At end cantilever dimension given is wrong. It should be "Varies from 500 to 1175"
1 DD SC-960-S-B3-SPD-3960 (Sheet-1) P0 18-04-2022 Plan At E-E 19-04-2022 Noted and Corrected CLOSED
instead of "Varies from 645 to 1175".
2 DD SC-960-S-B3-SPD-3960 (Sheet-1) P0 18-04-2022 Section 2-2 Downstand depth of seismic arrestor from superstructure is not given. 19-04-2022 Noted and Corrected CLOSED
5 DD SC-960-S-B3-SPD-3960 (Sheet-2) P0 18-04-2022 Section 3-3 Downstand depth of seismic arrestor from superstructure is not given. 19-04-2022 Noted and Corrected CLOSED
A longitudinal section should be also cut from pedestal so that dimension / clearance of
Section 6-6 added showing longitudinal section
7 DD SC-960-S-B3-SPD-3960 (Sheet-2) P0 18-04-2022 Section 3-3 downstand seismic arrestor from superstructure is clearly understood. Pl take care of 19-04-2022 CLOSED
at spherical bearing location
longitudinal slope of superstructure also while drawing such section.
With the longitudinal section 6-6 drawn , it is evident that minimum wedge length
Noted and revised Wedge drawing will be
7A DD SC-960-S-B3-SPD-3960 (Sheet-2) P1 21-04-2022 Section 6-6 required at bottom of soffit slab should be 2050mm. Pl check & modify . This may 26-04-2022 CLOSED
submitted seperately
require modification in separate wedge drg also.
Longitudinal elevation for Above-mentioned comment will require modification in Drg no- SC-960-S-B3-SPR-3962
7B DD SC-960-S-B3-SPR-3962 (Sheet-2) P1 21-04-2022 26-04-2022 Noted and Corrected CLOSED
diaphragm (Sheet-2)
Pl note that approval will be only accorded , once revised wedge rotation drg will be
7C DD General P2 28-04-2022 Wedge Rotation drg 21-06-2022 Noted CLOSED
submitted by DDC which has not submitted by DDC so far.
9 DD SC-960-S-B3-SPR-3961 (Sheet-1) P0 18-04-2022 Schedule In bar shape of A1a , bend to be shown at end of bar A1. 19-04-2022 Noted and Corrected CLOSED
10 DD SC-960-S-B3-SPR-3961 (Sheet-1) P0 18-04-2022 Schedule There is no bar no- A51 in any of sheet. Why it is shown in schedule? 19-04-2022 Bar mark A51 removed from schedule CLOSED
Bar no- A58 is shown as 6nos-10Y . It should be 6nos-16Y . This needs to be changed in
already approved cont unit P456 to P460 also. At edge of cantilever to increase its
11 DD SC-960-S-B3-SPR-3961 (Sheet-1) P0 18-04-2022 Schedule 19-04-2022 Noted and Corrected CLOSED
stiffness , more longitudinal reinf is required. This is being fiollowed in all approved
segmental superstructure also.
In earlier submission of continuous unit , bar A21a is continuous till support but in this
Elevation , section 2-2 &
submission it is curtailed very well before support resulting in very large spacing between
SC-960-S-B3-SPR-3961 (Sheet-2) & (Sheet-4), SC-960-S- Plan showing Bottom bars
12 DD P0 18-04-2022 bars which is not desirable at all to control shrinkage or thermal cracks during hardening 19-04-2022 Noted and modified as per approved drawing CLOSED
B3-SPR-3962 (Sheet-1 to 4) of 3 span continuous voided
process of concrete. Pl restore originaly approved detailing in continuous unit under
slab at Soffit Level
consideration.
SC-960-S-B3-SPR-3961 (Sheet-2) & (Sheet-4), SC-960-S- This is second time we are reminiding to DDC that above-mentioned comment is not
12B DD P2 28-04-2022 Elevation 21-06-2022 Noted and corrected CLOSED
B3-SPR-3962 (Sheet-1 to 4) implemented by DDC in Elevation. Very frustrating affair.
in solid portion stirrups in front of voider opening are A6e (whose details are given in
14 DD SC-960-S-B3-SPR-3961 (sheet-4) P0 18-04-2022 Section 2-2 19-04-2022 Noted and Corrected CLOSED
schedule) & not A6d.