You are on page 1of 2

URC TECHBRO

ENGINEERING SERVICES
TES RESPONSE SHEET TO URC DOCUMENT

TRANSMITTAL DATE REVIEW DOCUMENT No. DOCUMENT TITLE


NUMBER
0001 TECHNICAL SUBMITTAL FOR
TEMPORARY SHED

NAME DHINESH C NAME


DISCIPL Structural
INE
DATE 09.02.2023 DATE 09.02.2023

DOCUMENT REVIEW SHEET:


Sl. URC– COMMENTS TECHBRO – RESPONSE URC STATUS/R
No. COMMENT EMARK
ON
RESPONSE

HYD007-URC-A1-TF-SD-A-6001

Add Section along with Typical step details.


1
Add Details of Handrails & its fixing to Base frame.
2 This drawing is incomplete for review.
3 SHOW PROPER INTERFACE OF BEAM & SLAB
4 THESE LEVELS ARE AS PER SLOPE.
5 Have Common gusset. (Typ.)
6 SHOW PROPER INTERFACE OF BEAM & SLAB
Please check & avoid Duplicated details. There are two members
7 shown here at different levels. Please check the same.
CHANGE TITLE,
8 THIS IS NOT ONLY WIND GIRT.
Page 1 of 2
AVOID SHOWING BOTH LEVELS & DIMENSIONS.
9 TO AVOID DUPLICATION OF INFORMATION.
MENTION GRADE OF ALL ELEMENTS,
10 SEE TEXT OVERLAPS
11 STIFFNERS MISSING.

Page 2 of 2

You might also like