4 Asset management system requirements


4.1 General requirements 4.2 Asset management policy
The organization shall establish, document, implement, The organization's top management shall authorize
maintain and continually improve an asset an overall asset management policy.
management system in accordance with the
requirements of this PAS. The policy shall:
a) be derived from, and be consistent with, the
The organization shall define and document the scope organizational strategic plan;
of i t s asset management system.
b) be appropriate to the nature and scale of the
organization's assets and operations;
Where an organization chooses t o outsource any
aspect of asset management that affects conformity c) be consistent with other organizational policies;
to the requirements of Clause 4 of this PAS, the d) be consistent with the organization's overall risk
organization shall ensure control over such aspects management framework;
in accordance with the requirements of 4.4.2. e) provide the framework which enables the asset
NOTE This PAS requires that organizations establish, management strategy, objectives and plans t o be
implement and maintain an asset management polic)! produced and implemented;
strateg,! objectives and plans, Figure 5 illustrates the f) include a commitment t o comply with current
relationship between the organizationalstrategic plan applicable legislation, regulatory and statutory
and these elements of the asset managementsystem. requirements and with other requirements to
which the organization subscribes;

O BSI September 2008


6 - - -
- -
-- -- -
PAS 55-1 :2008

g) clearly state the principles t o be applied, such as the


organization's approach t o health and safety or
sustainable development;
h) include a commitment t o continual improvement in
asset management and asset management
performance;
i) be documented, implemented and maintained;
j) be communicated t o all relevant stakeholders,
including contracted service providers, where there
is a requirement that these persons are made aware
of their asset management policy-related
obligations;
k) be reviewed periodically t o ensure that it remains
relevant and consistent with the organizational
strategic plan.
NOTE 1 Organizations may choose to have a detailed asset
rnanagementpolicy for internal use which should provide
sufficient information and direction to drive the asset
managementsystem (parts of which may be confidential)
and have a summarized (non-confidential) version for
dissemination to its stakeholders.
NOTE 2 Organizations may also have one or more f) identify the function(s), performance and condition
functional policies relating to specific asset management of existing asset systems and critical assets;
activities, such as capital investment, operation, g) state the desired future function(s), performance
maintenance or contracting. It is essential, however; and condition of existing and new asset systems and
that alignment is maintained between such functional critical assets, on timescales aligned t o those of the
policies and the overall asset management policy organizational strategic plan;
h) clearly state the approach and principal methods by
4.3 Asset management strategy, objectives which assets and asset systems will be managed;
and plans
NOTE This may mclude, for example, the criteria to be
4.3.1 Asset management strategy adopted for determining asset criticality and value, the
The organization shall establish, document, implement Iife cycle and suxtainability bask for asset management
and maintain a long-term asset management strategy planning, the approach to asset risk and reliability
which shall be authorized by top management. management and the methods of optimization and
NOTE The time horizon for a long-term asset management decision-making.
strategy would normally be aligned with that of the i) provide sufficient information, direction and
organizational strategic plan. guidance t o enable specific asset management
objectives and asset management plan($ t o
The strategy shall: be produced;
a) be derived from, and be consistent with, the asset j) include criteria for optimizing and prioritizing
management policy and the organizational asset management objectives and plans;
strategic plan; k) be communicated t o all relevant stakeholders,
b) be consistent with other organizational policies including contracted service providers, where there
and strategies; is a requirement that these persons are made aware
c) identify and consider the requirements of relevant of their asset management strategy-related
stakeholders; obligations;

d) consider the life cycle management requirements I) be reviewed periodically t o ensure that it remains
of the assets; effective and consistent with the asset management
policy and organizational strategic plan and with
e) take account of asset-related risks (see 4.4.7), asset
other organizational policies and strategies.
and asset system criticalities;

O BSI September 2008 -


PAS 55-1 12008

4.3.2 Asset management objectives management strategy and objectives that they are intended
The organization shall establish and maintain asset to achieve.
management objectives, which shall:
The development of asset management plan(s) and life
a) be measurable (i.e. quantified andlor capable of
cycle activities shall include consideration of the impact
being demonstrated as achieved through objective
of actions in one life cycle phase upon the activities
assessment);
necessary in other life cycle phases.
b) be derived from, and consistent with, the asset
management strategy; The asset management plan(s) shall be optimized and
c) be consistent with the organization's commitment the actions prioritized. Multiple plans (for example,
to continual improvement; covering a portfolio of asset systems or assets) shall
d) be communicated to all relevant stakeholders, be jointly optimized and prioritized, taking into
including contracted service providers, where there account overall value, resource requirements,
is a requirement that these persons are made aware interdependencies, risks and performance impact.
of their obligations; NOTE Developing, optimizing, prioritizing and rntegrating
e) be reviewed and updated periodically by the asset management plan($ are iterative processes that start
organization t o ensure that they remain relevant with the development or update of the asset management
and consistent with the asset management strategy; strategy
f) consider legal, regulatory, statutory and other asset
The asset management plan(s) shall include
management requirements;
documentation of:
g) take account of the expectations of relevant
a) the specific tasks and activities (actions) required t o
stakeholders and financial, operational and business
optimize costs, risks and performance of the assets
requirements;
andlor asset system(s);
h) take account of asset management related risks;
b) the designated responsibilities and authorities for
i) consider improvement opportunities including new the implementation of such actions and for the
technologies and asset management tools, achievement of asset management objectives;
techniques and practices (see 4.6.5.2).
c) the means and time scales by which these actions
NOTE Objectives may be set for the asset management are to be achieved.
system, asset management activities andlor the performance
or condition of asset systems or assets. The asset management plan(s) shall be communicated
to all relevant stakeholders to the level of detail
4.3.3 Asset management plan(s) appropriate to their participation or business interests
The organization shall establish, document and in the delivery of the plan(s).
maintain asset management plan(s) to achieve the
asset management strategy and deliver the asset In the development of asset management plan($,
management objectives across the following life cycle the organization shall ensure that appropriate
activities: arrangements, functional policies, standards,
a) creation, acquisition or enhancement of assets; process(es) andlor procedure(s), asset management
enablers and resources are made available for the
b) utilization of assets;
efficient and cost effective implementation of
c) maintenance of assets; the plan(s).
d) decommissioning andlor disposal of assets. NOTE /t is essential that the plan(s) are reatistic and can be
NO7E 1Creat~h,aaqukition or enhancement hd&ez implemented.
design, m&djfitionI procurement, cmstructi~~?
and
commissioning. The asset management plan(s) shall include actions
MO7E2 Maintenance a h inclucks ingection, cmdi;U'~n t o improve the asset management system (see 4.6.5
monitoring IbndcmaI testingI ~ p d rie~f u h i h m p , m d / m and 4.7).
life &mi057 of @sets.W c ~ ~of Endividud
n t as&
The asset management plan($ shall be reviewed
m y a h k c~nsideredas maintenance i d am# systems.
periodically by the organization to ensure that they
MOTE 3 As& management ,dam61 can be fcw EnivvicfaE remain effective and consistent with the asset
assi wet type% @setsystemI awbk &wet pcx-Vbi,ios management strategy and objectives.
andtor rhe 8waII m pl mnapmenl sgstm. M Q W P ~ E
it is e m t i a i that the plan3 are ciafly linked ta dSe aset

--

8 - - - - - -
O BSI September 2008
PAS 55-1 12008

4.3.4 Contingency planning and emergency situations, and shall include


The organization shall establish, implement, and information on:
maintain plan($ and/or procedure(s) for identifying 1) essential personnel, emergency services and external
and responding to incidents and emergency situations, agencies, including contact details;
and maintaining the continuity of critical asset 2) arrangements for internal and external
management activities. communication;
3) how the organization will maintain or restore i t s
In developing i t s plan($ and procedure(s), the
critical asset management activities in the event of
organization shall consider:
a disruption;
a) asset-related risks that, if realized, could result in
4) the provision of resources, and the maintenance
incidents or emergency situations;
of any equipment, facilities or services that could
b) potential disruptions to i t s critical asset management be required during disruptions, incidents or
activities; emergency situations;
c) the most appropriate actions for responding t o an 5) recording of essential information whilst responding
incident or emergency situation, and mitigating the to, and managing, incidents and emergencies;
likely consequences;
6) the process for returning to normal operations.
d) the competence and training of personnel required
t o respond t o emergencies; The organization shall periodically review, test and,
e) the needs of relevant stakeholders who may be where deemed necessary, revise i t s plan(s) andlor
affected by incidents or emergency situations, or procedure(s) for incident and emergency preparedness
who may be required t o support the organization and response and continuity of important asset
t o respond to such events. management activities.
NOTE It is essential that the organization's contingency
The plan(s) and/or procedure(s) shall identify how the plans are reviewed after testing or the occurrence of
organization will respond to, and manage, incidents incidents, emergency situations or disruptions.

7--. s
&.--,
f
i
r I

C3 6% September 2008
- -
9
PAS 55-1 12008

4.4 Asset management enablers and controls


4.4.1 Structure, authority and responsibilities h) ensuring the availability of sufficient resources;
The organization shall establish and maintain an i) communicating t o all relevant stakeholders the
organizational structure of roles, responsibilities and importance of complying with the requirements of
authorities, consistent with the achievement of i t s asset the asset management system in order t o achieve
management policy, strategy, objectives and plans. i t s organizational strategic plan.

These roles, responsibilities and authorities shall be 4.4.2 Outsourcing of asset management activities
defined, documented and communicated t o the Where an organization chooses t o outsource any
relevant individuals. aspect of asset management that affects conformity
NO7E There is no need to establish a separate with the requirements of Clause 4, the organization
organizational structure provided the organizatjon's shall ensure control over such aspects. The organization
structure is ronsisfent with ahigving the requirements shall determine and document how these parts will be
set out in Clause 4. controlled and integrated into the organizations' asset
management system. The organization shall also
Top management shall provide evidence of its identify and document:
commitment t o the development and implementation a) the processes and activities that are t o be
of the asset management system and the continuous outsourced (including the scope and boundaries of
improvement of i t s effectiveness by: the outsourced processes and activities and their
a) appointing a member of top management who, interfaces with the organization's own processes
irrespective of other responsibilities, shall be and activities);
responsible for the overall design, maintenance, b) the processes and scope for the sharing of
documentation, review and improvement of the knowledge and information between the
organization's asset management system; organization and the contracted service provider(s);
b) appointing member(s) of management whose c) authorities and responsibilities within the
responsibility is to ensure that the assets and assets organization for managing the outsourced processes
systems deliver the requirements of the asset and activities.
management policy, strategy, objectives and plans
and who have the authority t o achieve this; 4.4.3 Training, awareness and competence
c) identifying and monitoring the requirements and The organization shall ensure that any person(s) under
expectations of the organization's stakeholders i t s direct control undertaking asset management
and taking corresponding and timely action, to related activities has an appropriate level of
the extent that these have implications for the competence in terms of education, training or
organization's management of its assets; experience.
d) ensuring that the asset management policy and NOTE Levels of appropriate asset management competence
strategy are consistent with the organizational can be ascertained through the use of a competency
strategic plan; requirements framework (see Bibliogmphy for examples
e) considering the adverse impact that the asset of relevant competency requirements frameworks).
management policy, asset management strategy,
asset management objectives and asset
management plan(s) might have on other aspects
of the organization. Conversely, considering
whether plans generated from other parts of
the organization might have an adverse affect
on asset management;
f) ensuring the viability of the asset management
policy, asset management strategy, asset
management objectives and asset management
plan(s);
g) ensuring asset-related risks are identified, assessed
and controlled, and are included in the
organization's overall risk management framework;

10. - -
- -- - -
- - - - - - - O BSI September 2008
PAS 55-1 :2008

Where asset management activities are outsourced, Communication, participaticn and consultation
the organization shall ensure that contracted service The organization shall ensure that pertinent asset
providers have arrangements in place t o ascertain and management information i s effectively communicated
demonstrate that their staff are competent. t o and from employees and other stakeholders,
including contracted service providers.
The organization shall develop plans for the human
resources required t o develop and implement its asset The organization shall ensure consultation with
management system. The organization shall identify stakeholders that is relevant and appropriate t o their
the competency requirements for these human involvement in:
resources and plan the training necessary for them
a) the development of the asset management strategy,
t o achieve these competencies. It shall arrange for
objectives and plan(s);
provision of this training and retain associated records.
b) the development of functional policies, engineering
The organization shall establish, implement and standards, process(es) and/or procedure($;
maintain process(es) and/or procedure(s) t o make c) risk assessments and determination of controls;
persons working under its control aware of: d) incident investigation;
a) the asset management related risks associated with e) the continual improvement of the asset
their work activities and the asset management management system.
benefits of personal performance;
b) their roles and responsibilities and the importance 4.4.5 Asset management system documentation
in complying with the asset management policy, The organization shall establish, implement and
process(es) andlor procedure(s) and plan($; maintain up-to-date documentation t o ensure that
c) the potential consequences of departure from i t s asset management system can be adequately
specified asset management process(es) and/or understood, communicated and operated. The asset
procedure(s). management system documentation shall include:
PAS 55-1 :2008

a) a description of the main elements of the asset 4.4.6 information management


management system and their interaction, and The organization shall identify the asset management
direction to related documents; information i t requires to meet the requirements of
b) the asset management policy, strategy, and Clause 4 of this specification considering all phases
objectives; of the asset life cycle. The information shall be of a
C) documents, including records, required by Clause 4 quality appropriate to the asset management decisions
of this specification. and activities it supports.

The organization shall establish documented The organization shall design, implement and
procedure(s) and/or operating criteria if their absence maintain a system(s) for managing asset management
could lead to failure t o achieve its asset management information. Employees and other stakeholders,
policy, asset management strategy, asset management including contracted service providers, shall have
objectives or t o control identified asset management access to the information relevant t o their asset
risks. management activities or responsibilities. Where
separate asset management information systems
NOTE 1 me as& r n a n m z . p d i @ mtqy anel other
exist, the organization shall ensure that the
elements sf the m?amgwnaE)tsystem FfO ~)&bve t@
information provided by these systems is consistent.
tm P ; ~ ~ u;uc;se$zam*
& FFasrnrn1$#
NQJE 2 /F & -it $ k b dwwm~b&n$ pmipWbd The organization shall establish, implement and
tP1 the E
Md a& rkks k h g mem&. & maintain procedure(s) for controlling all information
&m4daha b @$roptk& fa the Iwd at w k h the required by Clause 4 of this specification. These
Mil be us& and kept to ihe m i n i m procedures shall ensure:
iequhcl fw efktiwnes effi-.

12 <- -=
= r . - = - ~ - - ~ ~ = y - - 8 BSI
~ September 2008
PAS 55-1 :2008

a) the adequacy of the information is approved by d) provide for the classification of risks and
authorized personnel prior to use; identification of those risks that are t o be avoided.
b) information is maintained and adequacy assured eliminated or controlled by asset management
through periodic review and revision, including objectives and plans (see 4.3.2 and 4.3.3);
version control where appropriate; e) be consistent with the organization's operating
c) allocation of appropriate roles, responsibilities and experience and the capabilities of risk control
authorities regarding the origination, generation, measures employed;
capture, maintenance, assurance, transmission, f) provide for the monitoring of required actions t o
rights of access, retention, archiving and disposal ensure both the effectiveness and the timeliness of
of items of information; their implementation (see 4.6.1).
d) obsolete information is promptly removed from all
points of issue and points of use, or otherwise 4.4.7.3 Risk identification and assessment
assured against unintended use; The identification and assessment of risks shall
e) archival information retained for legal or knowledge consider the probability of credible events and their
preservation purposes is identified; consequences, and shall as a minimum cover:
f) information is secure and, if in electronic form, is a) physical failure risks, such as functional failure,
backed up and can be recovered. incidental damage, malicious damage or terrorist
action;
4.4.7 Risk management b) operational risks, including the control of the asset,
4.4.7.1 Risk management process(es) human factors and all other activities which affect
i t s performance, condition or safety;
The organization shall establish, implement and
maintain documented process(es) andlor procedure(s) c) natural environmental events (storm, floods, etc.,
for the ongoing identification and assessment of asset- including the likely effects of climate change);
related and asset management-related risks, and the d) factors outside of the organization's control, such as
identification and implementation of necessary control failures in externally supplied materials and services;
measures throughout the life cycles of the assets. e) stakeholder risks, such as failure to meet regulatory
performance requirements or risks t o the reputation
4.4.7.2 Risk management methodology of the organization;
The organization's methodology for risk management f) risks associated with the different life cycle phases
shall: of assets (see 4.5).
a) be proportionate to the level of risk under
consideration; 4.4.7.4 Use and maintenance of asset risk information
b) be defined with respect to i t s scope, nature and The organization shall ensure that the results of risk
timing to ensure it is proactive rather than reactive; assessments and the effects of risk control measures
c) include, where appropriate, the assessment of how are considered and, as appropriate, provide input into:
risks change or can change over time and usage; a) the asset management strategy;
PAS 55-1:2008

b) the asset management objectives; 4.5 Implementation of asset management


c) the asset management plan($; plan(s)
d) the identification of adequate resources including 4.5.1 Life cycle activities
staffing levels; The organization shall establish, implement and
e) the identification of training and competency needs maintain process(es) andlor procedure(s) for the
(see 4.4.3); implementation of its asset management plan($
f) the determination of controls for assets' life cycle and control of activities across the whole life cycle,
activities, and the implementation of asset including:
management plan(s) (see 4.5); a) creation, acquisition or enhancement of assets;
g) the organization's overall risk management b) utilization of assets;
framework. c) maintenance of assets;
d) decommissioning andlor disposal of assets.
The organization shall keep the results of identification
of risks, risk assessments and determined controls
The requirement for documentation to control these
up-to-date, and document these where not doing so
asset life cycle activities shall be in accordance with 4.4.5.
could affect the delivery of the asset management
objectives and the asset management strategy.
The process(es) and/or procedure(s) for the
implementation of the asset management plan(s) and
4.4.8 Legal and other requirements
for the control of life cycle activities shall:
The organization shall establish, implement and
1) be sufficient t o ensure that operations and activities
maintain process(es) andlor procedure($ for identifying
are carried out under specified conditions;
and accessing the legal, regulatory, statutory and other
applicable asset management requirements. 2) be consistent with the asset management policy,
asset management strategy and asset management
The organization shall ensure that the applicable legal objectives;
and other external obligations or requirements are 3) ensure that costs, risks and asset system performance
identified and incorporated into the corresponding are controlled across the asset life cycle phases.
elements of i t s asset management system.
The organization shall ensure that the planned
The organization shall keep this information up-to- arrangements, functional policies, standards,
date. The organization shall communicate information process(es) and procedure(s), asset management
on legal and other requirements to all relevant enablers and resources are utilized for the efficient
stakeholders. and cost effective implementation of the asset
management plan(s).
4.4.9 Management of change
Where existing arrangements are revised, or new 4.5.2 Tools, facilities and equipment
arrangements are introduced that could have an The organization shall ensure that tools, facilities and
impact on asset management activities, the equipment are maintained and, where appropriate,
organization shall assess the associated risks before calibrated. The organization shall establish and
the arrangements are implemented. The new or maintain process(es) and procedure($ t o control these
revised arrangements t o be considered shall include: maintenance and calibration activities, where such
a) revised organizational structure, roles or tools, facilities and equipment are essential for:
responsibilities; a) the implementation of i t s asset management plan($;
b) revised asset management policy, strategy, b) achieving the required function($ and performance
objectives or plans; from i t s assets or asset systems;
c) revised process(es) or procedure(s) for asset c) the monitoring and measurement of performance
management activities; and/or condition.
d) the introduction of new assets, asset systems or
technology;
e) the introduction of new contractors or suppliers.

The organization shall ensure that risks are managed


in accordance with 4.4.7.

14 - - - - O BSl September ZOO8


PAS 55-1 :2008

O BSI September 2008 --


- - - -
--- - --- - - - -
15
PAS 55-1 :2008

4.6 Performance assessment and improvement


4.6.1 Performance and condition monitoring d) lagging performance indicators t o enable detection
The organization shall establish, implement and of, and to provide data about, incidents and failures
maintain process(es) andlor procedure($ t o monitor and the asset management and for incidents.
measure the performance of the asset management failures or deficient performance of assets andlor
system and the performance and/or condition of asset systems;
assets andlor asset systems. The process(es) andlor e) both qualitative and quantitative measures,
procedure($ shall provide for the consideration of: appropriate t o the needs of the organization;
a) reactive monitoring to identify past or existing f) monitoring the overall effectiveness and efficiency
nonconformities in the asset management system, of the asset management system;
and any asset-related deterioration, failures or g) recording of monitoring and measurement data and
incidents; results to facilitate subsequent analysis of problem
b) proactive monitoring t o seek assurance that the causes to assist in determining corrective or
asset management system and assets andlor asset preventive actions andlor t o facilitate continual
systems are operating as intended. This shall include improvement (in accordance with 4.6.5).
monitoring to ascertain that the asset management
policy, strategy and objectives are met, the asset When setting the frequency of condition or
management plan(s) are implemented, and that the performance monitoring and the parameters for
process(es), procedure($ or other arrangements to measurement the organization shall consider, at a
control asset life cycle activities are effective; minimum, the costs of monitoring, the risks of failure
c) leading performance indicators to provide warning or nonconformity, and potential deterioration
of potential non-compliancewith the performance mechanisms and deterioration rates.
requirements of the asset management system
andlor the assets andlor asset systems;

16 - -
O BSI September 2008
PAS 55-1:2008

4.6.2 Investigation of asset-related failures, incidents 4.6.3 Evaluation of compliance


and nonconformities The organization shall establish, implement and
The organization shall establish, implement and maintain process(es) andlor procedure(s) for evaluation
maintain process(es) andlor procedure(s) for the of its compliance with applicable legal and other
handling and investigation of failures, incidents and regulatory or absolute requirements, and shall
nonconformities associated with assets, asset systems determine the frequency of such evaluations.
and the asset management system. These process(es)
andlor procedure(s) shall define responsibility and The organization shall keep records of the results of
authority for: these evaluations.
a) taking action to mitigate consequences arising from
a failure, incident or nonconformity; 4.6.4 Audit
b) investigating failures, incidents and nonconformities The organization shall ensure that audits of the asset
t o determine their root cause(s); management system are conducted to:
c) evaluating the need for preventive action($ t o avoid a) determine whether the asset management system:
failures, incidents and nonconformities occurring; i) conforms t o planned arrangements for asset
d) communicating, as appropriate t o relevant management, including the requirements of
stakeholders, the results of investigations and Clause 4;
identified corrective action(s) andlor preventive ii) has been implemented and is maintained;
action(s). iii) is effective in meeting the organization's asset
management policy, asset management strategy
Investigations shall be performed within a timescale and asset management objectives.
commensurate with the actual and/or potential
b) provide information to management.
consequences of the failure, incident or nonconformity.

O BSI September 2008 o- - -


o
- - - - - --- - ---
- -
17
PAS 55-1 :2008

Audit programme($ for elements of the asset The organization shall ensure that any necessary
management system shall be planned, established, changes arising from corrective andlor preventive
implemented and maintained by the organization, actions are made to the asset management system.
based on the results of risk assessments of the
organization's activities, and the results of previous 4.6.5.2 Continual improvement
audits. The organization shall establish, implement and
maintain process(es) andlor procedure(s) for identifying
Audit process(es) andlor procedure($ shall be opportunities and assessing, prioritizing and
established, implemented and maintained to address: implementing actions to achieve continual
1) the responsibilities, competencies and requirements improvement in:
for planning and conducting audits, reporting a) the optimal combination of costs, asset related risks
results and retaining associated records; and the performance and condition of assets and
2) the determination of audit criteria, scope and asset systems across the whole life cycle;
methods that are commensurate with the business b) the performance of the asset management system.
significance and risks being managed.
The organization shall actively seek and acquire
The selection of auditors and the conduct of audits knowledge about new asset management-related
shall ensure objectivity and the impartiality of the technology and practices, including new tools and
audit process. Audits shall be conducted by personnel techniques, and these shall be evaluated t o establish
independent of those having direct responsibility for their potential benefit t o the organization.
the activity being examined.
NOTE 1 The term "independent" here does not necessarily 4.6.6 Records
mean external to the organization. The organization shall establish and maintain records
NOTE 2 It is recommended that the seEectEon of auditom as necessary to demonstrate conformance t o the
considers their /we/ of understanding of good practice in requirements of i t s asset management system and
asset management and familiarity with the requirements Clause 4 of this PAS.
of Clause 4 of this PAS.
Records shall be legible, identifiable and traceable.
4.6.5 Improvement actions
4.6.5.1 Corrective and preventive action Records shall be maintained in accordance with the
requirements of 4.4.6.
The organization shall establish, implement and
maintain process(es) andlor procedure(s) for
instigating:
a) corrective action(s) for eliminating the causes of
observed poor performance and nonconformities
identified from investigations, evaluations of
compliance and audits t o avoid their recurrence;
b) preventive action($ for eliminating the potential
causes of nonconformities or poor performance.

Any corrective or preventive actions taken and their


timings shall be commensurate with the risk(s)
encountered.

Where a corrective or preventive action identifies


new or changed risks, or the need for new or changed
process(es), procedure(s) or other arrangements to
control asset life cycle activities, the proposed actions
shall be risk assessed prior to implementation
(see 4.4.7).

The organization shall keep records of the corrective


and preventive actions (see 4.6.6) taken and
communicate these t o relevant stakeholders.
PAS 55-1 :2008

4.7 Management review


Top management shall review at intervals that it h) changing circumstances, including developments in
determines appropriate the organization's asset legal and other requirements related to asset
management system to ensure i t s continuing management and changes in technology.
suitability, adequacy and effectiveness. Reviews shall
include assessing the need for changes to the asset The management review shall also cover aspects of the
management system, including asset management asset management system, if any, that are outsourced
policy, asset management strategy and asset t o a contracted service provider.
management objectives.
The outputs from management reviews, consistent
Input t o management reviews shall include: with the organization's commitment t o continual
a) results of internal audits and evaluations of improvement, shall include decisions and actions for
compliance with applicable legal requirements and possible changes to:
with other requirements to which the organization 1) asset management policy, strategy and objectives;
subscribes; 2) asset management performance requirements;
b) the results of communication, participation and 3) resources;
consultation with employees and other stakeholders
4) other elements of the asset management system.
(see 4.4.4);
C) relevant communication(s) from external Outputs from management reviews, which are relevant
stakeholders. including complaints; t o the organizational strategic plan, shall be made
d) records or reports on the asset management available to top management for consideration in
performance of the organization; reviews of the organizational strategic plan.
e) the extent to which objectives have been met;
Records of management reviews shall be retained and
f) performance in addressing incident investigations, information relevant to specific employees, contracted
corrective actions and preventive actions; service providers or other stakeholders made available
g) follow-up actions from previous management for communication purposes (see 4.4.4).
reviews;
PAS 55-1:2008

Annex A (informative)
Correspondence between PAS 55-1:2008. BS OHSAS 18001:2007,
BS EN IS0 14001:2004 and BS EN IS0 9001:2000

I PAS 55:2008 I OHSAS 18001:2007 1 IS0 14001:2004 1 IS0 9001:2000


0 Introduction 0 Introduction 0 Introduction 0 Introduction

1 Scope 1 Scope 1 Scope 1 Scope

2 Normative references 2 Normative references 2 Normative references 2 Normative references

3 Terms and definitions 3 Terms and definitions 3 Terms and definitions 3 Terms and definitions

4 Asset management system 4 OH&S management system 4 Environmental management 4 Quality management system
requirements (title only) elements (title only) system requirements (title only)
(title only)

4.1 General requirements 4.1 General requirements 4.1 General requirements 4.1 General requirements

4.2 Asset management policy 4.2 OH&S policy 4.2 Environmental policy 5.1 Management commitment
- - - - - ~ -

5.3 Quality

4.3 Asset management strategy, 4.3 Planning (title only) 4.3 Planning (title only) 5.4 Planning (title only)
objectives and plans
(title only)

4.3.1 Asset management - - -


strategy

4.3.2 Asset management 4.3.3 Objectives and 4.3.3 Objectives, targets and 5.4.1 Quality objectives
objectives programme(s) programme(s)

4.3.3 Asset management plan($ 4.3.3 Objectives and 4.3.3 Objectives, targets and 5.4.2 Quality management
programme(s) programme(s) system planning

7.1 Planning of produc


realization

4.3.4 Contingency planning 4.4.7 Emergency preparedness 4.4.7 Emergency preparedness -


and response and response

4.4 Asset management enablers - - -


and controls

4.4.1 Structure, authority 4.4.1 Resources, roles, 4.4.1 Resources, roles, 5.1 Management commitment
and responsibilities responsibility, responsibility and
accountability and authority 6.1 Provision of resources
authority
6.3 Infrastructure

4.4.2 Outsourcing of asset - - -


management activities

4.4.3 Training, awareness 4.4.2 Competence, training 4.4.2 Competence, training 6.2.1 (Human resources) General
and competence and awareness and awareness
6.2.2 Competence, awareness
and training

4.4.4 Communication, 4.4.3 Communication, 4.4.3 Communication 5.5.3 Internal communication


participation and participation and
consultation consultation 7.2.3 Customer communication

4.4.5 Asset management system 4.4.4 Documentation 4.4.4 Documentation 4.2.1 (Documentation
documentation requirements) Genera

4.4.5 Control of documents 4.4.5 Control of documents 4.2.3 Control of documents

- . - -- 8 BSI September 2008


20 - -
-

1-
- p -
PAS 55-1 :2008

4.4.6 Information management 4.4.5 Control of documents 4.4.5 Control of documents 4.2.3 Control of documents

4.4.7 Risk management

sk managemel
- 4.3.1 Hazard identification, risk
assessment and
determining controls
4.3.1 Environmental aspects -

.ocess(es)
--- -- -

4.4.7.2 Risk management


-ethodology
- -

4.4.7.3 Risk identification


and assessment

4.4.7.4 us, us,, ",


,,,,,,,LC,,,,,,,

asset risk information

4.4.8 Legal and other 4.3.2 Legal and other 4.3.2 Legal and other 5.2 Customer focus
requirements requirements requirements
. .1.1 Determination L .
requirements related t o
the product

4.4.9 Management of change 4.3.1 Hazard identification,


risk assessment and
4.3.1 Environmental aspects 5.2 Customer focus
-
--

determining controls 7.2.2 Rev~ewof requirements


-?lated t o t h e produ-'

8.5.1 Continual improvement

4.5 Implementation of asset 4.4 Implementation and 4.4 Implementation and 7 Product realization (title only)
management plan($ operation (title only) operation (title only)
(title only)

4.5.1 Life cycle activities 4.4.6 Operational control 4.4.6 Operational control 7.1 Plann~ngof product
realization
- -

7.2 Customer-related processes


-
7.3 Design and development

7.4 Purchasing
-
7.5 Production and service
provision

4.5.2 Tools, facilities and - - 7.6 Control of monitoring and


equipment measuring devices

4.6 Performance assessment and 4.5 Checking (title only) 4.5 Checking (title only) 8 Measurement, analysis and
improvement (title only) improvement (title only)

4.6.1 Performance and condition 4.5.1 Performance measurement 4.5.1 Monitoring and 8.1 General
- -
monitoring and monitoring measurement
8.2.3 Monitoring and
-1easurement o f processes

8.2.4 Monitoring and


measurement of product

,.4 Analysis .of do,,

4.6.2 Investigation of asset- 4.5.3 Incident investigation, - 8.3 Control of nonconforming


related failures, incidents nonconformity, corrective product
and non-conformances action and preventive
action (title O"I\O
-
4.5.j.1 Incident invesr~gmibn - -

O BSI September 2008 -


PAS 55-1:2008

--asuremer' -< processes

8.2.4 Monitoring and


measurement of product

4.6.4 A u d ~ t 4.5.5 Internal a u d ~ t 4.5.5 Internal a u d ~ t 8.2.2 Internal a u d ~ t

4.6.5 Improvement actlons 4.5.3.2 Nonconform~ty, 4.5.3 Nonconformity, actlon 8.3 Control of nonconform~ng
correctwe and and actlon product
preventlve actlon

4.6.5.1 Correct~veand 8.4 Analysis of data


--ventive action

4.6.5.2 Continual improvement 8.5.2 Corrective actlon


- - -

8.5.3 Preventive actlon

4.6.6 Records 4.5.4 Control of records 4.5.4 Control of records 4.2.4 Control of records

4.7 Management revlew 4.6 Management revlew 4.6 Management revlew 5.1 Management commitment

5.6 Management revia..


(title only)

5.6.1 General

5.6.2 Re

8.5.1 Continual Improvement

O BSI September 2008