The document provides a cost estimate for setting up electrical grid infrastructure for the Batwa Memon Society housing scheme 33. It estimates the total cost to be approximately Rs. 15.19 crores which includes Rs. 2.43 crores for a 4000KW grid contribution, Rs. 66 lakhs for 3 switch installations, Rs. 1.5 crores for 12km of HT cable, Rs. 10 crores for 20 power transformers costing Rs. 50 lakhs each, and additional costs for materials, taxes, and consultant fees.
The document provides a cost estimate for setting up electrical grid infrastructure for the Batwa Memon Society housing scheme 33. It estimates the total cost to be approximately Rs. 15.19 crores which includes Rs. 2.43 crores for a 4000KW grid contribution, Rs. 66 lakhs for 3 switch installations, Rs. 1.5 crores for 12km of HT cable, Rs. 10 crores for 20 power transformers costing Rs. 50 lakhs each, and additional costs for materials, taxes, and consultant fees.
The document provides a cost estimate for setting up electrical grid infrastructure for the Batwa Memon Society housing scheme 33. It estimates the total cost to be approximately Rs. 15.19 crores which includes Rs. 2.43 crores for a 4000KW grid contribution, Rs. 66 lakhs for 3 switch installations, Rs. 1.5 crores for 12km of HT cable, Rs. 10 crores for 20 power transformers costing Rs. 50 lakhs each, and additional costs for materials, taxes, and consultant fees.
KE Grid Contribution - 4000KW approx Rs, 2,43,00,000/-
Load (Rs.6075 per KW) 03 Switch (11 KV) Rs, 66,00,000/- 12km HT Cable (approx) (Rs.12500 per m) Rs, 1,50,00,000/- 20 PMT’s - 250KVA (Rs50,00,000 per Rs,10,00,00,000/- PMT) Other Materials and Taxes Rs, 20,00,000/- Consultant Fees Rs, 40,00,000/- Service Charges GRAND TOTAL Rs,15,19,00,000/-