You are on page 1of 1

10:31 AM I 2.

2KB/s 011 ;A 01) 55

7:12 ii LTEI
UN I

SCHOOL BASED ARALING 08/25/ 08/25/ 8 DEPED,


SPG 'RAINING PANUPLINAN 2017 2017 SMigES
3 of 5

E. Physical Development
F. Milestone

G. Challenges Met

Provision of additional garbage bin for the segregation of waste, the


bin for nabubulok, di-nabubulok and recyclable trash.

• Clean up drive along the pathways of the barangay is advocated


by the SPG as stipulated in the SPG Action Plan every first Friday of
the month.

Prepared by:
ELYEAtINT-111141
School A.P leader
Noted:
MELISSA G. TOLEDO
OIC

H. Pictorial

pdfcoffee.com

You might also like