Dear Eng.Walaa,
Thanks to arrange the following project
 
____________________________________________
If you have any request don’t hestitate to contact me
Best Regards,
Pola Nan Elias
Automation & Projects Manager
Mob : +20 128 068 8732
Email : pola.nan@eisac-automation.com
Address: 151 Ebeed St., Sahel, Cairo,EG

 
 
 
From: Mina Hatem [mailto:Mina.Hatem@alahrambeverages.com]

Sent: Tuesday, January 10, 2023 11:32 AM

To: pola.nan@eisac-automation.com

Cc: Fady Sedky <fady.sedky@alahrambeverages.com>

Subject: Wine Stabilization Tanks


 
Dear Eng. Pola
 
Happy New Year and Merry Christmas
 
Kindly we need a quotation for below:
Project Overview:
Temperature control in 8 tanks and to be added to the existing SCADA system.
Process Function Description:
1-After filling the specific tank (X) with product at certain level (it will be in the recipe, minimum level to start the process).

2- The recipe can be selected but it will run after the tank reaches to the minimum level selected in the recipe,

3- The digital output will be ignited to open the valves for cooling (it will be selection of which section of heat exchanger).

4- After safety delay the pump will run (the digital output will be ignited for pump).

5- After specific time (specified in the recipe) the agitator will run.

6- Digital out will be ignited for agitator.

7- All the above process will run till reach the specific temperature (specified on the recipe).

8- The above process will be end when the temperature reaches.


End process sequence:-

1- The digital out of the agitator will be off.

2- After delay time the digital output of the pump will be stopped.

3- After safety delay time the digital output of valves will be stopped.

Option:

Will be end process button to start the end process sequence regardless the temperature.

- Safety for pump dry run (flow switch in front of the pump).

Scope of delivery and installations:

 
1- All panels will be stainless steel panel IP55. ( Control Panel & Pneumatic Panel )
2- Air hoses.
3- Control cables 3*1 shielded.
4- Solenoid valves to be [FESTO or Hafner].
5- The PLC  1214C
* Already we have temperature transmitters for the tanks.
 
Thanks for your support and cooperation,

     

Mina Hatem

Maintenance Planner - Engineering - Gianaclis Plant

T. (+20) 24614 1000 - F. (+20) 246141001

mina.hatem@alahrambeverages.com

www.alahrambeverages.com

_____________________Disclaimer________________________

The information transmitted is intended only for the person or entity

to which it is addressed and may contain confidential and/or

privileged material. Any review, retransmission, dissemination or

other use of, or taking of any action in reliance upon, this information

by persons or entities other than the intended recipient is prohibited.

If you received this in error, please contact the sender and delete

the material from any computer.


Sketch.jpg
~1.9 MB

You might also like