The document outlines a budget and expected value (EV) for different divisions of a construction project. Division 2 includes excavation and foundation work with a budget of $134,000 which matches the EV. Division 3 focuses on concrete works like slabs, beams, and columns, with a total budget over $2.3 million, but an EV of only $80,500 capturing plain concrete works. A grand total budget of over $2.4 million is listed with an overall EV of around $214,500 and remaining balance of over $2.2 million.
The document outlines a budget and expected value (EV) for different divisions of a construction project. Division 2 includes excavation and foundation work with a budget of $134,000 which matches the EV. Division 3 focuses on concrete works like slabs, beams, and columns, with a total budget over $2.3 million, but an EV of only $80,500 capturing plain concrete works. A grand total budget of over $2.4 million is listed with an overall EV of around $214,500 and remaining balance of over $2.2 million.
The document outlines a budget and expected value (EV) for different divisions of a construction project. Division 2 includes excavation and foundation work with a budget of $134,000 which matches the EV. Division 3 focuses on concrete works like slabs, beams, and columns, with a total budget over $2.3 million, but an EV of only $80,500 capturing plain concrete works. A grand total budget of over $2.4 million is listed with an overall EV of around $214,500 and remaining balance of over $2.2 million.