SCOPE OF WORKS:
PROJECT REQUIREMENTS
A. MATERIALS
1. Gabions (PVC coated)
2. Filter Cloth
3. Boulders
4. Cement
5. Reinforcing steel bars
B. EQUIPMENT
1. Backhoe
2. Dump truck
3. Transit Mixer
C. LABOR
Skilled = 1 (Safety Marshall)
Unskilled = 5 (Checker, Warehouseman, 3 -Labor)
Subcon = 1 (Emmanuel Cabodte)
CLASSIFICATION OF RISKS
MEDIUM RISK
VICINITY MAP
2. Clearing and grubbing – area widening for the accessibility (backing) of heavy equipment such as dump
trucks for the delivery of boulders.
4. Structural Excavation
7. Unloading of boulders
11. Embankment
2. STRUCTURAL EXCAVATION
CONSTRUCTION METHODOLOGY: Backhoe excavate at least 4m wide with 1m workspace for the
workers access to move freely at the excavated area, height of the excavation may varies.
HAZARDS :
PREVENTION:
1. Conduct tool box meeting focuses on safety topics on specific job, such as workplace
hazards and safe work practices & all workers must wear PPE’s.
2. Install regulatory signs, warning signs & bollards 4.5mts apart with reflectorized tape
interconnected by caution tape.
3. Spotter/helper assists the equipments movement.
4. Flagman must be visible on work site for safety traffic.
CONSTRUCTION METHODOLOGY: Embankment materials from riverbanks use backfill to the portion
of project that is needed for embankment.
HAZARDS :
PREVENTION:
1. Conduct tool box meeting focuses on safety topics on specific job, such as workplace
hazards and safe work practices & all workers must wear PPE’s.
2. Operator must be trained on proper handling of equipment.
3. Install regulatory signs, warning signs with reflectorized tape interconnected by caution
tape.
4. Flagman visible on work site for safety traffic.
Hazards
The Protective & Safety Equipment shall be in accordance with the specifications and the
requirements of the contract.
Safety glasses
All personnel will be Safety shoes
handed out these Coveralls
items during their site Work gloves
induction. High visibility vest
Safety Helmets
METHODOLOGY
The side and end panels will be folded into the upright position to form a rectangular box. The top
corners of the box will be joined together with the thick selvedge wire which is sticking out from the
corners of each panel. This will make sure that the tops of all four sides of the box are level.
Wiring up will begin by securing the binding wire at the top corners of the panels to be joined, by
looping it through and twisting it together. Then the wire will be laced around the selvedges with single
loops and double loops in turn at 100 mm intervals. Finally, the wire will be fastened securely at the
bottom corner, and the loose end will be poked inside the gabion. Next, the diaphragms will be lifted
into the vertical position and will be wired up to the side panels in exactly the same way.
GENERAL NOTES:
These steps involve going through everything in a space, deciding what's necessary and what isn't, putting things in
order, cleaning, and setting up procedures for performing these tasks on a regular basis.
S: SCREENING of all Assessors, Examinees, and staff in order to ensure safety for all.
Complete a telephone screen via questionnaire prior to attending.
Everyone who enters an Assess Med location is Nurse screened on a secondary basis prior to entering the
location via questionnaire and touch less temperature screening.
Everyone is required to sanitize their hands, put on PPE including masks, gloves and shoe covers prior to entering
the facility.
A: ADJUSTING our Workspace to maintain social distancing
To accommodate physical spacing operating days and/or hours will be expanded.
Appointment times are staggered to enable social distancing, screening and time for cleaning assessment and
common areas/equipment.
Waiting and assessment areas have been rearranged to maintain 2m physical distancing with signage and floor
decals as reminders.
F: Focused efforts on enhanced cleaning and disinfecting our offices
Plexiglas screen guards have been installed at all locations in both reception and interview rooms.
Staff are responsible for cleaning the equipment and high touch surfaces in between each appointment in all areas
of the locations.
Work stations and all equipment are sanitized before and after use or as needed throughout the work day,
including high touch surfaces such as desks, phone, computer, printer, pens, door handles etc.
Everyone is required to sanitize their hands, put on PPE including masks, gloves and shoe covers prior to entering
a facility.
Education provided on the proper use of PPE including donning and doffing procedures.
Clinicians are required to wear and change gloves between each assessment.
Assessors are provided with face shields as required for physical exams.
Prepared by:
Checked by:
Reviewed by:
Verified by: