Installation Checklist
Model name: XN-10_11/20_21
Installation date:
Facility name:
Instrument S/N.:
Person in charge:
Installation results:
Sysmex Corporation
I. Installation environment
1) Check that the installation place is appropriate in terms of
temperature, humidity, wind, dust, vibration, water leakage, ―
sunlight, noise, and lighting.
2) Check that the installation space is appropriate. ―
3) Check that the installation floor has sufficient strength. ―
4) Check that the power supply and grounding are appropriate. ―
II. Unpacking
(1) Unpacking
1) Check that the instrument, and all of the consumables and options
―
are contained in the package.
2) Check that all of the accessories are contained in the package. ―
3) Check the instrument for any damage. ―
(2) Disposal of packing materials
1) Check that you have separated the packing materials and put
―
them in garbage bags.
III. Installation
(1) Installation of docking base
1) Check that you have installed the docking base in appropriate
―
orientation.
(2) Removal of securing fixtures used for transportation
1) Check that you have installed hex socket screws for positioning at
―
appropriate position.
2) Check that there is sufficient space (50 cm or more) at the rear
―
side.
3) Check that you have attached all fixing screws for main unit. ―
4) Check that you have removed all transportation fixing tapes. ―
5) Check that you have removed two clips for fixing drive mechanism
―
in front cover.
6) Check that there is no fluid leakage or damage inside the
―
instrument.
(3) Installation of sampler unit
1) Check that you have properly assembled Slider Assy and secured
―
in Table Assy.
2) Check that you have disconnected one end of USB cable in
―
sampler cover.
3) Check that you have secured sampler onto docking base. ―
4) Check that you have removed all transportation fixing tapes. ―
IV. Connection
(1) Connection of pneumatic tube and control cable
1) Check that you have correctly connected pneumatic tube to main
―
unit.
2) Check that you have connected control cable to PCB No. 90014-
―
J2 (main unit).
3) When sharing a pneumatic unit (XN-2000), check that you have
―
connected the wiring cord between the main units.
1/5
Internal use only
(Rev.0)
#
2/5
Internal use only
(Rev.0)
#
3/5
Internal use only
(Rev.0)
#
Revision History
Revision Date of revision Revised content Remarks
Rev.0 January 25, 2021 Edition rule has been changed due to system
-
migration.