You are on page 1of 5

Emirates steel

SAFETY INSPECTION REPORT HSD-GR-FM-087

Date of Inspection: Area:


Department: Phase Inspected:

Names and Designation of persons who conducted the inspection:


Name Designation

Issue No. : 0 Page 1 Issue Date : 15.10.2018


Emirates steel
SAFETY INSPECTION REPORT HSD-GR-FM-087

Part A – POSITIVE OBSERVATIONS


List any positives, any best practices that were observed during the inspection

Part B – AREAS OF IMPROVEMENT


List any areas of improvement that were observed during the inspection

Issue No. : 0 Page 2 Issue Date : 15.10.2018


Emirates steel
SAFETY INSPECTION REPORT HSD-GR-FM-087

Part C – INSPECTION CHECKLIST

If safe indicate with (√), if not indicate with (x) or mark not applicable (N/A). If any items are not listed add them in Category 18 (Others).

1. EMERGENCY EQUIPMENT / x 4. ELECTRICAL EQUIPMENT / x 7. HOUSEKEEPING / 5S / x


Fire points clearly identified   Condition of electrical/electronic equipment   Work area clean and tidy  
Fire Points/ alarm units / extinguishers unobstructed   Condition of electrical sockets/ switches   Floors and roadways free of trip/slip hazards  
Fire extinguishers/hydrants clearly identified   Condition of cable trays   All markings clearly defined as per standard  
Condition of fire extinguishers/hydrants   Condition of cables/ insulation   Condition of floors/ stairs
Fire extinguishers/hydrants serviced and checked   Cables neatly arranged and clipped   Storage of tools/ materials/ equipment  
Adequate pressure on fire extinguishers (green)   Electrical panels secured   Waste bins marked & color-coded as per standard  
First aid boxes identified (signage)   Electrical panels identified   Stacking (<3.5 times shortest base length)  
First aid box checklist in place and regularly checked Electrical panels easily accessible Storage areas defined with content & quantities  
First aid boxes content condition (not expired) Lock-out procedures in force 5S board is updated
2. HAND AND PORTABLE TOOLS Switch room matting in good order Procedures/Work Instructions are easily accessible
Condition of tools  / x Sub-stations/ MCC rooms locked 8. COMPRESSED GASES
No unneeded, defective or obsolete tools available 5. ACCESS / EGRESS POINTS   Cylinders stored upright and secured
Condition of cable/hose   Corridors/Passageways clear   All cylinders clearly marked/colour-coded / x
Portable tools clearly labelled   Doorways/ stairways clear  / x Valve guards in place
Inspection log updated All doors in good condition and easily opened   Condition of cylinders and hoses  
Deadman’s switch / guards in place   Exit routes adequately illuminated Stored away from heat source  
Obsolete tools/material kept in designated (RedTag) area Exit routes clearly marked Designated storage area (empties stored separately)
Proper storage when not in use   Emergency exit signs in place & illuminated   Flash-back arrestors fitted  
110 Volt supply for electrical tools   More than one exit from area   Fuel and oxygen cylinders separated  
3. HAZARDOUS SUBSTANCES   6. LIFTING EQUIPMENT Key available for acetylene cylinder  
Condition of storage containers   Colour Code display board updated   Condition of cylinder transportation tools
Containers clearly labelled  / x Lifting Equipment Colour Coded   9. PIPEWORKS / VALVES
Items stored in designated areas (including bunding)   S.W.L clearly marked  / x Condition of pipes, valves and flanges
Spill absorbent material available   Lifting Equipment in good condition   Pipes colour-coding clear
Register of stored materials available   Lifting Equipment properly stored   Condition of supports, clamps, brackets, insulation / x
MSDS available and latest revision (<5 years) Lifting Register available   Valves identified and tagged  
10. MACHINERY / x 15. ERGONOMICS / x 19. PERMIT TO WORK & EQUIPMENT ISOLATION / x

Issue No. : 0 Page 3 Issue Date : 15.10.2018


Emirates steel
SAFETY INSPECTION REPORT HSD-GR-FM-087

Rotating/ moving equipment guarded Sufficient work space Correct permit


Drive belts guarded Items/ controls within easy reach   Permit adhered to
Condition of covers/cladding Correct posture while working   Equipment correctly isolated
Condition of machine (no leaks, etc.) Tools ergonomically designed   All signatures/approvals in place
Starting controls shrouded Equipment ergonomically designed   20. MOBILE EQUIPMENT (PC, forklift, etc.) / x
All control buttons/ levers clearly labelled Sufficient lighting to prevent eye strain Overall condition of equipment
Emergency stop/ Trip wires easily accessible OFFICE-RELATED Checklist in place
11. LADDERS/ SCAFFOLD / x Suitable and adjustable chair Accuracy of checklist
Ladders in good condition   Footrest available Locked out (where relevant)  
Ladder/ scaffold register up to date   Control of glare on computer screen Safe use of mobile equipment
Non-metallic ladders only in Plant areas   Appropriate height of table Warning lights working
Working platform close boarded   Optimum distance from eyes to computer Reverse warning working (if applicable)
Guard rails/ Mid rails/ Toe boards in place   Positioning of keyboard and mouse Parking position
Scafftag valid   Clear filing system and files are well maintained 21. OTHERS (List Category No. & Details)  / x
Scaffold access ladder & base plate secure   16. HYGIENE AND WELFARE FACILITIES / x
12. INDOOR AREAS / x Condition of ablution & changing facilities  
Air Conditioning system working properly   Condition of lunchrooms/ kitchens    
Air conditioner filters clean   Proper storage facilities for PPE  
Adequate lighting Ventilation adequate  
Light fittings and covers clean   17. ENVIRONMENTAL / x
Noise level – not too high   Emissions
13. EMERGENCY RESPONSE / x Waste
Emergency phone number displayed   Spillages
Emergency lighting adequate  18. PROCESS SAFETY CRITICAL EQUIPMENT / x
14. SAFETY SIGNAGE  / x Integrity and Condition
 Availability, adequacy & condition Identified

Issue No. : 0 Page 4 Issue Date : 15.10.2018


Emirates steel
SAFETY INSPECTION REPORT HSD-GR-FM-087

Part D – DETAILS OF ANY DEVIATIONS IDENTIFIED THAT NEEDS SPECIFIC CORRECTIVE ACTION      

ACTION NR DEVIATION / PROPOSED ACTUAL


DETAILS OF CORRECTIVE ACTION ACTION BY WHOM
NONCONFORMANCE COMPLETION DATE COMPLETION DATE
         

   

Part E – CONFIRMATION, VERIFICATION AND CLOSE-OUT


 
DESIGNATION NAME EMP NO. SIGNATURE DATE
       
       
       

Issue No. : 0 Page 5 Issue Date : 15.10.2018

You might also like