Risk Assessment
Initial Risk Assessment
(without any controls in place) Residual Risk Assessment
Quality Opportunities Further
Activities / concerns/ Severity Risk Severity Risk or controls
SN Area Process Risks Rating likelihood rating Existing controls in place Rating likelihood rating improvement required
The list of approved
internal auditors are
not auditing available. The listed
own work auditors are independent Improvement
Conflict of
Impartiality during the 5 3 15 from the lab. Internal 2 1 2 in quality nil
1 interest
scheduled audits would be conducted process
internal audit as per the plan with the
approval from Branch
manager or MD.
Calibration
engineers
involved in All the marketing activities Improvement
2 Impartiality Detachment marketing 5 2 10 will be handled by sales 2 1 2 In the lab nil
where they and marketing team only results
perform the
calibration
favoring any
request that Calibration engineers are
Freedom Personnel free
3 Impartiality involves 5 2 10 not involved in the contract 2 1 2 nil
from bias of bias
falsification of review.
results
Page 1 of 7
Form Number FM-DT-50
DUTECH SAFETY & SECURITY CONSULTANCIES
Revision Number 02
Risk Assessment Matrix to Impartiality
Date of Effectiveness 12/07/2020
Page 2 of 7
Form Number FM-DT-50
DUTECH SAFETY & SECURITY CONSULTANCIES
Revision Number 02
Risk Assessment Matrix to Impartiality
Date of Effectiveness 12/07/2020
Page 3 of 7
Form Number FM-DT-50
DUTECH SAFETY & SECURITY CONSULTANCIES
Revision Number 02
Risk Assessment Matrix to Impartiality
Date of Effectiveness 12/07/2020
Page 4 of 7
Form Number FM-DT-50
DUTECH SAFETY & SECURITY CONSULTANCIES
Revision Number 02
Risk Assessment Matrix to Impartiality
Date of Effectiveness 12/07/2020
Improvement nil
Lab master equipment’s in the lab
Lab Performing Inaccurate are calibrated from results.
17 4 1 4 4 1
activities Calibration measurements accredited lab for accurate
measurements
Improvement nil
Lab standard test methods in the lab
Inaccurate results.
Lab Performing are developed and are
18 methods of 4 2 8 4 1
activities Calibration available at the place of
calibration
use.
Page 5 of 7
Form Number FM-DT-50
DUTECH SAFETY & SECURITY CONSULTANCIES
Revision Number 02
Risk Assessment Matrix to Impartiality
Date of Effectiveness 12/07/2020
Level of Risk
Impact
Probability very Low High Very
Medium 3
low 1 2 4 High 5
Very High (5) 5 10 15 20 25 Value Probability Definition
High (4) 4 8 12 16 20 5 Very High Atleast once in a day
Medium (3) 3 6 9 13 15 4 High Atleast once in a week
Low (2) 2 4 6 8 10 3 Medium Atleast once in a month
Very Low (1) 1 2 3 4 5 2 Low Atleast once in 6 months
1 Very Low Atleast once a year/Rarely occurs
Page 6 of 7
Form Number FM-DT-50
DUTECH SAFETY & SECURITY CONSULTANCIES
Revision Number 02
Risk Assessment Matrix to Impartiality
Date of Effectiveness 12/07/2020
Designation MR LM BM
Sign
Date 29-04-2020
Page 7 of 7