PepsiCo Planned Maintenance Schedule of Utilities 2022

CREATE MORE SMILES WITH EVERY SIP AND EVERY BITE


Sr # Equipment Location Frequency Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04 Status

January February March April May June July August September October November December
1 Packing Hall AHU 01 Admin Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
2 Packing Hall AHU 02 Admin Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
3 Packing Hall AHU 03 Admin Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
4 Packing Hall AHU 04 Admin Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
5 Chilled Water AHU 01 Admin Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
6 Chilled Water AHU 02 Admin Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Compressor
7 Compressor AHU 01 Room Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Compressor
8 Compressor AHU 02 Monthly Planned Planned Planned Planned
Room Roof
Actual Actual Actual Actual
January February March April May June July August September October November December
9 Dehumidifier 01 Admin Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
10 Dehumidifier 02 Admin Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
11 FAHU 01 Utility Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
12 FAHU 02 Utility Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
13 Dehumidifier 01 Seasoning Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
14 Dehumidifier 02 Seasoning Roof Monthly Planned Planned Planned Planned
14 Dehumidifier 02 Seasoning Roof Monthly
Actual Actual Actual Actual
January February March April May June July August September October November December
15 AHU 01 Cool Point Seasoning Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
16 AHU 01 Cool Point Seasoning Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
17 AHU 01 ASRS Outside Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
FGWH Loading
18 AHU 02 Monthly Planned Planned Planned Planned
Dock
Actual Actual Actual Actual
January February March April May June July August September October November December
19 Exhaust Fan 01 QA Lab Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
20 Exhaust Fan 02 QA Lab Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
21 Exhaust Fan 03 QA Lab Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
22 Exhaust Fan 04 QA Lab Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
23 Exhaust Fan 05 Utility Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
24 Exhaust Fan 06 Utility Roof Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Cold Store
25 Exhaust Fan 07 Monthly Planned Planned Planned Planned
inside(PC32)
Actual Actual Actual Actual
January February March April May June July August September October November December
RPM Roof (PC 32
26 Exhaust Fan 09 Monthly Planned Planned Planned Planned
Seasoning)
Actual Actual Actual Actual
January February March April May June July August September October November December
27 TEF 07 PC 32 Fryer Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
28 TEF 08 PC 32 Fryer Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
KK Seasoning
29 TEF 11 Monthly Planned Planned Planned Planned
Drum
Actual Actual Actual Actual
January February March April May June July August September October November December
30 TEF 12 KK Fryer Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
31 TEF 13 PC 50 Blancher Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
32 TEF 14 PC 32 Blancher Monthly
32 TEF 14 PC 32 Blancher Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
33 TEF 15 PC 50 Fryer Inlet Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
chiller and Air
34 Cooling Tower compressor Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
35 GD Compressors Compressor room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
36 N2 Dryers GD Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
37 Compressors Atlas Copco Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Air Dryer Atlas Copco Planned Planned Planned Planned
Actual Actual Actual Actual
intenance Schedule of Utilities 2022

RE SMILES WITH EVERY SIP AND EVERY BITE


Date
Preventive Maintenance Plan
Diesel Generators

Frequency
Sr.# Maintenance Checks Check Clean
Hours
1 Check Diesel Day Tank Level Daily
2 Check Engine Oil Level Daily
3 Check Radiator Coolant Level Daily
4 Inspect Diesel Generator for Leaks Daily
5 Check Air Filter Restriction Indicator Daily
6 Check Charge Alternator Daily
7 Drain Water from Primary Fuel Filters Daily

8 Inspect Container for Damage / Inlet & Outlet Daily


for Obstructions
9 Check Fuel Lines & Hoses Weekly
10 Cranck Case Breather Weekly
11 Cooling Fan Blades Weekly

12 Check Drive Belts Condition & Tension Weekly

13 Check Air Intake System for Leaks Weekly


14 Check Alternator Weekly
15 Drain Water from Fuel Tank Weekly
16 Check Alternator 8 Months 300 Hrs.
17 Check Operation of Emergency Stop Button 8 Months 300 Hrs.
18 Check Batteries Electrolyete Level 8 Months 300 Hrs.

19 Check Coolant Lines & Radiator Hoses for Wear 8 Months 300 Hrs.
& Cracks
20 Check Electrical Connections (Batteries, Starter 8 Months 300 Hrs.
Motor & Alternator Connections
21 Check Engine Ground 8 Months 300 Hrs.
22 Clean Radiator Matrix 8 Months 300 Hrs.
23 Replace Air Cleaner Element 8 Months 300 Hrs.
24 Replace Engine Oil & Filters 8 Months 300 Hrs.
25 Replace Water Seperator Element 8 Months 300 Hrs.

26 Replace Secondary Fuel Filter 8 Months 300 Hrs.

27 Check Engine Valve Lash 1000 Hrs 1000 Hrs

28 Check Alternator Stator Winding Insulation 12months 1500 Hrs


Resistance
29 Check Alternator Bearings 12months 1500 Hrs
30 Check Connections in Alternator Terminal Box 12months 1500 Hrs
31 Check Alternator 2000 Hrs 2000 Hrs
32 Check Aftercooler Core 2 Years
33 Check Engine Mounts 2 Years
34 Check Starting Motors 2 Years
35 Check Turbochargers 2 Years
36 Check Water Pump 2 Years
37 Check Fuel Injectors 2 Years 3000 Hrs
38 Check Aftercooler Core 2 Years 3000 Hrs
39 Replace Cooling System Coolant 4000 Hrs 4000 Hrs
40 Check Alternator Vibration Levels 3 Years 6000 Hrs
41 Clean & Regrease Alternator Bearings 3 Years 6000 Hrs
42 Check Alternator bearing housings 3 Years 6000 Hrs
43 Check Alternator Winding Condition 3 Years 6000 Hrs
44 Check Alternator Rotating Diode Assembly 3 Years 6000 Hrs
45 Replace Cooling System Coolant 3 Years 6000 Hrs
46 Replace Alternator Bearings 3 Years 6000 Hrs
47 Replace Alternator NDE O-Ring 3 Years 6000 Hrs
e Plan

Date: __ /___/____

Replace Last replaced Next Due Remarks


PROCESS HALL
Chilled, Exhaust & Fresh Air Ducts Diffuser Grills

PC 50 QTY Clean Replace KK QTY Schaff


Chilled
Exahust duct Chilled duct
6 11 duct
diffusers diffusers
diffusers

Chilled duct
29
diffusers

Fresh Air duct


7
diffusers
Exhaustfan
2
01,02 grills
Exhaust fans 04
hood (at fryer 1
outlet )
Total 45 11

Packaging HALL
Dehumidifier Grills = 05 nos
Diffuser Grills

QTY Pc 32 QTY
Exahust
9 duct 14
diffusers

Chilled
duct 17
diffusers

9 31

nos
Preventive Maintenance Plan
Chilled, Exhaust, Fresh Air Ducts Diffuser Grills & Halton H

Sr # Equipment QTY Responsibility


PC 50
1 Exhaust Duct Diffusers Cleaning. 6 Boota Tabassum

2 Chilled Duct Diffuser Cleaning. 29 Boota Tabassum

3 Fresh Air Duct Diffuser Cleaning. 7 Boota Tabassum

4 Exhaust Fan 01,02 Grills Cleaning 2 Boota Tabassum

Exhaust fans 04 hood (at fryer


5 outlet ) Filter Cleaning/ Replace if 1 Boota Tabassum
necessary

TEF(15) PC 50 Fryer Halton Hood


6 2 Boota Tabassum
Filter Cleaning/Replace if necessary

TEF(13) PC 50 Blancher Halton Hood


7 2 Boota Tabassum
Cleaning
KK

TEF (12) KK Fryer Outlet Halton


8 Hood Filters Cleaning/replace if 1 Boota Tabassum
necessary

TEF (11) KK Seasoning Halton Hood


9 2 Boota Tabassum
Filters Cleaning/replace if necessary

10 Chilled duct diffusers Cleaning 11 Boota Tabassum

Schaff
11 Chilled duct diffusers Cleaning 9 Boota Tabassum

PC 32
12 Exahust duct diffusers Cleaning. 14 Boota Tabassum
13 Chilled duct diffusers Cleaning 17 Boota Tabassum

(TEF 07) PC 32 Fryer Inlet Halton


14 Hood Filter Cleaning/replace if 1 Boota Tabassum
necessary

(TEF 08) PC 32 Fryer Outlet Halton


15 Hood filter cleaning. Replace if 1 Boota Tabassum
necessary

(TEF 14) PC 32 Blancher Halton


16 hood Filter Cleaning/ Replace if 2 Boota Tabassum
necessary
Packaging Hall
Dehumdifier Return duct diffusers
18 5 Boota Tabassum
Cleaning
Maintenance Plan
user Grills & Halton Hood Filter Cleaning
Date: __ /___/____

Frequency Check Clean Replace Next Due Remarks


PC 50
As per Boil out
/stock count
As per Boil out
/stock count
As per Boil out
/stock count
As per Boil out
/stock count

As per Boil out


/stock count

As per Boil out


/stock count

As per Boil out


/stock count
KK

As per Boil out


/stock count

As per Boil out


/stock count

As per Boil out


/stock count
chaff
As per Boil out
/stock count
PC 32
As per Boil out
/stock count
As per Boil out
/stock count

As per Boil out


/stock count

As per Boil out


/stock count

As per Boil out


/stock count

aging Hall
As per Boil out
/stock count
PepsiCo Planned Maintenance Schedule of Utilities 2022

CREATE MORE SMILES WITH EVERY SIP AND EVERY BITE


Sr # Strainers Equipment Type Location Frequency Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04

January February March April May June July August September October November December
1 Strainer 01 Process water Pump 01 Y Type Pump Room Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
2 Strainer 02 Process water Pump 02 Y Type Pump Room Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
3 Strainer 03 Process water Pump 03 Y Type Pump Room Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
4 Strainer 04 Main RO HP Pump 02 Y Type Pump Room Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
5 Strainer 05 3rd RO Feed water Tank 01 Y Type Pump Room Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Cooling Tower Circulation Compressor
6 Strainer 06 Y Type Monthly Planned Planned Planned Planned
Pump 01 Room
Actual Actual Actual Actual
January February March April May June July August September October November December
Cooling Tower Circulation Compressor
7 Strainer 07 Y Type Monthly Planned Planned Planned Planned
Pump 02 Room
Actual Actual Actual Actual
January February March April May June July August September October November December
8 Strainer 08 Chilled Water Pump 01 Y Type Chiller Roon Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
9 Strainer 09 Chilled Water Pump 02 Y Type Chiller Roon Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
10 Strainer 10 Chilled Water Pump 03 Y Type Chiller Roon Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
11 Strainer 11 Cooling Tower Pump 01 Y Type Chiller Roon Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
12 Strainer 12 Cooling Tower Pump 02 Y Type Chiller Roon Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
Chiller Roon Monthly January February March April May June July August September October November December
13 Strainer 13 Cooling Tower Pump 03 Y Type Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
14 Strainer 14 Thermal Oil Pump 01 Y Type Thermal Room Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
15 Strainer 15 Thermal Oil Pump 02 Y Type Thermal Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
16 Strainer 16 Thermal Oil Re-Filling Pump 01 Y Type Thermal Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
17 Strainer 17 Thermal Oil Re-Filling Pump 02 Y Type Thermal Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
18 Strainer 18 Diesel decanting Pump 01 Y Type Diesel Decanting Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
19 Strainer 19 Diesel decanting Pump 02 Y Type Diesel Decanting Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Water Reservoir
20 Strainer 20 Recycle ROCD Pump 01 Y Type Planned Planned Planned Planned
Roof
Actual Actual Actual Actual
January February March April May June July August September October November December
21 Strainer 21 Boiler Feed Water Pump 01 Y Type Boiler Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
22 Strainer 22 Boiler Feed Water Pump 02 Y Type Boiler Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
23 Strainer 23 Old FF Pump 01 Y Type Pump Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
24 Strainer 24 CHW AHU 01 Y Type Utility Roof Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
25 Strainer 25 CHW AHU 02 Y Type Utility Roof Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
26 Strainer 26 Packing Hall AHU 01 Y Type Admin Roof Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
27 Strainer 27 Packing Hall AHU 02 Y Type Admin Roof Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
28 Strainer 28 Packing Hall AHU 03 Y Type Admin Roof Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
29 Strainer 29 Packing Hall AHU 04 Y Type Admin Roof Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
30 Strainer 30 Natural Gas Line Near UPS Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
31 Strainer 31 Natural Gas Line Behind VO Tanks Planned Planned Planned Planned
Actual Actual Actual Actual
d Maintenance Schedule of Utilities 2022

ORE SMILES WITH EVERY SIP AND EVERY BITE


Status Date
Preventive Maintenance Plan
Strainers
D

Sr # Strainers Equipment Type Location Frequency Check

1 Strainer 01 Process water Pump 01 Y Type Pump Room Monthly

2 Strainer 02 Process water Pump 02 Y Type Pump Room Monthly

3 Strainer 03 Process water Pump 03 Y Type Pump Room Monthly

4 Strainer 04 Main RO HP Pump 02 Y Type Pump Room Monthly

5 Strainer 05 3rd RO Feed water Tank 01 Y Type Pump Room Monthly

Compressor
6 Strainer 06 Cooling Tower Circulation Pump 01 Y Type Room Monthly

Compressor
7 Strainer 07 Cooling Tower Circulation Pump 02 Y Type Monthly
Room

8 Strainer 08 Chilled Water Pump 01 Y Type Chiller Roon Monthly

9 Strainer 09 Chilled Water Pump 02 Y Type Chiller Roon Monthly

10 Strainer 10 Chilled Water Pump 03 Y Type Chiller Roon Monthly

11 Strainer 11 Cooling Tower Pump 01 Y Type Chiller Roon Monthly

12 Strainer 12 Cooling Tower Pump 02 Y Type Chiller Roon Monthly

Chiller Roon Monthly


13 Strainer 13 Cooling Tower Pump 03 Y Type
13 Strainer 13 Cooling Tower Pump 03 Y Type

14 Strainer 14 Thermal Oil Pump 01 Y Type Thermal Room Monthly

15 Strainer 15 Thermal Oil Pump 02 Y Type Thermal Room

16 Strainer 16 Thermal Oil Re-Filling Pump 01 Y Type Thermal Room

17 Strainer 17 Thermal Oil Re-Filling Pump 02 Y Type Thermal Room

Diesel
18 Strainer 18 Diesel decanting Pump 01 Y Type
Decanting

Diesel
19 Strainer 19 Diesel decanting Pump 02 Y Type
Decanting

Water
20 Strainer 20 Recycle ROCD Pump 01 Y Type
Reservoir Roof

21 Strainer 21 Boiler Feed Water Pump 01 Y Type Boiler Room

22 Strainer 22 Boiler Feed Water Pump 02 Y Type Boiler Room

23 Strainer 23 Old FF Pump 01 Y Type Pump Room

24 Strainer 24 CHW AHU 01 Y Type Utility Roof

25 Strainer 25 CHW AHU 02 Y Type Utility Roof

26 Strainer 26 Packing Hall AHU 01 Y Type Admin Roof

27 Strainer 27 Packing Hall AHU 02 Y Type Admin Roof

28 Strainer 28 Packing Hall AHU 03 Y Type Admin Roof


28 Strainer 28 Packing Hall AHU 03 Y Type Admin Roof

29 Strainer 29 Packing Hall AHU 04 Y Type Admin Roof

30 Strainer 30 Natural Gas Line Near UPS Room

Behind VO
31 Strainer 31 Natural Gas Line
Tanks
Date: __ /___/____

Clean Replace Next Due Remarks


PepsiCo Planned Maintenance Schedule of Utilities 2022

CREATE MORE SMILES WITH EVERY SIP AND EVERY BITE


Sr # Equipment Type Location Frequency Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04

January February March April May June July August September October November
1 Turbine 03 Gate 02 Monthly Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
Admin Front
2 Turbine 02 Monthly Planned Planned Planned Planned
Canteen
Actual Actual Actual Actual
January February March April May June July August September October November
Storm water Pump 01 Centrifugal Laundary area Monthly Planned Planned Planned Planned
3 Actual Actual Actual Actual
January February March April May June July August September October November
Storm water Pump 02 Centrifugal Laundary area Monthly Planned Planned Planned Planned
4 Actual Actual Actual Actual
January February March April May June July August September October November
Storm water pump 03 Centrifugal Laundary area Monthly Planned Planned Planned Planned
5 Actual Actual Actual Actual
January February March April May June July August September October November

Storm water Pump 04 Submersible Laundary area Monthly


Planned Planned Planned Planned
6 Actual Actual Actual Actual
January February March April May June July August September October November
Storm water Pump 01 Centrifugal Near Gate 04 Monthly Planned Planned Planned Planned
7 Actual Actual Actual Actual
January February March April May June July August September October November
Strom water Pump 02 Centrifugal Near Gate 04 Monthly Planned Planned Planned Planned
8 Actual Actual Actual Actual
January February March April May June July August September October November
Storm Water Pump 03 Centrifugal Near Gate 04 Monthly Planned Planned Planned Planned
9 Actual Actual Actual Actual
January February March April May June July August September October November
Storm water Pump 04 Submersible Near Gate 04 Monthly Planned Planned Planned Planned
10 Actual Actual Actual Actual
January February March April May June July August September October November
Storm water Pump 01 Centrifugal Near Gate 03 Monthly Planned Planned Planned Planned
11 Actual Actual Actual Actual
January February March April May June July August September October November
Storm water Pump 02 Centrifugal Near Gate 03 Monthly Planned Planned Planned Planned
10 Actual Actual Actual Actual
January February March April May June July August September October November
Storm water Pump 03 Centrifugal Near Gate 03 Monthly Planned Planned Planned Planned
11 Actual Actual Actual Actual
January February March April May June July August September October November
Storm water Pump 04 Submersible Near Gate 03 Monthly
12
Storm water Pump 04 Submersible Near Gate 03 Monthly Planned Planned Planned Planned
12 Actual Actual Actual Actual
January February March April May June July August September October November
Process water Pump 01 Centrifugal Pump Room Monthly Planned Planned Planned Planned
13 Actual Actual Actual Actual
January February March April May June July August September October November
Process water Pump 02 Centrifugal Pump Room Monthly Planned Planned Planned Planned
14 Actual Actual Actual Actual
January February March April May June July August September October November
Process water Pump 03 Centrifugal Pump Room Monthly Planned Planned Planned Planned
15 Actual Actual Actual Actual
January February March April May June July August September October November
RO Rejection Pump 01 Vertical Multistage centrifugal Pump Room Monthly Planned Planned Planned Planned
pump
16 Actual Actual Actual Actual
January February March April May June July August September October November
Vertical Multistage centrifugal
Main RO HP Pump 01 pump Pump Room Monthly Planned Planned Planned Planned
17 Actual Actual Actual Actual
January February March April May June July August September October November
Main RO HP Pump 02 Vertical Multistage centrifugal Pump Room Monthly Planned Planned Planned Planned
pump
18 Actual Actual Actual Actual
January February March April May June July August September October November
Horizontal multistage
Main CIP Tank Pump 01 centrifugal pump Pump Room Monthly Planned Planned Planned Planned
19 Actual Actual Actual Actual
January February March April May June July August September October November
Vertical Multistage centrifugal
3rd RO Feed water Tank 01 Pump Room Monthly Planned Planned Planned Planned
pump
20 Actual Actual Actual Actual
January February March April May June July August September October November
Cooling Tower Circulation Compressor
Centrifugal Monthly Planned Planned Planned Planned
Pump 01 Room
21 Actual Actual Actual Actual
January February March April May June July August September October November
Cooling Tower Circulation Compressor
Centrifugal Monthly Planned Planned Planned Planned
Pump 02 Room
22 Actual Actual Actual Actual
January February March April May June July August September October November
Heat Exchanger Pump 01 Centrifugal In line Pump Compressor Monthly Planned Planned Planned Planned
Room
23 Actual Actual Actual Actual
January February March April May June July August September October November
Compressor
Heat exchanger pump 02 Centrifugal In line Pump Monthly Planned Planned Planned Planned
Room
24 Actual Actual Actual Actual
January February March April May June July August September October November
Heat exchanger pump 03 Centrifugal In line Pump Compressor Monthly Planned Planned Planned Planned
Room
25 Actual Actual Actual Actual
January February March April May June July August September October November
Compressor
Heat exchanger pump 04 Centrifugal In line Pump Monthly Planned Planned Planned Planned
Room
26 Actual Actual Actual Actual
January February March April May June July August September October November
Chilled Water Pump 01 Centrifugal Chiller Roon Monthly Planned Planned Planned Planned
27 Actual Actual Actual Actual
January February March April May June July August September October November
Chilled Water Pump 02 Centrifugal Chiller Roon Monthly Planned Planned Planned Planned
28 Actual Actual Actual Actual
January February March April May June July August September October November
Chilled Water Pump 03 Centrifugal Chiller Roon Monthly Planned Planned Planned Planned
29 Actual Actual Actual Actual
January February March April May June July August September October November
Cooling Tower Pump 01 Centrifugal Chiller Roon Monthly Planned Planned Planned Planned
30 Actual Actual Actual Actual
January February March April May June July August September October November
Cooling Tower Pump 02 Centrifugal Chiller Roon Monthly Planned Planned Planned Planned
31 Actual Actual Actual Actual
January February March April May June July August September October November
Cooling Tower Pump 03 Centrifugal Chiller Roon Monthly Planned Planned Planned Planned
32 Actual Actual Actual Actual
January February March April May June July August September October November
Thermal Oil Pump 01 Centrifugal Thermal Room Monthly Planned Planned Planned Planned
33 Actual Actual Actual Actual
January February March April May June July August September October November
34 Thermal Oil Pump 02 Centrifugal Thermal Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
35 Thermal Oil Re-Filling Pump 01 Centrifugal Thermal Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
36 Thermal Oil Re-Filling Pump 02 Centrifugal Thermal Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
37 Diesel decanting Pump 01 Centrifugal Diesel Decanting Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
38 Diesel decanting Pump 02 Centrifugal Diesel Decanting Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
Water Reservoir
39 Recycle ROCD Pump 01 Centrifugal Planned Planned Planned Planned
Roof
Actual Actual Actual Actual
January February March April May June July August September October November
40 Arsenic Pump 01 Arsenic Filter Planned Planned Planned Planned
shed
Actual Actual Actual Actual
January February March April May June July August September October November
Arsenic Filter
41 Arsenic Pump 02 Planned Planned Planned Planned
shed
Actual Actual Actual Actual
January February March April May June July August September October November
42 Boiler Feed Water Pump 01 Centrifugal Boiler Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
43 Boiler Feed Water Pump 02 Centrifugal Boiler Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
Vertical Multistage centrifugal FF Pump Room
44 RO Supply Pump 01 Planned Planned Planned Planned
pump Outside
Actual Actual Actual Actual
January February March April May June July August September October November
45 RO Supply Pump 02 Vertical Multistage centrifugal FF Pump Room Planned Planned Planned Planned
pump Outside
Actual Actual Actual Actual
January February March April May June July August September October November
46 Old FF Pump 01 Centrifugal Pump Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
47 Spare FF Pump 01 Centrifugal Pump Room Planned Planned Planned Planned
47 Spare FF Pump 01 Centrifugal Pump Room
Actual Actual Actual Actual
January February March April May June July August September October November
48 Spare FF Pump 02 (Not in Centrifugal Pump Room Planned Planned Planned Planned
working)
Actual Actual Actual Actual
January February March April May June July August September October November
Vertical Multistage centrifugal
49 FF Jockey Pump 01 FF Pump Room Planned Planned Planned Planned
pump
Actual Actual Actual Actual
January February March April May June July August September October November
50 FF Jockey Pump 02 Vertical Multistage centrifugal FF Pump Room Planned Planned Planned Planned
pump
Actual Actual Actual Actual
January February March April May June July August September October November
51 Pumping Pit Pump 01 Submersible Waste Water Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
52 Pumping pit Pump 02 Submersible Waste Water Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
53 Chemical Dosing Pump 01 Diaphram Waste Water Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
54 Chemical Dosing Pump 02 Diaphram Waste Water Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
55 Equalization Tank Pump 01 Submersible Waste Water Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
56 Equalization Tank Pump 02 Submersible Waste Water Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
57 Equalization Tank Pump 03 Submersible Waste Water Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
58 Secondary settling Tank Pump Centrifugal Waste Water Planned Planned Planned Planned
01
Actual Actual Actual Actual
January February March April May June July August September October November
Secondary settling Tank Pump
59 02 Centrifugal Waste Water Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
Secondary Settling Tank Pump
60 Centrifugal Waste Water Planned Planned Planned Planned
03
Actual Actual Actual Actual
January February March April May June July August September October November
61 Primary Settling Tank Pump 01 Centrifugal Waste Water Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
62 Primary Settling Tank Pump 02 Centrifugal Waste Water Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
63 Aeration Tank Circulation Tank Centrifugal Waste Water Planned Planned Planned Planned
Pump 01
Actual Actual Actual Actual
January February March April May June July August September October November
Aeration Tank Circulation Tank
64 Pump 02 Centrifugal Waste Water Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
65 Recycle Pump 01 Centrifugal Waste Water
65 Recycle Pump 01 Centrifugal Waste Water Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
61 Biomas Pit Pump 01 Centrifugal Gate 04 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
62 Biomas Pit Pump 02 Submersible Gate 04 Planned Planned Planned Planned
Actual Actual Actual Actual
d Maintenance Schedule of Utilities 2022

E SMILES WITH EVERY SIP AND EVERY BITE


Quarter # 04 Status Date

December

December

December

December

December

December

December

December

December

December

December

December

December

December
December

December

December

December

December

December

December

December

December

December

December

December

December

December

December

December

December
December

December

December

December

December

December

December

December

December

December

December

December

December

December

December

December

December

December
December

December

December

December

December

December

December

December

December

December

December

December

December

December

December

December

December

December
December

December
Preventive & Periodic Maintenance Plan for Centrifugal Pum

Pump General Maintenance

Maintenance Checks Frequency Check

Check Pump Alignment 1M

Check for bearing Temperature and Abnormal Sound 1-W

Motor & Pump Bearing Greasing 2-W


Check Pump Coupling & Packing 3-M
Check for Coupling Guard Cover 1-W
Check for NRV Operation 2M
Clean Pump Strainer 1M
Check for Pump Cavitation 1M
Check for Expansion Below 2W

Pump Annual Maintenance Plan Check

Ensure Pump Isolation before Overhauling & apply LOTO


Pump Annual Maintenance

Pump Coupling Dismantle


Dismantle Pump Casing
Dismantle Impeller
Dismantle shaft and Bearing
Dismantle Mechanical Seal
Inspection of Pump Shaft
Inspection of Impeller
Inspection of Bearing Housing
Inspection of Pump Volute.

Electrical

Inspection Test DE
GE Value
Vibration
Motor Inspection Sound
Current Ampere
Rated Ampere
Motor
Temperature
Motor Inspection
Inspection Test
Frequency
Check Status
Inspect Motor Isolator 1-W
Inspect Motor Ground 1-W
Inspect Motor Resistance 1-W
Inspect Motor Terminal Box for Cables Looseness 1-W
ce Plan for Centrifugal Pumps

Date: ____ /____/____

aintenance

Replace Work Duration Comments

0.5

0.5
1
0.2
0.5
1
0.5
0.2

Replace Work Duration Comments

0.5

1
1
1
2
0.5
0.5
0.5
0.5
0.5

al

NDE Work Duration Comments


0.1
0.1
0.1
0.1
0.1
0.1

ection
Inspection Test
Work Duration Comments
Status
0.1
0.2
0.2
0.5
Preventive Maintenance Plan
AHU 01(Packing Hall)
Date: __ /__ /____ Location: Admin Roof

Last
Sr.# Maintenance Checks Frequency Check Clean Replace Next Due Remarks
replaced

Mechanical

1 Bellow inspection chilled water line. Daily visually inspection


during linewalk
Intake,Exhaust & Return Duct flexible Daily visually inspection
2
connection with AHU inspection. during linewalk
Check for AHU door closed and locked Daily visually inspection
3
properly during linewalk
Daily visually inspection
4 AHU Drain check.
during linewalk

5 Pre filter Cleaning/replace if necessary. 3 Days

6 Bag filters cleaning. stock count

7 Condenser & heating coils cleaning. Stock count

8 Unit inside and outside body cleaning. Stock count

9 Fan propeller cleaning. Stock count

10 Check the hold down bolts for tightness. Stock count

11 AHU inside body Torch inspection Stock count

Strainer cleaning.( NOT NECESSARY IN if welding or cutting job done


12
CLOSE LOOP) on lines
Electrical

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


13 STOCK COUNT
Amp:

Rated:______ Current:_______

14 Motor isolators inspection. STOCK COUNT

15 Electrical DB cleaning and connection STOCK COUNT


tightening.
16 VFD inspection. STOCK COUNT
Motor bearing lubrication replace if
17 STOCK COUNT
necessary.

18 Heating coils limit switch inspection. STOCK COUNT

E&I
Fresh air duct Temperature sensor
19 Monthly
inspection.

Return air duct Temperature/Humidity


20 Monthly
sensor inspection.

21 Return air duct Firestat sensor inspection. Monthly

22 DPS across Pre filters inspection. Monthly


23 DPS across Bag filters inspection. Monthly

24 Cooling coil inlet temperature sensor Monthly


inspection.
Chilled water supply Temperature sensor
25 Monthly
inspection.
Chilled water return Temperature sensor
26 Monthly
inspection.
27 2 Way Motorized valve inspection. Monthly
28 DPS across fan inspection. Monthly
29 Supply air temperature sensor Monthly

30 Smoke detector signal from fire panel Monthly


check.

Remarks

Performed By: Signature:


Preventive Maintenance Plan
AHU 02 (Packing Hall)
Date: __ /__ /____ Location: Admin Roof

Last
Sr.# Maintenance Checks Frequency Check Clean Replace Next Due Remarks
replaced

Mechanical

1 Bellow inspection chilled water line. Daily visually inspection


during linewalk
Intake,Exhaust & Return Duct flexible Daily visually inspection
2
connection with AHU inspection. during linewalk
Check for AHU door closed and locked Daily visually inspection
3
properly during linewalk
Daily visually inspection
4 AHU Drain check.
during linewalk

5 Pre filter Cleaning/replace if necessary. 3 Days

6 Bag filters cleaning. stock count

7 Condenser & heating coils cleaning. Stock count

8 Unit inside and outside body cleaning. Stock count

9 Fan propeller cleaning. Stock count

10 Check the hold down bolts for tightness. Stock count

11 AHU inside body Torch inspection Stock count

Strainer cleaning.( NOT NECESSARY IN if welding or cutting job done


12
CLOSE LOOP) on lines
Electrical

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


13 STOCK COUNT
Amp:

Rated:______ Current:_______

14 Motor isolators inspection. STOCK COUNT

15 Electrical DB cleaning and connection STOCK COUNT


tightening.
16 VFD inspection. STOCK COUNT
Motor bearing lubrication replace if
17 STOCK COUNT
necessary.

18 Heating coils limit switch inspection. STOCK COUNT

E&I
Fresh air duct Temperature sensor Daily visually inspection
19
inspection. during linewalk

Return air duct Temperature/Humidity Daily visually inspection


20
sensor inspection. during linewalk

Daily visually inspection


21 Return air duct Firestat sensor inspection.
during linewalk

22 DPS across Pre filters inspection. Daily visually inspection


during linewalk

23 DPS across Bag filters inspection. Daily visually inspection


during linewalk
Cooling coil inlet temperature sensor Daily visually inspection
24
inspection. during linewalk
Chilled water supply Temperature sensor Daily visually inspection
25
inspection. during linewalk
Chilled water return Temperature sensor Daily visually inspection
26
inspection. during linewalk
Daily visually inspection
27 2 Way Motorized valve inspection.
during linewalk
Daily visually inspection
28 DPS across fan inspection. during linewalk
Daily visually inspection
29 Supply air temperature sensor
during linewalk
Smoke detector signal from fire panel Daily visually inspection
30
check. during linewalk
Preventive Maintenance Plan
AHU 03 (Packing Hall)
Date: __ /__ /____ Location: Admin Roof

Last
Sr.# Maintenance Checks Frequency Check Clean Replace Next Due Remarks
replaced

Mechanical

1 Bellow inspection chilled water line. Daily visually inspection


during linewalk
Intake,Exhaust & Return Duct flexible Daily visually inspection
2
connection with AHU inspection. during linewalk
Check for AHU door closed and locked Daily visually inspection
3
properly during linewalk
Daily visually inspection
4 AHU Drain check.
during linewalk

5 Pre filter Cleaning/replace if necessary. 3 Days

6 Bag filters cleaning. stock count

7 Condenser & heating coils cleaning. Stock count

8 Unit inside and outside body cleaning. Stock count

9 Fan propeller cleaning. Stock count

10 Check the hold down bolts for tightness. Stock count

11 AHU inside body Torch inspection Stock count

Strainer cleaning.( NOT NECESSARY IN if welding or cutting job done


12
CLOSE LOOP) on lines
Electrical

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


13 STOCK COUNT
Amp:

Rated:______ Current:_______

14 Motor isolators inspection. STOCK COUNT

15 Electrical DB cleaning and connection STOCK COUNT


tightening.
16 VFD inspection. STOCK COUNT
Motor bearing lubrication replace if
17 STOCK COUNT
necessary.

18 Heating coils limit switch inspection. STOCK COUNT

E&I
Fresh air duct Temperature sensor Daily visually inspection
19
inspection. during linewalk

Return air duct Temperature/Humidity Daily visually inspection


20
sensor inspection. during linewalk

Daily visually inspection


21 Return air duct Firestat sensor inspection.
during linewalk

22 DPS across Pre filters inspection. Daily visually inspection


during linewalk

23 DPS across Bag filters inspection. Daily visually inspection


during linewalk
Cooling coil inlet temperature sensor Daily visually inspection
24
inspection. during linewalk
Chilled water supply Temperature sensor Daily visually inspection
25
inspection. during linewalk
Chilled water return Temperature sensor Daily visually inspection
26
inspection. during linewalk
Daily visually inspection
27 2 Way Motorized valve inspection.
during linewalk
Daily visually inspection
28 DPS across fan inspection. during linewalk
Daily visually inspection
29 Supply air temperature sensor
during linewalk
Smoke detector signal from fire panel Daily visually inspection
30
check. during linewalk
Preventive Maintenance Plan
AHU 04 (Packing Hall)
Date: __ /__ /____ Location: Admin Roof

Last
Sr.# Maintenance Checks Frequency Check Clean Replace Next Due Remarks
replaced

Mechanical

1 Bellow inspection chilled water line. Daily visually inspection


during linewalk
Intake,Exhaust & Return Duct flexible Daily visually inspection
2
connection with AHU inspection. during linewalk
Check for AHU door closed and locked Daily visually inspection
3
properly during linewalk
Daily visually inspection
4 AHU Drain check.
during linewalk

5 Pre filter Cleaning/replace if necessary. 3 Days

6 Bag filters cleaning. stock count

7 Condenser & heating coils cleaning. Stock count

8 Unit inside and outside body cleaning. Stock count

9 Fan propeller cleaning. Stock count

10 Check the hold down bolts for tightness. Stock count

11 AHU inside body Torch inspection Stock count

Strainer cleaning.( NOT NECESSARY IN if welding or cutting job done


12
CLOSE LOOP) on lines
Electrical

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


13 STOCK COUNT
Amp:

Rated:______ Current:_______

14 Motor isolators inspection. STOCK COUNT

15 Electrical DB cleaning and connection STOCK COUNT


tightening.
16 VFD inspection. STOCK COUNT
Motor bearing lubrication replace if
17 STOCK COUNT
necessary.

18 Heating coils limit switch inspection. STOCK COUNT

E&I
Fresh air duct Temperature sensor Daily visually inspection
19
inspection. during linewalk

Return air duct Temperature/Humidity Daily visually inspection


20
sensor inspection. during linewalk

Daily visually inspection


21 Return air duct Firestat sensor inspection.
during linewalk

22 DPS across Pre filters inspection. Daily visually inspection


during linewalk

23 DPS across Bag filters inspection. Daily visually inspection


during linewalk
Cooling coil inlet temperature sensor Daily visually inspection
24
inspection. during linewalk
Chilled water supply Temperature sensor Daily visually inspection
25
inspection. during linewalk
Chilled water return Temperature sensor Daily visually inspection
26
inspection. during linewalk
Daily visually inspection
27 2 Way Motorized valve inspection.
during linewalk
Daily visually inspection
28 DPS across fan inspection. during linewalk
Daily visually inspection
29 Supply air temperature sensor
during linewalk
Smoke detector signal from fire panel Daily visually inspection
30
check. during linewalk
Preventive Maintenance Plan
CHW FAHU 01 (Process Hall)
Date: __ /__ /____ Location: Utility Roof

Last
Sr.# Maintenance Checks Frequency Check Clean Replace Next Due Remarks
replaced

Mechanical

1 Bellow inspection chilled water line. Daily visually inspection


during linewalk
Intake,Exhaust & Return Duct flexible Daily visually inspection
2
connection with AHU inspection. during linewalk
Check for AHU door closed and locked Daily visually inspection
3
properly during linewalk
Daily visually inspection
4 AHU Drain check.
during linewalk

5 Pre filter Cleaning/replace if necessary. 3 Days

6 Bag filters cleaning. stock count

7 Condenser coils cleaning. Stock count

8 Unit inside and outside body cleaning. Stock count

9 Fan propeller cleaning. Stock count

10 Fan belt inspection replace if necessary. Stock count

11 Check the hold down bolts for tightness. Stock count

12 AHU inside body Torch inspection Stock count

if welding or cutting job done


13 Strainer cleaning.
on lines
Electrical

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


14 STOCK COUNT
Amp:

Rated:______ Current:_______

15 Motor isolators inspection. STOCK COUNT

16 Electrical DB cleaning and connection STOCK COUNT


tightening.
17 VFD inspection. STOCK COUNT
Motor bearing lubrication replace if
18 STOCK COUNT
necessary.
E&I

19 Fresh air duct Temperature sensor Daily visually inspection


inspection. during linewalk
Daily visually inspection
20 DPS across Pre filters inspection.
during linewalk
Cooling coil inlet Temperature sensor Daily visually inspection
21
inspection. during linewalk
Chilled water supply Temperature sensor Daily visually inspection
22
inspection. during linewalk
Daily visually inspection
23 2 Way Motorized valve inspection.
during linewalk
Daily visually inspection
24 DPS across fan inspection.
during linewalk
Daily visually inspection
25 Supply air temperature sensor
during linewalk
Preventive Maintenance Plan
CHW FAHU 02 (Process Hall)
Date: __ /__ /____ Location: Utility Roof

Last
Sr.# Maintenance Checks Frequency Check Clean Replace Next Due Remarks
replaced

Mechanical

1 Bellow inspection chilled water line. Daily visually inspection


during linewalk
Intake,Exhaust & Return Duct flexible Daily visually inspection
2
connection with AHU inspection. during linewalk
Check for AHU door closed and locked Daily visually inspection
3
properly during linewalk
Daily visually inspection
4 AHU Drain check.
during linewalk

5 Pre filter Cleaning/replace if necessary. 3 Days

6 Bag filters cleaning. stock count

7 Condenser coils cleaning. Stock count

8 Unit inside and outside body cleaning. Stock count

9 Fan propeller cleaning. Stock count

10 Fan belt inspection replace if necessary. Stock count

11 Check the hold down bolts for tightness. Stock count

12 AHU inside body Torch inspection Stock count

if welding or cutting job done


13 Strainer cleaning.
on lines
Electrical

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


14 STOCK COUNT
Amp:

Rated:______ Current:_______

15 Motor isolators inspection. STOCK COUNT

16 Electrical DB cleaning and connection STOCK COUNT


tightening.
17 VFD inspection. STOCK COUNT
Motor bearing lubrication replace if
18 STOCK COUNT
necessary.
E&I

19 Fresh air duct Temperature sensor Daily visually inspection


inspection. during linewalk
Daily visually inspection
20 DPS across Pre filters inspection.
during linewalk
Cooling coil inlet Temperature sensor Daily visually inspection
21
inspection. during linewalk
Chilled water supply Temperature sensor Daily visually inspection
22
inspection. during linewalk
Daily visually inspection
23 2 Way Motorized valve inspection.
during linewalk
Daily visually inspection
24 DPS across fan inspection.
during linewalk
Daily visually inspection
25 Supply air temperature sensor
during linewalk
Preventive Maintenance Plan
Compressor AHU 01
Date: __ /__ /____ Location: Compressor Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary.

2 Condenser coils cleaning.

3 Unit inside and outside body cleaning.

4 Fan propeller cleaning.

Belt and Pulley inspection /replace if


5
necessary

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


6
Amp:

Rated:______ Current:_______

7 Motor isolators inspection.

8 Electrical DP cleaning and connection


tightening.

9 VFD inspection.

10 Fan & Motor bearing lubrication.

11 Fan and motor bearing replacement.

12 Check the hold down bolts for tightness.

13 Drain check.

14 Strainer cleaning.

Inlet and outlet flexible connection


15
inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Compressor AHU 02
Date: __ /__ /____ Location: Compressor Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary.

2 Condenser coils cleaning.

3 Unit inside and outside body cleaning.

4 Fan propeller cleaning.

5 Belt and Pulley inspection /replace if


necessary

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


6
Amp:

Rated:______ Current:_______

7 Motor isolators inspection.

Electrical DP cleaning and connection


8
tightening.

9 VFD inspection.

10 Fan & Motor bearing lubrication.

11 Fan and motor bearing replacement.

12 Check the hold down bolts for tightness.

13 Drain check.

14 Strainer cleaning.

Inlet and outlet flexible connection


15
inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Dehumidifier 01
Date: __ /__ /____ Location: Admin Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary.

2 Condenser & heating coils cleaning.

3 Unit inside and outside body cleaning.

4 Fan propeller cleaning.

5 Desiccant rotor inspection and cleaning.

Rotor drive chain inspection and


6
lubrication.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

Electrical DP cleaning and connection


9
tightening.

10 VFD inspection.

11 Fan & Motor bearing lubrication.

12 Fan and motor bearing replacement.

13 Check the hold down bolts for tightness.

14 Drain check.

15 Strainer cleaning.

16 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Dehumidifier 02
Date: __ /__ /____ Location: Admin Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary.

2 Condenser & heating coils cleaning.

3 Unit inside and outside body cleaning.

4 Fan propeller cleaning.

5 Desiccant rotor inspection and cleaning.

Rotor drive chain inspection and


6
lubrication.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

Electrical DP cleaning and connection


9
tightening.

10 VFD inspection.

11 Fan & Motor bearing lubrication.

12 Fan and motor bearing replacement.

13 Check the hold down bolts for tightness.

14 Drain check.

15 Strainer cleaning.

16 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
FAHU 01
Date: __ /__ /____ Location: Utility Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary.

2 Unit inside and outside body cleaning.

3 Fan propeller cleaning.

Belt and Pulley inspection /replace if


4 necessary

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


5
Amp:

Rated:______ Current:_______

6 Motor isolators inspection.

7 Electrical DP cleaning and connection


tightening.

8 VFD inspection.

9 Fan & Motor bearing lubrication.

10 Fan and motor bearing replacement.

11 Check the hold down bolts for tightness.

Inlet and outlet flexible connection


12
inspection

Comments:

Checked By: ____________


FAHU 01

Preventive Maintenance Plan


FAHU 02
Date: __ /__ /____ Location: Utility Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary.

2 Unit inside and outside body cleaning.

3 Fan propeller cleaning.

Belt and Pulley inspection /replace if


4 necessary

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


5
Amp:

Rated:______ Current:_______

6 Motor isolators inspection.

7 Electrical DP cleaning and connection


tightening.

8 VFD inspection.

9 Fan & Motor bearing lubrication.

10 Fan and motor bearing replacement.

11 Check the hold down bolts for tightness.

Inlet and outlet flexible connection


12
inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Dehumidifier 01
Date: __ /__ /____ Location: Seasoning Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary.

2 Condenser & heating coils cleaning.

3 Unit inside and outside body cleaning.

4 Fan propeller cleaning.

5 Desiccant rotor inspection and cleaning.

Rotor drive belt inspection/replace if


6
necessary.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

Electrical DP cleaning and connection


9
tightening.

10 VFD inspection.

11 Fan & Motor bearing lubrication.

12 Fan and motor bearing replacement.

13 Check the hold down bolts for tightness.

14 Drain check.
Inlet and outlet flexible connection
16
inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Dehumidifier 02
Date: __ /__ /____ Location: Seasoning Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary.

2 Condenser & heating coils cleaning.

3 Unit inside and outside body cleaning.

4 Fan propeller cleaning.

5 Desiccant rotor inspection and cleaning.

Rotor drive belt inspection/replace if


6
necessary.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

Electrical DP cleaning and connection


9
tightening.

10 VFD inspection.

11 Fan & Motor bearing lubrication.

12 Fan and motor bearing replacement.

13 Check the hold down bolts for tightness.

14 Drain check.
Inlet and outlet flexible connection
16
inspection

Comments:

Checked By: ____________


s

Preventive Maintenance Plan


AHU 01 Cool Point
Date: __ /__ /____ Location: Seasoning Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Condenser Coils and fins cleaning.

2 Condenser Fan inspection.

3 Fan propeller cleaning.

4 Gas inspection.

Belt and Pulley inspection /replace if


5
necessary

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


6
Amp:

Rated:______ Current:_______

7 Motor isolators inspection.

Electrical DP cleaning and connection


8
tightening.

9 VFD inspection.

10 Fan & Motor bearing lubrication.

11 Fan and motor bearing replacement.

12 Check the hold down bolts for tightness.

13 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


s

Preventive Maintenance Plan


AHU 02 Cool Point
Date: __ /__ /____ Location: Seasoning Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Condenser Coils and fins cleaning.

2 Condenser Fan inspection.

3 Fan propeller cleaning.

4 Gas inspection.

Belt and Pulley inspection /replace if


5
necessary

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


6
Amp:

Rated:______ Current:_______

7 Motor isolators inspection.

Electrical DP cleaning and connection


8
tightening.

9 VFD inspection.

10 Fan & Motor bearing lubrication.

11 Fan and motor bearing replacement.

12 Check the hold down bolts for tightness.

13 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
AHU 01
Date: __ /__ /____ Location: ASRS Outside

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Condenser Coils and fins cleaning.

2 Condenser Fan inspection.

3 Fan propeller cleaning.

4 Gas inspection.

Belt and Pulley inspection /replace if


5
necessary

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


6
Amp:

Rated:______ Current:_______

7 Motor isolators inspection.

Electrical DP cleaning and connection


8
tightening.

9 VFD inspection.

10 Fan & Motor bearing lubrication.

11 Fan and motor bearing replacement.

12 Check the hold down bolts for tightness.

13 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
AHU 02
Date: __ /__ /____ Location: FGWH Loading Dock

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Condenser Coils and fins cleaning.

2 Condenser Fan inspection.

3 Fan propeller cleaning.

4 Gas inspection.

Belt and Pulley inspection /replace if


5
necessary

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


6
Amp:

Rated:______ Current:_______

7 Motor isolators inspection.

Electrical DP cleaning and connection


8
tightening.

9 VFD inspection.

10 Fan & Motor bearing lubrication.

11 Fan and motor bearing replacement.

12 Check the hold down bolts for tightness.

13 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Exhaust Fans 01
Date: __ /__ /____ Location: QA Lab Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary

2 Intake and exhaust grills and dampers


cleaning.

3 Belt inspection /replace if necessary.

4 Fan and Motor Pulley alignment


adjustment
Fan and motor bearing lubrication/ replace
5
if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

Electrical DP cleaning and connection


9
tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Exhaust Fans 02
Date: __ /__ /____ Location: QA Lab Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary

2 Intake and exhaust grills and dampers


cleaning.

3 Belt inspection /replace if necessary.

4 Fan and Motor Pulley alignment


adjustment
Fan and motor bearing lubrication/ replace
5
if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

Electrical DP cleaning and connection


9
tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Exhaust Fans 03
Date: __ /__ /____ Location: QA Lab Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary

2 Intake and exhaust grills and dampers


cleaning.

3 Belt inspection /replace if necessary.

4 Fan and Motor Pulley alignment


adjustment
Fan and motor bearing lubrication/ replace
5
if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

Electrical DP cleaning and connection


9
tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Exhaust Fans 04
Date: __ /__ /____ Location: QA Lab Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary

2 Intake and exhaust grills and dampers


cleaning.

3 Belt inspection /replace if necessary.

4 Fan and Motor Pulley alignment


adjustment
Fan and motor bearing lubrication/ replace
5
if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

Electrical DP cleaning and connection


9
tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Exhaust Fans 05
Date: __ /__ /____ Location: Utility Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary

2 Intake and exhaust grills and dampers


cleaning.

3 Belt inspection /replace if necessary.

4 Fan and Motor Pulley alignment


adjustment
Fan and motor bearing lubrication/ replace
5
if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

Electrical DP cleaning and connection


9
tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Exhaust Fans 06
Date: __ /__ /____ Location: Utility Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary

2 Intake and exhaust grills and dampers


cleaning.

3 Belt inspection /replace if necessary.

4 Fan and Motor Pulley alignment


adjustment
Fan and motor bearing lubrication/ replace
5
if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

Electrical DP cleaning and connection


9
tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Exhaust Fans 07
Date: __ /__ /____ Location: PC 32 Cold store inside

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary

2 Intake and exhaust grills and dampers


cleaning.

3 Belt inspection /replace if necessary.

4 Fan and Motor Pulley alignment


adjustment
Fan and motor bearing lubrication/ replace
5
if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

Electrical DP cleaning and connection


9
tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Exhaust Fans 09
Date: __ /__ /____ Location: Seasoning Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Filter Cleaning/replace if necessary

2 Intake and exhaust grills and dampers


cleaning.

3 Belt inspection /replace if necessary.

4 Fan and Motor Pulley alignment


adjustment
Fan and motor bearing lubrication/ replace
5
if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

Electrical DP cleaning and connection


9
tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
TEF 07
Date: __ /__ /____ Location: PC 32 Fryer

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Halton hood & Duct cleaning

2 Platform Cleaning

5 Fan and motor bearing lubrication/ replace


if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

9 Electrical DP cleaning and connection


tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
TEF 08
Date: __ /__ /____ Location: PC 32 Fryer

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Halton hood & Duct cleaning

2 Platform Cleaning

5 Fan and motor bearing lubrication/ replace


if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

9 Electrical DP cleaning and connection


tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
TEF 11
Date: __ /__ /____ Location: KK Seasoning Drum

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Halton hood & Duct cleaning

2 Platform Cleaning

5 Fan and motor bearing lubrication/ replace


if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

9 Electrical DP cleaning and connection


tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
TEF 12
Date: __ /__ /____ Location: KK Fryer

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Halton hood & Duct cleaning

2 Platform Cleaning

5 Fan and motor bearing lubrication/ replace


if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

9 Electrical DP cleaning and connection


tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
TEF 13
Date: __ /__ /____ Location: PC 50 Blancher

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Halton hood & Duct cleaning

2 Platform Cleaning

5 Fan and motor bearing lubrication/ replace


if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

9 Electrical DP cleaning and connection


tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
TEF 14
Date: __ /__ /____ Location: PC 32 Blancher

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Halton hood & Duct cleaning

2 Platform Cleaning

5 Fan and motor bearing lubrication/ replace


if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

9 Electrical DP cleaning and connection


tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
TEF 15
Date: __ /__ /____ Location: PC 50 Fryer Inlet

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Halton hood & Duct cleaning

2 Platform Cleaning

5 Fan and motor bearing lubrication/ replace


if necessary

6 Fan propeller and casing cleaning.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


7
Amp:

Rated:______ Current:_______

8 Motor isolators inspection.

9 Electrical DP cleaning and connection


tightening.

10 VFD inspection.

11 Check the hold down bolts for tightness.

12 Inlet and outlet flexible connection


inspection

Comments:

Checked By: ____________


Preventive Maintenance Plan
Cooling Tower
Date: __ /__ /____ Location: ENGG Workshop Roof

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Visual Inspection of appropriate water


flow in Cooling Tower

2 Hot water sump cleaning.

3 PVC Fills Cleaning/replace if necessary

4 Water level sensor inspection.

5 Check for tearing and cracking in the


structure

6 Fan and motor excessive vibration check

Belt and Pulley inspection/ replace if


7
necessary.

8 Fan propeller cleaning.

9 Fan & Motor bearing lubrication.

10 Fan & Motor bearing replacement.

Motor Cleaning and inspection.

GE:___ , Vib:____ ,Sound: _____


11
Amp:

Rated:______ Current:_______

12 Motor isolators inspection.

13 Electrical DP cleaning and connection


tightening.

14 VFD inspection.

15 Platform cleaning.

Comments:

Checked By: ____________


Preventive Maintenance Plan
Compressor 01
Date: __ /__ /____ Location: Compressor Room

Sr.# Maintenance Checks Frequency Check Clean Replace Last replaced Next Due Remarks

1 Check that condensate is discharged during


loading
Check oil level.
2 Below mid-level:__________
Up mid-level:______________

Drain condensate from the air receiver, if


3 installed

4 Clean compressor.

5 Check for possible leaks.

6 Check Coolers clean if necessary.

Carry out service actions according to the


7 displayed service plans

Comments:

Checked By: ____________


UPFL Planned Maintenance Schedule of All Mopping Machines 2019

Sr # Machine Name Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04 Status Date


January February March April May June July August September October November December
1 Dry Mix Lavori #1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
2 Dry Mix Lavori #2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Dry Mix Karcher #3
3 (New) Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle Cleantech
4 Planned Planned Planned Planned
#1
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle Cleantech
5 #2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle Cleantech
6 Planned Planned Planned Planned
#3 (New)
Actual Actual Actual Actual
UPFL Planned Maintenance Schedule of All Lifting Equipment 2019

Sr # Machine Name Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04 Status Date


January February March April May June July August September October November December
Crown Reach Truck
1 Planned Planned Planned Planned
# 01
Actual Actual Actual Actual
January February March April May June July August September October November December
2 Crown Reach Truck Planned Planned Planned Planned
# 02
Actual Actual Actual Actual
January February March April May June July August September October November December
3 BT Reach Truck # 03 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
4 BT-Stacker # 01 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
5 BT-Stacker # 02 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
6 New CHL Lifter Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
7 Doosan Lifter Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
8 Jungheinrich Planned Planned Planned Planned
Stacker # 01
Actual Actual Actual Actual
January February March April May June July August September October November December
Jungheinrich
9 Planned Planned Planned Planned
Stacker # 02
Actual Actual Actual Actual
January February March April May June July August September October November December
10 Jungheinrich Planned Planned Planned Planned
Stacker # 03
Actual Actual Actual Actual
January February March April May June July August September October November December
11 Real Lifter Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
12 Drum Tilter Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
13 Hand Lifter Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
14 Lifting Hoist Planned Planned Planned Planned
Actual Actual Actual Actual
UPFL Planned Maintenance Schedule of All Exhaust Fans 2019

Sr # Machine Name Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04 Status Date


January February March April May June July August September October November December
1 Engineering Store 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
2 Engineering Store 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
3 AC Workshop Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
4 Generator Room 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
5 Generator Room 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
6 Generator Room 3 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
7 Generator Room 4 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
8 Generator Room 5 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
9 LT Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
10 HT Switch Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
11 Transformer Room Planned Planned Planned Planned
1
Actual Actual Actual Actual
January February March April May June July August September October November December
12 Transformer Room Planned Planned Planned Planned
2
Actual Actual Actual Actual
January February March April May June July August September October November December
Mechanical
13 Planned Planned Planned Planned
Workshop
Actual Actual Actual Actual
January February March April May June July August September October November December
14 Engineering Office Planned Planned Planned Planned
MT
Actual Actual Actual Actual
January February March April May June July August September October November December
Engineering Office
15 Planned Planned Planned Planned
LT
Engineering Office
15 LT
Actual Actual Actual Actual
January February March April May June July August September October November December
16 Workers Facility 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
17 Workers Facility 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
18 Workers Facility 3 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
19 Workers Facility 4 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
20 Workers Facility 5 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
21 Workers Facility 6 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
22 Main Toilet Area 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
23 Main Toilet Area 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
24 Main Toilet Area 3 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
25 Dining Hall 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
26 Dining Hall 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
27 Canteen Kitchen 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
28 Canteen Kitchen 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
29 Main Office MT Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
30 Main Office LT Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
31 MO Telephone Planned Planned Planned Planned
Exchange
Actual Actual Actual Actual
January February March April May June July August September October November December
32 Canteen No. 2 # 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
33 Canteen No. 2 # 2 Planned Planned Planned Planned
33 Canteen No. 2 # 2
Actual Actual Actual Actual
January February March April May June July August September October November December
34 Canteen No. 2 # 3 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
35 Canteen No. 2 # 4 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
36 Canteen No. 2 # 5 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
37 Canteen No. 2 # 6 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
38 Canteen No. 2 # 7 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
39 Canteen No. 2 # 8 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
40 Canteen No. 2 # 9 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
41 Canteen No. 2 # 10 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
42 RO Plant (ETP) Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
43 Scrap Yard Area 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
44 Scrap Yard Area 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
45 Printers Workshop Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
46 Soup Washing Area Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
47 Chicken Area Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
48 Autoclave Room 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
49 Autoclave Room 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
50 Mayonnaise Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
51 Egg Reception Planned Planned Planned Planned
51 Egg Reception
Actual Actual Actual Actual
January February March April May June July August September October November December
52 Egg Breaking Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Tomato Ketchup FF Planned Planned Planned Planned
53
#1
Actual Actual Actual Actual
January February March April May June July August September October November December
54 Tomato Ketchup FF Planned Planned Planned Planned
#2
Actual Actual Actual Actual
January February March April May June July August September October November December
Knorr Washing
55 Planned Planned Planned Planned
Area
Actual Actual Actual Actual
January February March April May June July August September October November December
56 ArtoFax Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
57 Noodle 600 Line Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
58 Noodle Old Line Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
59 Noodle Warehouse Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
60 RM Store 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
61 RM Store 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
62 Main Warehouse Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
63 Charging Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Fruit Washing Area Planned Planned Planned Planned
64 1
Actual Actual Actual Actual
January February March April May June July August September October November December
Fruit Washing Area Planned Planned Planned Planned
65
2
Actual Actual Actual Actual
January February March April May June July August September October November December
66 Chemical Room Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Fruit Washing Area Planned Planned Planned Planned
67
1
Actual Actual Actual Actual
January February March April May June July August September October November December
Fruit Washing Area
68 Planned Planned Planned Planned
2
Actual Actual Actual Actual
January February March April May June July August September October November December
69 Chemical Room Planned Planned Planned Planned
69 Chemical Room
Actual Actual Actual Actual
January February March April May June July August September October November December
Compressor Room
70 Planned Planned Planned Planned
1
Actual Actual Actual Actual
January February March April May June July August September October November December
Compressor Room Planned Planned Planned Planned
71
2
Actual Actual Actual Actual
January February March April May June July August September October November December
Absorption Chiller
72 Planned Planned Planned Planned
(CPR)
Actual Actual Actual Actual
UPFL Planned Maintenance Schedule of Water Filters 2019

Sr # Filters Area Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04 Status Date


January February March April May June July August September October November December
1 Mayo 5 Micron Filter Mayo Processing Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
2 Mayo 1 Micron Filter Mayo Processing Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
3 Mayo Carbon Filter Mayo Processing Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Mayo UV Sterlizer
4 Mayo Processing Planned Planned Planned Planned
Inspection (Green/Red)
Actual Actual Actual Actual
January February March April May June July August September October November December
5 Canteen 5 Micron Filter Dinning Hall Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
6 Noodle 600 5 Micron Filter Noodle 600 (New) Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle 800
7 Noodle 800 5 Micron Filter (Proposed) Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Process Water Main 0.5 Process Water Planned Planned Planned Planned
8 Micron Bag Filter 1 Main
Actual Actual Actual Actual
January February March April May June July August September October November December
Process Water Main 0.5 Process Water Planned Planned Planned Planned
9 Micron Bag Filter 2 Main
Actual Actual Actual Actual
UPFL Planned Maintenance Schedule of Air Filters 2019

Sr # Filters Area Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04 Status Date


January February March April May June July August September October November December
1 MP1 Air Filter/Regulator Dry Mix Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
2 MP2 Air Filter/Regulator Dry Mix Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
3 MP3 Air Filter/Regulator Dry Mix Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
4 MP4 Air Filter/Regulator Dry Mix Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
5 MP5 Air Filter/Regulator Dry Mix Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
6 Ketchup Main Assembly Ketchup Planned Planned Planned Planned
Festo Filter Assembly
Actual Actual Actual Actual
January February March April May June July August September October November December
Ketchup Main Line Hepa Planned Planned Planned Planned
7 Ketchup
Filter
Actual Actual Actual Actual
January February March April May June July August September October November December
8 Hassia 1 Filter Assembly Ketchup Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
9 Hassia 2 Filter Assembly Ketchup Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November December
10 FFSM Filter Assembly Ketchup Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November December
11 Mespack Filter Assembly Ketchup Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November December
Purree Pump Filter Planned January Planned Planned Planned
12 Ketchup
Assembly
Actual Actual Actual Actual
February March April May June July August September October November December
Vaccum Kettle Filter Planned January Planned Planned Planned
13 Assembly 1 Ketchup
Actual Actual Actual Actual
February March April May June July August September October November December
14 Vaccum Kettle Filter Ketchup Planned January Planned Planned Planned
Assembly 2
14 Vaccum Kettle Filter Ketchup
Assembly 2
Actual Actual Actual Actual
February March April May June July August September October November December
Floar Coater 1 Filter Planned January Planned Planned Planned
15 Assembly Ketchup
Actual Actual Actual Actual
February March April May June July August September October November December
Floar Coater 2 Filter Planned January Planned Planned Planned
16 Assembly Ketchup
Actual Actual Actual Actual
February March April May June July August September October November December
17 Noodle 800 Air Regulator 1 Noodle Planned January Planned Planned Planned
Actual January Actual Actual Actual
February March April May June July August September October November December
18 Noodle 800 Air Regulator 2 Noodle Planned Planned Planned Planned
Actual January Actual Actual Actual
February March April May June July August September October November December
19 Noodle 800 Air Regulator 3 Noodle Planned Planned Planned Planned
Actual January Actual Actual Actual
February March April May June July August September October November December
20 Noodle 800 Air Regulator 4 Noodle Planned Planned Planned Planned
Actual January Actual Actual Actual
February March April May June July August September October November December
21 Noodle 800 Air Regulator 5 Noodle Planned Planned Planned Planned
Actual January Actual Actual Actual
February March April May June July August September October November December
22 Noodle 800 Air Regulator 6 Noodle Planned Planned Planned Planned
Actual January Actual Actual Actual
February March April May June July August September October November December
23 Noodle 800 Air Regulator 7 Noodle Planned Planned Planned Planned
Actual January Actual Actual Actual
February March April May June July August September October November December
24 Noodle 800 Air Regulator 8 Noodle Planned Planned Planned Planned
Actual January Actual Actual Actual
February March April May June July August September October November December
25 Noodle 800 Air Regulator 9 Noodle Planned Planned Planned Planned
Actual January Actual Actual Actual
January February March April May June July August September October November December
26 Noodle 800 Air Regulator Noodle Planned Planned Planned Planned
10
Actual Actual Actual Actual
January February March April May June July August September October November December
27 Noodle 800 Air Regulator Noodle Planned Planned Planned Planned
11
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle 800 Air Regulator Planned Planned Planned Planned
28 Noodle
12
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle 800 Air Regulator Planned Planned Planned Planned
29 13 Noodle
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle 800 Air Regulator Planned Planned Planned Planned
30 Noodle
14
30 Noodle 800 Air Regulator Noodle
14
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle 800 Air Regulator Planned Planned Planned Planned
31 15 Noodle
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle 800 Air Regulator Planned Planned Planned Planned
32 16 Noodle
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle 800 Air Regulator Planned Planned Planned Planned
33 Noodle
17
Actual Actual Actual Actual
January February March April May June July August September October November December
34 Noodle 800 Air Regulator Noodle Planned January Planned Planned Planned
18
Actual Actual Actual Actual
February March April May June July August September October November December
35 Noodle 600 Air Regulator 1 Noodle Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November December
36 Noodle 600 Air Regulator 2 Noodle Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November December
37 Noodle 600 Air Regulator 3 Noodle Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November December
38 Noodle 600 Air Regulator 4 Noodle Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November December
39 Noodle 600 Air Regulator 5 Noodle Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November December
40 Noodle 600 Air Regulator 6 Noodle Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November December
41 Noodle 600 Air Regulator 7 Noodle Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November December
42 Noodle 600 Air Regulator 8 Noodle Planned January Planned Planned Planned
Actual January Actual Actual Actual
February March April May June July August September October November December
43 Noodle 600 Air Regulator 9 Noodle Planned Planned Planned Planned
Actual January Actual Actual Actual
February March April May June July August September October November December
44 Day Oil Tak Air Regulator Noodle Planned Planned Planned Planned
Actual January Actual Actual Actual
February March April May June July August September October November December
Palm Oil Storage Tank Air Planned Planned Planned Planned
45 Regulator Noodle
Actual January Actual Actual Actual
UPFL Planned Maintenance Schedule of Steam Stainers 2019

Sr # Filters Area Size (Inch) Company Pressure (Bar) Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04
January February March April May June July August September October November
1 CPR Main Header Stainer Outer Area 2.5 KITZ 16 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
2 CPR Steam Line Stainer Utility 2.5 KITZ 16 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
Ketchup/Mayo Hot Water
3 Tank Stainer Outer Area 1 Local 16 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
Ketchup Main Steam Planned Planned Planned Planned
4 Header Stainer Ketchup 2 KITZ 16
Actual Actual Actual Actual
January February March April May June July August September October November
Ketchup Condensate Tank
5 Outer Area 2 KITZ 16 Planned Planned Planned Planned
Stainer
Actual Actual Actual Actual
January February March April May June July August September October November
6 DCM Condensate Tank Outer Area 2 KITZ 16 Planned Planned Planned Planned
Stainer
Actual Actual Actual Actual
January February March April May June July August September October November
DCM Hot Water Tank Planned Planned Planned Planned
7 Outer Area 1 Local 16
Stainer
Actual Actual Actual Actual
January February March April May June July August September October November
Noodle Backside Planned Planned Planned Planned
8 Outer Area 1.5 Local 16
Condensate Tank Stainer
Actual Actual Actual Actual
January February March April May June July August September October November
Noodle Backside Hot Planned January Planned Planned Planned
9 Outer Area 1.5 Local 16
Water Tank Stainer
Actual Actual Actual Actual
February March April May June July August September October November
Noodle Palm Oil Tank 60 Planned January Planned Planned Planned
10 Outer Area 1 Local 16
Ton
Actual Actual Actual Actual
February March April May June July August September October November
Noodle Palm Oil Tank 13 Planned January Planned Planned Planned
11 Outer Area 1 KITZ 16
Ton
Actual Actual Actual Actual
February March April May June July August September October November
12 Noodle 600 Noodle 2 KITZ 16 Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
13 Noodle 800 Noodle 2 KITZ 16 Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
14 Kettle 1 Ketchup 1 KITZ 16 Planned January Planned Planned Planned
14 Kettle 1 Ketchup 1 KITZ 16
Actual Actual Actual Actual
February March April May June July August September October November
15 Kettle 2 Ketchup 1 KITZ 16 Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
16 Kettle 3 Ketchup 1 KITZ 16 Planned January Planned Planned Planned
Actual Actual Actual Actual
Schedule of Steam Stainers 2019

Quarter # 04 Status Date


December

December

December

December

December

December

December

December

December

December

December

December

December

December
December

December
UPFL Planned Maintenance Schedule of PSVs Planned Inspection 2019

Sr # Filters Area Type of Media Set Pressure Popping Pressure Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04
January February March April May June July August September October November
1 Boiler 4 PSV 1 Boiler House Steam 10 Bar 10.4 Bar Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
2 Boiler 4 PSV 2 Boiler House Steam 10 Bar 10.6 Bar Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
3 Boiler 4 Economiser PSV Boiler House Water 20 Bar 20.2 Bar Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
4 Open Kettle Ketchup Steam 3 Kg/Cm2 3.8 Kg/Cm2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
5 Vaccum Kettle 1 Ketchup Steam 4.5 Kg/Cm2 5.2 Kg/Cm2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
6 Vaccum Kettle 2 Ketchup Steam 4.5 Kg/Cm2 65 PSI Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
7 Vaccum Kettle 3 Ketchup Steam 4.5 Kg/Cm2 65 PSI Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
8 Noodle 300 Heat Exchanger Noodle Steam 10 Kg/Cm2 Circuit Off Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
9 Noodle 600 Heat Exchanger Noodle Steam 10 Kg/Cm2 8.4 Bar Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
10 Noodle 800 Heat Exchanger Noodle Steam 10 Kg/Cm2 8.9 Bar Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
11 Altas Copco 1 New Utility Hub Air 9 Kg/Cm2 Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
12 Altas Copco 2 New Utility Hub Air 9 Kg/Cm2 Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
13 Sanco VS-20 1 Utility Roof Air 9 Kg/Cm2 10.2 Bar Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
14 Sanco VS-20 2 Utility Roof Air 9 Kg/Cm2 10.1 Bar Planned January Planned Planned Planned
14 Sanco VS-20 2 Utility Roof Air 9 Kg/Cm2 10.1 Bar
Actual Actual Actual Actual
February March April May June July August September October November
15 Process Water Supply Outer Area Water 5 Kg/Cm2 Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
16 Fire Fighting Header Outer Area Water 8 Kg/Cm2 Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
17 DCM Open Kettle DCM Steam 5 Kg/Cm2 3.6 Bar Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
18 Autoclave DCM Steam 8 Kg/Cm2 3 Bar Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
19 HFO Circuit Fuel Line Outer Area Fuel 6 Kg/Cm2 Circuit Off Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
20 CPR Main Header Outer Area Steam 9 Kg/Cm2 Circuit Off Planned January Planned Planned Planned
Actual Actual Actual Actual
edule of PSVs Planned Inspection 2019

Quarter # 04 Status Date


December

December

December

December

December

December

December

December

December

December

December

December

December

December
December

December

December

December

December

December
UPFL Planned Maintenance Schedule of PSVs Planned Inspection 2019

Sr # Filters Area Type of Media Set Pressure Popping Pressure Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04
January February March April May June July August September October November
1 Boiler 4 PSV 1 Boiler House Steam 10 Bar 10.4 Bar Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
2 Boiler 4 PSV 2 Boiler House Steam 10 Bar 10.6 Bar Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
3 Boiler 4 Economiser PSV Boiler House Water 20 Bar 20.2 Bar Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
4 Open Kettle Ketchup Steam 3 Kg/Cm2 3.8 Kg/Cm2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
5 Vaccum Kettle 1 Ketchup Steam 4.5 Kg/Cm2 5.2 Kg/Cm2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
6 Vaccum Kettle 2 Ketchup Steam 4.5 Kg/Cm2 65 PSI Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
7 Vaccum Kettle 3 Ketchup Steam 4.5 Kg/Cm2 65 PSI Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
8 Noodle 300 Heat Exchanger Noodle Steam 10 Kg/Cm2 Circuit Off Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
9 Noodle 600 Heat Exchanger Noodle Steam 10 Kg/Cm2 8.4 Bar Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
10 Noodle 800 Heat Exchanger Noodle Steam 10 Kg/Cm2 8.9 Bar Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
11 Altas Copco 1 New Utility Hub Air 9 Kg/Cm2 Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
12 Altas Copco 2 New Utility Hub Air 9 Kg/Cm2 Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
13 Sanco VS-20 1 Utility Roof Air 9 Kg/Cm2 10.2 Bar Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
14 Sanco VS-20 2 Utility Roof Air 9 Kg/Cm2 10.1 Bar Planned January Planned Planned Planned
14 Sanco VS-20 2 Utility Roof Air 9 Kg/Cm2 10.1 Bar
Actual Actual Actual Actual
February March April May June July August September October November
15 Process Water Supply Outer Area Water 5 Kg/Cm2 Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
16 Fire Fighting Header Outer Area Water 8 Kg/Cm2 Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
17 DCM Open Kettle DCM Steam 5 Kg/Cm2 3.6 Bar Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
18 Autoclave DCM Steam 8 Kg/Cm2 3 Bar Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
19 HFO Circuit Fuel Line Outer Area Fuel 6 Kg/Cm2 Circuit Off Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
20 CPR Main Header Outer Area Steam 9 Kg/Cm2 Circuit Off Planned January Planned Planned Planned
Actual Actual Actual Actual
edule of PSVs Planned Inspection 2019

Quarter # 04 Status Date


December

December

December

December

December

December

December

December

December

December

December

December

December

December
December

December

December

December

December

December
UPFL Planned Maintenance Schedule of PSVs Planned Inspection 2019

Sr # Filters Area Size Pressure Other Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04


Specifications
January February March April May June July August September October November
1 Aglomerator 1 Steam Trap Knorr FF Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
2 Kettle 1 Steam Trap Ketchup Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
3 Kettle 2 Steam Trap Ketchup Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
4 Kettle 3 Steam Trap Ketchup Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November
Ketchup Open Kettle
5 Ketchup Planned Planned Planned Planned
Steam Trap
Actual Actual Actual Actual
January February March April May June July August September October November
Mayo/Ketchup Hot Water Planned Planned Planned Planned
6 Outer Area
Tank Steam Trap
Actual Actual Actual Actual
January February March April May June July August September October November
Mayo Pasteurization Tank Planned Planned Planned Planned
7 Mayo
Steam Trap
Actual Actual Actual Actual
January February March April May June July August September October November
Main Steam Header Steam Planned Planned Planned Planned
8 Outer Area
Trap
Actual Actual Actual Actual
January February March April May June July August September October November
Noodle Main Steam Planned January Planned Planned Planned
9 Outer Area
Header
Actual Actual Actual Actual
February March April May June July August September October November
10 CPR Main Steam Header Outer Area Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
11 Darre Dryer Steam Trap DCM Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
12 Autoclave Steam Trap DCM Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
13 Open Kettle Steam Trap DCM Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
14 DCM Hot Water Tank DCM
14 DCM Hot Water Tank DCM Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
15 Absorption Chiller Steam CPR Planned January Planned Planned Planned
Trap
Actual Actual Actual Actual
February March April May June July August September October November
16 Noodle 600 Steam Trap Noodle Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
17 Noodle 800 Steam Trap Noodle Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
18 Noodle 300 Steam Trap Noodle Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
Noodle Palm Oil Steam Planned January Planned Planned Planned
19 Noodle
Trap
Actual Actual Actual Actual
February March April May June July August September October November
20 Noodle Hot Water Tank Noodle Planned January Planned Planned Planned
Actual Actual Actual Actual
February March April May June July August September October November
21 CPR Main Header Outer Area Planned January Planned Planned Planned
Actual Actual Actual Actual
edule of PSVs Planned Inspection 2019

Quarter # 04 Status Date

December

December

December

December

December

December

December

December

December

December

December

December

December

December
December

December

December

December

December

December

December
UPFL Planned Maintenance Schedule of PSVs Planned Inspection 2019

Sr # Areas Quarter # 01 Quarter # 02 Quarter # 03 Quarter # 04 Status Date

January February March April May June July August September October November December
1 Main Office Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
2 Canteen Kitchen Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
3 Worker's Facility Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
4 New Worker's Facility 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
4 New Worker's Facility 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
5 Dining Hall Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Dry Mix Hand Washing Planned Planned Planned Planned
6
Area
Actual Actual Actual Actual
January February March April May June July August September October November December
7 Conveyor 1 Dry Mix Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
8 Dry Mix to Warehouse Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
9 Soup Area to Warehouse Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
10 Mayo to Warehouse 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
10 Mayo to Warehouse 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
11 Mayo Area Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
12 Ketchup GF 1 Planned Planned Planned Planned
12 Ketchup GF 1
Actual Actual Actual Actual
January February March April May June July August September October November December
12 Ketchup GF 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
13 Ketchup FF Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
14 DCM 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
14 DCM 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
15 AutoClave Room 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
15 AutoClave Room 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
16 Egg Reception 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
16 Egg Reception 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
17 Main Warehouse Door 1 #1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
17 Main Warehouse Door 1 #2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
18 Main Warehouse Door 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
Main Warehouse Planned Planned Planned Planned
19 Emergency Door
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle to Noodle Planned Planned Planned Planned
20
Warehouse 1 #1
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle to Noodle Planned Planned Planned Planned
20
Warehouse 1 #2
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle to Noodle Planned Planned Planned Planned
21 Warehouse 2
Actual Actual Actual Actual
January February March April May June July August September October November December
Noodle 600 Line Flour
22
Warehouse 1
22 Noodle 600 Line Flour Planned Planned Planned Planned
Warehouse 1
Actual Actual Actual Actual
January February March April May June July August September October November December
22 Noodle 600 Line Flour Planned Planned Planned Planned
Warehouse 2
Actual Actual Actual Actual
January February March April May June July August September October November December
22 Noodle 600 Line Flour Planned Planned Planned Planned
Warehouse 3
Actual Actual Actual Actual
January February March April May June July August September October November December
23 Noodle 300 Line Flour Planned Planned Planned Planned
Warehouse
Actual Actual Actual Actual
January February March April May June July August September October November December
24 Noodle Main Entrance 1 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
24 Noodle Main Entrance 2 Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
25 Noodle 800 Line Entrance Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
26 RM Store Planned Planned Planned Planned
Actual Actual Actual Actual
January February March April May June July August September October November December
27 Canteen Planned Planned Planned Planned
Actual Actual Actual Actual