B.
Annual demand 1000 units x 50 weeks
(Each desk requires 0.2 meters of = 50000 units of desks
meranti wood)
Cost of placing and receiving RM 50 per order
Carrying cost 5% from its cost (RM1)
Lead time 3 -5 weeks
EOQ=
√ 2 ×1000 units ×50 weeks × RM 20
RM 1
EOQ = 1414.21 meters
b. Re-order level = Max Consumption x Max Reorder Period
= 800 unit × 5 weeks
= 4000 meters
c. Maximum Stock level = Reorder Level – (Min Consumption x Min Reorder Period)
+ EOQ
= 4000 meters – ( 300 units × 3 weeks) + 1414.21 meters
= 4511.21 meters
d. Minimum Stock level = Reorder Level – (Normal Consumption x Normal Reorder
Period)
27 50 RM16.00 RM800.00 - - -
30
QUESTION 3
Employee Type Hours Units produced Units rejected
worked Board Learning Board Learning
Game Kit Game kit
Sufian Skilled 45 60 80 2 -
Arul Skilled 43 55 60 - 2
Hafiz Semi-skilled 50 50 30 5 4
i. Rate per hour for skilled and semi-skilled are RM 8.50 and RM7.00 per hour
respectively
ii. Overtime is paid at a rate of a time and a half of the normal hourly rate.
iii. Time allowed per good unit is categorized according to worker's grade:
Product Grade Standard time in
minutes
Board Game Skilled 30 minutes
Semi-skilled 40 minutes
Learning Kit Skilled 24 minutes
Semi-skilled 30 minutes
iv. Bonus will be paid on individual basis. The bonus is calculated based on time
saved at 40% of the normal hourly rate.
a. Calculate the total wages for all employee for the fourth week of December
2019.
Sufian:
Basic Wage = 40 hours × RM8.50
= RM 340
Overtime = Hours worked – Normal hours
= 45 – 40 = 5 hours
Overtime payment = Basic OT + OT Premium
= (5 hours × RM8.50) + (5 hours ×RM8.50×1/2)
= RM 63.80
Total wage = Basic wage + Overtime
= RM340 + RM 63.80
= RM403.80
Arul:
Basic Wage = 40 hours × RM8.50
= RM 340
Overtime = Hours worked – Normal hours
= 43 – 40 = 3 hours
Overtime payment = Basic OT + OT Premium
= (3 hours × RM8.50) + (3 hours ×RM8.50×1/2)
= RM 38.25
Total wage = Basic wage + Overtime
= RM340 + RM 38.25
= RM 378.25
Hafiz:
Basic Wage = 40 hours × RM7.00
= RM 280
Overtime = Hours worked – Normal hours
= 50 – 40 = 10 hours
Overtime payment = Basic OT + OT Premium
= (10 hours × RM7.00) + (10 hours ×RM7.00×1/2)
= RM 105
Total wage = Basic wage + Overtime
= RM 280 + RM 105
= RM 385
Therefore, the total wages for all employee for the fourth week of December
2019 is