Dear Eng.Walaa,
Thanks to arrange the following project
____________________________________________
If you have any request don’t hestitate to contact me
Best Regards,
Pola Nan Elias
Automation & Projects Manager
Mob : +20 128 068 8732
Email : pola.nan@eisac-automation.com
Address: 151 Ebeed St., Sahel, Cairo,EG
From: Mina Hatem [mailto:Mina.Hatem@alahrambeverages.com]
To: pola.nan@eisac-automation.com
2- The recipe can be selected but it will run after the tank reaches to the minimum level selected in the recipe,
3- The digital output will be ignited to open the valves for cooling (it will be selection of which section of heat exchanger).
4- After safety delay the pump will run (the digital output will be ignited for pump).
5- After specific time (specified in the recipe) the agitator will run.
7- All the above process will run till reach the specific temperature (specified on the recipe).
2- After delay time the digital output of the pump will be stopped.
3- After safety delay time the digital output of valves will be stopped.
Option:
Will be end process button to start the end process sequence regardless the temperature.
- Safety for pump dry run (flow switch in front of the pump).
1- All panels will be stainless steel panel IP55. ( Control Panel & Pneumatic Panel )
2- Air hoses.
3- Control cables 3*1 shielded.
4- Solenoid valves to be [FESTO or Hafner].
5- The PLC 1214C
* Already we have temperature transmitters for the tanks.
Thanks for your support and cooperation,
Mina Hatem
mina.hatem@alahrambeverages.com
www.alahrambeverages.com
_____________________Disclaimer________________________
other use of, or taking of any action in reliance upon, this information
If you received this in error, please contact the sender and delete