Professional Documents
Culture Documents
Front Page
Front Page
Note:
_1st Semester/2022-2023_
Semester/School Year
Revision No.______
LAB/ACTIVITY NO._____1______
_______BSCE 4A______
Year and Section
Related Literature:
Narrative Report:
The curing process of cement is dated to finish in
approximately 28 calendar days, which is basically a long period
of time. There are a lot of researches done where they
experimented in adding different chemicals to the cement with the
hope that it will cure the cement faster than normal. This
research aims to determine if adding calcium chloride to the
mixture will have an effect to its curing period.
Proposed Materials:
Calcium Chloride
Cement Mixture
Mixing rod
Molder
Water