ENGINEERING SERVICES TES RESPONSE SHEET TO URC DOCUMENT
TRANSMITTAL DATE REVIEW DOCUMENT No. DOCUMENT TITLE
NUMBER 0001 TECHNICAL SUBMITTAL FOR TEMPORARY SHED
NAME DHINESH C NAME
DISCIPL Structural INE DATE 09.02.2023 DATE 09.02.2023
DOCUMENT REVIEW SHEET:
Sl. URC– COMMENTS TECHBRO – RESPONSE URC STATUS/R No. COMMENT EMARK ON RESPONSE
HYD007-URC-A1-TF-SD-A-6001
Add Section along with Typical step details.
1 Add Details of Handrails & its fixing to Base frame. 2 This drawing is incomplete for review. 3 SHOW PROPER INTERFACE OF BEAM & SLAB 4 THESE LEVELS ARE AS PER SLOPE. 5 Have Common gusset. (Typ.) 6 SHOW PROPER INTERFACE OF BEAM & SLAB Please check & avoid Duplicated details. There are two members 7 shown here at different levels. Please check the same. CHANGE TITLE, 8 THIS IS NOT ONLY WIND GIRT. Page 1 of 2 AVOID SHOWING BOTH LEVELS & DIMENSIONS. 9 TO AVOID DUPLICATION OF INFORMATION. MENTION GRADE OF ALL ELEMENTS, 10 SEE TEXT OVERLAPS 11 STIFFNERS MISSING.
(Lab Report Operation Unit) Experiment 3: Separation of An Ordinary Binary Mixture Consisting of Acetic Acid and Water by Using Simple Batch Distillation Technique.