23FEB21
Delivery Planned Start Planned End Re-Planned Re-Planned Planned time Actual Start Actual time Planned vs. Actual
Product Tasks Subtasks PM Strengths to Complete Tasks and Subtasks Actual End Date
Due Date Date Date Start Date End Date to invest (hrs.) Date invested Time Invested
Log into Canvas to access modules and click the link to access Perusall
Access reading of Course Structure Conversation
Contributions Read document Provide detailed responses that relates to and support
Ensure to read all the instructor's comments
other PM questions based on my experience can help
14-Jan-21 Enter annotations before the deadline
2 Course Structure Conversation Contributions support the other PMs. Schedule time to enter any 13-Jan-21 14-Jan-21 N/A N/A 1 10-Jan-21 10-Jan-21 1.5 0.5
Verify earned score is updated and reflected in Canvas
questions on reading early to obtain any timely
Ensure assignment is completed in Perusall Download comments entered in Perusall as part of contingency plan for
responses from other PMs or the Client.
back up, then save to computer hardrive
Log into Canvas to access modules and click the link to access Perusall
Complete reading on Scrappy Project Management, Ch.1
Read document and provide thoughtful comments, questions and to the
& Ch.2
conversation. Provide detailed responses that relates to and support
other PM questions based on my experience can help
Submissions that demonstrate engagement with the concepts in Wiefling
3 14-Jan-21 Enter annotations before the deadline Verify earned score is updated and reflected in Canvas support the other PMs. Schedule time to enter any 13-Jan-21 14-Jan-21 N/A N/A 3 14-Jan-21 14-Jan-21 2.5 -0.5
(2007) Kickoff, Ch. 1 & Ch. 2
Download provided comments from Perusall as part of contingency plan questions on reading early to obtain any timely
Ensure assignment is completed in Perusall
for back up, then save to computer hardrive responses from other PMs or the Client.
Watch assigned video on Concepts in Conversation and Begin video within the Canvas module, respond and answer quiz questions
respond to quiz questions within the video to complete
Ensure assignment is complete and points are recorded Download question responses and answers and save to computer hardrive
in Canvas for back up
Submissions that demonstrate understanding of concepts in Answer questions with integrity and provide written
4 14-Jan-21 13-Jan-21 14-Jan-21 N/A N/A 1 14-Jan-21 14-Jan-21 1 0
Conversation with a PM - Part 1 Video Quiz responses to support that supports the content.
Module 1a & 1b
Log into Canvas to access modules and click the link to access Perusall
Complete reading on, What You Need to Know About
Project Management Read document and provide thoughtful comments, questions and to the Provide detailed responses that relates to and support
conversation. other PM questions based on my experience that can
Enter annotations before the deadline help support the other PMs questions and comments.
Submissions that demonstrate engagement with the concepts in
5 16-Jan-21 Verify earned score is updated and reflected in Canvas 15-Jan-21 16-Jan-21 N/A N/A 3 16-Jan-21 16-Jan-21 2.5 -0.5
O'Connell (2011) Intro, Ch. 1 & Ch. 2
Ensure assignment is completed in Perusall Download provided comments from Perusall as part of contingency plan Schedule time to enter any questions on reading early to
for back up, then save to computer hardrive obtain any timely responses from other PMs or the
Client.
Watch assigned video on Baseline Assessment and Begin video within the Canvas module, respond and answer quiz questions
respond to quiz questions within the video to complete
Ensure assignment is complete and points are recorded Download question responses and answers and save to computer hardrive
in Canvas for back up
Submissions that demonstrate understanding of concepts in Baseline Answer questions with integrity and provide written
8 21-Jan-21 20-Jan-21 21-Jan-21 N/A N/A 1 21-Jan-21 21-Jan-21 1 0
Assessment Video Quiz responses to support that supports the content.
Page 1 of 6
OGL320.Updated Project Plan.MFv1.1. 23FEB21
Delivery Planned Start Planned End Re-Planned Re-Planned Planned time Actual Start Actual time Planned vs. Actual
Product Tasks Subtasks PM Strengths to Complete Tasks and Subtasks Actual End Date
Due Date Date Date Start Date End Date to invest (hrs.) Date invested Time Invested
Log into Canvas to access modules and click the link to access Perusall
Complete reading of Scrappy Project Management,
Ch.10 & Ch. 11 Read document and provide thoughtful comments, questions and to the Provide detailed responses that relates to and support
conversation. other PM questions based on my experience that can
Enter annotations before the deadline help support the other PMs questions and comments.
Submissions that demonstrate engagement with the concepts in Wiefling
9 21-Jan-21 Verify earned score is updated and reflected in Canvas 20-Jan-21 21-Jan-21 N/A N/A 3 21-Jan-21 21-Jan-21 2 -1
(2007) Chapters 10 and 11
Ensure assignment is completed in Perusall Download provided comments from Perusall as part of contingency plan Schedule time to enter any questions on reading early to
for back up, then save to computer hardrive obtain any timely responses from other PMs or the
Client.
Watch assigned video on Concepts in Rubrics and Begin video within the Canvas module, respond and answer quiz questions
respond to quiz questions within the video to complete
Ensure assignment is complete and points are recorded Download question responses and answers and save to computer hardrive
in Canvas for back up
Submissions that demonstrate understanding of concepts in Rubrics Answer questions with integrity and provide written
10 21-Jan-21 20-Jan-21 21-Jan-21 N/A N/A 1 21-Jan-21 21-Jan-21 1 0
Video Quiz responses to support that supports the content.
Module 1a & 1b
Log into Canvas to access modules and click the link to access Perusall
Complete reading of What is Quality Assurance
Read document and provide thoughtful comments, questions and to the Provide detailed responses that relates to and support
conversation. other PM questions based on my experience that can
Enter annotations before the deadline help support the other PMs questions and comments.
Submissions that demonstrate engagement with the concepts in What is
11 23-Jan-21 Verify earned score is updated and reflected in Canvas 22-Jan-21 23-Jan-21 N/A N/A 2 23-Jan-21 23-Jan-21 2 0
Quality Assurance?
Ensure assignment is completed in Perusall Download provided comments from Perusall as part of contingency plan Schedule time to enter any questions on reading early to
for back up, then save to computer hardrive obtain any timely responses from other PMs or the
Client.
Log into Canvas to access modules and click the link to access Perusall
Complete reading of Effective Project Planning
Read document and provide thoughtful comments, questions and to the Provide detailed responses that relates to and support
conversation. other PM questions based on my experience that can
Enter annotations before the deadline help support the other PMs questions and comments.
Submissions that demonstrate engagement with the concepts in De
13 26-Jan-21 Verify earned score is updated and reflected in Canvas 24-Jan-21 26-Jan-21 N/A N/A 2 26-Jan-21 26-Jan-21 2 0
Reyck (2010) - Effective Project Planning
Ensure assignment is completed in Perusall Download provided comments from Perusall as part of contingency plan Schedule time to enter any questions on reading early to
for back up, then save to computer hardrive obtain any timely responses from other PMs or the
Client.
Watch assigned video on Concepts in Planning and Begin video within the Canvas module, respond and answer quiz questions
respond to quiz questions within the video to complete
Ensure assignment is complete and points are recorded Download question responses and answers and save to computer hardrive
in Canvas for back up
Submissions that demonstrate understanding of Concepts in Planning for Answer questions with integrity and provide written
14 26-Jan-21 25-Jan-21 26-Jan-21 N/A N/A 1 26-Jan-21 26-Jan-21 1 0
Contingencies Video Quiz responses to support that supports the content.
Module 2
Create product tasks and sub tasks using the outline format, in a bulleted Demonstrate ability to outline and produce a product
15 Products, Tasks, and Subtasks 28-Jan-21 list and sub list. Save file once complete with written instructions to detail how I can produce a 27-Jan-21 28-Jan-21 N/A N/A 1.5 28-Jan-21 28-Jan-21 1.5 0
product with task and subtask described.
Cut and paste list from word file to Canvas and ensure format is correct,
Submit product description in to Canvas then submit assignment.
Log into Canvas to access modules and click the link to access Perusall
Complete reading on WBS
Read document and provide 7 thoughtful comments Dedicate time to provide clear input to plan, provide
Enter annotations before the deadline
video submission even though being on camera is
Submissions that demonstrate engagement with the concepts in Work Verify earned score is updated and reflected in Canvas
16 28-Jan-21 uncomfortable, double check all entries to ensure 27-Jan-21 28-Jan-21 N/A N/A 2 28-Jan-21 29-Jan-21 2 0
Break Down Structure (WBS) Ensure assignment is completed in Perusall Download comments entered in Perusall as part of contingency plan for
accuracy, make it easy to understand and display well to
back up, then save to computer hardrive
the client.
Page 2 of 6
OGL320.Updated Project Plan.MFv1.1. 23FEB21
Delivery Planned Start Planned End Re-Planned Re-Planned Planned time Actual Start Actual time Planned vs. Actual
Product Tasks Subtasks PM Strengths to Complete Tasks and Subtasks Actual End Date
Due Date Date Date Start Date End Date to invest (hrs.) Date invested Time Invested
Choose format (e.g. Table or Outline format) that is best to display your
plan
Create and deliver the Initial Project Plan
Build table format in excel to begin inputting data for initial project plan
Include Product Names(exact), due dates and provided instruction as Dedicate time to provide clear input to plan, provide
written in Canvas modules. video submission even though being on camera is
17 Initial Project Plan 30-Jan-21 Check with Rubric as project plan is in progress and verify information is uncomfortable, double check all entries to ensure 17-Jan-21 30-Jan-21 2-Feb-21 2-Feb-21 20 20-Jan-21 30-Jan-21 20 0
Evaluate the Project Plan you created using the rubric
accurately reflected per client's requirements accuracy, make it easy to understand and display well to
Ensure format for document is readable by Canvas to allow client to read the client.
Submit Project plan in Canvas
within the Canvas tool
Watch assigned video on Concepts on Feedback and Begin video within the Canvas module, respond and answer quiz questions
respond to quiz questions within the video to complete
Ensure assignment is complete and points are recorded Download question responses and answers and save to computer hardrive
in Canvas for back up
Submissions that demonstrate understanding of the concepts in the Provide examples of how I have received feedback, and
19 4-Feb-21 3-Feb-21 4-Feb-21 N/A N/A 1 4-Feb-21 4-Feb-21 1 0
Feedback Video Quiz how to seek out feedback for this class.
Watch assigned video on Concepts in Habits and respond Begin video within the Canvas module, respond and answer quiz questions
to quiz questions within the video to complete
Ensure assignment is complete and points are recorded Download question responses and answers and save to computer hardrive
in Canvas for back up
Submissions that demonstrate understanding of Concepts in Habits Video Answer questions with integrity and provide written
20 6-Feb-21 5-Feb-21 6-Feb-21 N/A N/A 1 6-Feb-21 6-Feb-21 0.5 -0.5
Quiz responses to support that supports the content.
Log into Canvas to access modules and click the link to access Perusall
Complete reading of Beyond Bias Read document, prioritize the client's comments and review each one.
Provide detailed responses that relates to and support
Respond to, answer, and provide additional comments to other PMs input
other PM questions based on my experience that can
Module 3
to the reading.
help support the other PMs questions and comments.
Submissions that demonstrate engagement with the concepts in Enter annotations before the deadline
21 9-Feb-21 7-Feb-21 9-Feb-21 N/A N/A 3 9-Feb-21 9-Feb-21 2 -1
Halvorson and Rock (2015) and with Desjardins (2018) Verify earned score is updated and reflected in Canvas
Schedule time to enter any questions on reading early to
Ensure assignment is completed in Perusall Download comments entered in Perusall as part of contingency plan for
obtain any timely responses from other PMs or the
back up, then save to computer hardrive
Client.
Watch assigned video on Biases and respond to quiz Begin video within the Canvas module, respond and answer quiz questions
questions within the video to complete
Ensure assignment is complete and points are recorded Download question responses and answers and save to computer hardrive
in Canvas for back up
Submissions that demonstrate understanding of concepts in Biases Video Answer questions with integrity and provide written
22 9-Feb-21 10-Feb-21 9-Feb-21 N/A N/A 1 9-Feb-21 9-Feb-21 0.75 -0.25
Quiz responses to support that supports the content.
Log into Canvas to access modules and click the link to access Perusall
Complete Reading on Critical Thinking Read document, prioritize the client's comments and review each one.
Provide detailed responses that relates to and support
Respond to, answer, and provide additional comments to other PMs input
other PM questions based on my experience that can
to the reading.
help support the other PMs questions and comments.
Submissions that demonstrate engagement with the concepts in Cottrell Enter annotations before the deadline
23 11-Feb-21 10-Feb-21 11-Feb-21 N/A N/A 3 11-Feb-21 11-Feb-21 3 0
(2011) - Critical Thinking Verify earned score is updated and reflected in Canvas
Schedule time to enter any questions on reading early to
Ensure assignment is completed in Perusall Download comments entered in Perusall as part of contingency plan for
obtain any timely responses from other PMs or the
back up, then save to computer hardrive
Client.
Module 4
Watch assigned video on Critical Thinking and respond Begin video within the Canvas module, respond and answer quiz questions
to quiz questions within the video to complete
Ensure assignment is complete and points are recorded Download question responses and answers and save to computer hardrive
in Canvas for back up
Submissions that demonstrate understanding of concepts in Critical Answer questions with integrity and provide written
24 11-Feb-21 12-Feb-21 11-Feb-21 N/A N/A 1 11-Feb-21 11-Feb-21 0.5 -0.5
Thinking Video Quiz responses to support that supports the content.
Page 3 of 6
OGL320.Updated Project Plan.MFv1.1. 23FEB21
Delivery Planned Start Planned End Re-Planned Re-Planned Planned time Actual Start Actual time Planned vs. Actual
Product Tasks Subtasks PM Strengths to Complete Tasks and Subtasks Actual End Date
Due Date Date Date Start Date End Date to invest (hrs.) Date invested Time Invested
Log into Canvas to access modules and click the link to access Perusall
Complete reading on Scrappy Project Management, Ch.
Read document, prioritize the client's comments and review each one.
7 & Ch.8 for Prioritizing and Change. Provide detailed responses that relates to and support
Respond to, answer, and provide additional comments to other PMs input
other PM questions based on my experience that can
to the reading.
help support the other PMs questions and comments.
Submissions that demonstrate engagement with the concepts in Wiefling Enter annotations before the deadline
25 13-Feb-21 12-Feb-21 13-Feb-21 N/A N/A 3 13-Feb-21 13-Feb-21 2 -1
(2007) Ch. 7 & 8 Verify earned score is updated and reflected in Canvas
Schedule time to enter any questions on reading early to
Ensure assignment is completed in Perusall Download comments entered in Perusall as part of contingency plan for
obtain any timely responses from other PMs or the
back up, then save to computer hardrive
Client.
either :
Complete the table based on Fulfilling PM Principals described and how they are related to the principals and
(1) the actions you did to fulfill the specified principles
26 Fulfilling PM Principles 16-Feb-21 reference area. 14-Feb-21 16-Feb-21 N/A N/A 2 16-Feb-21 16-Feb-21 2.5 0.5
(2) the actions you could have completed to fulfill the specified principles.
Read the other entries from the members in your group and discuss them.
Ask questions, make comments, and look for familiarities.
Read the Job Description provided in Canvas Use gained understanding to best relate the job
Analyze a real Project Manager Job Description focusing Analyze each sentence that is highlighted blue
descriptions and qualifications to the PMBOK Principals
on the PMBOK Project Management Principles Copy the table provided in Canvas and place each highlighted blue
in the table.
sentence in the cell that you feel it best fits
27 PM Principles at Work 18-Feb-21 17-Feb-21 18-Feb-21 N/A N/A 2 18-Feb-21 18-Feb-21 2.25 0.25
Read the other entries from the members in your group and discuss them.
Review other PMs analyses and see how others use the
Ask questions, make comments, look for similarities
job descriptions to expand on the principals in multiple
principal areas as well.
Log into Canvas to access modules and click the link to access Perusall
Complete reading on What You Need to Know About
Read document, prioritize the client's comments and review each one.
Project Management, Ch. 4, 5 & 6 Provide detailed responses that relates to and support
Respond to, answer, and provide additional comments to other PMs input
other PM questions based on my experience that can
to the reading.
help support the other PMs questions and comments.
Submissions that demonstrate engagement with the concepts in Enter annotations before the deadline
28 20-Feb-21 19-Feb-21 20-Feb-21 N/A N/A 3 20-Feb-21 20-Feb-21 2 -1
O'Connell (2011) Ch. 4, 5, & 6 Verify earned score is updated and reflected in Canvas
Schedule time to enter any questions on reading early to
Ensure assignment is completed in Perusall Download comments entered in Perusall as part of contingency plan for
obtain any timely responses from other PMs or the
back up, then save to computer hardrive
Client.
Post Updated and Improved Project Plan to solicit peer Upload recent project plan to Canvas for peer review
feedback before the product is due. Post comments and provide feedback to other's Projects Plans to earn Had planned to complete early and submit for peer
credit. review.
Pre Peer Feedback on UPDATED Project Plans
29 22-Feb-21 21-Feb-21 22-Feb-21 N/A N/A 4 N/A N/A 0 -4
(Optional / Extra Credit) Elected not to take optional/extra credit submission due
to project being on track and work load for previous
week being greater than planned.
Module 5
1 - Conduct a Quality Control (QC) evaluation of the Initial Project Plan you
created using the rubric provided
Maintain entries as work is completed and allow for
2 - Update and improve the Project Plan based on your QC evaluation and
minimal impact to time spent and maximize efficiency in
based on your evaluation of the peer feedback it received
planning.
Update Project Plan & perform the following 5 steps to 3- Conduct a Quality Control (QC) evaluation of the Updated and
13-Feb-21 23-Feb-21 23-Feb-21 23-Feb-21 20 2-Feb-21 23-Feb-21 6.5 13.5
your project plan Improved Project Plan you created using the rubric provided
Update entries based on QC evaluation and update as
4 - Describe the Active Planning you have been doing for the last several
needed.
30 Updated and Improved Project Plan 23-Feb-21 weeks
5 - Then you will evaluate the Updated and Improved Project Plans
created and delivered by four of your colleagues using the same rubric you
used to evaluate your product.
Describe in three paragraphs the active planning you
have been doing Prepare in word format in a separate file. Complete action planning for remaining of project
Deliver by uploading both Updated and Improved Project Plan and Active timeline and utilize information to develop word 15-Feb-21 16-Feb-21 N/A N/A 2 23-Feb-21 23-Feb-21 2 0
Submit files to Canvas Planning document to Canvas. summary.
Page 4 of 6
OGL320.Updated Project Plan.MFv1.1. 23FEB21
Delivery Planned Start Planned End Re-Planned Re-Planned Planned time Actual Start Actual time Planned vs. Actual
Product Tasks Subtasks PM Strengths to Complete Tasks and Subtasks Actual End Date
Due Date Date Date Start Date End Date to invest (hrs.) Date invested Time Invested
Log into Canvas to access modules and click the link to access Perusall
Complete reading on Why People Fail to Recognized
Read document, prioritize the client's comments and review each one.
Their Own Incompetence Provide detailed responses that relates to and support
Respond to, answer, and provide additional comments to other PMs input
other PM questions based on my experience that can
to the reading.
help support the other PMs questions and comments.
Submissions that demonstrate engagement with the concepts in Why Enter annotations before the deadline 0 - estimate based on
32 27-Feb-21 26-Feb-21 27-Feb-21 N/A N/A 3 25-Feb 27-Feb-21 3
People Fail to Recognize their own Incompetence Verify earned score is updated and reflected in Canvas adjustments
Schedule time to enter any questions on reading early to
Ensure assignment is completed in Perusall Download comments entered in Perusall as part of contingency plan for
obtain any timely responses from other PMs or the
back up, then save to computer hardrive
Client.
Watch assigned video on Concepts in Conversation with Begin video within the Canvas module, respond and answer quiz questions
a PM Part 2, and respond to quiz questions within the to complete
video
Module 6
Ensure assignment is complete and points are recorded Download question responses and answers and save to computer hardrive
in Canvas for back up
Submissions that demonstrate understanding of concepts in Answer questions with integrity and provide written 0 - estimate based on
33 27-Feb-21 25-Feb-21 27-Feb-21 N/A N/A 1 25-Feb-21 27-Feb-21 1
Conversation with a PM - Part 2 Video Quiz responses to support that supports the content. adjustments