8D Imprecise UV Spot
8D Imprecise UV Spot
Team Members :
仓库 Anggy
生产部 Partogi
生产部 Arifan
QC Arif
1. Determine the root cause the problem that occured on January 26, 2023
yuanshilai yuanshilai
partogi partogi 1/26/2023
2. Do rechecking all stock finish check of Giftbox at new era warehouse to ensure no Anggy Anggy
found the same problem before assembly and send to customer (Stock 7000 Pcs) Arif Arif
1. Re-position between Screen and pattern film, verify by Leader and IPQC
yuanshilai yuanshilai
2. Educate / Training to operator, do checking using film every 200 sheets for the operator partogi partogi 1/27/2023
and every 1 hour for IPQC Arif Arif
3. Do screening 100% before assembly process
Partogi Partogi
Mustofa Mustofa
Arif 1/27/2023
Arif
周玉恩 周玉恩
Comments : Monitoring corrective action for up to 3 months with The same problem in the future