MATERIAL ISSUE SLIP

(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 2 0 0 0 0 1


DATE
PO NO. 12/29/2021
ITEM DESCRIPTION HEC-SR-02831 - 2021/12/29 - MIS-70036

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 37

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 0 2


DATE
PO NO. 1/17/2022
ITEM DESCRIPTION HEC-SR-03721 - 2022/05/23 - MIS IB3 00002

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 37

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 0 3


DATE
PO NO. 6/11/2022
ITEM DESCRIPTION PIPE - HEC-SR-03830 - 2022/06/11 - MIS IB3 00003

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 0 4


DATE
PO NO. 7/6/2022
ITEM DESCRIPTION PIPE - HEC-SR-04050 - 2022/07/06 - MIS IB3 00004

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 060 ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 0 5


DATE
PO NO. 7/6/2022
ITEM DESCRIPTION GATE VLV - HEC-SR-04048 - 2022/07/06 - MIS IB3 00005

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 060 ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 0 6


DATE
PO NO. 7/6/2022
ITEM DESCRIPTION CHECK VLV - HEC-SR-04051 - 2022/07/06 - MIS IB3 00006

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 060 ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 0 7


DATE
PO NO. 7/6/2022
ITEM DESCRIPTION PIPE - HEC-SR-04078 - 2022/07/09 - MIS IB3 00007

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 160R ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 0 8


DATE
PO NO. 7/6/2022
ITEM DESCRIPTION VLV - HEC-SR-04077 - 2022/07/09 - MIS IB3 00008

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 160R ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 0 9


DATE
PO NO. 19-07-2022
ITEM DESCRIPTION Bolt&nut HEC-SR-04139 - 2022/07/19 - MIS IB3 00009

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 160R ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 1 0


DATE
PO NO. 19-07-2022
ITEM DESCRIPTION GASKET HEC-SR-04142 - 2022/07/19 - MIS IB3 00010

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 160R ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 1 1


DATE
PO NO. 7/23/2022
ITEM DESCRIPTION STUD BOLT- HEC-SR-04190 - 2022/07/23 - MIS IB3 00011

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 160R ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 1 2


DATE
PO NO. 7/27/2022
ITEM DESCRIPTION FLANGE - HEC-SR-04221 - 2022/07/27 - MIS IB3 00012

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 060R01 ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 1 3


DATE
PO NO. 7/27/2022
ITEM DESCRIPTION GASKET - HEC-SR-04222 - 2022/07/27 - MIS IB3 00013

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 160R ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 1 4


DATE
PO NO. 7/27/2022
ITEM DESCRIPTION FLANGE - HEC-SR-04224 - 2022/07/27 - MIS IB3 00014

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 160R ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 1 5


DATE
PO NO. 7/28/2022
ITEM DESCRIPTION STUD BOLT - HEC-SR-04232 - 2022/07/27 - MIS IB3 00015

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 160R ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 1 6


DATE
PO NO. 7/28/2022
ITEM DESCRIPTION GASKET - HEC-SR-04235 - 2022/07/27 - MIS IB3 00016

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 160R ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 1 7


DATE
PO NO. 7/28/2022
ITEM DESCRIPTION VALVE - HEC-SR-04234 - 2022/07/28 - MIS IB3 00017

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 160R ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 1 8


DATE
PO NO. 7/28/2022
ITEM DESCRIPTION FLANGE - HEC-SR-04233 - 2022/07/28 - MIS IB3 00018

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 067R01 ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 2 0


DATE
PO NO. 8/1/2022
ITEM DESCRIPTION BOLT - HEC-SR-04255 - 2022/08/01 - MIS IB3 00020

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO


3. OTHERS ( 160R ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
IDENT CODE TAG NO (DEVIATION DESCRIPTION) REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

10

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 1 9


DATE
PO NO. 8/1/2022

ITEM DESCRIPTION SUPPORT - 2022/08/01 - MIS IB3 00019

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED

1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO

3. OTHERS ( 160R ) □ YES □ NO

ITEM NAME Q'TY


IDENT DESCRIPTION
No SIZE UNIT LOCATION
(DEVIATION DESCRIPTION)
IDENT CODE TAG NO REQ'ED ISSUED

160R01-DMW-001-01
1 HOLD DOWN SUPPORT 8 EA 10
BC-AS8-G
160R01-DMW-001-02
2 HOLD DOWN SUPPORT 8 EA 1
BC-AS8
160R01-DMW-001-02
3 HOLD DOWN SUPPORT 8 EA 2
BC-AS8-G
160R01-DMW-001-02
4 HOLD DOWN SUPPORT 8 EA 1
BC-AS8-S
060R01-P-015-01
5 HOLD DOWN SUPPORT 10 EA 3
BC-AC10-G
060R01-P-015-01
6 HOLD DOWN SUPPORT 10 EA 1
BC-BC6-S
060R01-P-015-02
7 HOLD DOWN SUPPORT 8 EA 2
BC-BC8-G
060R01-P-016-01
8 HOLD DOWN SUPPORT 8 EA 2
BC-BC8-G
060R01-P-016-02
9 HOLD DOWN SUPPORT 10 EA 3
BC-AC10-G
060R01-P-215-01
10 HOLD DOWN SUPPORT 10 EA 3
BC-AC10-G
060R01-P-215-01
11 HOLD DOWN SUPPORT 10 EA 1
BC-BC6-S
060R01-P-215-02
12 HOLD DOWN SUPPORT 8 EA 2
BC-BC8-G
060R01-P-216-01
13 HOLD DOWN SUPPORT 8 EA 2
BC-BC8-G
060R01-P-216-02
14 HOLD DOWN SUPPORT 10 EA 3
BC-AC10-G
060R01-P-225-01
15 HOLD DOWN SUPPORT 10 EA 3
BC-AC10-G
060R01-P-225-01
16 HOLD DOWN SUPPORT 10 EA 1
BC-BC6-S
060R01-P-225-02
17 HOLD DOWN SUPPORT 8 EA 2
BC-BC8-G
060R01-P-226-01
18 HOLD DOWN SUPPORT 8 EA 2
BC-BC8-G
060R01-P-226-02
19 HOLD DOWN SUPPORT 10 EA 3
BC-AC10-G
060R01-P-235-01
20 HOLD DOWN SUPPORT 10 EA 3
BC-AC10-G
060R01-P-235-01
21 HOLD DOWN SUPPORT 10 EA 1
BC-BC6-S
060R01-P-235-02
22 HOLD DOWN SUPPORT 8 EA 2
BC-BC8-G
060R01-P-236-01
23 HOLD DOWN SUPPORT 8 EA 2
BC-BC8-G
060R01-P-236-02
24 HOLD DOWN SUPPORT 10 EA 3
BC-AC10-G
060A01-P-001-02
25 HOLD DOWN SUPPORT 16 EA 1
BC-AC16
060A01-P-001-03
26 HOLD DOWN SUPPORT 16 EA 1
BC-AC16-G
060A01-P-001-04
27 HOLD DOWN SUPPORT 16 EA 3
BC-AC16-G
060A01-P-001-04
28 HOLD DOWN SUPPORT 16 EA 2
BC-AC8
060A01-P-001-05
29 HOLD DOWN SUPPORT 10 EA 1
BC-AC10-S
060A01-P-001-05
30 HOLD DOWN SUPPORT 16 EA 1
BC-AC16-A
060A01-P-001-05
31 HOLD DOWN SUPPORT 16 EA 4
BC-AC16-G
060A01-P-001-05
32 HOLD DOWN SUPPORT 16 EA 2
BC-AC8
060A01-P-113-01
33 HOLD DOWN SUPPORT 12 EA 1
BC-AC12
060A01-P-113-01
34 HOLD DOWN SUPPORT 12 EA 1
BC-AC12-G
060A01-P-114-01
35 HOLD DOWN SUPPORT 12 EA 1
BC-AC12
060A01-P-114-01
36 HOLD DOWN SUPPORT 12 EA 1
BC-AC12-G
060A01-P-115-01
37 HOLD DOWN SUPPORT 12 EA 1
BC-AC12
060A01-P-115-01
38 HOLD DOWN SUPPORT 12 EA 1
BC-AC12-G
060A01-P-116-01
39 HOLD DOWN SUPPORT 12 EA 1
BC-AC12
060A01-P-116-01
40 HOLD DOWN SUPPORT 12 EA 1
BC-AC12-G

41

42

43

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE
SIGNATURE

DATE
MATERIAL ISSUE SLIP
(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. REPORT NO. MIS P I B 3 0 0 0 2 1


DATE
PO NO. 8/3/2022

ITEM DESCRIPTION Orifice - 2022/08/03 - MIS IB3 00021

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED

1. PACKING LIST □ YES □ NO

2. FABRICATION DRAWING □ YES □ NO

3. OTHERS ( 160R01 ) □ YES □ NO

ITEM NAME Q'TY


IDENT DESCRIPTION
No SIZE UNIT LOCATION
(DEVIATION DESCRIPTION)
IDENT CODE TAG NO REQ'ED ISSUED

1 DETAIL ATTACHED

2 AREA 41

43

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME

SIGNATURE

DATE