BILL OF MATERIAL

I.D 3200
"A"
VENDOR DATA STATUS
1: APPROVED. SUBMIT FINAL
2: APPROVED WITH COMMENT
3: NOT APPROVED
(REVISED AND RESUBMIT)
4: APPROVAL NOT REQUIRED
INFORMATION ONLY

Permission to proceed does not constitute


VIEW "A"-"A" acceptance or approval of design details,
ELEVATION calculations, Analysis, test methods or
materials developed or selected by the
supplier and does not releive supplier from
full compliance with contractual obligations.

REVIEW DATE : 2021. 10. 18


"X" "X" LEAD ENGINEER
ENGINEER

J.S.PARK S.H.YOON

BOOT
WET H 2 S SERVICE
APPROVED FOR CONSTRUCTION
"Y" "Y"

DETAIL 2 Fathin JOSHI

DETAIL 1
2021.10.14
2021.10.14 17:41:04
+08'00'
17:22:01 +08'00'

TEMPORARY SADDLE DETAIL

WASHER DETAIL
SADDLE #1 SADDLE #1
SECTION "X"-"X" SECTION "Y"-"Y"
FOR LPG FEED SURGE DRUM
(C-063-01)

TM

SADDLE #2
SADDLE #2
SECTION "Y"-"Y"
SECTION "X"-"X"