You are on page 1of 1

MATERIAL ISSUE SLIP

(REPORT NO: 26071-100-GPX-)

SHIPMENT NO. RL-474 REPORT NO. MIS I C E 1 0 0 0 0 0


PO NO. 26071-100-PO-JX00-00065 (Nobi) DATE 25/03/2023

ITEM DESCRIPTION PERFORATED TRAY

The Subcontractor shall properly classify, keep in order and store the received equipment and materials in accordance with the material handling procedure. The
Subcontractor shall be liable for any loss and damage of the received equipment and materials whilst it is in his care and custody.

ATTACHMENTS: REFER. DOC. NO. ATTACHED


1. PACKING LIST RL-474

□ YES □ NO

2. FABRICATION DRAWING □ YES □ NO

3. OTHERS ( ) □ YES □ NO

ITEM NAME IDENT DESCRIPTION Q'TY


No SIZE UNIT LOCATION
PACKING NO. BOX NO. (DEVIATION DESCRIPTION) REQ'ED ISSUED

PERFORATED TRAY
1 300Wx75Hx3000L EA 79 CDU N
RL-474 26 of 60

SUBCON CONTRACTOR SUBCON


CONSTRUCTION FE FMC
REQUESTER RECEIVER
HEC REKIND PP JO HEC REKIND PP ISSUER

NAME LEE SANG SU

SIGNATURE

DATE 25/03/2023
PHONE 0823 5086-3683

You might also like