Mon 17/10/22
25 1.5 Temporary Building And Works 19 days Thu 27/10/22 Thu 17/11/22
26 1.5.1 Contractor's Temporary Site Office 2 days Thu 27/10/22 Fri 28/10/22
27 1.5.2 Temporary Lighting And Power 3 days Sat 29/10/22 Tue 1/11/22
28 1.5.3 Project Signboard 3 days Wed 2/11/22 Fri 4/11/22
29 1.5.4 Temporary Hoarding 3 days Sat 5/11/22 Tue 8/11/22
30 1.5.5 Temporary Scaffolding 3 days Wed 9/11/22 Fri 11/11/22
31 1.5.6 Tempory Access And Roads 3 days Sat 12/11/22 Tue 15/11/22
32 1.5.7 Plant & Machinery 2 days Wed 16/11/22 Thu 17/11/22
33 1.6 Site Clearance & Earth 14 days Fri 18/11/22 Sat 3/12/22
34 1.6.1 Site Clearing 5 days Fri 18/11/22 Wed 23/11/22
35 1.6.2 Flood Level 5 days Thu 24/11/22 Tue 29/11/22
36 1.6.3 Earthworks 4 days Wed 30/11/22 Sat 3/12/22
37 1.7 Temporary Works 8 days Mon 5/12/22 Wed 14/12/22
38 1.7.1 Wash Through 4 days Mon 5/12/22 Thu 8/12/22
39 1.7.2 Temporary Earth Drain 4 days Fri 9/12/22 Wed 14/12/22
40 1.8 House Building 123 days Thu 15/12/22 Wed 17/5/23
41 1.8.1 Substructure 25 days Thu 15/12/22 Sat 14/1/23
42 1.8.1.1 Pile Cap 16 days Thu 15/12/22 Wed 4/1/23
43 1.8.1.1.1 Excavation 6 days Thu 15/12/22 Wed 21/12/22

Task Project Summary Manual Task Start-only Deadline

Project: MS PROJECT Split Inactive Task Duration-only Finish-only Progress


Date: Thu 3/11/22 Milestone Inactive Milestone Manual Summary Rollup External Tasks Manual Progress

Summary Inactive Summary Manual Summary External Milestone

Page 1

10
ID WBS Task Name Duration Start Finish Qtr 4, 2022 Qtr 1, 2023 Qtr 2, 2023 Qtr 3, 2023 Qtr 4, 2023
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
44 1.8.1.1.2 Formwork 8 days Thu 22/12/22 Sat 31/12/22
45 1.8.1.1.3 Reinforcement 5 days Thu 22/12/22 Wed 28/12/22
46 1.8.1.1.4 Concrete 5 days Thu 29/12/22 Wed 4/1/23
47 1.8.1.2 Column Stump 9 days Thu 5/1/23 Sat 14/1/23
48 1.8.1.2.1 Formwork 6 days Thu 5/1/23 Wed 11/1/23
49 1.8.1.2.2 Reinforcement 5 days Thu 5/1/23 Tue 10/1/23
50 1.8.1.2.3 Concrete 4 days Wed 11/1/23 Sat 14/1/23
51 1.8.2 Superstructure 37 days Wed 11/1/23 Fri 24/2/23
52 1.8.2.1 1st Floor 37 days Wed 11/1/23 Fri 24/2/23
53 1.8.2.1.1 1st Floor Beam & Slab 9 days Wed 11/1/23 Fri 20/1/23
54 1.8.2.1.1.1 Formwork 8 days Wed 11/1/23 Thu 19/1/23
55 1.8.2.1.1.2 Reinforcement 5 days Wed 11/1/23 Mon 16/1/23
56 1.8.2.1.1.3 Concrete 4 days Tue 17/1/23 Fri 20/1/23
57 1.8.2.1.2 1st Floor Column 9 days Sat 21/1/23 Wed 1/2/23
58 1.8.2.1.2.1 Formwork 8 days Sat 21/1/23 Tue 31/1/23
59 1.8.2.1.2.2 Reinforcement 5 days Sat 21/1/23 Fri 27/1/23
60 1.8.2.1.2.3 Concrete 4 days Sat 28/1/23 Wed 1/2/23
61 1.8.2.1.3 1st Floor Wall 11 days Thu 2/2/23 Wed 15/2/23
62 1.8.2.1.3.1 Brick Work 11 days Thu 2/2/23 Wed 15/2/23
63 1.8.2.1.4 Staircase 8 days Thu 16/2/23 Fri 24/2/23
64 1.8.2.1.4.1 Formwork 8 days Thu 16/2/23 Fri 24/2/23
65 1.8.2.1.4.2 Reinforcement 5 days Thu 16/2/23 Tue 21/2/23
66 1.8.2.1.4.3 Concrete 3 days Wed 22/2/23 Fri 24/2/23
67 1.8.3 2st Floor 38 days Wed 22/2/23 Thu 6/4/23
68 1.8.3.1 2st Floor Beam & Slab 9 days Wed 22/2/23 Fri 3/3/23
69 1.8.3.1.1 Formwork 8 days Wed 22/2/23 Thu 2/3/23
70 1.8.3.1.2 Reinforcement 5 days Wed 22/2/23 Mon 27/2/23
71 1.8.3.1.3 Concrete 4 days Tue 28/2/23 Fri 3/3/23
72 1.8.3.2 2nd Floor Column 9 days Sat 4/3/23 Tue 14/3/23
73 1.8.3.2.1 Formwork 8 days Sat 4/3/23 Mon 13/3/23
74 1.8.3.2.2 Reinforcement 5 days Sat 4/3/23 Thu 9/3/23
75 1.8.3.2.3 Concrete 4 days Fri 10/3/23 Tue 14/3/23
76 1.8.3.3 2nd Floor Wall 11 days Wed 15/3/23 Mon 27/3/23
77 1.8.3.3.1 Brick Work 11 days Wed 15/3/23 Mon 27/3/23
78 1.8.3.4 Staircase 9 days Tue 28/3/23 Thu 6/4/23
79 1.8.3.4.1 Formwork 8 days Tue 28/3/23 Wed 5/4/23
80 1.8.3.4.2 Reinforcement 5 days Tue 28/3/23 Sat 1/4/23
81 1.8.3.4.3 Concrete 4 days Mon 3/4/23 Thu 6/4/23
82 1.8.4 3rd Floor 34 days Mon 3/4/23 Wed 17/5/23
83 1.8.4.1 3rd Floor Beam & Slab 9 days Mon 3/4/23 Thu 13/4/23
84 1.8.4.1.1 Formwork 8 days Mon 3/4/23 Wed 12/4/23
85 1.8.4.1.2 Reinforcement 5 days Mon 3/4/23 Fri 7/4/23
86 1.8.4.1.3 Concrete 4 days Mon 10/4/23 Thu 13/4/23
87 1.8.4.2 3rd Floor Column 9 days Mon 10/4/23 Wed 19/4/23

Task Project Summary Manual Task Start-only Deadline

Project: MS PROJECT Split Inactive Task Duration-only Finish-only Progress


Date: Thu 3/11/22 Milestone Inactive Milestone Manual Summary Rollup External Tasks Manual Progress

Summary Inactive Summary Manual Summary External Milestone

Page 2

11
ID WBS Task Name Duration Start Finish Qtr 4, 2022 Qtr 1, 2023 Qtr 2, 2023 Qtr 3, 2023 Qtr 4, 2023
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
88 1.8.4.2.1 Formwork 8 days Mon 10/4/23 Tue 18/4/23
89 1.8.4.2.2 Reinforcement 5 days Mon 10/4/23 Fri 14/4/23
90 1.8.4.2.3 Concrete 4 days Sat 15/4/23 Wed 19/4/23
91 1.8.4.3 3rd Floor Wall 11 days Thu 20/4/23 Sat 6/5/23
92 1.8.4.3.1 Brick Work 11 days Thu 20/4/23 Sat 6/5/23
93 1.8.4.4 Staircase 9 days Mon 8/5/23 Wed 17/5/23
94 1.8.4.4.1 Formwork 8 days Mon 8/5/23 Tue 16/5/23
95 1.8.4.4.2 Reinforcement 5 days Mon 8/5/23 Fri 12/5/23
96 1.8.4.4.3 Concrete 4 days Sat 13/5/23 Wed 17/5/23
97 1.9 Roof 23 days Thu 18/5/23 Wed 14/6/23
98 1.9.1 Roof Beam and Slab 23 days Thu 18/5/23 Wed 14/6/23
99 1.9.1.1 Formwork 8 days Thu 18/5/23 Fri 26/5/23
100 1.9.1.2 Reinforcement 5 days Thu 18/5/23 Tue 23/5/23
101 1.9.1.3 Concrete 4 days Wed 24/5/23 Sat 27/5/23
102 1.9.1.4 Roof Trusses 8 days Mon 29/5/23 Wed 7/6/23
103 1.9.1.5 Roofer 6 days Thu 8/6/23 Wed 14/6/23
104 1.10 Finishes 30 days Thu 8/6/23 Thu 13/7/23
105 1.10.1 Door Installation 3 days Thu 8/6/23 Sat 10/6/23
106 1.10.2 Window Installation 3 days Thu 8/6/23 Sat 10/6/23
107 1.10.3 Floor Finishing 4 days Mon 12/6/23 Thu 15/6/23
108 1.10.4 Wall Finishing 5 days Fri 16/6/23 Wed 21/6/23
109 1.10.5 Ceiling 7 days Thu 22/6/23 Fri 30/6/23
110 1.10.6 Roof Finishing 5 days Sat 1/7/23 Thu 6/7/23
111 1.10.7 Painting 6 days Fri 7/7/23 Thu 13/7/23
112 1.11 Mechanical Work 35 days Fri 16/6/23 Fri 28/7/23
113 1.11.1 Plumbing & Sanitary Service 22 days Fri 16/6/23 Wed 12/7/23
114 1.11.1.1 Cold Water Service 3 days Fri 7/7/23 Mon 10/7/23
115 1.11.1.2 Sanitary Service 2 days Tue 11/7/23 Wed 12/7/23
116 1.11.1.3 Plumbing 4 days Fri 16/6/23 Tue 20/6/23
117 1.11.1.4 Sanitary Equipment 2 days Wed 21/6/23 Thu 22/6/23
118 1.11.2 Fire Protection Service 13 days Fri 23/6/23 Sat 8/7/23
119 1.11.2.1 Hose Reel System 5 days Fri 23/6/23 Wed 28/6/23
120 1.11.2.2 Automatic Fire Alarm and Detection System 3 days Fri 30/6/23 Mon 3/7/23
121 1.11.2.3 Portable Fire Extinguisher 3 days Tue 4/7/23 Thu 6/7/23
122 1.11.2.4 Miscellaneous items 2 days Fri 7/7/23 Sat 8/7/23
123 1.11.3 Air Conditioning & Ventilation Service 16 days Mon 10/7/23 Fri 28/7/23
124 1.11.3.1 Air Conditioning System 6 days Mon 10/7/23 Sat 15/7/23
125 1.11.3.2 Exhaust System 4 days Mon 17/7/23 Fri 21/7/23
126 1.11.3.3 Miscellaneous items 2 days Sat 22/7/23 Mon 24/7/23
127 1.11.3.4 Pre Testing & Comissioning 1 day Tue 25/7/23 Tue 25/7/23
128 1.11.3.5 Lift Operation Services 3 days Wed 26/7/23 Fri 28/7/23
129 1.12 Electrical Work 22 days Sat 29/7/23 Wed 23/8/23
130 1.12.1 Element 1:Lv System 3 days Sat 29/7/23 Tue 1/8/23
131 1.12.2 Element 2: Corridor/ Common Area 3 days Wed 2/8/23 Fri 4/8/23

Task Project Summary Manual Task Start-only Deadline

Project: MS PROJECT Split Inactive Task Duration-only Finish-only Progress


Date: Thu 3/11/22 Milestone Inactive Milestone Manual Summary Rollup External Tasks Manual Progress

Summary Inactive Summary Manual Summary External Milestone

Page 3

12
ID WBS Task Name Duration Start Finish Qtr 4, 2022 Qtr 1, 2023 Qtr 2, 2023 Qtr 3, 2023 Qtr 4, 2023
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
132 1.12.3 Element 3: Menangement Office 3 days Sat 5/8/23 Tue 8/8/23
133 1.12.4 Element 4: Wifi Service 2 days Wed 9/8/23 Thu 10/8/23
134 1.12.5 Element 5: Lightning Protection System 3 days Fri 11/8/23 Mon 14/8/23
135 1.12.6 Element 6: Public Address System 3 days Tue 15/8/23 Thu 17/8/23
136 1.12.7 Element 7: Any Other Works 3 days Fri 18/8/23 Mon 21/8/23
137 1.12.8 Pre Testing & Comissioning 2 days Tue 22/8/23 Wed 23/8/23
138 1.13 Infrastructure 23 days Thu 24/8/23 Thu 21/9/23
139 1.13.1 Drain and Drainage 4 days Thu 24/8/23 Mon 28/8/23
140 1.13.2 Fence 3 days Tue 29/8/23 Fri 1/9/23
141 1.13.3 Tnb and Water Supply 7 days Sat 2/9/23 Sat 9/9/23
142 1.13.4 Road 5 days Mon 11/9/23 Fri 15/9/23
143 1.13.5 Landscape 4 days Mon 18/9/23 Thu 21/9/23
144 1.14 Project Finish 0 days Thu 21/9/23 Thu 21/9/23 21/9

Task Project Summary Manual Task Start-only Deadline

Project: MS PROJECT Split Inactive Task Duration-only Finish-only Progress


Date: Thu 3/11/22 Milestone Inactive Milestone Manual Summary Rollup External Tasks Manual Progress

Summary Inactive Summary Manual Summary External Milestone

Page 4

13
5.0 DESIGN PROCESS AND PARAMETERS

The goal of every structure is to be designed based on its strength, stability, and serviceability.
Normally, there are three requirements that need to be satisfied in design of a structure. The
three requirements are stability to prevent the overturning or buckling of the structure, the
strength to withstand the stressed caused by various loads, and lastly the serviceability to
guarantee adequate performance under the service load conditions. Therefore, to meet these
goals, the structural design should comply with the standards and design code.

5.1 Code of Practice

The code of practice used in this project are as follows.

i) Malaysian Standard MS EN documents on Design of Structures:


1) MS EN 1990: 2010 – Eurocode – Basis of Structural Design
2) MS EN 1991: 2010 – Eurocode – Actions on Structures
3) MS EN 1992: 2010 – Eurocode – Design of Concrete Structures

ii) Malaysia National Annex Documents to Eurocodes:


1) MS EN 1990: 2010 – Malaysia National Annex to Eurocode
2) MS EN 1991-1-1: 2010 – Malaysia National Annex to Eurocode 1: General
Action – Densities, Self - Weight, Imposed Loads for Buildings
3) MS EN 1992-1-1: 2010 – Malaysia National Annex to Eurocode 2: Design of
Concrete Structures – Part 1-1: General Rules and Rules for Building
Structures
4) MS 1553: 2002 – Code of Practice on Wind Loading for Building Structure
5) MS EB 1997-1: 2012 – Malaysia National Annex to Eurocode 7: Geotechnical
Design – Part 1: General Rules
6) MS EN 1998-1: 2017 – Malaysia National Annex to Eurocode 8: Design
Structures for Earthquake Resistance – Part 1: General Rules, Seismic Actions
and Rules for Building

14
5.2 Design Parameters

1) Concrete cover
Concrete cover or also known as nominal cover will be calculated using the Equation
4.1 in Clause 4.4.1.1 (2) from Eurocode 2 as shown below.
Cnom = Cmin + Δ Cdev
To determine the value of Cmin, the greater value between minimal cover with regards
to bond, nominal cover with regard to durability, and minimal required axis distance
for R60 resistance shall be used. The recommended value of Δ Cdev according to the
National Annex is 10 mm. The parameter that will be used to determine the value
of Cmin, are as follows.
i) Exposure class – Exposure class that used in this project is XC3 referred to
the Table 4.1 MS EN 1992-1-1: 2004 that is suitable for dry and
permanently wet.
ii) Design life – The design life for the building will refer to the Clause 2.3 in
MS EN 1990, which is 50 years in category 4.
iii) Fire resistance – The standard fire resistance is R60 based on the Uniform
Building by Law.
iv) Durability – The minimum cover with regards to the durability used in this
project is 25 mm.
v) Bond – The minimum cover due to bond is 10 mm which is same as the
diameter of reinforcement bar, by referred to the Table 4.2 in BS EN 1992-
1-1:2004
2) Loadings
There are two types of loading, permanent action and variable action are taken
into consideration.
i) Characteristics Permanent Action, Gk - Permanent actions, which also
known as dead loads, are those actions that remain constant throughout
time, such as self-weight of beam, column, slabs, walls, and finishes.
ii) Characteristics Variable Action, Qk – Action caused by people.

15
5.3 Materials Properties

Unit weight of concrete = 25N/mm2

Characteristic strength of concrete, fck = 30 N/mm2 (Class C30/37)

Characteristic strength of steel, fyk = 500 N/mm2

16
ARCHITECTURAL DRAWING

17
KUARTERS 3 TINGKAT

6700 6700
A 6700
3350 3350 3350 3350 3350 3350
1200 2150 1200 2150 2150 1200

CT PP
SC CT
NV
325

2.40m²
F.L 0.100m
2000

BATH 1 BATH 1 BATH 1


CT PP
SC
NV
CT CADAN AN PEMBINAAN SE OLAH
TS1022 11.63m² TS1022 TS1022 BERASRAMA PENUH BARU YAN
4700

F.L 0.150m
MASTER BEDROOM MASTER BEDROOM MASTER BEDROOM MEN ANDUN I 24 BILI DARJAH, ASRAMA
BEDROOM 1 BEDROOM 1 BEDROOM 1 750 MURID, RUMAH URU DAN LAIN-LAIN
B B
CT PP
SC CT
NV EMUDAHAN BER AITAN DI BANDAR BARU
2700

15.74m²
F.L 0.150m
TS1022 TS1022 TS1022
SALA TIN I, SEPAN , SELAN OR.

FAMILY AREA FAMILY AREA FAMILY AREA


3225
13025
3725

CT PP
SC CT
NV Inspire Consultant Sdn Bhd
30.14m² No.9, Jalan Universiti 14,
F.L 0.150m 86400, Parit Raja,
7 7 7 Batu Pahat, Johor
6 6 6 Tel:07 - 351 7491
Fax: 07 – 351 7492
1400 500

5 5 5 5 5 5
CT PP
4 SC CT 4 4 4 4 4 ARCHITECT'S SIGNATURE :
3 NV 3 3 3 3 3
7.00m²
2 2 2 2 2 2
F.L 0.100m 1 1 1
1 1 1
BEDROOM 2 BEDROOM 2 BEDROOM 2
3500

CT PP
SC CT
NV
7.00m² Siti Hajar Binti Raduan
No. K/P : 970604-02-5418
F.L 0.150m
BATH 2 BATH 2 BATH 2

FOYER
CT PP
1100

SC
NV
- FOYER FOYER
5.64m² FOYER FOYER FOYER
F.L 0.050m
X

X
X

X
X

X
X

X
4500

X
CAR PORCH CAR PORCH CAR PORCH CAR PORCH CAR PORCH CAR PORCH
X

X
F.L 0.000m
X

X
CR -
SCS -
X

X
NV
15.07m²
X

X
X

X
UARTERS ELAS F
- ROUND FLOOR PLAN
X

A
ROUND FLOOR PLAN
SCALE 1 : 100
FP 3S IC IDP SEC5 5

18
KUARTERS 3 TINGKAT

6700 6700
A 6700
3350 3350 3350 3350 3350 3350
325 1200 2150 2150 1200 1200 2150 2150 1200 1200 2150 2150 1200

kitchen kitchen kitchen kitchen kitchen kitchen


sink sink sink sink sink sink
2000

CT PP
SC CT CBASA2 CBASA2 CBASA2 CBASA2 CBASA2 CBASA2
NV
2.40m²
YARD YARD YARD YARD YARD YARD
F.L 3.550m

kitchen

kitchen

kitchen

kitchen

kitchen

kitchen
hob

hob

hob

hob

hob

hob
KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN
4700

CT PP
CADANGAN PE BINAAN SEKOLAH
CT
SC
PP
CT
SC
NV
CT BERASRA A PENUH BARU YANG
B NV
2.40m² BATH 3
8.60m²
F.L 3.600m BATH 3 BATH 3 BATH 3 BATH 3 BATH 3 B ENGANDUNGI 24 BILIK DARJAH, ASRA A
2700

F.L 3.550m 750 URID, RU AH GURU DAN LAIN-LAIN


KE UDAHAN BERKAITAN DI BANDAR BARU
SALAK TINGGI, SEPANG, SELANGOR.
17 18 19 20 19 18 17 17 18 19 20 20 19 18 17 17 18 19 20 19 18 17

16 16 16
16 16 16
15 15 15
15 15 15
14 14 14
14 14 14
13 13 13
13 13 13
12 12 12
3225

12 12 12
13025
3725

11 11 11
10 DINING DINING 28 10 DINING DINING 28 28 DINING DINING 10
27 27 27
9 9 9
26 26 26
8 8 8 Inspire Consultant Sdn Bhd
25 25 25
7 7 7 No.9, Jalan Universiti 14,
24 24 24 86400, Parit Raja,
6 6 6
5 23 5 23 23 5 Batu Pahat, Johor
1400 500

22 22 22 Tel:07 - 351 7491


CT PP 21 21 21 Fax: 07 – 351 7492
SC CT
NV
21.25m²
F.L 3.550m
ARCHITECT'S SIGNATURE :
3500

LIVING LIVING LIVING LIVING LIVING LIVING

Siti Hajar Binti Raduan


No. K/P : 970604-02-5418

CT PP
1100

SC CT
NV
3.69m² BALCONY BALCONY BALCONY BALCONY BALCONY BALCONY
F.L 3.550m
4500

KUARTERS KELAS F
- FIRST FLOOR PLAN

A
FIRST FLOOR PLAN
SCALE 1 : 100
FFP K3S IC IDP SEC5 G5

19
KUARTERS 3 TINGKAT

6700 6700
A 6700
2750 1200 2750 2750 1200 2750 2750 1200 2750

CADAN AN PEMBINAAN SE OLAH


BERASRAMA PENUH BARU YAN
MEN ANDUN I 24 BILI DARJAH, ASRAMA
325

750 MURID, RUMAH URU DAN LAIN-LAIN


EMUDAHAN BER AITAN DI BANDAR BARU
SALA TIN I, SEPAN , SELAN OR.
2000

BATH 4 BATH 4 BATH 4


4000

BEDROOM 1 BEDROOM 2
CT PP CT PP
SCS CT CT PP
SCS CT BEDROOM 1 BEDROOM 2 BEDROOM 1
BEDROOM 2
B B
NV SCS CT NV
11.00m² NV 11.00m²
2.40m²
2700

F.L 6.800m F.L 6.800m


F.L 6.750m

Inspire Consultant Sdn Bhd


No.9, Jalan Universiti 14,
86400, Parit Raja,
Batu Pahat, Johor
Tel:07 - 351 7491
Fax: 07 – 351 7492
14 14 14
15 13 15 13 13 15
FAMILY 16 12 FAMILY 16 12 12 16
FAMILY
3925

AREA 17 11 AREA 17 11 11 17 AREA


ARCHITECT'S SIGNATURE :
13350

3225

CT PP 18 10 18 10 10 18
SCS CT 19 9 19 9 9 19
NV
20 8 20 8 8 20
20.74m²
F.L 6.800m 21 7 21 7 7 21

6 6 6
5 5 5
4 4 4
Siti Hajar Binti Raduan
3 3 3 No. K/P : 970604-02-5418
1900

CT PP CT PP CT PP
SCS CT SCS CT SCS CT
NV NV NV
14.67m² 2.52m² 9.60m²
F.L 6.800m
4000

F.L 6.800m F.L 6.750m


TS1022 TS1022 TS1022 TS1022
2100

MASTER BEDROOM BATH 5 BEDROOM 3 MASTER BEDROOM BATH 5 BEDROOM 3 BEDROOM 3 BATH 5 MASTER BEDROOM
1100

A
UARTERS ELAS F

SECOND FLOOR PLAN - SECOND FLOOR PLAN

SCALE 1 : 100

SFP 3S IC IDP SEC5 5

20
KUARTERS 3 TINGKAT

6700 6700
A 6700
2750 1200 2750 2750 1200 2750 2750 1200 2750

CA AN AN PE B NAAN SE LA
BERASRA A PENU BARU AN
EN AN UN 24 B L ARJA , ASRA A
325

750 UR , RU A URU AN LA N-LA N


E U A AN BER A TAN BAN AR BARU
SALA T N , SEPAN , SELAN R.
2000
4000

B B
2700

Inspire Consultant Sdn Bhd


No.9, Jalan Universiti 14,
86400, Parit Raja,
Batu Pahat, Johor
Tel:07 - 351 7491
Fax: 07 – 351 7492
3925
13350

ARCHITECT'S SIGNATURE :
3225

Siti Hajar Binti Raduan


No. K/P : 970604-02-5418
1900
4000
2100
1100

A
UARTERS ELAS F
- R F PLAN

R F PLAN
SCALE 1 : 100

RP 3S C P SEC5 5

21
KUARTERS 3 TINGKAT

6700 6700 6700


3350 3350 3350 3350 3350 3350 CADANGAN PEMBINAAN SE OLA
1200 2150 1200 2150 2150 1200 BERASRAMA PENU BARU ANG
MENGANDUNGI 24 BILI DARJA , ASRAMA
750 MURID, RUMA GURU DAN LAIN-LAIN
EMUDA AN BER AITAN DI BANDAR BARU
SALA TINGGI, SEPANG, SELANGOR.

ROOF BEAM LEVEL


3200

Inspire Consultant Sdn Bhd


No.9, Jalan Universiti 14,
86400, Parit Raja,
Batu Pahat, Johor
Tel:07 - 351 7491
Fax: 07 – 351 7492
2ND FLOOR LEVEL

ARCHITECT'S SIGNATURE :
3200
9850

Siti Hajar Binti Raduan


No. K/P : 970604-02-5418

FIRST FLOOR LEVEL


3450

GROUND FLOOR LEVEL


150

FRONT ELEVATION UARTERS ELAS F


- FRONT ELEVATION
SCALE 1 : 100

FE 3S IC IDP SEC5 G5

22
KUARTERS 3 TINGKAT

13025 325
4500 1100 3500 3725 4700
1400 500 3225 2700 2000
CADANGAN PEMBINAAN SE OLA
BERASRAMA PENU BARU ANG
MENGANDUNGI 24 BILI DARJA , ASRAMA
750 MURID, RUMA GURU DAN LAIN-LAIN
EMUDA AN BER AITAN DI BANDAR BARU
SALA TINGGI, SEPANG, SELANGOR.

ROOF BEAM LEVEL


3200

Inspire Consultant Sdn Bhd


No.9, Jalan Universiti 14,
86400, Parit Raja,
Batu Pahat, Johor
Tel:07 - 351 7491
Fax: 07 – 351 7492
2ND FLOOR LEVEL

ARCHITECT'S SIGNATURE :
3200
9850

Siti Hajar Binti Raduan


No. K/P : 970604-02-5418

FIRST FLOOR LEVEL


3450

3000

GROUND FLOOR LEVEL


150

SIDE ELEVATION
UARTERS ELAS F
SCALE 1 : 100 - SIDE ELEVATION

SE 3S IC IDP SEC5 G5

23
KUARTERS 3 TINGKAT

13025 325
4500 1100 3775 3450 4700
4000 3225 2700 2000
CADANGAN PEMBINAAN SE OLAH
BERASRAMA PENUH BARU YANG
MENGANDUNGI 24 BILI DARJAH, ASRAMA
750 MURID, RUMAH GURU DAN LAIN-LAIN
EMUDAHAN BER AITAN DI BANDAR BARU
SALA TINGGI, SEPANG, SELANGOR.

ROOF BEAM LEVEL

FAMILY
3200

Inspire Consultant Sdn Bhd


AREA No.9, Jalan Universiti 14,
86400, Parit Raja,
BEDROOM 3 BEDROOM 2 Batu Pahat, Johor
Tel:07 - 351 7491
Fax: 07 – 351 7492

2ND FLOOR LEVEL


ARCHITECT'S SIGNATURE :
3200
9850

LIVING BATH
Siti Hajar Binti Raduan
3 No. K/P : 970604-02-5418

YARD
FIRST FLOOR LEVEL
3450

BEDROOM 1
GROUND FLOOR LEVEL
150

SECTION A-A UARTERS ELAS F


- SIDE ELEVATION SECTION A-A

SCALE 1 : 100

SESA-A 3S IC IDP SEC5 G5

24
KUARTERS 3 TINGKAT

6700 6700 6700


CADANGAN PEMBINAAN SEKOLAH
3350 3350 3350 3350 3350 3350 BERASRAMA PENUH BARU ANG
MENGANDUNGI 24 BILIK DARJAH, ASRAMA
1200 2150 1200 2150 2150 1200 750 MURID, RUMAH GURU DAN LAIN-LAIN
KEMUDAHAN BERKAITAN DI BANDAR BARU
SALAK TINGGI, SEPANG, SELANGOR.

ROOF BEAM LEVEL


3200

Inspire Consultant Sdn Bhd


No.9, Jalan Universiti 14,
BEDROOM 2 BEDROOM 2 BEDROOM 1 86400, Parit Raja,
BEDROOM 1 BEDROOM 1 BEDROOM 2 Batu Pahat, Johor
2ND FLOOR LEVEL Tel:07 - 351 7491
Fax: 07 – 351 7492

ARCHITECT'S SIGNATURE :
3200
9850

BATH BATH BATH BATH BATH BATH


3 3 3 3 3 3

KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN KITCHEN Siti Hajar Binti Raduan
FIRST FLOOR LEVEL No. K/P : 970604-02-5418
3450

MASTER BEDROOM 1 MASTER BEDROOM 1 BEDROOM 1 MASTER


GROUND FLOOR LEVEL BEDROOM BEDROOM BEDROOM
150

SECTION B-B KUARTERS KELAS F


- SIDE ELEVATION SECTION B-B

SCALE 1 : 100

SESB-B K3S IC IDP SEC5 G5

25
KUARTERS 3 TINGKAT

6700 6700 6700


3350 3350 3350 3350 3350 3350 CADANGAN PEMBINAAN SE OLA
1200 2150 2150 1200 2150 1200 BERASRAMA PENU BARU ANG
MENGANDUNGI 24 BILI DARJA , ASRAMA
750 MURID, RUMA GURU DAN LAIN-LAIN
EMUDA AN BER AITAN DI BANDAR BARU
SALA TINGGI, SEPANG, SELANGOR.

ROOF BEAM LEVEL

Inspire Consultant Sdn Bhd


No.9, Jalan Universiti 14,
3200

86400, Parit Raja,


Batu Pahat, Johor
Tel:07 - 351 7491
Fax: 07 – 351 7492

2ND FLOOR LEVEL


ARCHITECT'S SIGNATURE :
3200
9850

Siti Hajar Binti Raduan


No. K/P : 970604-02-5418

FIRST FLOOR LEVEL


3450

GROUND FLOOR LEVEL


150

REAR ELEVATION UARTERS ELAS F


- REAR ELEVATION

SCALE 1 : 100

RE 3S IC IDP SEC5 G5

26
PROPOSAL STRUCTURAL LAYOUT
PLAN AND STRUCTURAL
ARRANGEMENT

27
KUARTERS 3 TINGKAT

A B C D
6700 6700 6700

3350 3350 3350 3350 3350 3350

1200 2150 1200 2150 2150 1200


325

1 CADANGAN PEMBINAAN SEKOLAH


BERASRAMA PENUH BARU YANG
MENGANDUNGI 24 BILIK DARJAH, ASRAMA
2000

750 MURID, RUMAH GURU DAN LAIN-LAIN


KEMUDAHAN BERKAITAN DI BANDAR BARU
SALAK TINGGI, SEPANG, SELANGOR.
2
4700
2700

3 Inspire Consultant Sdn Bhd


N . ,J U 4,
400, P R ,
B P ,J
T 07 - 35 74
3225

F 07 35 74 2
13025

3725

7 7 ARCHITECT'S SIGNATURE :
6 6

4
500

5 5 5 5 5 5
4 4 4 4 4 4
1400

3 3 3 3 3 3 Siti Hajar Binti Raduan


No. K/P : 970604-02-5418
2 2 2 2 2 2
1 1 1 1 1 1
3500

5
6
1100

GROUND FLOOR PLAN


SCALE 00

KUARTERS KELAS F
- GROUND FLOOR STRUCTURAL PLAN

GFSP/K3S/IC/IDP/SEC5/G5

28
KUARTERS 3 TINGKAT

6700 6700 6700


3350 3350 3350 3350 3350 3350

1200 2150 2150 1200 1200 2150 2150 1200 1200 2150 2150 1200

325

2000
CADANGAN PEMBINAAN SEKOLAH
BERASRAMA PENUH BARU YANG
MENGANDUNGI 24 BILIK DARJAH, ASRAMA
750 MURID, RUMAH GURU DAN LAIN-LAIN
4700

KEMUDAHAN BERKAITAN DI BANDAR BARU


SALAK TINGGI, SEPANG, SELANGOR.
2700

17 18 19 20 19 18 17 7 20 20 19 18 17 17 18 19 20 7

16 16
16
15 15
15 5 5
14 14
14 4 4
3 3
13 3 3
12
12
2
12
2 Inspire Consultant Sdn Bhd
3225

N . ,J U 4,
13025

11
3725

10 2 0 2 2 0
400, P R ,
27 27 27 B P ,J
9
2 2 2 T 07 - 35 74
8
25 25 25
F 07 35 74 2
7 7 7
24 24 24
6
5 23 5 23 23 5
22 22 22
500

2 2 2 ARCHITECT'S SIGNATURE :
1400

Siti Hajar Binti Raduan


3500

No. K/P : 970604-02-5418


1100

FIRST FLOOR PLAN


SCALE 00

KUARTERS KELAS F
- FIRST FLOOR STRUCTURAL PLAN

FFSP/K3S/IC/IDP/SEC5/G5

29
KUARTERS 3 TINGKAT

6700 6700 6700


2750 1200 2750 2750 1200 2750 2750 1200 2750

CADANGAN PEMBINAAN SEKOLAH


BERASRAMA PENUH BARU YANG
MENGANDUNGI 24 BILIK DARJAH, ASRAMA
750 MURID, RUMAH GURU DAN LAIN-LAIN
KEMUDAHAN BERKAITAN DI BANDAR BARU
325

SALAK TINGGI, SEPANG, SELANGOR.


2000
4000
2700

Inspire Consultant Sdn Bhd


N . ,J U 4,
400, P R ,
B P ,J
T 07 - 35 74
F 07 35 74 2
3925

ARCHITECT'S SIGNATURE :
13350

3225

Siti Hajar Binti Raduan


No. K/P : 970604-02-5418
1900
4000
2100
1100

KUARTERS KELAS F
SECOND FLOOR PLAN - SECOND FLOOR STRUCTURAL PLAN

SCALE 00

SFSP/K3S/IC/IDP/SEC5/G5

30
8.0 GROUP MEETING MINUTES AND PROGRESS REPORT

Minutes Of Meeting 1

Company Inspire Consulting SDN BHD


Venue : Google Meet
Date : 29th October 2022
Time : 09:00 p.m

Project Name: Cadangan Pembinaan Sekolah Berasrama Penuh Baru Yang


Mengandungi 24 Bilik Darjah, Asrama 750 Murid, Rumah Guru Dan
Lain-Lain Kemudahan Berkaitan Di Bandar Baru Salak Tinggi, Sepang,
Selangor.
Meeting Objective:
Find a complete an architectural drawing with a minimum of 3 storey building and
assigned roles for each group members.
Attendance:
1. Mohd Syawal Asnawi Bin Sukri (Chairman) CF190130 Syawal
2. Amirul Adam Bin Mohd Abdul Rahman CF190126 Amirul
3. Muhammad Shahrul Niezam Bin Mohd Jaafar DF190137 Shahrul
4. Nur Sabrina Binti Mohd Daud CF190059 Sabrina
5. Siti Hajar Binti Raduan CF190058 Hajar
Meeting Agenda:
No. Topic Responsible
1. The Chairman welcome the members and called the meeting to order Syawal
at 09:00 p.m. The Chairman thanked the members for being present
and informed the main purposed of the meeting was to discuss
regarding finding an architectural drawing with a minimum of 3
storey building.
2. Each group members were assigned a role for the project. Syawal,
Amirul,
Shahrul,
Sabrina,
Hajar

31
3. Discussed when is the next meeting would be held. Syawal,
Amirul,
Shahrul,
Sabrina,
Hajar
Conclusion:
The Chairman summarised the decisions made at the meeting and thanked the members for
participating for the meetings. The meeting was adjourned at 09:30 p.m.
Attachment:

Prepared by, Confirmed by,

……………………….. …………………..……
(Sabrina) (Syawal)
Date: 30th October 2022 Date: 30th October 2022

32
Minutes Of Meeting 2

Company : Inspire Consulting SDN BHD


Venue : Google Meet
Date : 31th October 2022
Time : 09:00 p.m

Project Name: Cadangan Pembinaan Sekolah Berasrama Penuh Baru Yang


Mengandungi 24 Bilik Darjah, Asrama 750 Murid, Rumah Guru Dan
Lain-Lain Kemudahan Berkaitan Di Bandar Baru Salak Tinggi, Sepang,
Selangor.
Meeting Objective:
Selecting an architectural drawing of 3 storey building and software to be use for the
project.
Attendance:
1. Mohd Syawal Asnawi Bin Sukri (Chairman) CF190130 Syawal
2. Amirul Adam Bin Mohd Abdul Rahman CF190126 Amirul
3. Muhammad Shahrul Niezam Bin Mohd Jaafar DF190137 Shahrul
4. Nur Sabrina Binti Mohd Daud CF190059 Sabrina
5. Siti Hajar Binti Raduan CF190058 Hajar
Meeting Agenda:
No. Topic Responsible
1. The Chairman welcome the members and called the meeting to order Syawal
at 09:00 p.m. The Chairman thanked the members for being present
and informed the main purposed of the meeting was to select the
architectural drawing of 3 storey building for the project.
2. Deciding on architectural drawing of 3 storey building and software Syawal,
to be use for the project. Amirul,
Shahrul,
Sabrina,
Hajar

33
3. Discussing in using Esteem Software for the 3-storey building. Syawal,
Shahrul,
Sabrina,
Hajar
4. Deciding on report planning and scheduling for the project. Syawal,
Amirul
5. Discussed when is the next meeting would be held. Syawal,
Amirul,
Shahrul,
Sabrina,
Hajar
Conclusion:
The Chairman summarised the decisions made at the meeting and thanked the members for
participating for the meetings. The meeting was adjourned at 09:40 p.m.
Attachment:

Prepared by, Confirmed by,

……………………….. …………………..……
(Sabrina) (Syawal)
Date: 1st November 2022 Date: 1st November 2022

34
Minutes Of Meeting 3

Company : Inspire Consulting SDN BHD


Venue : Google Meet
Date : 1st November 2022
Time : 10:45 a.m.

Project Name: Cadangan Pembinaan Sekolah Berasrama Penuh Baru Yang


Mengandungi 24 Bilik Darjah, Asrama 750 Murid, Rumah Guru Dan
Lain-Lain Kemudahan Berkaitan Di Bandar Baru Salak Tinggi, Sepang,
Selangor.
Meeting Objective:
Preparation for Preliminary Report (Structure) and submission of the report.
Attendance:
1. Mohd Syawal Asnawi Bin Sukri (Chairman) CF190130 Syawal
2. Amirul Adam Bin Mohd Abdul Rahman CF190126 Amirul
3. Muhammad Shahrul Niezam Bin Mohd Jaafar DF190137 Shahrul
4. Nur Sabrina Binti Mohd Daud CF190059 Sabrina
5. Siti Hajar Binti Raduan CF190058 Hajar
Meeting Agenda:
No. Topic Responsible
1. The Chairman welcome the members and called the meeting to order Syawal
at 10:45 p.m. The Chairman thanked the members for being present
and informed the main purposed of the meeting was to discuss about
preparation for Preliminary Report (Structure) and submission of the
report.
2. Discussed the introduction of the company (company profile, Syawal
organization chart, mission and vision company, project location
area).
3. Discussed in preparing the structural layout. Syawal,
Sabrina,
Hajar

35
4. Discussed the process and parameter for Esteem Software, Code of Syawal,
Practice use. Shahrul,
5. Discussed when is the next meeting would be held. Syawal,
Amirul,
Shahrul,
Sabrina,
Hajar
Conclusion:
The Chairman summarised the decisions made at the meeting and thanked the members for
participating for the meetings. The meeting was adjourned at 11:30 a.m.
Attachment:

Prepared by, Confirmed by,

……………………….. …………………..……
(Sabrina) (Syawal)
Date: 2nd November 2022 Date: 2nd November 2022