Professional Documents
Culture Documents
1
OFFICIAL COMPETENCY ASSESSMENT TOOL
2
OFFICIAL COMPETENCY ASSESSMENT TOOL
3
OFFICIAL COMPETENCY ASSESSMENT TOOL
Overall Performance:
𐄂 Satisfactory 𐄂 Not Satisfactory
Trainee’s Signature: Date:
Richie Juls Bacalso
Assessor’s Signature: Date:
4
OFFICIAL COMPETENCY ASSESSMENT TOOL
3. Trainee shall submit a presentation plan to the assessor that will serve as
his/her guide through-out the report.
5. Trainee shall provide only the video link for this Performance Test.
Trainee shall NOT send the video itself to the assessor and/or admin.
5
OFFICIAL COMPETENCY ASSESSMENT TOOL
Presentation Plan
Report: WEEKLY PROJECT ACCOMPLISHMENT PROJECT REPORT
Intended Audience: MANAGEMENT AND ENGINEERS
Objective # 1: TO PRESENT THE KPI OF THE PROJECT
Objective # 2: TO DISCUSS ISSUES AND CONCERNS OF THE PROJECT
Slide Required Resources
Timing Topic Activity
No.
3 MINS SELF INTRODUCTION 1-8 SELF INTRO AND
PRESENTATION
AND 40
SECOND ACTUAL
S DISCUSSED THE CURRENT TARGET: 88.57% PROJECT NARRATIVE
KPI OF THE PROJECT REPORT
INHOUSE
TARGET: 88.57% SCURVE UDPATE
OBJECTIVES OF THE CUSTOMER POWER POINT
REPORT TARGET: 86.87% PRESENTATION
Strong
Introduction VARIANCE
PRESENTATION OF THE AGAINST
REPORT INHOUSE:
0.00%
VARIANCE
AGAINST
CUSTOMER:
1.70%
Payment for
Subcon;
DOCUMENT I.D NUMBER
1 MIN ISSUES AND CONCERS 10 MR. Jaire Uto Alim FOR PAYMENT PROCESS
MR. Jovel GAPATE
6
OFFICIAL COMPETENCY ASSESSMENT TOOL
SHOWING ACTUAL
PICTURE
1 MIN PROGRESS PHOTOS 13-16 COMPILATIONS JOBSITE PICTURES
7
OFFICIAL COMPETENCY ASSESSMENT TOOL
Paste your
link here 🡪
https://drive.google.com/file/d/1zEKO485OvxypZg0ihWSGUmvYgD14xNtZ/view?usp=share_link
(Do not email the
MP4 file. Please
submit the video This is to informed that the report used in this presentation was accomplished last August 2022, for the
link from your reason that the project was reported complete last August 30, so I am no longer handling projects as of
Google Drive. today.
Make sure to grant
viewing access to
the assessor/s.
Assessor’s Comments: