WORKSITE PLAN

Project Name: 21 DO DP UPPER TIBANBAN FC


Project Amount: Php 47,528,165.15
Expiration Date: December 4, 2021
Project Engineer:Richie Juls Bacalso

TYPE OF WORK: FLOOD CONTROL


(LABOR EXTENSIVE)

SCOPE OF WORKS:

1. Gabions (PVC coated)


2. Filter Cloth
3. Embankment from Structure Excavation
4. Embankment from Borrow (Common Soil)
5. Structural Concrete (Class "A", 14 days)

PROJECT REQUIREMENTS

A. MATERIALS
1. Gabions (PVC coated)
2. Filter Cloth
3. Boulders
4. Cement
5. Reinforcing steel bars
B. EQUIPMENT
1. Backhoe
2. Dump truck
3. Transit Mixer
C. LABOR
Skilled = 1 (Safety Marshall)
Unskilled = 5 (Checker, Warehouseman, 3 -Labor)
Subcon = 1 (Emmanuel Cabodte)

CLASSIFICATION OF RISKS

MEDIUM RISK

21DO-DP UPPER TIBANBAN FC


Maer Summit Konstrukt Co.
Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
UPPER TIBANBAN, GOVERNOR GENEROSO, DAVAO ORIENTAL

VICINITY MAP

Equipment and Manpower Movements @ 21DO-DP UPPER TIBANBAAN FC


Maer Summit Konstrukt Co.
Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
1. Before site operations

2. Clearing and grubbing – area widening for the accessibility (backing) of heavy equipment such as dump
trucks for the delivery of boulders.

3. Clearing and grubbing for the preparation of structural excavation.

4. Structural Excavation

5. Embankment from structural excavation


Maer Summit Konstrukt Co.
Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
6. Delivery of boulders.

7. Unloading of boulders

8. Installation of Filter Cloth

9. Gabion installation, piling and assembly.

Maer Summit Konstrukt Co.


Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
10. Installation of filter cloth,

11. Embankment

12. Completed/Finished Project.

1. INDIVIDUAL REMOVAL OF TREES


Maer Summit Konstrukt Co.
Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
 Hazards
 Equipment Operation during the removal of trees.
 Falling debris
 Electrical posts and lines present in the area
 Safety Procedures
 Equipment Operation during the removal of trees
 An Operator must completely wear the Personal Protective Equipment (PPE’s) before
the start of the operation.
 Ensure that the equipment/s are fully functional and operational before the conduct of
the activity.
 Always maintain 3-point contact. (2hands and 1foot or 2feet and 1 hand).

Maer Summit Konstrukt Co.


Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
 To get off the machine, make sure that the machine is parked, and further movement
prevented. Shut off the machine if necessary.
 Falling debris
 All workers must have a complete PPE'S: Hard hat, Reflectorized vest, safety shoes
and gloves, Safety eyeglasses.
 Installation of Reflectorized and Visible Warning Signages must be present.
 There should be an active spotter/ Helper for the Equipments and all falling debris
present in the area.
 Proper Installment of bollards and caution tape.
 There should be a traffic head/ flagman present during the activity, it should be
attentive to manage the traffic.

2. STRUCTURAL EXCAVATION

 CONSTRUCTION METHODOLOGY: Backhoe excavate at least 4m wide with 1m workspace for the
workers access to move freely at the excavated area, height of the excavation may varies.

 HAZARDS :

1. Falls into trench or excavation.


2. Tripping over equipment
3. Exposure to underground services or overhead electrical cables.
4. Incidents involving vehicles and other mobile equipment.

 PREVENTION:
1. Conduct tool box meeting focuses on safety topics on specific job, such as workplace
hazards and safe work practices & all workers must wear PPE’s.
2. Install regulatory signs, warning signs & bollards 4.5mts apart with reflectorized tape
interconnected by caution tape.
3. Spotter/helper assists the equipments movement.
4. Flagman must be visible on work site for safety traffic.

Maer Summit Konstrukt Co.


Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
3. EMBANKMENT FROM STRUCTURAL EXCAVATION

 CONSTRUCTION METHODOLOGY: Embankment materials from riverbanks use backfill to the portion
of project that is needed for embankment.

 HAZARDS :

1. Incidents involving vehicles and other mobile equipment on site.


2. Resources or property may be covered by the excavated soil.

 PREVENTION:
1. Conduct tool box meeting focuses on safety topics on specific job, such as workplace
hazards and safe work practices & all workers must wear PPE’s.
2. Operator must be trained on proper handling of equipment.
3. Install regulatory signs, warning signs with reflectorized tape interconnected by caution
tape.
4. Flagman visible on work site for safety traffic.

4. INSTALLATION OF PVC COATED GABIONS


Maer Summit Konstrukt Co.
Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
Figure. Top view of the actual movement @ Upper Tibanban FC area, during the installation of gabions.

 Hazards

 Equipment Operation during the activity.


 Tripping hazards slip, trips and falls
 Trapping injuries
 Falling materials
 Defective plant and equipment
 Collapse of loose materials at slopes
 Personnel struck by equipment or vehicle
 Equipment tipping
 Equipment fall from embankment edges
 Manpower

The Protective & Safety Equipment shall be in accordance with the specifications and the
requirements of the contract.
 Safety glasses
 All personnel will be  Safety shoes
handed out these  Coveralls
items during their site  Work gloves
induction.  High visibility vest
 Safety Helmets

 METHODOLOGY

 Assembly and Forming the Structure

Maer Summit Konstrukt Co.


Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
 Each gabion mesh will be unfolded on a hard, flat surface. All kinks will be stretched and stamped out.
It will be made sure that all creases are in the correct positions for forming the box, one at the edge of
each end panel and each diaphragm.

 The side and end panels will be folded into the upright position to form a rectangular box. The top
corners of the box will be joined together with the thick selvedge wire which is sticking out from the
corners of each panel. This will make sure that the tops of all four sides of the box are level.

 Wiring up will begin by securing the binding wire at the top corners of the panels to be joined, by
looping it through and twisting it together. Then the wire will be laced around the selvedges with single
loops and double loops in turn at 100 mm intervals. Finally, the wire will be fastened securely at the
bottom corner, and the loose end will be poked inside the gabion. Next, the diaphragms will be lifted
into the vertical position and will be wired up to the side panels in exactly the same way.

Maer Summit Konstrukt Co.


Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
 The lids will be tightly stretched over the filling and will be wired down. The corners will be temporarily
secured first, to ensure that there is enough mesh to cover the whole area. Some filling may have to be
removed from the top of the gabion to prevent the lid from being over-stretched.

GENERAL NOTES:

 Project Engineer must be present during critical activities at all time.


 Housekeeping must be perfume daily and garbage disposal area must be established.
 All operators or drivers must be experienced and skilled enough to perform critical activities.
 Tools and light equipment must be turned over to warehouse and heavy equipment parking area
must also be established.
 All workers must wear the required PPE’s for that activity (ex. Safety vest, hard hat, facemask,
gloves, safety harness, welding mask, welding gloves, safety shoes).
 COVID PROTOCOLS must be strictly followed at all times.
 Toolbox meeting must be conducted before any activities will commence.

5 Steps of this Methodology

Maer Summit Konstrukt Co.


Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
1. Sort
2. Set in Order
3. Shine
4. Standardized
5. Sustain

These steps involve going through everything in a space, deciding what's necessary and what isn't, putting things in
order, cleaning, and setting up procedures for performing these tasks on a regular basis.

COVID – 19 PROTOCOL SAFETY

S:  SCREENING of all Assessors, Examinees, and staff in order to ensure safety for all.
 Complete a telephone screen via questionnaire prior to attending.
 Everyone who enters an Assess Med location is Nurse screened on a secondary basis prior to entering the
location via questionnaire and touch less temperature screening.
 Everyone is required to sanitize their hands, put on PPE including masks, gloves and shoe covers prior to entering
the facility.
A:  ADJUSTING our Workspace to maintain social distancing
 To accommodate physical spacing operating days and/or hours will be expanded.
 Appointment times are staggered to enable social distancing, screening and time for cleaning assessment and
common areas/equipment.
 Waiting and assessment areas have been rearranged to maintain 2m physical distancing with signage and floor
decals as reminders.
F: Focused efforts on enhanced cleaning and disinfecting our offices
 Plexiglas screen guards have been installed at all locations in both reception and interview rooms.
 Staff are responsible for cleaning the equipment and high touch surfaces in between each appointment in all areas
of the locations.
 Work stations and all equipment are sanitized before and after use or as needed throughout the work day,
including high touch surfaces such as desks, phone, computer, printer, pens, door handles etc.

E: EFFECTIVE usage of Personal Protective Equipment

 Everyone is required to sanitize their hands, put on PPE including masks, gloves and shoe covers prior to entering
a facility.
 Education provided on the proper use of PPE including donning and doffing procedures.
 Clinicians are required to wear and change gloves between each assessment.
 Assessors are provided with face shields as required for physical exams.

R: REACHING the best possible outcomes

Maer Summit Konstrukt Co.


Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
Rest assured, as we navigate this pandemic, we are doing so in full alignment with regularly updated
recommendations made by credible health authorities like the World Health Organization (WHO), Centers for
Disease Control and Prevention (CDC), Provincial Public Health Authorities and the Regulatory Colleges.

Prepared by:

RICHIE JULS BACALSO


Project Engineer

Checked by:

ANJO T. IMPERIAL DENNIS TAN


Area Supervisor Unit Head

Reviewed by:

JOVENTINO P. CAHULOGAN ALDE JANE A. DEGAMO JACKIE P. TIU BOT


FOD Manager TSD Manager Admin Unit Head

Verified by:

EMMANUEL O. VALGUNA LENNART B. SUELTO


IT Admin Comptroller

Recommending Approval: Approved by:

JOFRE A. QUIJADA DINO MAE D. SUELTO


Maer Summit Konstrukt Co.
Maer Summit Center, 43 Telstar, Doña Vicenta, Davao City, Philippines
222-8766 & 222-8768 (Telefax)
maerkon@yahoo.com.ph
Executive Officer Managing Partner