You are on page 1of 2

Novikontas Jūras koledža 1.

līmeņa profesionālā augstākā izglītība: Kuģa vadītājs


Course Navigācija un locija
Revi
Exercise No. 333 2 Edition 01.04.2017
sion
Title TIDE CALCULATION-6
Reference Navigācija un locija Duration 2 hours
Responsibility Form is used by trainee

OBJECTIVE OF EXERCISE:

The objective of this exercise is:


Understand how to determine ELEMENTS OF TIDE using Admiralty Tide Tables.

EXERCISE DESCRIPTION:

Remarks:
1. Use for answer College’s Answer Form in Word format.
2. Show your calculations and formulas used for calculations, if any.

In this exercise, you should answer the questions ( use Admiralty Tide Tables) :

1. Calculate time and heights of HW and LW in port WARSASH, UK (time zone – GMT) on the
14.03.2000 (use tidal prediction form).
2. Find heights of tide at 07.30 and 12.30 LT 14.03.2000.
3. Draw daily MEAN SPRING AND NEAP CURVES.
4. Find tidal range.
5. Find tide gates (time interval) when height of water is higher than 2.5 m.
6. Find time when height of water is 1.0 m exactly.

© NOVIKONTAS Form CHS-PT


Rev.05.08.2011
PERFORMANCE CRITERIA: Evaluation Scale
Reference skills and knowledge or question 3 2 1
1. Use of Tide tables (HW/LW).
2. Use of Tide tables (Interpolation).
3. Use of Tide tables (Diagram).
4. Use of Tide tables (Range).
5. Use of Tide tables (Tide gate).
6. Use of Tide tables (Exact height).
TOTAL:

ASSESSMENT CRITERIA:

Each subject to be performed accordingly


Performed correct: 3 points
Performed partly: 2 points
Major mistakes: 1 point
Not performed: 0 point

Maximum points of this exercise: 18 points


Requirement to achieve objective of exercise: 13 points

© NOVIKONTAS Form CHS-PT


Rev.05.08.2011

You might also like