You are on page 1of 1

ADDENDUM FOR ADJUSTMENT OF SEPTIC TANK AT OFFICE AREA.

JHA Number: T7-22-CHEC-JHA-002

CHEC OFFICE

Equipment: Self-loader, shovel, lifting gears, wheelbarrows etc

METHOD.

In adjustment of the septic tank, the self-loader will be positioned on stable ground

to properly adjust the tank tensioning lifting gears in the position of lifting eye on

the tank and then the space around the tank will be filled with rocks/stones to attain

rigidity.

Other work methods associated with this task are referenced in WMS T-14.472.470

for the construction of a temporary construction facility.

Provision for adequate supervision and HSSE coverage (HSEO, Permit holder,
Environmental officer.)
There must be an approved work authorization PTW and HSSE coverage for

adjustment of the septic tank.