Professional Documents
Culture Documents
Date Format Number format Criteria for STOP Card with intervention
1-Jan-13 41275 Date Date Intervention/Enco Type-Code
31-Jan-13 41305 Jan >=41275 <=41305 YES <=2
1-Feb-13 41306 Date Date Intervention/Enco Type-Code
28-Feb-13 41333 Feb >=41306 <=41333 Yes <=2
1-Mar-13 41334 Date Date Intervention/Enco Type-Code
31-Mar-13 41364 Mar >=41334 <=41364 Yes <=2
1-Apr-13 41365 Date Date Intervention/Enco Type-Code
30-Apr-13 41394 Apr >=41365 <=41394 Yes <=2
1-May-13 41395 Date Date Intervention/Enco Type-Code
31-May-13 41425 May >=41395 <=41425 Yes <=2
1-Jun-13 41426 Date Date Intervention/Enco Type-Code
30-Jun-13 41455 Jun >=41426 <=41455 Yes <=2
1-Jul-13 41456 Date Date Intervention/Enco Type-Code
31-Jul-13 41486 Jul >=41456 <=41486 Yes <=2
1-Aug-13 41487 Date Date Intervention/Enco Type-Code
31-Aug-13 41517 Aug >=41487 <=41517 Yes <=2
1-Sep-13 41518 Date Date Intervention/Enco Type-Code
30-Sep-13 41547 Sep >=41518 <=41547 Yes <=2
1-Oct-13 41548 Date Date Intervention/Enco Type-Code
31-Oct-13 41578 Oct >=41548 <=41578 Yes <=2
1-Nov-13 41579 Date Date Intervention/Enco Type-Code
30-Nov-13 41608 Nov >=41579 <=41608 Yes <=2
1-Dec-13 41609 Date Date Intervention/Enco Type-Code
31-Dec-13 41639 Dec >=41609 <=41639 Yes <=2
Date Format Number format Criteria for STOP Card: Unsafe Act Criteria for STOP Card:
1-Jan-13 41275 Date Date Type-Code Date
31-Jan-13 41305 Jan >=41275 <=41305 1 >=39083
1-Feb-13 41306 Date Date Type-Code Date
28-Feb-13 41333 Feb >=41306 <=41333 1 >=39114
1-Mar-13 41334 Date Date Type-Code Date
31-Mar-13 41364 Mar >=41334 <=41364 1 >=39142
1-Apr-13 41365 Date Date Type-Code Date
30-Apr-13 41394 Apr >=41365 <=41394 1 >=39173
1-May-13 41395 Date Date Type-Code Date
31-May-13 41425 May >=41395 <=41425 1 >=39203
1-Jun-13 41426 Date Date Type-Code Date
30-Jun-13 41455 Jun >=41426 <=41455 1 >=39234
1-Jul-13 41456 Date Date Type-Code Date
31-Jul-13 41486 Jul >=41456 <=41486 1 >=39264
1-Aug-13 41487 Date Date Type-Code Date
31-Aug-13 41517 Aug >=41487 <=41517 1 >=39295
1-Sep-13 41518 Date Date Type-Code Date
30-Sep-13 41547 Sep >=41518 <=41547 1 >=39326
1-Oct-13 41548 Date Date Type-Code Date
31-Oct-13 41578 Oct >=41548 <=41578 1 >=39356
1-Nov-13 41579 Date Date Type-Code Date
30-Nov-13 41608 Nov >=41579 <=41608 1 >=39387
1-Dec-13 41609 Date Date Type-Code Date
31-Dec-13 41639 Dec >=41609 <=41639 1 >=39417
Date Format Number format Criteria: Striking against or being struck by objects Criteria:
1-Jan-13 41275 Date Date Class-Code Date
31-Jan-13 41305 Jan >=41275 <=41305 C01 >=41275
1-Feb-13 41306 Date Date Class-Code Date
28-Feb-13 41333 Feb >=41306 <=41333 C01 >=41306
1-Mar-13 41334 Date Date Class-Code Date
31-Mar-13 41364 Mar >=41334 <=41364 C01 >=41334
1-Apr-13 41365 Date Date Class-Code Date
30-Apr-13 41394 Apr >=41365 <=41394 C01 >=41365
1-May-13 41395 Date Date Class-Code Date
31-May-13 41425 May >=41395 <=41425 C01 >=41395
1-Jun-13 41426 Date Date Class-Code Date
30-Jun-13 41455 Jun >=41426 <=41455 C01 >=41426
1-Jul-13 41456 Date Date Class-Code Date
31-Jul-13 41486 Jul >=41456 <=41486 C01 >=41456
1-Aug-13 41487 Date Date Class-Code Date
31-Aug-12 41152 Aug >=41487 <=41152 C01 >=41487
1-Sep-13 41518 Date Date Class-Code Date
30-Sep-13 41547 Sep >=41518 <=41547 C01 >=41518
1-Oct-13 41548 Date Date Class-Code Date
31-Oct-13 41578 Oct >=41548 <=41578 C01 >=41548
1-Nov-13 41579 Date Date Class-Code Date
30-Nov-13 41608 Nov >=41579 <=41608 C01 >=41579
1-Dec-13 41609 Date Date Class-Code Date
31-Dec-13 41639 Dec >=41609 <=41639 C01 >=41609
Date Format Number format Criteria: Wrong for the job Criteria:
1-Jan-13 41275 Date Date Class-Code Date
31-Jan-13 41305 Jan >=41275 <=41305 D01 >=41275
1-Feb-13 41306 Date Date Class-Code Date
28-Feb-13 41333 Feb >=41306 <=41333 D01 >=41306
1-Mar-13 41334 Date Date Class-Code Date
31-Mar-13 41364 Mar >=41334 <=41364 D01 >=41334
1-Apr-13 41365 Date Date Class-Code Date
30-Apr-13 41394 Apr >=41365 <=41394 D01 >=41365
1-May-13 41395 Date Date Class-Code Date
31-May-13 41425 May >=41395 <=41425 D01 >=41395
1-Jun-13 41426 Date Date Class-Code Date
30-Jun-13 41455 Jun >=41426 <=41455 D01 >=41426
1-Jul-13 41456 Date Date Class-Code Date
31-Jul-13 41486 Jul >=41456 <=41486 D01 >=41456
1-Aug-13 41487 Date Date Class-Code Date
31-Aug-12 41152 Aug >=41487 <=41152 D01 >=41487
1-Sep-13 41518 Date Date Class-Code Date
30-Sep-13 41547 Sep >=41518 <=41547 D01 >=41518
1-Oct-13 41548 Date Date Class-Code Date
31-Oct-13 41578 Oct >=41548 <=41578 D01 >=41548
1-Nov-13 41579 Date Date Class-Code Date
30-Nov-13 41608 Nov >=41579 <=41608 D01 >=41579
1-Dec-13 41609 Date Date Class-Code Date
31-Dec-13 41639 Dec >=41609 <=41639 D01 >=41609
Date Format Number format Criteria: Wrong for the job Criteria:
1-Jan-13 41275 Date Date Class-Code Date
31-Jan-13 41305 Jan >=41275 <=41305 E01 >=41275
1-Feb-13 41306 Date Date Class-Code Date
28-Feb-13 41333 Feb >=41306 <=41333 E01 >=41306
1-Mar-13 41334 Date Date Class-Code Date
31-Mar-13 41364 Mar >=41334 <=41364 E01 >=41334
1-Apr-13 41365 Date Date Class-Code Date
30-Apr-13 41394 Apr >=41365 <=41394 E01 >=41365
1-May-13 41395 Date Date Class-Code Date
31-May-13 41425 May >=41395 <=41425 E01 >=41395
1-Jun-13 41426 Date Date Class-Code Date
30-Jun-13 41455 Jun >=41426 <=41455 E01 >=41426
1-Jul-13 41456 Date Date Class-Code Date
31-Jul-13 41486 Jul >=41456 <=41486 E01 >=41456
1-Aug-13 41487 Date Date Class-Code Date
31-Aug-12 41152 Aug >=41487 <=41152 E01 >=41487
1-Sep-13 41518 Date Date Class-Code Date
30-Sep-13 41547 Sep >=41518 <=41547 E01 >=41518
1-Oct-13 41548 Date Date Class-Code Date
31-Oct-13 41578 Oct >=41548 <=41578 E01 >=41548
1-Nov-13 41579 Date Date Class-Code Date
30-Nov-13 41608 Nov >=41579 <=41608 E01 >=41579
1-Dec-13 41609 Date Date Class-Code Date
31-Dec-13 41639 Dec >=41609 <=41639 E01 >=41609
Criteria for STOP Card: Unsafe Condition Criteria for STOP Card: Safe Act
Date Type-Code Date Date Type-Code
<=39113 2 >=39083 <=39113 3
Date Type-Code Date Date Type-Code
<=39141 2 >=39114 <=39141 3
Date Type-Code Date Date Type-Code
<=39172 2 >=39142 <=39172 3
Date Type-Code Date Date Type-Code
<=39202 2 >=39173 <=39202 3
Date Type-Code Date Date Type-Code
<=39233 2 >=39203 <=39233 3
Date Type-Code Date Date Type-Code
<=39263 2 >=39234 <=39263 3
Date Type-Code Date Date Type-Code
<=39294 2 >=39264 <=39294 3
Date Type-Code Date Date Type-Code
<=39325 2 >=39295 <=39325 3
Date Type-Code Date Date Type-Code
<=39355 2 >=39326 <=39355 3
Date Type-Code Date Date Type-Code
<=39386 2 >=39356 <=39386 3
Date Type-Code Date Date Type-Code
<=39416 2 >=39387 <=39416 3
Date Type-Code Date Date Type-Code
<=39447 2 >=39417 <=39447 3
0 Criteria: 0
Date Class-Code Date Date Class-Code
<=41305 H02 >=41275 <=41305 H03
Date Class-Code Date Date Class-Code
<=41333 H02 >=41306 <=41333 H03
Date Class-Code Date Date Class-Code
<=41364 H02 >=41334 <=41364 H03
Date Class-Code Date Date Class-Code
<=41394 H02 >=41365 <=41394 H03
Date Class-Code Date Date Class-Code
<=41425 H02 >=41395 <=41425 H03
Date Class-Code Date Date Class-Code
<=41455 H02 >=41426 <=41455 H03
Date Class-Code Date Date Class-Code
<=41486 H02 >=41456 <=41486 H03
Date Class-Code Date Date Class-Code
<=41152 H02 >=41487 <=41152 H03
Date Class-Code Date Date Class-Code
<=41547 H02 >=41518 <=41547 H03
Date Class-Code Date Date Class-Code
<=41578 H02 >=41548 <=41578 H03
Date Class-Code Date Date Class-Code
<=41608 H02 >=41579 <=41608 H03
Date Class-Code Date Date Class-Code
<=41639 H02 >=41609 <=41639 H03
Criteria: Stopping job Criteria: Attaching Grounds Criteria: Performing Locks
Date Date Class-Code Date Date Class-Code Date Date
>=41275 <=41305 A04 >=41275 <=41305 A05 >=41275 <=41305
Date Date Class-Code Date Date Class-Code Date Date
>=41306 <=41333 A04 >=41306 <=41333 A05 >=41306 <=41333
Date Date Class-Code Date Date Class-Code Date Date
>=41334 <=41364 A04 >=41334 <=41364 A05 >=41334 <=41364
Date Date Class-Code Date Date Class-Code Date Date
>=41365 <=41394 A04 >=41365 <=41394 A05 >=41365 <=41394
Date Date Class-Code Date Date Class-Code Date Date
>=41395 <=41425 A04 >=41395 <=41425 A05 >=41395 <=41425
Date Date Class-Code Date Date Class-Code Date Date
>=41426 <=41455 A04 >=41426 <=41455 A05 >=41426 <=41455
Date Date Class-Code Date Date Class-Code Date Date
>=41456 <=41486 A04 >=41456 <=41486 A05 >=41456 <=41486
Date Date Class-Code Date Date Class-Code Date Date
>=41487 <=41152 A04 >=41487 <=41152 A05 >=41487 <=41152
Date Date Class-Code Date Date Class-Code Date Date
>=41518 <=41547 A04 >=41518 <=41547 A05 >=41518 <=41547
Date Date Class-Code Date Date Class-Code Date Date
>=41548 <=41578 A04 >=41548 <=41578 A05 >=41548 <=41578
Date Date Class-Code Date Date Class-Code Date Date
>=41579 <=41608 A04 >=41579 <=41608 A05 >=41579 <=41608
Date Date Class-Code Date Date Class-Code Date Date
>=41609 <=41639 A04 >=41609 <=41639 A05 >=41609 <=41639
Criteria: Contacting temperature extremes Criteria: Contacting electrical current Criteria: Inhaling, Absorbing, or Swallow
Date Date Class-Code Date Date Class-Code Date Date
>=41275 <=41305 C04 >=41275 <=41305 C05 >=41275 <=41305
Date Date Class-Code Date Date Class-Code Date Date
>=41306 <=41333 C04 >=41306 <=41333 C05 >=41306 <=41333
Date Date Class-Code Date Date Class-Code Date Date
>=41334 <=41364 C04 >=41334 <=41364 C05 >=41334 <=41364
Date Date Class-Code Date Date Class-Code Date Date
>=41365 <=41394 C04 >=41365 <=41394 C05 >=41365 <=41394
Date Date Class-Code Date Date Class-Code Date Date
>=41395 <=41425 C04 >=41395 <=41425 C05 >=41395 <=41425
Date Date Class-Code Date Date Class-Code Date Date
>=41426 <=41455 C04 >=41426 <=41455 C05 >=41426 <=41455
Date Date Class-Code Date Date Class-Code Date Date
>=41456 <=41486 C04 >=41456 <=41486 C05 >=41456 <=41486
Date Date Class-Code Date Date Class-Code Date Date
>=41487 <=41152 C04 >=41487 <=41152 C05 >=41487 <=41152
Date Date Class-Code Date Date Class-Code Date Date
>=41518 <=41547 C04 >=41518 <=41547 C05 >=41518 <=41547
Date Date Class-Code Date Date Class-Code Date Date
>=41548 <=41578 C04 >=41548 <=41578 C05 >=41548 <=41578
Date Date Class-Code Date Date Class-Code Date Date
>=41579 <=41608 C04 >=41579 <=41608 C05 >=41579 <=41608
Date Date Class-Code Date Date Class-Code Date Date
>=41609 <=41639 C04 >=41609 <=41639 C05 >=41609 <=41639
Criteria: Other
Date Date Class-Code
>=41275 <=41305 D04
Date Date Class-Code
>=41306 <=41333 D04
Date Date Class-Code
>=41334 <=41364 D04
Date Date Class-Code
>=41365 <=41394 D04
Date Date Class-Code
>=41395 <=41425 D04
Date Date Class-Code
>=41426 <=41455 D04
Date Date Class-Code
>=41456 <=41486 D04
Date Date Class-Code
>=41487 <=41152 D04
Date Date Class-Code
>=41518 <=41547 D04
Date Date Class-Code
>=41548 <=41578 D04
Date Date Class-Code
>=41579 <=41608 D04
Date Date Class-Code
>=41609 <=41639 D04
Criteria: Other
Date Date Class-Code
>=41275 <=41305 E04
Date Date Class-Code
>=41306 <=41333 E04
Date Date Class-Code
>=41334 <=41364 E04
Date Date Class-Code
>=41365 <=41394 E04
Date Date Class-Code
>=41395 <=41425 E04
Date Date Class-Code
>=41426 <=41455 E04
Date Date Class-Code
>=41456 <=41486 E04
Date Date Class-Code
>=41487 <=41152 E04
Date Date Class-Code
>=41518 <=41547 E04
Date Date Class-Code
>=41548 <=41578 E04
Date Date Class-Code
>=41579 <=41608 E04
Date Date Class-Code
>=41609 <=41639 E04
Criteria: Procedure not understood Criteria: Procedure not followed Criteria: Other
Date Date Class-Code Date Date Class-Code Date Date
>=41275 <=41305 F04 >=41275 <=41305 F05 >=41275 <=41305
Date Date Class-Code Date Date Class-Code Date Date
>=41306 <=41333 F04 >=41306 <=41333 F05 >=41306 <=41333
Date Date Class-Code Date Date Class-Code Date Date
>=41334 <=41364 F04 >=41334 <=41364 F05 >=41334 <=41364
Date Date Class-Code Date Date Class-Code Date Date
>=41365 <=41394 F04 >=41365 <=41394 F05 >=41365 <=41394
Date Date Class-Code Date Date Class-Code Date Date
>=41395 <=41425 F04 >=41395 <=41425 F05 >=41395 <=41425
Date Date Class-Code Date Date Class-Code Date Date
>=41426 <=41455 F04 >=41426 <=41455 F05 >=41426 <=41455
Date Date Class-Code Date Date Class-Code Date Date
>=41456 <=41486 F04 >=41456 <=41486 F05 >=41456 <=41486
Date Date Class-Code Date Date Class-Code Date Date
>=41487 <=41152 F04 >=41487 <=41152 F05 >=41487 <=41152
Date Date Class-Code Date Date Class-Code Date Date
>=41518 <=41547 F04 >=41518 <=41547 F05 >=41518 <=41547
Date Date Class-Code Date Date Class-Code Date Date
>=41548 <=41578 F04 >=41548 <=41578 F05 >=41548 <=41578
Date Date Class-Code Date Date Class-Code Date Date
>=41579 <=41608 F04 >=41579 <=41608 F05 >=41579 <=41608
Date Date Class-Code Date Date Class-Code Date Date
>=41609 <=41639 F04 >=41609 <=41639 F05 >=41609 <=41639
Criteria: #NAME?
Date Date Class-Code
>=41275 <=41305 G04
Date Date Class-Code
>=41306 <=41333 G04
Date Date Class-Code
>=41334 <=41364 G04
Date Date Class-Code
>=41365 <=41394 G04
Date Date Class-Code
>=41395 <=41425 G04
Date Date Class-Code
>=41426 <=41455 G04
Date Date Class-Code
>=41456 <=41486 G04
Date Date Class-Code
>=41487 <=41152 G04
Date Date Class-Code
>=41518 <=41547 G04
Date Date Class-Code
>=41548 <=41578 G04
Date Date Class-Code
>=41579 <=41608 G04
Date Date Class-Code
>=41609 <=41639 G04
Criteria: 0
Date Date Class-Code
>=41275 <=41305 H04
Date Date Class-Code
>=41306 <=41333 H04
Date Date Class-Code
>=41334 <=41364 H04
Date Date Class-Code
>=41365 <=41394 H04
Date Date Class-Code
>=41395 <=41425 H04
Date Date Class-Code
>=41426 <=41455 H04
Date Date Class-Code
>=41456 <=41486 H04
Date Date Class-Code
>=41487 <=41152 H04
Date Date Class-Code
>=41518 <=41547 H04
Date Date Class-Code
>=41548 <=41578 H04
Date Date Class-Code
>=41579 <=41608 H04
Date Date Class-Code
>=41609 <=41639 H04
Performing Locks Criteria: Other
Class-Code Date Date Class-Code
A06 >=41275 <=41305 A07
Class-Code Date Date Class-Code
A06 >=41306 <=41333 A07
Class-Code Date Date Class-Code
A06 >=41334 <=41364 A07
Class-Code Date Date Class-Code
A06 >=41365 <=41394 A07
Class-Code Date Date Class-Code
A06 >=41395 <=41425 A07
Class-Code Date Date Class-Code
A06 >=41426 <=41455 A07
Class-Code Date Date Class-Code
A06 >=41456 <=41486 A07
Class-Code Date Date Class-Code
A06 >=41487 <=41152 A07
Class-Code Date Date Class-Code
A06 >=41518 <=41547 A07
Class-Code Date Date Class-Code
A06 >=41548 <=41578 A07
Class-Code Date Date Class-Code
A06 >=41579 <=41608 A07
Class-Code Date Date Class-Code
A06 >=41609 <=41639 A07
Inhaling, Absorbing, or Swallowing Criteria: Repetitive Motions Criteria: Awkward positions/static postures
Class-Code Date Date Class-Code Date Date Class-Code
C06 >=41275 <=41305 C07 >=41275 <=41305 C08
Class-Code Date Date Class-Code Date Date Class-Code
C06 >=41306 <=41333 C07 >=41306 <=41333 C08
Class-Code Date Date Class-Code Date Date Class-Code
C06 >=41334 <=41364 C07 >=41334 <=41364 C08
Class-Code Date Date Class-Code Date Date Class-Code
C06 >=41365 <=41394 C07 >=41365 <=41394 C08
Class-Code Date Date Class-Code Date Date Class-Code
C06 >=41395 <=41425 C07 >=41395 <=41425 C08
Class-Code Date Date Class-Code Date Date Class-Code
C06 >=41426 <=41455 C07 >=41426 <=41455 C08
Class-Code Date Date Class-Code Date Date Class-Code
C06 >=41456 <=41486 C07 >=41456 <=41486 C08
Class-Code Date Date Class-Code Date Date Class-Code
C06 >=41487 <=41152 C07 >=41487 <=41152 C08
Class-Code Date Date Class-Code Date Date Class-Code
C06 >=41518 <=41547 C07 >=41518 <=41547 C08
Class-Code Date Date Class-Code Date Date Class-Code
C06 >=41548 <=41578 C07 >=41548 <=41578 C08
Class-Code Date Date Class-Code Date Date Class-Code
C06 >=41579 <=41608 C07 >=41579 <=41608 C08
Class-Code Date Date Class-Code Date Date Class-Code
C06 >=41609 <=41639 C07 >=41609 <=41639 C08
Class-Code
F06
Class-Code
F06
Class-Code
F06
Class-Code
F06
Class-Code
F06
Class-Code
F06
Class-Code
F06
Class-Code
F06
Class-Code
F06
Class-Code
F06
Class-Code
F06
Class-Code
F06
Criteria: Other
Date Date Class-Code
>=41275 <=41305 B09
Date Date Class-Code
>=41306 <=41333 B09
Date Date Class-Code
>=41334 <=41364 B09
Date Date Class-Code
>=41365 <=41394 B09
Date Date Class-Code
>=41395 <=41425 B09
Date Date Class-Code
>=41426 <=41455 B09
Date Date Class-Code
>=41456 <=41486 B09
Date Date Class-Code
>=41487 <=41152 B09
Date Date Class-Code
>=41518 <=41547 B09
Date Date Class-Code
>=41548 <=41578 B09
Date Date Class-Code
>=41579 <=41608 B09
Date Date Class-Code
>=41609 <=41639 B09
Criteria: Other
Date Date Class-Code
>=41275 <=41305 C09
Date Date Class-Code
>=41306 <=41333 C09
Date Date Class-Code
>=41334 <=41364 C09
Date Date Class-Code
>=41365 <=41394 C09
Date Date Class-Code
>=41395 <=41425 C09
Date Date Class-Code
>=41426 <=41455 C09
Date Date Class-Code
>=41456 <=41486 C09
Date Date Class-Code
>=41487 <=41152 C09
Date Date Class-Code
>=41518 <=41547 C09
Date Date Class-Code
>=41548 <=41578 C09
Date Date Class-Code
>=41579 <=41608 C09
Date Date Class-Code
>=41609 <=41639 C09
Classification
Date Format Number format Criteria for STOP Card with intervention
1-Jan-13 41275 Date Date Intervention/Enco Type-Code
31-Jan-13 41305 Jan >=41275 <=41305 YES <=2
1-Feb-13 41306 Date Date Intervention/Enco Type-Code
28-Feb-13 41333 Feb >=41306 <=41333 Yes <=2
1-Mar-13 41334 Date Date Intervention/Enco Type-Code
31-Mar-13 41364 Mar >=41334 <=41364 Yes <=2
1-Apr-13 41365 Date Date Intervention/Enco Type-Code
30-Apr-13 41394 Apr >=41365 <=41394 Yes <=2
1-May-13 41395 Date Date Intervention/Enco Type-Code
31-May-13 41425 May >=41395 <=41425 Yes <=2
1-Jun-13 41426 Date Date Intervention/Enco Type-Code
30-Jun-13 41455 Jun >=41426 <=41455 Yes <=2
1-Jul-13 41456 Date Date Intervention/Enco Type-Code
31-Jul-13 41486 Jul >=41456 <=41486 Yes <=2
1-Aug-13 41487 Date Date Intervention/Enco Type-Code
31-Aug-12 41152 Aug >=41487 <=41152 Yes <=2
1-Sep-13 41518 Date Date Intervention/Enco Type-Code
30-Sep-13 41547 Sep >=41518 <=41547 Yes <=2
1-Oct-13 41548 Date Date Intervention/Enco Type-Code
31-Oct-13 41578 Oct >=41548 <=41578 Yes <=2
1-Nov-13 41579 Date Date Intervention/Enco Type-Code
30-Nov-13 41608 Nov >=41579 <=41608 Yes <=2
1-Dec-13 41609 Date Date Intervention/Enco Type-Code
31-Dec-13 41639 Dec >=41609 <=41639 Yes <=2
Date Format Number format Criteria for STOP Card: Unsafe Act Criteria for STOP Card:
1-Jan-13 41275 Date Date Type-Code Date
31-Jan-13 41305 Jan >=41275 <=41305 1 >=39083
1-Feb-13 41306 Date Date Type-Code Date
28-Feb-13 41333 Feb >=41306 <=41333 1 >=39114
1-Mar-13 41334 Date Date Type-Code Date
31-Mar-13 41364 Mar >=41334 <=41364 1 >=39142
1-Apr-13 41365 Date Date Type-Code Date
30-Apr-13 41394 Apr >=41365 <=41394 1 >=39173
1-May-13 41395 Date Date Type-Code Date
31-May-13 41425 May >=41395 <=41425 1 >=39203
1-Jun-13 41426 Date Date Type-Code Date
30-Jun-13 41455 Jun >=41426 <=41455 1 >=39234
1-Jul-13 41456 Date Date Type-Code Date
31-Jul-13 41486 Jul >=41456 <=41486 1 >=39264
1-Aug-13 41487 Date Date Type-Code Date
31-Aug-12 41152 Aug >=41487 <=41152 1 >=39295
1-Sep-13 41518 Date Date Type-Code Date
30-Sep-13 41547 Sep >=41518 <=41547 1 >=39326
1-Oct-13 41548 Date Date Type-Code Date
31-Oct-13 41578 Oct >=41548 <=41578 1 >=39356
1-Nov-13 41579 Date Date Type-Code Date
30-Nov-13 41608 Nov >=41579 <=41608 1 >=39387
1-Dec-13 41609 Date Date Type-Code Date
31-Dec-13 41639 Dec >=41609 <=41639 1 >=39417
Date Format Number format Criteria: Equipment/ Facility not exist Criteria:
1-Jan-13 41275 Date Date Class-Code Date
31-Jan-13 41305 Jan >=41275 <=41305 C1 >=41275
1-Feb-13 41306 Date Date Class-Code Date
28-Feb-13 41333 Feb >=41306 <=41333 C1 >=41306
1-Mar-13 41334 Date Date Class-Code Date
31-Mar-13 41364 Mar >=41334 <=41364 C1 >=41334
1-Apr-13 41365 Date Date Class-Code Date
30-Apr-13 41394 Apr >=41365 <=41394 C1 >=41365
1-May-13 41395 Date Date Class-Code Date
31-May-13 41425 May >=41395 <=41425 C1 >=41395
1-Jun-13 41426 Date Date Class-Code Date
30-Jun-13 41455 Jun >=41426 <=41455 C1 >=41426
1-Jul-13 41456 Date Date Class-Code Date
31-Jul-13 41486 Jul >=41456 <=41486 C1 >=41456
1-Aug-13 41487 Date Date Class-Code Date
31-Aug-12 41152 Aug >=41487 <=41152 C1 >=41487
1-Sep-13 41518 Date Date Class-Code Date
30-Sep-13 41547 Sep >=41518 <=41547 C1 >=41518
1-Oct-13 41548 Date Date Class-Code Date
31-Oct-13 41578 Oct >=41548 <=41578 C1 >=41548
1-Nov-13 41579 Date Date Class-Code Date
30-Nov-13 41608 Nov >=41579 <=41608 C1 >=41579
1-Dec-13 41609 Date Date Class-Code Date
31-Dec-13 41639 Dec >=41609 <=41639 C1 >=41609
Criteria for STOP Card: Unsafe Condition Criteria for STOP Card: Safe Act
Date Type-Code Date Date Type-Code
<=39113 2 >=39083 <=39113 3
Date Type-Code Date Date Type-Code
<=39141 2 >=39114 <=39141 3
Date Type-Code Date Date Type-Code
<=39172 2 >=39142 <=39172 3
Date Type-Code Date Date Type-Code
<=39202 2 >=39173 <=39202 3
Date Type-Code Date Date Type-Code
<=39233 2 >=39203 <=39233 3
Date Type-Code Date Date Type-Code
<=39263 2 >=39234 <=39263 3
Date Type-Code Date Date Type-Code
<=39294 2 >=39264 <=39294 3
Date Type-Code Date Date Type-Code
<=39325 2 >=39295 <=39325 3
Date Type-Code Date Date Type-Code
<=39355 2 >=39326 <=39355 3
Date Type-Code Date Date Type-Code
<=39386 2 >=39356 <=39386 3
Date Type-Code Date Date Type-Code
<=39416 2 >=39387 <=39416 3
Date Type-Code Date Date Type-Code
<=39447 2 >=39417 <=39447 3
Criteria: Defective equipment Criteria: PPE not available Criteria: Ergonomic issue with equipm
Date Date Class-Code Date Date Class-Code Date Date
>=41275 <=41305 C4 >=41275 <=41305 C5 >=41275 <=41305
Date Date Class-Code Date Date Class-Code Date Date
>=41306 <=41333 C4 >=41306 <=41333 C5 >=41306 <=41333
Date Date Class-Code Date Date Class-Code Date Date
>=41334 <=41364 C4 >=41334 <=41364 C5 >=41334 <=41364
Date Date Class-Code Date Date Class-Code Date Date
>=41365 <=41394 C4 >=41365 <=41394 C5 >=41365 <=41394
Date Date Class-Code Date Date Class-Code Date Date
>=41395 <=41425 C4 >=41395 <=41425 C5 >=41395 <=41425
Date Date Class-Code Date Date Class-Code Date Date
>=41426 <=41455 C4 >=41426 <=41455 C5 >=41426 <=41455
Date Date Class-Code Date Date Class-Code Date Date
>=41456 <=41486 C4 >=41456 <=41486 C5 >=41456 <=41486
Date Date Class-Code Date Date Class-Code Date Date
>=41487 <=41152 C4 >=41487 <=41152 C5 >=41487 <=41152
Date Date Class-Code Date Date Class-Code Date Date
>=41518 <=41547 C4 >=41518 <=41547 C5 >=41518 <=41547
Date Date Class-Code Date Date Class-Code Date Date
>=41548 <=41578 C4 >=41548 <=41578 C5 >=41548 <=41578
Date Date Class-Code Date Date Class-Code Date Date
>=41579 <=41608 C4 >=41579 <=41608 C5 >=41579 <=41608
Date Date Class-Code Date Date Class-Code Date Date
>=41609 <=41639 C4 >=41609 <=41639 C5 >=41609 <=41639
Criteria: Inadequate Inspection/ mainten Criteria: Communication did not Occur Criteria: Supervision did not occur
Date Date Class-Code Date Date Class-Code Date Date
>=41275 <=41305 E4 >=41275 <=41305 E5 >=41275 <=41305
Date Date Class-Code Date Date Class-Code Date Date
>=41306 <=41333 E4 >=41306 <=41333 E5 >=41306 <=41333
Date Date Class-Code Date Date Class-Code Date Date
>=41334 <=41364 E4 >=41334 <=41364 E5 >=41334 <=41364
Date Date Class-Code Date Date Class-Code Date Date
>=41365 <=41394 E4 >=41365 <=41394 E5 >=41365 <=41394
Date Date Class-Code Date Date Class-Code Date Date
>=41395 <=41425 E4 >=41395 <=41425 E5 >=41395 <=41425
Date Date Class-Code Date Date Class-Code Date Date
>=41426 <=41455 E4 >=41426 <=41455 E5 >=41426 <=41455
Date Date Class-Code Date Date Class-Code Date Date
>=41456 <=41486 E4 >=41456 <=41486 E5 >=41456 <=41486
Date Date Class-Code Date Date Class-Code Date Date
>=41487 <=41152 E4 >=41487 <=41152 E5 >=41487 <=41152
Date Date Class-Code Date Date Class-Code Date Date
>=41518 <=41547 E4 >=41518 <=41547 E5 >=41518 <=41547
Date Date Class-Code Date Date Class-Code Date Date
>=41548 <=41578 E4 >=41548 <=41578 E5 >=41548 <=41578
Date Date Class-Code Date Date Class-Code Date Date
>=41579 <=41608 E4 >=41579 <=41608 E5 >=41579 <=41608
Date Date Class-Code Date Date Class-Code Date Date
>=41609 <=41639 E4 >=41609 <=41639 E5 >=41609 <=41639
Personal Choice Criteria: Other
Class-Code Date Date Class-Code
A6 >=41275 <=41305 A7
Class-Code Date Date Class-Code
A6 >=41306 <=41333 A7
Class-Code Date Date Class-Code
A6 >=41334 <=41364 A7
Class-Code Date Date Class-Code
A6 >=41365 <=41394 A7
Class-Code Date Date Class-Code
A6 >=41395 <=41425 A7
Class-Code Date Date Class-Code
A6 >=41426 <=41455 A7
Class-Code Date Date Class-Code
A6 >=41456 <=41486 A7
Class-Code Date Date Class-Code
A6 >=41487 <=41152 A7
Class-Code Date Date Class-Code
A6 >=41518 <=41547 A7
Class-Code Date Date Class-Code
A6 >=41548 <=41578 A7
Class-Code Date Date Class-Code
A6 >=41579 <=41608 A7
Class-Code Date Date Class-Code
A6 >=41609 <=41639 A7
Ergonomic issue with equipment Criteria: Repetitive Motions Criteria: Awkward positions/static postures
Class-Code Date Date Class-Code Date Date Class-Code
C6 >=41275 <=41305 C7 >=41275 <=41305 C8
Class-Code Date Date Class-Code Date Date Class-Code
C6 >=41306 <=41333 C7 >=41306 <=41333 C8
Class-Code Date Date Class-Code Date Date Class-Code
C6 >=41334 <=41364 C7 >=41334 <=41364 C8
Class-Code Date Date Class-Code Date Date Class-Code
C6 >=41365 <=41394 C7 >=41365 <=41394 C8
Class-Code Date Date Class-Code Date Date Class-Code
C6 >=41395 <=41425 C7 >=41395 <=41425 C8
Class-Code Date Date Class-Code Date Date Class-Code
C6 >=41426 <=41455 C7 >=41426 <=41455 C8
Class-Code Date Date Class-Code Date Date Class-Code
C6 >=41456 <=41486 C7 >=41456 <=41486 C8
Class-Code Date Date Class-Code Date Date Class-Code
C6 >=41487 <=41152 C7 >=41487 <=41152 C8
Class-Code Date Date Class-Code Date Date Class-Code
C6 >=41518 <=41547 C7 >=41518 <=41547 C8
Class-Code Date Date Class-Code Date Date Class-Code
C6 >=41548 <=41578 C7 >=41548 <=41578 C8
Class-Code Date Date Class-Code Date Date Class-Code
C6 >=41579 <=41608 C7 >=41579 <=41608 C8
Class-Code Date Date Class-Code Date Date Class-Code
C6 >=41609 <=41639 C7 >=41609 <=41639 C8
Supervision did not occur
Class-Code
E6
Class-Code
E6
Class-Code
E6
Class-Code
E6
Class-Code
E6
Class-Code
E6
Class-Code
E6
Class-Code
E6
Class-Code
E6
Class-Code
E6
Class-Code
E6
Class-Code
E6
Criteria: Other
Date Date Class-Code
>=41275 <=41305 C9
Date Date Class-Code
>=41306 <=41333 C9
Date Date Class-Code
>=41334 <=41364 C9
Date Date Class-Code
>=41365 <=41394 C9
Date Date Class-Code
>=41395 <=41425 C9
Date Date Class-Code
>=41426 <=41455 C9
Date Date Class-Code
>=41456 <=41486 C9
Date Date Class-Code
>=41487 <=41152 C9
Date Date Class-Code
>=41518 <=41547 C9
Date Date Class-Code
>=41548 <=41578 C9
Date Date Class-Code
>=41579 <=41608 C9
Date Date Class-Code
>=41609 <=41639 C9
CODE CLASSIFICATION ACTIVITY OBSERVED
A Hazard Recognition
1 BLASTING / PAINTING
A1 Training not provided 2 CATERING RELATED ACTIVITIES
A2 Inadequate risk evaluation/ assessment 3 CHEMICAL HANDLING
A3 Inadequate communication on risk 4 CONFINED SPACE
B Human Error 5 DIVING/ UNDERWATER ACTIVITY
B1 Fatique 6 ELECTRICAL
B2 Sickness/ Injury 7 ISOLATION AND LOTO
B3 Substance Abuse 8 LIFTING / RIGGING
B4 Forgetfulness 9 PROJECT ROUTINES
B5 Lack or overconfidence 10 MANUAL HANDLING
C Equipment/ Facility Design 11 OPERATION ROUTINES
C1 Equipment/ Facility not exist 12 PERSONNEL / MATERIAL TRANSPORTATION
C2 Design deficiency 13 RADIOGRAPHY
C3 Installation deficiency 14 WELDING / BURNING
C4 Defective equipment 15 SCAFFOLDING
C5 PPE not available 16 PIGGING ACTIVITY
C6 Ergonomic issue with equipment 17 INSPECTION/ AUDIT
D Performance Presurre 18 GENERAL HOUSEKEEPING
D1 Supervisor induced 19 GRINDING/ CUTTING
D2 self induced 20 OVER THE SIDE/ HEIGHT ELEVATION
D3 task overload-not enough resources 21 CIVIL WORKS
D4 time constraint
D5 failed to ask for help
E System/ Process Issues
E1 Procedure unavailable
E2 procedure not communicate/understood
E3 Procedure difficult to follow
E4 Inadequate Inspection/ maintenance
E5 Communication did not Occur
E6 Supervision did not occur
F Personal Choice
F1 Risk considered acceptable
F2 deliberately disagreed the instruction
LEGEND
abc PERLU DIISI
abc TIDAK PERLU DIISI/DIRUBAH KARENA ADA RUMUSNYA
Interve
IMMEDIATE CORRECTIVE ACTION ntion/
UNSAFE ACT / UNSAFE CONDITION HESS
No Date Location Submitter Name Conf Division Company & ACTION TO PREVENT Encou Type-Code Type - Content Class-Code Class-Content Class-Sub Content Classification Type Code Activity Observed Type Code Root Cause Root Cause- Sub Content Status PMO REMARK
OBSERVED Rules No
RECURRENCE ragem
ent
Observed worker have been mobilizing Apreciate them and asked them for
1 1-Jan-14 OPF Saheb Machfud OK Maintenance SAKA scaffolding material they did manual hendling keeping up YES 3 Safe Act F Procedure Procedure 8 Not in hess rules
properly
Observed jety area near loding arm ada mengusulkan membuat drainase hole
5 1-Jan-14 Jety Saheb Machfud OK Maintenance SAKA genangan air yang berpotensi membuat lantai yang gunanya air mengalir habis YES 2 Unsafe Condition G04 Orderliness Other 8 Not in hess rules
licin dan berkarat
Team kerja PM heater, Tool yang digunakan Apreciate mengunakan alat yang
6 2-Jan-14 LPGF Suyadi OK Maintenance SAKA sesuai dengan jenis pekerjaan kondisi tool tepat YES 4 Safe Condition D Tools Tools 8 Not in hess rules
bagus semua, kerja aman
Pekerja memakai APD lengkap saat bekerja APD wajib di gunakan saat bekerja
9 2-Jan-14 OTF Mizainus OK Contractor Klaras YES 3 Safe Act B P.P.E P.P.E 8 Not in hess rules
Handrill di area swi pump sudah banyak yang segera di lakukan pengecatan agar
18 4-Jan-14 SWI m ishaq OK Operation SAKA berkarat dan membutuhkan pengechatan tidak cepat rusak YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
ulang agar lebih awet
piperack conviyor pupuk petro kimia yang di memberi tahu ke petro kimia agar di
19 4-Jan-14 jalur pipa M Ali Charis OK Contractor Security atas jalur pipa banyak yang berkarat takut perbaiki YES 2 Unsafe Condition G04 Orderliness Other 8 Not in hess rules
patah dan mengenai jalur pipa
Saya menemukan ular di dalam wherehouse Saya laporkan ke supervisior dan ular
20 4-Jan-14 W/h mudzakir OK Contractor APS sewaktu bekerja mengecek barang tersebut saya ambil dan buang keluar YES 2 Unsafe Condition G04 Orderliness Other 8 Not in hess rules
where house
new constrution of lpg rerun inlet piping was Reported to project leader to make
21 4-Jan-14 LPGF OK Production SAKA found inproper it is touching the platform and adjustment before the line will be YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
PSV support connected to the new pump
Ganjar Yudhiarto
Ditemukan air tergenang di area fire heater, Good habbit
22 5-Jan-14 GPF OK Production SAKA membuka saluran air tersebutsupaya air tidak YES 3 Safe Act G04 Orderliness Other 8 Not in hess rules
tergenang
Budi Suwardono
Pengetesan manual call point dilakukan Anauncement di public address di
dengan komunikasi yang baik antara opration lakukan supaya semua orang
23 5-Jan-14 OPF OK Production SAKA dan EHS team mengerti ada test manual call point, YES 3 Safe Act G Orderliness Orderliness 8 Not in hess rules
GOOD job
Budi Suwardono
ETP area operator melakuan house keeping Apreciate
24 5-Jan-14 ETP OK Production SAKA dan skimming di etp area , mencegak minyak YES 3 Safe Act A Reactions of people Reactions of people 8 Not in hess rules
tumpah dari ETP
Budi Suwardono
Manual call point test was done in good Good job Apreciate
coordination between EHS and OPS team
also the CCR make PA announcement prior
25 5-Jan-14 OPF Ganjar Yudhiarto OK Production SAKA to job execution so all contractor and personel YES 3 Safe Act F Procedure Procedure 8 Not in hess rules
working onsite are aware the person of plant
alaram activation
Melihat pipa utility water leaking di area COT Segera memberi informasi ke Opr
A Papa diameter 2 " Supv dan team segera mengisolasi
valve supply dan kemudian di lakukan
26 6-Jan-14 OTF Suyadi OK Maintenance SAKA perbaikan..appreciate to team YES 2 Unsafe Condition e03 Equipment Unsafe condition 8 Not in hess rules
terpal pada shelter fabrikasi rebar sobek dan melakukan perbaikan terpal
27 6-Jan-14 API separator Yusuf iftikar OK Contractor YAMA terbuka akibat angin kencang YES 2 Unsafe Condition e03 Equipment Unsafe condition 8 Not in hess rules
Penarikan kabel power kabel PWTP B dengan menabah jumlah pekerja dan
jumlah pekerja yang terbatas bisa penarikan dilakukan perlahan
30 6-Jan-14 API separator Rizka OK Contractor YAMA mengakibatkan cedera karena beban terlalu YES 2 Unsafe Condition c09 Positions of people Other 8 Not in hess rules
berat
Pos Security 3 kalau hujan deras dan angin mohon untuk segera diperbaiki
31 6-Jan-14 Sukadi OK Contractor Security YES 2 Unsafe Condition g04 Orderliness Other 8 Not in hess rules
Pos 3 air masuk kedalam pos
team kerja fabrikasi spool pipe 2 " untuk repair appreciate
32 6-Jan-14 WS Suyadi OK Maintenance SAKA fresh water line leaking, posisi kerja YES 3 Safe Act c Positions of people Positions of people 8 Not in hess rules
ergonomis
pekerja memakai rubber shoes di dlam lahan tindakan yang sudah baik dengan
35 6-Jan-14 API separator Crystin Ok Contractor YAMA fond API yang tergenang memakai rubber shoes YES 3 Safe Act b P.P.E P.P.E 8 Not in hess rules
Melihat Gulungan kabel listrik yang sudah tak melaporkan ke supv agar di follow up
37 7-Jan-14 LPGF Joni Christiadi OK Production SAKA terpakai di bawah lube oil cooler gtc yang YES 2 Unsafe Condition g03 Orderliness Orderliness, not followed 8 Not in hess rules
baru
menemukan Pressure indicator untuk fuel segera diganti yang baru oleh
38 7-Jan-14 GPF Heru Prastyo OK Production SAKA blanketing supply ke heating medium drain departemen yang berwenang YES 2 Unsafe Condition e03 Equipment Unsafe condition 8 Not in hess rules
vessel sudah rusak
melihat lampu di area sphere tank C sudah Melaporkan kepada pihak terkait
39 7-Jan-14 LPGF Heru Prastyo OK Production SAKA lama tidak menyala untuk segera diganti yang baru oleh YES 2 Unsafe Condition e03 Equipment Unsafe condition 8 Not in hess rules
departemen yang berwenang
Melihat cover pelindung drain lline hose COT Melaporkan kepada pihak terkait
40 7-Jan-14 OTF Heru Prastyo OK Production SAKA C bautnya menonjol hampir lepas dari ulirnya untuk segera ditindak lanjuti YES 2 Unsafe Condition e03 Equipment Unsafe condition 8 Not in hess rules
menemukan kondisi di ETP air buangan dari memberi tahu rekan untuk menyetop
open drain kotor ada layer minyak di inlet pompa open drain jika sudah rendah
receiving levelnya, dan meminta helper untuk
43 7-Jan-14 GPF Sutras OK Production SAKA membersihkan layer minyak di area YES 2 Unsafe Condition a03 Reactions of people Rearranging job 8 Not in hess rules
ETP
pada saat hujan disertai angin .portal di depan melaporkan pada supv, kemudian di
53 8-Jan-14 Pos 1 Imam Budianto OK Contractor Security posko arah masuk OPF roboh dikarenakan foto dan dipasang barikade dan YES 2 Unsafe Condition e04 Equipment Other 8 Not in hess rules
keropos pada bagian bawah kemudian di laporkan ke CCR
Ada seorang pekerja yang tidak memakai stop pekerja karena mereka tidak
61 9-Jan-14 API separator Kharis OK Contractor YAMA sarung tangan saat bekerja memasang kawat membawa sarung tangan YES 1 Unsafe Act B05 P.P.E Hands & arms 8 Not in hess rules
pada water stop
seringkali mendapati pekerja tidak memakai sudah saya laporkan ke EHS tolong
62 9-Jan-14 API separator Syaiful Arif OK Contractor MJE helm waktu naik motor di jalan untuk di perketat dan peringatkan YES 1 Unsafe Act B01 P.P.E Head 8 Not in hess rules
tidak semua pekerja mempunyai pengetahuan saran untuk memberikan training P3k
65 9-Jan-14 OPF K.Nasiin OK Contractor Klaras tentang pertolongan pertama pada saat kepada subcontraktor YES 2 Unsafe Condition F02 Procedure Procedure inadequate 8 Not in hess rules
emergency
atap di workshop bocor besar sehingga lantai mohon untuk segera di perbaiki
68 9-Jan-14 WS maryanta purwanta OK Maintenance SAKA licin YES 2 Unsafe Condition G04 Orderliness Other 8 Not in hess rules
melihat ada sign board di area sphere roboh melapor pada yang berwenang untuk
70 9-Jan-14 LPGF Heru Prastyo OK Production SAKA karena terjangan angin saat hujan turun di follow up YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
found reset push button for SDV liquid inlet ro inform to CCR to create notification to
71 9-Jan-14 LPGF Eddy Sanjaya OK Production SAKA sphere C was not work properly repair it YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
lampu Lorong antara Cabin EHS dan operator mohon untuk segera di perbaiki
72 9-Jan-14 UPF Heru Prastyo OK Production SAKA sudah lama padam YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
81 9-Jan-14 LPGF Agus Bk OK Contractor Klaras pekerja menggunakan APD lengkap Good job YES 3 Safe Act B P.P.E P.P.E 8 Not in hess rules
82 9-Jan-14 LPGF Agus Bk OK Contractor Klaras pekerja melakukan koordinasi dengan baik Good job YES 3 Safe Act F Procedure Procedure 8 Not in hess rules
Windshock diarea slug catcher area sudah saran untuk diganti baru
83 10-Jan-14 Slug Catcher Zan Rahmadi Ok Production SAKA rusak YES 2 Unsafe Condition e03 Equipment Unsafe condition 8 Not in hess rules
melihat pekerja tidak menggunakan helm saat meminta pekerja untuk memakai helm
85 10-Jan-14 API separator Julian Ds OK Contractor YAMA unloading material YES 1 Unsafe Act b01 P.P.E Head 8 Not in hess rules
Found wilden pump at open drain cannt work infirmation to CCR and follow up to
89 10-Jan-14 LPGF Eddy Sanjaya OK Production SAKA optimum. Maintenace and it has done YES 2 Unsafe Condition e03 Equipment Unsafe condition 8 Not in hess rules
completely
adanya plywood di sekitar areal akses jalan meletakan plywood ke tempat yang
102 11-Jan-14 API separator Crystin Ok Contractor YAMA yang beresiko kecelekaan kerja tidak menghalangi akses jalan YES 2 Unsafe Condition g03 Orderliness Orderliness, not followed 8 Not in hess rules
melihat pekerja melakukan pekerjaan pogging stop pekerjaan dan meminta petugas
110 12-Jan-14 Smoking Shelter Andi S Ginting OK Contractor APS di area smoking tanpa menggunakan earplug untuk menggunakan earplug YES 1 Unsafe Act b03 P.P.E Ears 8 Not in hess rules
pada saat masuki toilet admin tercium bau di komunikasikan agar tempat
sangat menyengat ternyata habis di pogging, tersebut di beri tanda setelah di
111 12-Jan-14 Admin Building yayat candrahayat OK Production SAKA tanpa ada pemberitahuan bahwa temapt fogging YES 2 Unsafe Condition g04 Orderliness Other 8 Not in hess rules
tersebut habis di fogging
Stavol Meter buat power dispenser air munim mematikan dan mencabut aliran listrik
112 12-Jan-14 WS Sholahudin OK Contractor APS di WS meakanik tiba2 memercikan api ke alat tersebut YES 2 Unsafe Condition e03 Equipment Unsafe condition 8 Not in hess rules
langit langit di klinik rusak setelah terkena mohon untuk segera di perbaiki
113 12-Jan-14 Clinic dede rukma sonjaya OK EHS SMI terjangan angin 4 hari yang lalu dan exhaust YES 2 Unsafe Condition e03 Equipment Unsafe condition 8 Not in hess rules
di klinik mengeluarkan bunyi bising
melihat crane yang melakukan pengangkutan stop , minta petugas safety untuk
116 13-Jan-14 API separator Joni Christiadi OK Production SAKA di API separator belum di barikade memasang barikade YES 2 Unsafe Condition e03 Equipment Unsafe condition 8 Not in hess rules
128 13-Jan-14 LPGF pugo wicak OK Contractor Klaras persedian air di lapangan mencukupi good job YES 4 Safe Condition g Orderliness Orderliness 8 Not in hess rules
pekerja memakai PPE lengkap pada saat good job
129 13-Jan-14 LPGF chafid OK Contractor Klaras bekerja YES 3 Safe Act b P.P.E P.P.E 8 Not in hess rules
lantai grating sebgai pentutup bar screen di mohon untuk segera di cat ulang
132 14-Jan-14 SWI Rosso Pramono OK Production SAKA SWI sudah berkarat YES 2 Unsafe Condition e03 Equipment Unsafe condition 8 Not in hess rules
Sebelum melakukan confined space entry tool Good job , memastikan pekerja
box meeting dilakukan membahas bahaya mengerti dalam pekerjaan terutama
kerja di ruang terbatas dan cara yang di high risk
159 16-Jan-14 OPF nurwidodo siman OK Production SAKA penangulanganya, EHS opration mecanic YES 3 Safe Act F Procedure Procedure 4 Confined Space Entry
team ikut serta dalam tool box meeting
Mengamati pekerja melakukan isolation pada Good job, memastikan dengan pihak
suatu peralatan akan diadakan confined yang akan bekerja isolation yang telah
space entry, positive isolation di lakukan dan di lakukan
160 16-Jan-14 OPF nurwidodo siman OK Production SAKA di beri tahu kepada pihak yang akan bekerja YES 3 Safe Act E Equipment Equipment 4 Confined Space Entry
Team kerja PM fire monitor, PTW JSA Apreciated prosedur kerja lengkap
162 16-Jan-14 OPF Suyadi OK Maintenance SAKA lengkap, prosedur kerja lengkap YES 4 Safe Condition F Procedure Procedure 8 Not in hess rules
Team lifting memindakan pipa dari area api Good job
sparator ke lay down ringger sudah
mengenakan rompi, sign board di pasang 2
163 16-Jan-14 API separator Heri S OK Contractor YAMA sisi dan tag line di ikat di 2 sisi ujung matrial YES 3 Safe Act F Procedure Procedure 2 Lifting & Hoisting
yang di angkat sebagai kontrol mooving
Melihat pekerja sedang memasang oil kerja bagus supaya bila ada
168 16-Jan-14 LPGF K.Nasiin OK Contractor Klaras contaiment ketika mengisi BBM tumpahan bbm tidak langsung ke YES 3 Safe Act G Orderliness Orderliness 8 Not in hess rules
tanah
Masih terlihat pekerja yang mengerinda tanpa menegur dan menjelaskan bahaya
171 16-Jan-14 COT_B Abdul Aziz OK EHS SAKA mengunakan sarung tangan dari tindakanya tersebut YES 1 Unsafe Act B05 P.P.E Hands & arms 5 Hot Work
Seorang pekerja saat di area pond tidak Menegur untuk segera mengunakan
173 17-Jan-14 Api sparator devani OK Contractor YAMA mengunakan safty glass saat mengangkat APD nya YES 1 Unsafe Act B02 P.P.E Eyes & face 2 Lifting & Hoisting
formwork
Terlihat kabel instrumeniasi di area TIE -IN info ke operator untuk di teruskan ke
179 18-Jan-14 COT_B Abdul Aziz OK EHS SAKA antara COT A dan COT-B pihak terkait sementara sudah di YES 2 Unsafe Condition E03 Equipment Unsafe condition 1 EnergyIsolation
lakukan insolation
Pekerja sudah memakai APD yang lengkap Pastikan APD layak pakai
195 20-Jan-14 LPGF romadhon OK Contractor Klaras ketika bekerja YES 3 Safe Act B P.P.E P.P.E 8 Not in hess rules
196 20-Jan-14 LPGF Chafid OK Contractor Klaras kordinasi antar pekerja sangat baik Pertahankan YES 3 Safe Act G Orderliness Orderliness 8 Not in hess rules
Mengamati pekerja yang menyirami dengan Good job
197 20-Jan-14 LPGF K.Nasiin OK Contractor Klaras air ketika ada aktifitas jack hammer untuk YES 3 Safe Act G Orderliness Orderliness 5 Hot Work
mengurangi debu dari aktifitas tersebut
Telah di temukan pekerjaan pengelasan yang Stop pekerjaan tsb memberi tahu
dikerjakan tidak pada tempatnya selter form kepada pekerja untuk melakukan
work yang di setujui oleh pihak HESS, tetapi pengelasan di tempat khusus form
198 20-Jan-14 Api sparator Wahid Sutrisno OK EHS SAKA dilakukan di selter pekerjaan penyetelan rubar work yang telah disetujui oleh pihak YES 1 Unsafe Act F05 Procedure Procedure not followed 5 Hot Work
hess
telah menetahui pagar area parkir rusak dan mohon segera di tindak lanjuti
199 20-Jan-14 gate 1 Andy Y OK Contractor YAMA dalam keadaan terbuka, berpotensi orang YES 2 Unsafe Condition G04 Orderliness Other 8 Not in hess rules
bisa masuk ke area yelow zone
Melihat seseorang mengangkat air galon Memberi tahu orang tersebut untuk
dengan posisi membungkuk mengangkat sambil jongkok, karena
200 20-Jan-14 SWI Mujito Sroyo OK Production SAKA kalau posisi membungkuk bisa YES 1 Unsafe Act C09 Positions of people Other 8 Not in hess rules
menyebabkan cidera punggung
Terdapat screen pada saluran air , dalam Agar di perbaiki screen saluran yang
201 20-Jan-14 OPF arief nugroho OK SCM SAKA kondisi korosif sebagian besi, screen sudah korosif sebelum terjadi keusakan lebih YES 2 Unsafe Condition E Equipment Equipment 8 Not in hess rules
patah2 karena korosif lanjut
202 21-Jan-14 Pos 3 romadhon OK Contractor Klaras Persediaan ear pluq di post 3 habis Mohon di sediakan YES 2 Unsafe Condition D04 Tools Other 8 Not in hess rules
Melepas PSV di butane line metering area, Good job
PSV diisolasi valve inlet dan outlet di PSV di
kunci dan di depress supaya presurnya zero
203 21-Jan-14 LPGF Agus Riyanta OK Production SAKA sebelum diserahkan kepada maintenance YES 2 Unsafe Condition E Equipment Equipment 1 EnergyIsolation
205 21-Jan-14 LPGF romadhon OK Contractor Klaras Kerjasama antar pekerja sudah bagus Pertahankan YES 3 Safe Act G Orderliness Orderliness 8 Not in hess rules
Mengamati pekerja yang mengunakan jack Good job
206 21-Jan-14 LPGF romadhon OK Contractor Klaras hammer dengan posisi yang benar dan YES 3 Safe Act B P.P.E P.P.E 5 Hot Work
mengunakan APD yang lengkap
Menemukan kabel soket dan penutup socet Meminta pada contarktor tersebut
210 22-Jan-14 COT_C umar OK EHS SAKA terlepas untuk memasang penutup socet yang YES 2 Unsafe Condition E03 Equipment Unsafe condition 1 EnergyIsolation
terlepas
Terlihat sepatu safty contraktor MJE sudah Info ke SPV contraktor agar segera
211 22-Jan-14 GPF Abdul Aziz OK EHS SAKA berlubang pada tumitnya menganti safty shoesnya YES 2 Unsafe Condition B07 P.P.E Feet & legs 8 Not in hess rules
house crane manual di swi di swi rantainya Langsung di ikat pada handrill supaya
tidak di ikat di kawatirkan terkena angin lebih aman dan tidak terkena pompa
212 22-Jan-14 SWI Agus budiono OK Production SAKA kencang dan terkena pompa yang sedang YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
runing
Didapatkan lantai dari wickbold garage terjadi Hold sementara pekerjaan di area
subsidance dan jika diinjak potentially akan tersebut, segera info ke departeman
ambles, kondisi ini sangat berbahaya jika saat terkait untuk chek kondisi dan
analisa tiba2 lantai diinjak dan ambles , dan perbaikan
equipment drop/damage sementara yang
224 23-Jan-14 Laboratory OK Engineering SAKA dianalisa adalah LPG dengan beberapa YES 2 Unsafe Condition G04 Orderliness Other 8 Not in hess rules
dangerous gas ( H2, O2, N2 )
Mohammad Effendi
AC di ruang ganti operator berbunyi dan Lapor ke SPV agar di perbaiki
225 23-Jan-14 OPF Agus budiono OK Production SAKA terdapat tetesan air ke dalamruangan, perlu YES 2 Unsafe Condition D03 Tools In unsafe condition 8 Not in hess rules
perbaikan
Toilet area Lampu toilet deket quarantine area banyak Mohon di perbaiki
226 23-Jan-14 K.Nasiin OK Contractor Klaras yang putus YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
Quarantine
Melihat pekerja bekerja di ketinggian di area Apresiasi
fire water tank pada pekerjaan scafolding
227 23-Jan-14 GPF Sony Ade W OK Contractor SMI telah mengunakan body harness dengan YES 3 Safe Act B P.P.E P.P.E 3 Working at Heights
benar dan APD lengkap
Pig removal at PIG reciver PJB, Good Apreciate for all party
231 23-Jan-14 PJB Budi Suwardono OK Production SAKA coordination mechanic, oprationfor troble YES 3 Safe Act G Orderliness Orderliness 8 Not in hess rules
shoot
Pigging activity sales gas coordination field, Apreciate for all party for good and
232 23-Jan-14 GPF Budi Suwardono OK Production SAKA CCR,OFFshore,PJB metering profesional habbit job YES 3 Safe Act G Orderliness Orderliness 8 Not in hess rules
Pembuangan tanah bekas galian di beri terpal Good job supaya mudah untuk
237 24-Jan-14 LPGF romadhon OK Contractor Klaras supaya tidak bercampur dengan gravel, pengambilanya YES 3 Safe Act G Orderliness Orderliness 6 Excavation & Trenching
Pekerja sudah memakai APD lengkap saat Apreciate
238 24-Jan-14 LPGF romadhon OK Contractor Klaras bekerja YES 3 Safe Act B P.P.E P.P.E 6 Excavation & Trenching
Pantauan depan OPF selokan banyak ikan Mohon di cek siapa tau ada limbah
242 26-Jan-14 OPF mashudin OK Contractor Security mati dan bau tidak sedap yang mencemari YES 2 Unsafe Condition G04 Orderliness Other 8 Not in hess rules
Selang compresor terlepas pada saat di Stop dan meminta untuk memperbaiki
243 26-Jan-14 Api sparator Wahid Sutrisno OK EHS SAKA gunakan dan wiplock tidak berfungsi serta ikut selang tersebut YES 2 Unsafe Condition E03 Equipment Unsafe condition 5 Hot Work
terlepas karena salah pemasangan
Kondisi panel fire pump berfungsi dengan baik Follow up weekly fire pump test
246 26-Jan-14 Gpf Abdul Aziz OK EHS SAKA YES 4 Safe Condition E Equipment Equipment 1 EnergyIsolation
PM pompa close drain B yang dilakukan oleh Apresiasi kepada team mekanik
team mekanik telah selesai dengan aman,
248 27-Jan-14 Close drain Sunar OK Production SAKA confined space prosedur sudah dilakukan YES 3 Safe Act F Procedure Procedure 4 Confined Space Entry
dengan benar
PM sump pit pump di heating medium drain Apresiasi kepada team mekanik
250 27-Jan-14 Drain vessel Sunar OK Production SAKA vessel dilakukan sesuai prosedur oleh YES 3 Safe Act F Procedure Procedure 5 Hot Work
mekanik
Melihat sebuah mesin idle hanya di support Menyampaikan pada safety officer
dengan balok kayu relatif kecil yang dari kontraktor untuk di follow up
253 27-Jan-14 Api sparator suharyo haryono OK Production SAKA diberdirikan sementara mesin terletak di dekat dengan diberi support yang lebih YES 2 Unsafe Condition E03 Equipment Unsafe condition 5 Hot Work
akses lalu lalang orang stabil
Menemukan korek dan rokok dalam truk yang Menyuruh menitipkan rokok dan korek
255 27-Jan-14 Gate 4 m syafii OK Contractor Security mau ke red zone di post scurity YES 2 Unsafe Condition F04 Procedure Procedure not understood 7 Land Transportation
Pada proses T-in line crud oil tanki A.B.C Good job
263 27-Jan-14 Api sparator Andy Y OK Contractor YAMA lancar dan tidak terjadi insident dan acident YES 3 Safe Act G Orderliness Orderliness 8 Not in hess rules
Melihat seorang karyawan yang memberi ear Apreciate pada karyawan tersebut
plug kepada kontraktor yang tidak membawa
266 28-Jan-14 OTF Mujito Sroyo OK Production SAKA dan memakai ear plug pada waktu bekerja di YES 3 Safe Act B P.P.E P.P.E 8 Not in hess rules
area bising
Pengantian fire hidrant nozle oleh team Good coordination dengan area
269 28-Jan-14 Metering Abdul Aziz OK EHS SAKA mekanik PPE proper Prosedur proper operator YES 3 Safe Act F Procedure Procedure 8 Not in hess rules
Mengamati pekerja mekanik mengecek alat Lakukan dan pastikan bahwa alat
270 28-Jan-14 GTC Afandi OK Contractor Klaras sebelum di gunakan aman untuk di gunakan YES 3 Safe Act D Tools Tools 8 Not in hess rules
Mengamati pekerja pengecoran di area api Good job, apresiasi untuk SPV dan
sparator didelesaikan dengan aman safety yang selalu mengingatkan
komunikasi yang baik antara saka safety dan pekerjaanya
273 28-Jan-14 Api Sparator Haidar OK Engineering SAKA supervisior dan saling mengingatkan tentang YES 3 Safe Act G Orderliness Orderliness 8 Not in hess rules
safety
Mengamati salah satu valve regulator fire Menyampaikan kepada shift SPV
water rig 451-SPU-009 dengancar seal supaya di follow up dengan
274 29-Jan-14 OTF suharyo haryono OK Production SAKA terlepas, bisa membahayakan saat terjadi pemasangan car seal baru YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
kebakaran jika valve dalam kondisi tertutup
Ditemukan 12ea kabel electric dari jugtion box Info ke CCR untuk di buatkan
436-JBPE-19 area reagent gas compresor notifikasi dan scaffolding untuk
LPGF keluar dari tray nya,Berpotensi kabel merapikanya
275 29-Jan-14 LPGF Sunar OK Production SAKA melorot kebawah dan menggangu akses jalan YES 2 Unsafe Condition E03 Equipment Unsafe condition 3 Working at Heights
Menemukan koneksi tubing untuk 135-LT-127 Melaporkan ke CCRO kondisi
caustic soda level transmiter bocor dan tersebut dan meminta instrument
276 29-Jan-14 GPF Sutras OK Production SAKA chemicalnya merembes potensi pencemaran personel untuk memperbaiki YES 2 Unsafe Condition E Equipment Equipment 8 Not in hess rules
lingkungan
Melihat pekerja melakukan pembersihan Terus lakukan agar area kerja aman
288 30-Jan-14 LPGF Hariri OK Contractor Klaras lokasi dan perapian alat dengan dan rapi YES 3 Safe Act G Orderliness Orderliness 8 Not in hess rules
menempatkan pada tempatnya
Pekerja sudah memakai APD yang lengkap Pastikan semua pekerja memakai
289 30-Jan-14 GTC Afandi OK Contractor Klaras APD YES 3 Safe Act B P.P.E P.P.E 8 Not in hess rules
290 30-Jan-14 GTC Afandi OK Contractor Klaras Koordinasi sebelum bekarja Pertahankan yang sudah bagus YES 3 Safe Act G Orderliness Orderliness 8 Not in hess rules
Mengamati pekerja yang kooperatif bsa jadi tetap smangat dan support untuk
291 30-Jan-14 GTC Afandi OK Contractor Klaras conto teman kerjanya pekerja YES 3 Safe Act G Orderliness Orderliness 8 Not in hess rules
Mengamati pipa bocor pada joint coneksinya Memberikan box atau kotak berisi
di area LPGF GTC tumpahan tersebut ke pasir agar tumpahan chemical
292 30-Jan-14 GTC Robby Firly OK EHS SAKA tanah tersebut tidak melebar , dan info YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
kepada operator
Mengamati seorang kontraktor pada coverall Menginfo pada EHS kontraktor agar
293 30-Jan-14 LPGF Robby Firly OK EHS SAKA lututnya sobek segera di follow up YES 2 Unsafe Condition B07 P.P.E Feet & legs 8 Not in hess rules
Di saat waktu sholat banyak yang lalu lalangdi Kondisi memaksa untuk demikian
projec mushola yang mana pada saat mau karena belum ada pilihan tempat,
294 30-Jan-14 OPF Sugito OK Maintenance SAKA wudlu tidak mengunakan alas kaki dan menghimbau untuk lebih waspada YES 2 Unsafe Condition G04 Orderliness Other 8 Not in hess rules
berpontensi luka kaki terhadap potensi luka kai
Fire monitor di area GPF berfungsi normal Continue weekly test and good action
302 2-Feb-14 Fire pump Abdul Aziz OK EHS SAKA YES 4 Safe Condition E Equipment Equipment 8 Not in hess rules
Melihat cover lampu jalan posisi terbuka di Mohon agar segera di tutup supaya
305 3-Feb-14 Red zone OK Contractor APS area belakang warehouse dan kabel trafo tidak terjadi korsleting YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
sikring terbuka tanpa cover penutup
Ludful Hakim
Wastafel toilet depan CCR rusak Mohon dibenahi karena banyak yang
306 3-Feb-14 Toilet K.Nasiin OK Contractor Klaras memerlukan YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
Memastikan pekerja memakai PPE yang APD wajib di gunakan saat bekerja
309 3-Feb-14 GTC K.Nasiin OK Contractor Klaras lengkap sebelum memulai pekerjaan YES 3 Safe Act B P.P.E P.P.E 8 Not in hess rules
Seorang pekerja sedang instal rebar pada Menegur pekerja bahwa kondisi
dinding pingir dengan posisi berdiri di pipa tersebut tidak aman dan memberi
braching ,sehinga potensi tergelincir ataupun masukanuntuk pekerja install rebar
311 4-Feb-14 Api sparator Abraham T Ok Contractor YAMA terpeleset sangat besar dapat dilakukan dari sisi luar yang YES 1 Unsafe Act C09 Positions of people Other 8 Not in hess rules
memiliki alas pijak yang lebih aman
Memnemukan tubing 1/4" untuk water trap Melaporkan pada shift SPV CCRO
drain di air instrument compresor unit B tentang kondisi tersebut meminta
kondisinya patah potensi udara compresi agar ada notifikasi untuk permintaan
313 4-Feb-14 GPF Sutras OK Production SAKA release tidak terkontrol menyebabkan kerja air perbaikan oleh maintenance team,, YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
kompresor tidak optimal sudah di eksekusi oleh maintenance
team night dan group C
Melihat SPV memberikan pengarahan Pastikan pekerja paham apa yang dia
320 4-Feb-14 GTC Nur sahid OK Contractor Klaras pekerjaan kepada pekerjanya lakukan YES 3 Safe Act G Orderliness Orderliness 8 Not in hess rules
Menemukan pekerja kontraktor saat bekerja selamat bekerja dan selalu menjaga
tidak mengunakan sarung tangan, setelah keselamatan
diingatka agar memakai APD dengan lengkap
322 4-Feb-14 OPF Rosso Pramono OK Production SAKA saat bekerja baru mereka mamakainya, YES 1 Unsafe Act B05 P.P.E Hands & arms 8 Not in hess rules
Melihat rekan bekerja yang melakukan house Apresiasi tindakan tersebut Good job,
325 4-Feb-14 GPF Sutras OK Production SAKA keeping di area EDG shelter area , menyapu good action, house keeping yang YES 3 Safe Act F Procedure Procedure 8 Not in hess rules
debu di sekitaran area bagus
memngkomunikasikan pentingnya H2
Melihat personil di LPGF tidak memakai H2S
S detector dan dipakai di luar baju
personal detektor dan ternyata setelah di
327 5-Feb-14 LPGF Deden Setyawan OK Maintenance SAKA supaya bekerja dengan baik YES 1 Unsafe Act E03 Equipment Unsafe condition 8 Not in hess rules
konfirmasi ,personil tersebut menyimpannya
di saku celana
Maintanace team review untuk lifting plan Good job
motor instrument Air compressor GPF A, hasil
328 5-Feb-14 GPF maryanta purwanta OK Maintenance SAKA review kemudian di komunikasikan ke seluruh YES 3 Safe Act f Procedure Procedure 8 Not in hess rules
team
333 5-Feb-14 LPGF Nursahid OK Contractor Klaras koordinasi antar pekerja bagus keep itu up YES 3 Safe Act f Procedure Procedure 8 Not in hess rules
Mengamati pekerja yang bekerja mengunakan Apreciate
334 5-Feb-14 LPGF Nursahid OK Contractor Klaras PPE lengkap YES 3 Safe Act b P.P.E P.P.E 8 Not in hess rules
337 5-Feb-14 GPF Abdul Aziz OK EHS SAKA semua hose connector terpasang safety pin good job YES 4 Safe Condition e Equipment Equipment 8 Not in hess rules
teknisi melakukan PM di pompa holding pond apresiasi
338 5-Feb-14 LPGF Sunar OK Production SAKA dengan aman setelah sebelumnya di isolasi YES 3 Safe Act f Procedure Procedure 8 Not in hess rules
sewaktu tim elektrik akan melepas motor GPF menghubungi leader scafolding untuk
instrument air compresor berat 1 ton bracing menambah bracing, setelah di
347 7-Feb-14 GPF maryanta purwanta OK Maintenance SAKA untuk scafolding masih kurang kuat. pasang bracing , motor di lepas dan YES 2 Unsafe Condition E03 Equipment Unsafe condition 8 Not in hess rules
diangkat selesai dengan aman
melihat masih banyak besi yang nongol di saya ptong dengan menggunakan
349 7-Feb-14 LPGF Nursahid OK Contractor Klaras sisa bongkahan beton gunting besi supaya tidak mencederai YES 2 Unsafe Condition g03 Orderliness Orderliness, not followed 8 Not in hess rules
personil
Menemukan engsel pintu shelter lepas satu mohon untuk diperbaiki, jika pintu
sehingga tidak akan bisa menahan beban terlepas dan mengenai pile chemical
366 10-Feb-14 Chemical Shelter Mudzakir OK Contractor APS pintu maka resiko tumpah dan sangat YES 2 Unsafe Condition e03 Equipment Unsafe condition 8 Not in hess rules
berbahaya
CD/CR
1 Hartono 0
2 Arijatno 0
3 Subali 0
4 Endro Probo 0
5 Lailatul Fitriyah 0
0
MARINE
1 Tresna Putra 0
2 Yhon Novery 0
3 Angga Sugita 0
4 Zaenuri Inung 0
SCM
1 Istondo Prayudi 0
2 Abdul Wahib 0
3 Yohanes Sudiro 0
4 Irfan Agusto 0
5 Sofyan 0
6 Mirza Riandyani 0
7 0
8 0
HR/IS/FINANCE
1 Wignyo Suwanda 0
2 Ronal Monanda 0
3 Banu Widodo 0
4 Setiawan 0
5 Vivi Rachmani 0
CONTRACTOR
1 Sholehudin 0
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
10 0
11 0
0
0 0 0 0 0 0 0
0
0 0
0 0
0 0
4 4 4
4 4 4
0 0
0
0 0
2 2 2
2 2 2
4 4 4
0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0
0 0
2 2 2
0 0
0 0
1 1 1
1
1 1 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0 346 23 0
No. Name TITLE Name Conf Division Company Actual Target Percentage
1 Abdul Aziz Med OK EHS SAKA 45 2 2250% 45
2 Abdul Wahib Analyst OK SCM SAKA 0 2 0% 0 STOP Card EHS 2011
3 Achmad Komarudin Elect. Tech OK Maintenance SAKA 0 2 0% 0
4 Adhi Kurniawan Eng. Team Lead OK Engineering SAKA 0 2 0% 0
5 Agoeng Wachjoedi Civil Eng OK Engineering SAKA 0 2 0% 0
6 Agung Chandra Sr. Instr. Tech OK Maintenance SAKA 0 2 0% 0
7 Agus Budiono Operator OK Production SAKA 2 2 100% 2
8 Agus Riyanta Operator OK Production SAKA 10 2 500% 10
9 Agus Suparman Technician OK EHS SAKA 2 2 100% 2 STOP Card Manager 2011
10 Agus Supriatna Opr. CR OK Production SAKA 0 2 0% 0
11 Agus Santoso HR OK HR/IS/Finance SAKA 0 2 0%
12 Alexandru Ciutina Operation Specialist OK Production SAKA 0 2 0% 0
13 Andika Khostarosa Eng Coord OK Engineering SAKA 0 2 0% 0
14 Angga Sugita Jetty Operator OK Marine SAKA 0 2 0% 0
15 Anvi Febrianti Syafei Facilities Eng OK Engineering SAKA 0 2 0% 0
16 Apriadi Hajar Sr. Facilities Eng OK Engineering SAKA 0 2 0% 0
0 2 4 6 8 10 12
17 Arijatno Officer Com. Dev. OK CD/CR SAKA 0 2 0% 0
18 Asep Abdurahman Lab. Tech OK Engineering SAKA 0 2 0% 0
19 Ayip Ismi Sr. Oprt OK Production SAKA 1 2 50% 1
20 Bagus Candra d Operator OK Production SAKA 0 2 0% 0
21 Bambang Mulyo Hadi Sr. Oprt OK Production SAKA 0 2 0% 0
22 Bambang Santoso Mech. Tech OK Maintenance SAKA 1 2 50% 1
23 Banu Widodo Analyst IT Service Delivery OK HR/IS/Finance SAKA 0 2 0% 0
24 Bowo Astoto Supv. Electrical OK Maintenance SAKA 0 2 0% 0 0 2 4 6 8 10 12
25 Budi Suwardono Supv OK Production SAKA 8 2 400% 8
26 Chrisheriyanto TB Operator OK Production SAKA 1 2 50% 1
27 David Hindle Operation Specialist OK Production SAKA 0 2 0% 0 STOP Card Opration
28 Dede Rukma Sonjaya Med OK EHS SMI 1 2 50% 1
29 Deden Setyawan Instr. Tech OK Maintenance SAKA 9 2 450% 9
30 Dina Marcella Budget & SAP Coord OK Engineering SAKA 0 2 0% 0
31 Dini Ertanto Mech. Tech OK Maintenance SAKA 0 2 0% 0
32 Djoko Agus Operator OK Production SAKA 0 2 0% 0
33 Dominikus Heru Sr. Oprt OK Production SAKA 0 2 0% 0
34 Doyo Suwono Sr. Instr. Tech OK Maintenance SAKA 0 2 0% 0
35 Dwi Dartanto Sr. Oprt OK Operation SAKA 0 2 0% 0
36 Dwi Paramita Onshore Facilities Manager OK Maintenance SAKA 0 2 0% 0
37 Dyah Ariesta Admin. Assistant OK Production SAKA 0 2 0% 0
38 Eddy Sanjaya Operator OK Production SAKA 8 2 400% 8
39 Edwarsyah Training Coord OK Engineering SAKA 0 2 0% 0
40 Edwan Gunawan Operator OK Production SAKA 0 2 0% 0
41 Edwin Huda Operator OK Production SAKA 0 2 0% 0
42 Eka Mukthi Fitriansyah Elect. Tech OK Maintenance SAKA 0 2 0% 0
43 Eko Agus Setiawan Sr. Elect. Tech OK Maintenance SAKA 0 2 0% 0
44 Endarwanto Operator OK Production SAKA 0 2 0% 0
45 Endro Probo Ext. Relation OK CD/CR SAKA 0 2 0% 0
46 Errik Yusnadi Saleh Specilaist OK EHS SAKA 0 2 0% 0
47 Estu Subagyo Sr. Facilities Eng OK Engineering SAKA 0 2 0% 0
48 whid Sr. Facilities Eng OK Engineering SAKA 0 2 0% 0
49 Fajri Julisyah Sr. Oprt OK Production SAKA 0 2 0% 0
50 Farid Budianto Med OK EHS SAKA 9 2 450% 9
51 Faried Iskandar Dozyn Metering Coord OK Engineering SAKA 0 2 0% 0
52 Fathurrahman Bajuri Opr. CR OK Production SAKA 0 2 0% 0
53 Fitria Receptionist OK Production SAKA 0 2 0% 0
54 Ganjar Yudhiarto Production Superintendent OK Production SAKA 2 2 100% 2
55 Hannan Fatoni Sr. Coord. DCS Ok Engineering SAKA 0 2 0% 0
56 Hartono Officer Com. Dev. OK CD/CR SAKA 0 2 0% 0
57 Henry Rimbun Narotop Technician OK EHS SAKA 0 2 0% 0
58 Heru Dwi Mulyono Operator OK Operation SAKA 0 2 0% 0
59 I Putu Ariseputra Facilities Eng OK Engineering SAKA 0 2 0% 0
60 Indra Gunawan 2 2 100% 2
0 2 4 6 8 10 12
Operator OK Production SAKA
61 Indra Kirana Operator OK Production SAKA 0 2 0% 0
62 Irfan Agusto Associate Supply OK SCM SAKA 1 2 50% 1
63 Irwan Afria Instr. Tech OK Maintenance SAKA 0 2 0% 0 STOP Card Maintenance
64 Istondo Prayudi Team Lead OK SAKA 0 2 0% 0
65 Joni Christiadi Operator OK Production SAKA 12 2 600% 12
66 Karlan Suratmin MP Coord. OK Maintenance SAKA 0 2 0% 0
67 Ketut Sugiantara Sr. Mech. Tech OK Maintenance SAKA 0 2 0% 0
68 Krista Libra Supv OK Production SAKA 0 2 0% 0
69 Kusmarianto Sr. Oprt OK Production SAKA 0 2 0% 0
70 Lailatul Fitriyah Admin. Assistant OK CD/CR SAKA 0 2 0% 0
71 Lalu Aman Opr. CCRO OK Production SAKA 1 2 50% 1
72 Lusia Pratiwi Tech. Assistant OK Production SAKA 0 2 0% 0
73 M Iwan Metering Tech OK Engineering SAKA 0 2 0% 0
74 Maryanta Purwanta Sr. Elect. Tech OK Maintenance SAKA 6 2 300% 6
75 Mirza Riandyani Admin OK SCM SAKA 0 2 0% 0
76 Mohammad Andrijanto Alwi Supt OK Maintenance SAKA 0 2 0% 0
77 Mohammad Effendi Lab. Supv OK Engineering SAKA 1 2 50% 1
78 Mohammad Rasyid Opr. CR OK Production SAKA 0 2 0% 0
79 Mohammad Rozi Sr. Oprt OK Production SAKA 2 2 100% 2
80 Mudasir Ibrahim Sr. Oprt OK Production SAKA 0 2 0% 0
81 Muhammad Pasaribu Production Supervisor OK Production SAKA 0 2 0% 0
82 Mujito Sroyo Operator OK Production SAKA 3 2 150% 3
83 Nessia Irwanti Document Control OK Engineering SAKA 0 2 0% 0
84 Ngadirin Prawiro Operator OK Production SAKA 0 2 0% 0
85 Novy Cahyanti Admin. Assistant OK Engineering SAKA 0 2 0% 0
86 Nunik Triana Admin. Assistant OK Maintenance SAKA 0 2 0% 0
87 Nurwidodo Siman Operator OK Production SAKA 6 2 300% 6
88 Octavianus Hutapea Production Supervisor OK Production SAKA 0 2 0% 0
89 Oky Arie Prasetyo Sr. Oprt OK Production SAKA 0 2 0% 0
90 Pramudi Wibowo Instr. Supv OK Maintenance SAKA 0 2 0% 0
91 Ricky Riswandri Onshore Production Manager OK Production SAKA 0 2 0% 0
92 Rino Ferdiansyah Lab. Tech OK Engineering SAKA 0 2 0% 0
93 Rizal Eng OK Engineering SAKA 0 2 0% 0
94 Ronal Monanda Facility Officer OK HR/IS/Finance SAKA 0 2 0% 0
95 Rosso Pramono Operator OK Production SAKA 2 2 100% 2
96 Rusli Ayatullah Opr. CR OK Production SAKA 0 2 0% 0 0 2 4 6 8 10 12
97 Saheb Machfud Supv OK Maintenance SAKA 2 2 100% 2
98 Satrio Marhendrawan Supv OK EHS SAKA 0 2 0% 0
99 Setiawan Accounting OK HR/IS/Finance SAKA 0 2 0% 0
100 Sintia Pritasari Environmentalist OK EHS SAKA 0 2 0% 0 STOP Card Engineering
101 Sofyan HA Store man OK SCM SAKA 0 2 0% 0
102 Subali Ext. Relation OK CD/CR SAKA 0 2 0% 0
103 Sugito MP Coord. OK Maintenance SAKA 2 2 100% 2
104 Suharto Mech. Tech OK Maintenance SAKA 0 2 0% 0
105 Suharyo Haryono Plant Manager OK Production SAKA 4 2 200% 4
106 Sulistyo Handoko Sr. Facilities Eng OK Engineering SAKA 0 2 0% 0
107 Sunar Operator OK Production SAKA 6 2 300% 6
108 Supriyanto Sr. Oprt OK Production SAKA 0 2 0% 0
109 Sutaman Sr. Oprt OK Production SAKA 1 2 50% 1
110 Sutras Operator OK Production SAKA 7 2 350% 7
111 Suwito Bin Sumino Operator OK Production SAKA 2 2 100% 2
112 Suyadi Sr. Mech. Tech OK Maintenance SAKA 9 2 450% 9
113 Suyanto Parno Mech. Tech OK Maintenance SAKA 4 2 200% 4
114 Taufiq Septiaraya Lab. Tech OK Engineering SAKA 0 2 0% 0
115 Tedy Apriadi Ass. Lab. Supv OK Engineering SAKA 0 2 0% 0
116 Teguh Nugroho Mech. Tech OK Maintenance SAKA 0 2 0% 0
117 Teuku Faisal Opr. CCRO OK Production SAKA 2 2 100% 2
118 Tresna Putra Coordinator OK Marine SAKA 0 2 0% 0
119 Triwibowo Eng. Team Lead OK Engineering SAKA 0 2 0% 0
120 Umar Technician OK EHS SAKA 1 2 50% 1
121 Vivi Rachmani Data Technician OK HR/IS/Finance SAKA 0 2 0% 0
122 Wawan Ridwan Surahman Sr. Oprt OK Production SAKA 0 2 0% 0
123 Wignyo Suwanda Senior HR Analyst OK HR/IS/Finance SAKA 0 2 0% 0
124 Wisnu Baroto Ops. Eng OK Engineering SAKA 0 2 0% 0
125 Yayat Candrahayat Production Superintendent OK Production SAKA 3 2 150% 3 0 2 4 6 8 10 12
126 Yhon Novery Ass. Coord OK Marine SAKA 0 2 0% 0
127 Yohanes Sudiro Analyst OK SCM SAKA 0 2 0% 0
128 Yusnaini Operator OK Production SAKA 0 2 0% 0
129 Yusuf Darmawan Instr. Tech OK Maintenance SAKA 0 2 0% 0
130 Zaenal Abidin Production Spv / Buget team Ok Production SAKA 0 2 0% 0
131 Zainuri Inung Jetty Operator OK Marine SAKA 0 2 0% 0
132 Zan Rahmadi Opr. CR Ok Production SAKA 1 2 50% 1
133 M Edhfin Anas Security OK Contractor Security 0 2 0% 0
134 M Syafii Security OK Contractor Security 4 2 200% 4
135 Taufik Hidayat Security OK Contractor Security 0 2 0% 0
136 Mushonif Security OK Contractor Security 0 2 0% 0
137 Kholil Security OK Contractor Security 0 2 0% 0
138 A.Nizam Security OK Contractor Security 0 2 0% 0
139 M Assasudin Security OK Contractor Security 0 2 0% 0
140 Darko Security OK Contractor Security 0 2 0% 0
141 M.Nasyrudin Security OK Contractor Security 0 2 0% 0
142 Imam Budianto Security OK Contractor Security 1 2 50% 1
143 Supardiyanto MJE OK Contractor MJE 0 2 0% 0
144 Sholahudin General Support OK Contractor APS 1 2 50% 1
145 Inge VIP OK VIP SAKA 0 2 0% 0
146 Alvin Sitorus SCM OK SCM SAKA 0 2 0% 0
147 Fery Sarjana SCM OK SCM SAKA 0 2 0% 0
148 Amri Yahya SCM OK SCM SAKA 0 2 0% 0
149 Visitor PE (Expat) 7/12/2011 Visitor OK Visitor SAKA 0 2 0% 0
150 Lamar David Visitor OK Visitor SAKA 0 2 0% 0
151 Glenn Wilson Visitor OK Visitor SAKA 0 2 0% 0
152 Nailil Ula Safety Officer OK Contractor Klaras 0 2 0% 0
153 Ridlwan Store man OK SCM SAKA 0 2 0% 0
154 Zainul Arifin Security OK Contractor Security 0 2 0% 0
155 M Ali Charis Security OK Contractor Security 2 2 100% 2
156 Soni Yudha Slikbar OK Contractor SLIKBAR 0 2 0% 0
157 Kiki Slikbar OK Contractor SLIKBAR 0 2 0% 0
158 Sukadi Security OK Contractor Security 1 2 50% 1
159 Affani Security OK Contractor Security 0 2 0% 0
160 Angga Slikbar OK Contractor SLIKBAR 0 2 0% 0
161 Embleton EHS Asia OK EHS SAKA 0 2 0% 0
162 Jane Honey Facilities Eng OK Engineering SAKA 0 2 0% 0
163 Setiawan B.S Senior HR Analyst OK HR/IS/Finance SAKA 0 2 0% 0
164 Suandi Security OK Contractor Security 0 2 0% 0
165 Suhadi Instrument OK Maintenance APS 0 2 0% 0
166 Abdullah Security OK Contractor Security 0 2 0% 0
167 M.Nasir Security OK Contractor Security 0 2 0% 0
168 Yusuf Renaldi Security OK Contractor Security 0 2 0% 0
169 Ali Fikri Driver OK Contractor Pratama 0 2 0% 0
170 Mashudin Security OK Contractor Security 1 2 50% 1
171 Rokhmad Security OK Contractor Security 0 2 0% 0
172 Saeful Arif Mech. Tech OK Contractor Security 0 2 0% 0
173 M Ishaq Operator OK Operation SAKA 1 2 50% 1
174 Achmad Misbah Gnerela service / OB CCR OK Contractor APS 0 2 0% 0
175 Gatot Iswadi Instrument TTE OK Contractor APS 0 2 0% 0
176 Mudzakir TTE OK Contractor APS 2 2 100% 2
177 Ameria Engineer OK Engineering SAKA 0 2 0% 0
178 M.Razi Engineer OK Engineering SAKA 0 2 0% 0
179 Aditya Putra Operator OK Production SAKA 0 2 0% 0
180 Saiful Arif Mechanic OK Maintenance APS 0 2 0% 0
181 Arief Budiman Instrument OK Contractor APS 0 2 0% 0
182 Goes Rahmat Security OK Contractor Security 0 2 0% 0
183 Apri Hidayat Security Admin OK Security Admin Security 0 2 0% 0
184 Nor Adha VIP OK Production SAKA 0 2 0% 0
185 Mulyanto Gearindo OK Contractor GEARINDO 0 2 0% 0
186 A.Riyadi Gearindo OK Contractor GEARINDO 0 2 0% 0
187 M Ihsanudin Gearindo OK Contractor GEARINDO 0 2 0% 0
188 Ali Nurdin Gearindo OK Contractor GEARINDO 0 2 0% 0
189 Ahmad Riyadi Gearindo OK Contractor GEARINDO 0 2 0% 0
190 M.Ihsan Gearindo OK Contractor GEARINDO 0 2 0% 0
191 M Imam T Gearindo OK Contractor GEARINDO 0 2 0% 0
192 Khasanudin Gearindo OK Contractor GEARINDO 0 2 0% 0
193 Agus Murdiono Gearindo OK Contractor GEARINDO 0 2 0% 0
194 Abdi Fahmi Operator OK Production SAKA 2 2 100% 2
195 Wahid Sutrisno EHS OK EHS SAKA 3 2 150% 3
196 Gigin Ridza SCM OK SCM SAKA 0 2 0% 0
197 Syaiful A Gearindo OK Contractor GEARINDO 0 2 0% 0
198 Ulul Azmi Gearindo OK Contractor GEARINDO 0 2 0% 0
199 Michael Reck VIP OK VIP SAKA 0 2 0% 0
200 Robby Gearindo OK Contractor GEARINDO 0 2 0% 0
201 Hervianto Gearindo OK Contractor GEARINDO 0 2 0% 0
202 Ruddy Evans VIP OK VIP SAKA 0 2 0% 0
203 Collin Leghton VIP OK VIP SAKA 0 2 0% 0
204 Leonardus Gearindo OK Contractor GEARINDO 0 2 0% 0
205 David Edwards Gearindo OK Contractor GEARINDO 0 2 0% 0
206 Karel david Gearindo OK Contractor GEARINDO 0 2 0% 0
207 Fajar H Gearindo OK Contractor GEARINDO 0 2 0% 0
208 Taram Satiraksa HESS OK EHS-KL SAKA 0 2 0% 0
209 Haris Dwi Prasetyo HESS OK EHS SAKA 2 2 100% 2
210 Iskurniadi PMS OK Contractor Pratma 0 2 0% 0
211 Eko Haryanto TTE OK Contractor APS 0 2 0% 0
212 Royke Taufik HESS OK Engineering SAKA 0 2 0% 0
213 Febri Himawan HESS OK SCM SAKA 0 2 0% 0
214 Darmono TTE OK Contractor APS 0 2 0% 0
215 Alfian RM Aprentice OK Engineering SAKA 0 2 0% 0
216 Fitra Listyo Aprentice OK EHS CONT 0 2 0% 0
217 Achmad S Gearindo OK Contractor GEARINDO 0 2 0% 0
218 Suprianto Gearindo OK Contractor GEARINDO 0 2 0% 0
219 Ardian SG Gearindo OK Contractor GEARINDO 0 2 0% 0
220 Robby Firly SAKA OK EHS SAKA 2 2 100% 2
221 Dimas Gearindo OK Contractor GEARINDO 0 2 0% 0
222 Febri Gearindo OK Contractor GEARINDO 0 2 0% 0
223 Muslihun Gearindo OK Contractor GEARINDO 0 2 0% 0
224 Yedi Casman Gearindo OK Contractor GEARINDO 0 2 0% 0
225 Johan Gearindo OK Contractor GEARINDO 0 2 0% 0
226 Lutfi R Gearindo OK Contractor GEARINDO 0 2 0% 0
227 Hendra Gearindo OK Contractor GEARINDO 0 2 0% 0
228 Heru Prastyo Operator OK Production SAKA 14 2 700% 14
229 Suryo Purnomo Klaras OK Contractor Klaras 0 2 0% 0
230 Abdul Malik TTE OK Contractor APS 0 2 0% 0
231 Agus H Klaras OK Contractor Klaras 0 2 0% 0
232 Yudha HESS OK Contractor SAKA 0 2 0% 0
233 Adi Sudaryanto HESS OK Offshore SAKA 0 2 0% 0
234 Samsul Maarif TTE OK Contractor APS 0 2 0% 0
235 Rudy TTE OK Contractor APS 0 2 0% 0
236 Arif Budiman TTE OK Contractor APS 0 2 0% 0
237 Nurul Huda TTE OK Contractor APS 0 2 0% 0
238 Sujono Klaras OK Contractor Klaras 0 2 0% 0
239 K.Nasiin Klaras OK Contractor Klaras 10 2 500% 10
240 Alan Howels HESS VIP OK VIP SAKA 0 2 0% 0
241 M.Chusaini Supv OK Maintenance SAKA 0 2 0% 0
242 Yusuf iftikar YAMA OK Contractor YAMA 7 2 350% 7
243 M.Chusnul Athok Security OK Contractor Security 0 2 0% 0
244 Hadi Istianto TTE OK Contractor APS 0 2 0% 0
245 Andi S Ginting TTE OK Contractor APS 1 2 50% 1
246 Munawir TTE OK Contractor APS 0 2 0% 0
247 Samsul Hadi TTE OK Contractor APS 0 2 0% 0
248 Suyanto YAMA OK Contractor YAMA 0 2 0% 0
249 Ambit Klaras OK Contractor Klaras 0 2 0% 0
250 Putri Afdolu Akbar HESS OK Maintenance SAKA 4 2 200% 4
251 Puguh Klaras OK Contractor Klaras 0 2 0% 0
252 Mahendra Klaras OK Contractor Klaras 0 2 0% 0
253 M Ramadhan Security OK Contractor Security 0 2 0% 0
254 Afandi Klaras OK Contractor Klaras 9 2 450% 9
255 Susanto Klaras OK Contractor Klaras 0 2 0% 0
256 Rozak Klaras OK Contractor Klaras 0 2 0% 0
257 Ramadon Klaras OK Contractor Klaras 1 2 50% 1
258 M Zainus Subli Klaras OK Contractor Klaras 0 2 0% 0
259 Sahid Klaras OK Contractor Klaras 0 2 0% 0
260 Joni B Klaras OK Contractor Klaras 0 2 0% 0
261 Khafid Klaras OK Contractor Klaras 0 2 0% 0
262 Didik Klaras OK Contractor Klaras 0 2 0% 0
263 M.Sholeh Klaras OK Contractor Klaras 0 2 0% 0
264 A Mawardi Klaras OK Contractor Klaras 0 2 0% 0
265 Slamet D.K Klaras OK Contractor Klaras 0 2 0% 0
266 Muntahar Klaras OK Contractor Klaras 0 2 0% 0
267 Agus BK Klaras OK Contractor Klaras 10 2 500% 10
268 Pugo Wicak Klaras OK Contractor Klaras 4 2 200% 4
269 Fadil Klaras OK Contractor Klaras 0 2 0% 0
270 Nur Sahid Klaras OK Contractor Klaras 2 2 100% 2
271 Romadhon Klaras OK Contractor Klaras 12 2 600% 12
272 Napaat Klaras OK Contractor Klaras 0 2 0% 0
273 Zailandra Klaras OK Contractor Klaras 0 2 0% 0
274 Raswo Edi.P PT Yama OK Contractor YAMA 1 2 50% 1
275 Mat Khoirul Klaras OK Contractor Klaras 0 2 0% 0
276 Hery TTE OK Contractor APS 0 2 0% 0
277 M.Emil TTE OK Contractor APS 0 2 0% 0
278 Muslim TTE OK Contractor APS 0 2 0% 0
279 M Khoirul MISWACO OK Contractor MISWACO 0 2 0% 0
280 Ubaidillah Klaras OK Contractor Klaras 0 2 0% 0
281 Steve Dyer Production OK Production SAKA 0 2 0% 0
282 Asep Andriana Security OK Contractor Security 0 2 0% 0
283 Wiwin Yulianto PT Yama OK Contractor YAMA 0 2 0% 0
284 Kholidin PT Yama OK Contractor YAMA 0 2 0% 0
285 Danar PT Yama OK Contractor YAMA 0 2 0% 0
286 Wahyu PT Yama OK Contractor YAMA 0 2 0% 0
287 Iflahus Salam Security OK Contractor Security 0 2 0% 0
288 Ismu Buyung PT Yama OK Contractor YAMA 0 2 0% 0
289 Miftahul Ulum Security OK Contractor Security 0 2 0% 0
290 Zuhal f Security OK Contractor Security 0 2 0% 0
291 Ashari TTE OK Contractor APS 0 2 0% 0
292 Julian DS PT Yama OK Contractor YAMA 5 2 250% 5
293 Nur Junaidi Security OK Contractor Security 0 2 0% 0
294 Arifin MJE OK Contractor MJE 1 2 50% 1
295 Ludful Hakim TTE OK Contractor APS 1 2 50% 1
296 M Arif Wahyudin Security OK Contractor Security 0 2 0% 0
297 Fajrul Falah Security OK Contractor Security 0 2 0% 0
298 M Edfin Anas Security OK Contractor Security 0 2 0% 0
299 M Nashir Security OK Contractor Security 0 2 0% 0
300 Rohman A YAMA OK Contractor YAMA 0 2 0% 0
301 A Arif R Gearindo OK Contractor GEARINDO 0 2 0% 0
302 Syaiful Anam Security OK Contractor Security 0 2 0% 0
303 Syailendra Security OK Contractor Security 0 2 0% 0
304 Izzul A Security OK Contractor Security 0 2 0% 0
305 Khoiful Security OK Contractor Security 0 2 0% 0
306 Mujid R Security OK Contractor Security 0 2 0% 0
307 M khoirul Anwar Gearindo OK Contractor GEARINDO 0 2 0% 0
308 Ahmad Syauqie Gearindo OK Contractor GEARINDO 0 2 0% 0
309 Hariri Klaras OK Contractor Klaras 9 2 450% 9
310 Abdul Rochman Security OK Contractor Security 0 2 0% 0
311 Ferry Juliardi Gearindo OK Contractor GEARINDO 0 2 0% 0
312 Ahmad Haidar Engineer OK Engineering SAKA 0 2 0%
313 Rofiudin TTE OK Contractor APS 0 2 0% 0
314 Dedy Y Security OK Contractor Security 0 2 0% 0
315 Basuki Gearindo OK Contractor GEARINDO 0 2 0% 0
316 Mift Surur Security OK Contractor Security 0 2 0% 0
317 Fajri Gearindo OK Contractor GEARINDO 0 2 0% 0
318 M. Agus C Security OK Contractor Security 0 2 0% 0
319 Sukardi Security OK Contractor Security 0 2 0% 0
320 Joko Gearindo OK Contractor GEARINDO 0 2 0% 0
321 Lukman hakim Security OK Contractor Security 0 2 0% 0
322 M.Ulin YAMA OK Contractor YAMA 0 2 0% 0
323 Adi YAMA OK Contractor YAMA 0 2 0% 0
324 M. Khoirul Anwar Gearindo OK Contractor GEARINDO 0 2 0% 0
325 Sugeng YAMA OK Contractor YAMA 0 2 0% 0
326 Tri Cahyo YAMA OK Contractor YAMA 0 2 0% 0
327 M. Zakki K Security OK Contractor Security 0 2 0% 0
328 Dian Eko P YAMA OK Contractor YAMA 0 2 0% 0
329 Aryo Murbantoro HESS OK Production SAKA 0 2 0% 0
330 Farid Gearindo OK Contractor GEARINDO 0 2 0% 0
331 Zahrul Umam Gearindo OK Contractor GEARINDO 0 2 0% 0
332 Abd.rochim Security OK Contractor Security 0 2 0% 0
333 Edy S YAMA OK Contractor YAMA 0 2 0% 0
334 Oos Koswara YAMA OK Contractor YAMA 0 2 0% 0
335 Waras Gearindo OK Contractor GEARINDO 0 2 0% 0
336 Devani YAMA OK Contractor YAMA 4 2 200% 4
337 Adi Bowo YAMA OK Contractor YAMA 0 2 0% 0
338 Sony A YAMA OK Contractor YAMA 0 2 0% 0
339 Andri A YAMA OK Contractor YAMA 1 2 50% 1
340 Sony Ade W Medic OK Contractor SMI 1 2 50% 1
341 Kun Cahyono Gearindo OK Contractor GEARINDO 0 2 0% 0
342 Amrozi Gearindo OK Contractor GEARINDO 0 2 0% 0
343 Suyono Gearindo OK Contractor GEARINDO 0 2 0% 0
344 Riesta Dyah HESS OK Production SAKA 0 2 0%
345 Ridwan Gearindo OK Contractor GEARINDO 0 2 0% 0
346 Hadi G Gearindo OK Contractor GEARINDO 0 2 0% 0
347 Danang Gearindo OK Contractor GEARINDO 0 2 0% 0
348 Haidar HESS OK Engineering SAKA 1 2 50% 1
349 Nusul Gearindo OK Contractor GEARINDO 0 2 0% 0
350 HEVI M TTE OK Contractor APS 0 2 0% 0
351 Wiem Gearindo OK Contractor GEARINDO 0 2 0% 0
352 MUUW YAMA OK Contractor GEARINDO 0 2 0% 0
353 Arik Gearindo OK Contractor GEARINDO 0 2 0% 0
354 Widi S Gearindo Ok Contractor GEARINDO 0 2 0% 0
355 Varun Gearindo Ok Contractor GEARINDO 0 2 0% 0
356 Mahfud Gearindo Ok Contractor GEARINDO 0 2 0% 0
357 M.Itmam Gearindo Ok Contractor GEARINDO 0 2 0% 0
358 Ula Mulyana Gearindo Ok Contractor GEARINDO 0 2 0% 0
359 Crystin YAMA Ok Contractor YAMA 3 2 150% 3
360 Hadi prayitno Gearindo Ok Contractor GEARINDO 0 2 0% 0
361 Fahri Rumbiharminto HESS Ok Engineering SAKA 0 2 0%
362 Supardianto MJE Ok Contractor MJE 0 2 0% 0
363 Ganjar Gearindo Ok Contractor GEARINDO 0 2 0% 0
364 Edy purwanto Gearindo Ok Contractor GEARINDO 0 2 0% 0
365 Resty YAMA Ok Contractor YAMA 0 2 0% 0
366 Purwanto Gearindo Ok Contractor GEARINDO 0 2 0% 0
367 Achmad Untung Security OK Contractor Security 0 2 0% 0
368 Nurul Fasich Security OK Contractor Security 0 2 0% 0
369 Agus murdiono Gearindo Ok Contractor GEARINDO 0 2 0% 0
370 Fajar W HESS Ok Engineering SAKA 0 2 0%
371 Saiful Anam Security OK Contractor Security 0 2 0% 0
372 Munadi Gearindo Ok Contractor GEARINDO 0 2 0% 0
373 Sukartono Gearindo Ok Contractor GEARINDO 0 2 0% 0
374 Sholeh B YAMA Ok Contractor YAMA 0 2 0% 0
375 wahyu YAMA Ok Contractor YAMA 0 2 0% 0
376 Sunardi Gearindo Ok Contractor GEARINDO 0 2 0% 0
377 Eshario Rino Gearindo Ok Contractor GEARINDO 0 2 0% 0
378 sugiono Gearindo Ok Contractor GEARINDO 0 2 0% 0
379 Abraham T YAMA Ok Contractor YAMA 5 2 250% 5
380 Syafii Gearindo Ok Contractor GEARINDO 0 2 0% 0
381 khusnul Athok Security OK Contractor Security 0 2 0% 0
382 Nursahid Klaras OK Contractor Klaras 9 2 450% 9
383 Imam Syafei Welder OK Contractor Klaras 0 2 0% 0
384 Ahmad Dharil YAMA OK Contractor YAMA 0 2 0% 0
385 Kasdin YAMA OK Contractor YAMA 0 2 0% 0
386 M. Ismail YAMA OK Contractor YAMA 0 2 0% 0
387 Nurali YAMA OK Contractor YAMA 1 2 50% 1
388 M. Nurudin YAMA OK Contractor YAMA 0 2 0% 0
389 Abd. Chafid Klaras OK Contractor Klaras 0 2 0% 0
390 Mat Ali YAMA OK Contractor YAMA 0 2 0% 0
391 Kharis YAMA OK Contractor YAMA 2 2 100% 2
392 M Nur dirjo YAMA OK Contractor YAMA 0 2 0% 0
393 Riyadi YAMA OK Contractor YAMA 0 2 0% 0
394 Fadlullah YAMA OK Contractor YAMA 0 2 0% 0
395 Agus Irama YAMA OK Contractor YAMA 0 2 0% 0
396 Heri S YAMA OK Contractor YAMA 3 2 150% 3
397 Imam Tahmid Gearindo Ok Contractor GEARINDO 0 2 0% 0
398 Aminudin Yama OK Contractor YAMA 0 2 0% 0
399 Yan TTE OK Contractor APS 0 2 0% 0
400 Imam W YAMA OK Contractor YAMA 0 2 0%
401 Ali santoso Gearindo OK Contractor GEARINDO 0 2 0%
402 Mulyono Gearindo OK Contractor GEARINDO 0 2 0%
403 Heri Eko Gearindo OK Contractor GEARINDO 0 2 0%
404 Mugni YAMA OK Contractor YAMA 0 2 0%
405 Baidowi Gaerindo OK Contractor GEARINDO 0 2 0%
406 Choirul Anam MJE OK Contractor MJE 1 2 50%
407 Mizainus Klaras OK Contractor Klaras 6 2 300%
408 Rizka YAMA OK Contractor YAMA 2 2 100%
409 Syaiful Arif MJE OK Contractor MJE 6 2 300%
410 Nurdirjo YAMA OK Contractor YAMA 1 2 50%
411 Andy Y YAMA OK Contractor YAMA 14 2 700%
412 chafid YAMA OK Contractor Klaras 14 2 700%
413 Zuhal fanani Scurity OK Contractor Security 1 2 50%
414 Muhadi YAMA OK Contractor YAMA 1 2 50%
415 Triyono Spectra OK Contractor Spetra 1 2 50%
416 Arief nugroho SCM OK SCM SAKA 1 2 50%
INSERT ROW HANYA DI SINI UNTUK PENAMBAHAN NAMA PERSONIL
MAXIMUM 45
Done/Finalized
OPF STOP CARD ACTION TRACKER - 2013
IMMEDIATE CORRECTIVE
UNSAFE ACT / UNSAFE CONDITION
No. Date Location Submitter Company ACTION & ACTION TO PREVENT Type - Content Class-Content Classification
OBSERVED
RECURRENCE
1
Observed gress growth to high
Informed to contarktor cordinator to
2 2-Jan-14 LPGF Teuku Faisal SAKA suronding LLP fire area beter to cut it for Unsafe Condition Orderliness Not in hess rules
arrange cut it
nice to see, and safe from wild animal
Mohon segera semua kucing di
Terlalu banyak kucing di opf
relokasi atau di buang keluar OPF,
3 3-Jan-14 OPF Ayip ismi SAKA menyebabkan banyak lalat karena Unsafe Condition Orderliness Not in hess rules
karena jumlahnya banyak dan bisa
banyak yang memberi makan
menimbulkan banyak penyakit
Handrail di area SWI pump sudah
banyak yang berkarat dan segera di lakukan pengecatan agar
4 4-Jan-14 SWI m ishaq SAKA Unsafe Condition Equipment Not in hess rules
membutuhkan pengecatan ulang agar tidak cepat rusak
lebih awet
found reset push button for SDV liquid inform to CCR to create notification
35 9-Jan-14 LPGF Eddy Sanjaya SAKA Unsafe Condition Equipment Not in hess rules
inlet ro sphere C was not work properly to repair it
mengingatkan dan
seorang pekerja tidak menggunakan
60 14-Jan-14 API separator Abraham T YAMA mengkomunikasikan pekerja Unsafe Act P.P.E Not in hess rules
safety helmet
tersebut akan pentingnya APD
Terlihat sepatu safety contraktor MJE Info ke SPV contraktor agar segera
75 22-Jan-14 GPF Abdul Aziz SAKA Unsafe Condition P.P.E Not in hess rules
sudah berlubang pada tumitnya menganti safety shoesnya
Menginformasikan ke WH personal
Melihat portable eyewash /emergency
86 1/25/2014 WH Irfan Agusto SAKA agar mengisi portable eyewash Unsafe Condition Equipment Not in hess rules
eyewash dalam keadaan air kosong
tersebut
Pantauan depan OPF selokan
Mohon di cek siapa tau ada Not in hess
87 26-Jan-14 OPF mashudin Security banyak ikan mati dan bau tidak Unsafe Condition Orderliness
limbah yang mencemari rules
sedap
Menemukan korek dan rokok dalam Menyuruh menitipkan rokok dan Land
91 27-Jan-14 Gate 4 m syafii Security Unsafe Condition Procedure
truk yang mau ke red zone korek di post scurity Transportation
Di saat waktu sholat banyak yang lalu Kondisi memaksa untuk demikian
lalang di project mushola yang mana karena belum ada pilihan tempat,
30-Jan-14 OPF Sugito SAKA Unsafe Condition Orderliness Not in hess rules
pada saat mau wudlu tidak mengunakan menghimbau untuk lebih waspada
alas kaki dan berpontensi luka kaki terhadap potensi luka kai
Menemukan engsel pintu shelter lepas mohon untuk diperbaiki, jika pintu
satu sehingga tidak akan bisa menahan terlepas dan mengenai pile
Chemical Not in hess
112 10-Feb-14 Mudzakir KTP beban pintu chemical maka resiko tumpah dan Unsafe Condition Equipment
Shelter rules
sangat berbahaya
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
Leader PIC Status Remark
OPEN
CLOSED
CLOSED
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Production need to create
M Chusaini Pramudi W Open
notification
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Suharyo H Ronal M Open
Closed
Closed
Closed
Closed
CLOSED
CLOSED
CLOSED
CLOSED
Closed
Closed
Closed
Closed
Closed
OPEN
CLOSED
Closed
Satrio Buangan
Errikdari
S opf, tidak
Closed
ada yang keselokan depan. Dicheck dari arus balik outfall tidak ada
Closed
Closed
Closed
Closed
Closed
Ganjar Y Shift SPV OPEN
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
Adi Sarwanto 8 10
Budi OIM 0 10
Dave Simpson 1
Didid WN 0
Jahnawi Wasisto 0
Joseph Wicaksono 0
Louis Muschalek 0
M. Chusaini 0
8
Steve Waroka 2
Ahmad Fachrizal 10
Agus Supriyadi 0
Agustinus Iriyanto 0
2
Aris Wibowo 8
Gatot IP 1
Hartoyo 0 1
Imam Ustaat 0
John Deddy 0
Saheb Machfud #NAME? 0
Supratman 0 0
t
n
R
en
tio
rin
nc
EH
C
m
D
ra
na
ee
ge
Didid WN 0
pe
te
n
a
gi
n
O
an
ai
En
M
M
0
0
t
n
R
en
nc
tio
rin
EH
C
m
D
ra
na
ee
ge
C
pe
te
n
a
gi
n
O
an
M. Chuasini 0
ai
En
M
M
Sutik Hardono 0
Dicky Priatna 0
Risma Yudhanto 0
Suprayitno Supandi 0
Agustinus Iriyanto 0
Agus Riyadi 0
Bambang S Boedi 0
Ari Mulyawan 1
Reinwardt Firdaus 2
Adi Sarwanto 8
Nugroho Setiono 45
4
EH
S
4
C
D
C
R
0
M
ar
in
e
0
Card Submitted vs Dept (ytd)
SC
H M
0
R
/IS
/F
i na
nc
e
0
C
on
tra
ct
3
or
dn
an
Yu
ord
ah
10
0
1
2
3
4
5
6
7
8
9
Ad m
a
Ad e B nto
i S uc
ud ho
0
ar ri
A
Ba se yan
m p t
9
ba To o
n g ha
0
D ri
ra
Bu jad
2
di
O
1
D pt
id
H Ed y M
an y
a H
M Ge ad
A rh i
R l i A an
0 0 0
ah w
a a
R ma lu
STOP Cards - M
0 0 0 0 1
1
or
M
e
e
e
in
nc
nc
EH
ct
SC
ar
D
na
tra
M
C
on
i
0 0 0 0 0
/F
/IS
C
0
R
H
D pt
H Ed y M
ba To o
Bu jad
D ri
rh i
Ad e B nto
a a
ar ri
M Ge ad
t
n g ha
ud ho
R l i A an
O
Ba se yan
a
H
ra
R ma lu
id
i S uc
di
Ad m
an y
ah
ah w
m p
or
a
A
d
A
Yu
n an
Ad
STOP Submitter 2011- Pre Ops C
Offshore Line Management (Ytd)
50
45
40
35
30
25
20
15
2 10
5
0 0 0 0 0 0 0 0
0 0 0 0 0 0
i i di
ni
N
s in no tn
a
nt
o
nd n to a e
N st
o no ek ai ok
a W
ua rd
o ia ha a ya iy Bo
W si so al id Pr
p
Ir i R
id a k ch hu
s ar id h a
Yu
d Su us
S
id a
us W D .C H k y o us ng
D iW ic .C M t ik ic a itn in Ag
w W M ev
e
Su D m y t ba
na h is M
St
is ra us m
h ep u R p Ag Ba
Ja s Lo Su
Jo
45 50
45
40
35
30
25
20
15
8 10
5
0 0 0 0 0 0 0 0
0
N ni o a to di to di
t o no W asi don iatn an an an iya
an tio di
d hu ar Pr udh Sup Iriy s R S
w e Di . C ik H ky s u
S Y o g
h o M ut Dic ma itn tinu Ag ban A
o S s ay s
Ri upr Agu B am
S
20
15
8 10
5
0 0 0 0 0 0 0 0
0
N ni o a to di to di
t o no W asi don iatn an an an iya
an tio di
d hu ar Pr udh Su p
Iri
y R
w e Di . C ik H ky s gus g S
S Y o u
o M ut Dic ma itn tin A ban A
oh S i s ray us m
R up Ag Ba
S
Ba se an
9
m p T to
ba o
n g ha
0
D ri
ra
Bu jad
2
di
O
1
D pt
id
H Ed y M
an y
a H
M Ge ad
A rh i
R l i A an
ah w
a a
R ma lud
ud t W i n
hy i
Ta H dod
uf ard o
ik
H j an
ar to
w
an
Ag to
0 0 0 0 0 0 0
Ag s u
us Su
ti n pri
u s ya
d
Ar Iriy i
is an
W to
0 0
ib
o
G wo
at
ot 8
H IP
1
Im ar
am toy
o
Jo Us
Sa hn taa
he D t
b ed
STOP Cards - Maintenance (July - Aug 2010)
M dy
0 0 0
a
Su chf
pr ud
at
m
an
0
D
id
M id
.C W
hu N
as
in
0 0
i
1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
he D t
D pt
M dy
H IP
H Ed y M
m p T to
Bu jad
uf ard o
ar to
W to
D ri
rh i
Ar Iriy i
a a
ud t W i n
to
G wo
pr ud
an
hu N
i
M Ge ad
Sa hn taa
in
am toy
Ta H dod
n g ha
R l i A an
.C W
O
H jan
u s ya
is an
Ba se an
R ma lud
an
as
b ed
ot
Su chf
m
o
H
ra
id
Jo Us
o
di
Im ar
M id
ti n pri
at
ib
at
w
i
an y
id
ah w
us Su
D
a
ba
Ag s
ik
hy
A
u
Ag
45
1 2
0 0 0 0 0
o i to di di s o
nt nd a e an au
t n o
a ya
n iy Bo w
rd an tio
Su
p
Ir i R ya Fi ar
w Se
s S ul
o us u ng iM dt i S o
yi
tn in Ag ba Ar ar Ad r oh
ra u st m in
w ug
Ag Ba R
e N
45
1 2
0 0 0 0 0 0 0
o a to di to di di n s to o
d on iatn an an an iya oe awa dau an tion
r r h p i y R B y F i r w e
a P ud Su Ir s S ul ar S
c ky a Y no nus gu ng i M rdt di S ho
i i t i A a r a ro
D ism ay st b A nw A
ug
R upr Agu am
Rei N
S B
8
1 2
0 0 0 0 0 0 0
o a to di to di di n s to o
don iatn an an an iya oe awa dau an tion
ar Pr udh Su p y B ly r rw Se
Iri R Fi
k y Y o us gus g S Mu rdt i Sa ho
c a
Di ism ayit sti
n n A ban Ari wa Ad o
u m in u gr
r
R up Ag
S Ba Re N
Risk considered acceptable 17
Forgetfulness 9 6 Top Rank of STOP Card Contribu
Inadequate risk evaluation/ assessment 8
Inadequate communication on risk 8
Training not provided 5
PPE not available 4
PPE not available 4
procedure not communicate/understood 3
Training not provided 5
Installation deficiency 3
Inadequate communication on risk
Design deficiency 3
Defective equipment 3
Inadequate risk evaluation/ assessment
Equipment/ Facility not exist 2
Inadequate Inspection/ maintenance 1
Forgetfulness
deliberately disagreed the instruction 1
Risk considered acceptable
Hazard Recognition 50
Personal Choice 39 STOP Card - Contributory Cause
Human Error 31
Equip- Facility Design 32
System - Procedure Issue 15
System - Procedure Issue 15
Human Error
Personal Choice
Hazard Recognition
1
2
3
4
5
6
7
8
9
nk of STOP Card Contributory Causes
ot available 4
ot provided 5
tion on risk 8
assessment 8
rgetfulness 9
acceptable 17
15
32
31
39
50
ONSHORE STOP CARD RECORD 2013 ONSHORE STOP CARD RECORD 2013
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec TOTAL Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec TOTAL
Reactions of people 0 0 0 0 0 0 0 2 0 0 0 0 2 CODE CLASSIFICATION
Adjusting P.P.E 0 0 0 0 0 0 0 0 0 0 0 0 A Hazard Recognition
Changing position 0 0 0 0 0 0 0 0 0 0 0 0 A1 Training not provided 0 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Rearranging job 0 0 0 0 0 0 0 2 0 0 0 0 2 A2 Inadequate risk evaluation/ assessment #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME?
Stopping job 0 0 0 0 0 0 0 0 0 0 0 0 A3 Inadequate communication on risk Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Attaching Grounds 0 0 0 0 0 0 0 0 0 0 0 0 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Performing Locks 0 0 0 0 0 0 0 0 0 0 0 0 B Human Error
Other 0 0 0 0 0 0 0 0 0 0 0 0 B1 Fatique Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
P.P.E 0 0 0 0 0 0 0 11 0 0 0 0 11 6000 B2 Sickness/ Injury 0
Head 0 0 0 0 0 0 0 1 0 0 0 0 1 B3 Substance Abuse Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Eyes & face 0 0 0 0 0 0 0 5 0 0 0 0 5 B4 Forgetfulness Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Ears 0 0 0 0 0 0 0 2 0 0 0 0 2 B5 Lack or overconfidence Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Respiratory system 0 0 0 0 0 0 0 0 0 0 0 0 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Hands & arms 0 0 0 0 0 0 0 2 0 0 0 0 2 C Equipment/ Facility Design
Trunk 0 0 0 0 0 0 0 0 0 0 0 0 C1 Equipment/ Facility not exist Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Feet & legs 0 0 0 0 0 0 0 0 0 0 0 0 C2 Design deficiency Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Fall Protection 0 0 0 0 0 0 0 1 0 0 0 0 1 C3 Installation deficiency Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 C4 Defective equipment Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Position of people (injury causes) 0 0 0 0 0 0 0 4 0 0 0 0 4 C5 PPE not available
Striking against or being struck by objects 0 0 0 0 0 0 0 3 0 0 0 0 3 C6 Ergonomic issue with equipment Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Caught in, out, or between objects 0 0 0 0 0 0 0 0 0 0 0 0 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Falling 0 0 0 0 0 0 0 0 0 0 0 0 D Performance Presurre
Contacting temperature extremes 0 0 0 0 0 0 0 0 0 0 0 0 D1 Supervisor induced Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Contacting electrical current 0 0 0 0 0 0 0 0 0 0 0 0 D2 self induced Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Inhaling, Absorbing, or Swallowing a hazardous substance 0 0 0 0 0 0 0 1 0 0 0 0 1 D3 task overload-not enough resources Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Repetitive Motions 0 0 0 0 0 0 0 0 0 0 0 0 D4 time constraint Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Awkward positions/static postures 0 0 0 0 0 0 0 0 0 0 0 0 D5 failed to ask for help Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Other 0 0 0 0 0 0 0 0 0 0 0 0 E System/ Process Issues
Tools 0 0 0 0 0 0 0 11 0 0 0 0 11 E1 Procedure unavailable
Tools Wrong for the job 0 0 0 0 0 0 0 1 0 0 0 0 1 E2 procedure not communicate/understood Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Tools Used incorrectly 0 0 0 0 0 0 0 1 0 0 0 0 1 E3 Procedure difficult to follow Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Tools In unsafe condition 0 0 0 0 0 0 0 8 0 0 0 0 8 E4 Inadequate Inspection/ maintenance Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Other 0 0 0 0 0 0 0 1 0 0 0 0 1 E5 Communication did not Occur Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Equipment 0 0 0 0 0 0 0 60 0 0 0 0 60 Supervision did not occur
EquipWrong for the job 0 0 0 0 0 0 0 0 0 0 0 0 0% F Personal Choice
Equip Used incorrectly 0 0 0 0 0 0 0 0 0 0 0 0 0% F1 Risk considered acceptable Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Equip Unsafe condition 0 0 0 0 0 0 0 50 0 0 0 0 50 83% F2 deliberately disagreed the instruction Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Other 0 0 0 0 0 0 0 10 0 0 0 0 10 17% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Procedures 0 0 0 0 0 0 0 15 0 0 0 0 15 ACTIVITY OBSERVED
Procedure unavailable 0 0 0 0 0 0 0 0 0 0 0 0 0 0% 1 BLASTING / PAINTING 0 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Procedure inadequate 0 0 0 0 0 0 0 0 0 0 0 0 0 0% 2 CATERING RELATED ACTIVITIES Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Procedure not known 0 0 0 0 0 0 0 0 0 0 0 0 0 0% 3 CHEMICAL HANDLING Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Procedure not understood 0 0 0 0 0 0 0 1 0 0 0 0 1 7% 4 CONFINED SPACE Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Procedure not followed 0 0 0 0 0 0 0 14 0 0 0 0 14 93% 5 DIVING/ UNDERWATER ACTIVITY Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0% 6 ELECTRICAL Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Orderliness 0 0 0 0 0 0 0 46 0 0 0 0 46 7 ISOLATION AND LOTO
Orderliness not known 0 0 0 0 0 0 0 0 0 0 0 0 0 0% 8 LIFTING / RIGGING Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Orderliness not understood 0 0 0 0 0 0 0 0 0 0 0 0 0 0% 9 MAINTENANCE ROUTINES Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Orderliness, not followed 0 0 0 0 0 0 0 8 0 0 0 0 8 17% 10 MANUAL HANDLING Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Other 0 0 0 0 0 0 0 38 0 0 0 0 38 83% 11 OPERATION ROUTINES Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
0 0 0 0 0 0 0 Err:504 0 0 0 0 Err:504 12 PERSONNEL / MATERIAL TRANSPORTATION
0 0 0 0 0 0 0 0 0 0 0 0 0 13 RADIOGRAPHY Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
0 0 0 0 0 0 0 Err:504 0 0 0 0 Err:504 14 WELDING / BURNING Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
0 0 0 0 0 0 0 Err:504 0 0 0 0 Err:504 15 SCAFFOLDING Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
0 0 0 0 0 0 0 Err:504 0 0 0 0 Err:504 16 PIGGING ACTIVITY Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec TOTAL 17 INSPECTION/ AUDIT
Reactions of people Err:504 Err:504 18 GENERAL HOUSEKEEPING
P.P.E Err:504 Err:504 CIVIL WORKS
Position of people Err:504 Err:504 GRINDING
Tools Err:504 Err:504
Equipment Err:504 Err:504
Procedures Err:504 Err:504
Orderliness Err:504 Err:504
Cek Total 0% 0% 0% 0% 0% 0% 0% Err:504 0% 0% 0% 0% Err:504
Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec YTD
Safe Observations 0 0 0 0 0 0 0 -149 0 0 0 0 -149 ###
Unsafe Observations (Acts and Conditions) 0 0 0 0 0 0 0 149 0 0 0 0 149 ###
Unsafe Acts ONLY 0 0 0 0 0 0 0 0 0 0 0 0 0
STOP CARDS TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Encouragement and Intervention 0 0 0 0 0 0 0 0 0 0 0 0 0
Intervention of Unsafe Acts and Condition 0 0 0 0 0 0 0 0 0 0 0 0 0
Intervention of Unsafe Acts ONLY 0 0 0 0 0 0 0 0 0 0 0 0 0
Unsafe Non-Intervention 0 0 0 0 0 0 0 149 0 0 0 0 149
Non-inteventions nor Encouragement 0 0 0 0 0 0 0 0 0 0 0 0 0
Encouragement Only (safe) 0 0 0 0 0 0 0 0 0 0 0 0
Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec YTD
Safe Observations
Unsafe Observations
Total Encouragement and Intervention
ALL Intervention (Unsafe Act & Condition) 0%
Intervention (UNSAFE ACT ONLY) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 1200%
Non-inteventions nor Encouragement
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 1000%
Interventio
n/
Encourage 800%
Start Date End Date Date Date Type-Code ment Date Date Type-Code Intervention/Encouragement
Total OBSERVATIONS Card Data
1-Feb-14 7-Feb-14 >=41671 <=41677 1 YES >=41671 <=41677 2 YES 600%
Safe Observations 49
Unsafe Act 3 464 400%
Unsafe Condition 10 32
OBSERVATION CARDS TOTAL 62 14.5 200%
Intervention of Unsafe Act 3 100%
Intervention of Unsafe Condtion 10 100% 0%
Reactions of P.P.E Position of Tools Equipment Procedures Orderliness
HESS RULES Category Jan Feb Mar April May Jun Jul Aug Sep Oct Nov Dec YTD people people
Energy Isolation 0
Lifting and Hoisting 0 Jul Aug Sep Oct Nov
Working at Heights 0
Confined Space Entry 0 .]]
Hot Work 0
Excavation & Trenching 0
Accumulation
Land Transportation 0
Not in HESS Rules 0
Procedures
100%
90% 100%
80% 90%
70% 80%
60% Jan
P.P.E 70%
Feb
50% 60%
Equipment Mar
40% Procedures 50% Apr
30% Linear (Apr)
40%
20%
0% 0% 30%
10% 0% 0%
0% 0% Procedures 20%
0% 0% 0%
0% 0% Equipment 10%
Jan 0%
Feb 0% P.P.E
Mar 0% 0% 0% 0% 0%
Apr Jan Feb Mar Apr
P.P.E Equipment
100% 100%
90% 90%
80% 80%
Jan Jan
70% 70%
Feb Feb
60% Mar 60% Mar
50% Apr 50% Apr
40% Linear (Apr) 40% Linear (Apr)
30% 30%
20% 20%
10% 10%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Jan Feb Mar Apr Jan Feb Mar Apr
January 2013
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1 0 0 0 0 0
0
Reactions of people P.P.E Position of people Tools Equipment Proced
(injury causes)
3
0 0 0
305 1500%
STOP
1000%
155 14 500%
5 9 0%
Card
J F MA M J J A S O N D
a ea pa uuue c oe
n b r ri y n l g p t v c
l
Submissi
on -
2013(ytd
)
Page 150
Or-
Pro
der-
Posi-
Equi
Re-
ce-
li-
tion
Tool
pme
dure
ac- STOP
ness
P.P.
ofs
nt
tions
s unsafe
peo-E
of
ple criteria 2013
peo
ple (YTD)
4
2
0
1 2 3 4 5 6 7 8 9 1 1 1 1
0 1 2 3
STOP - PPE 2013 (YTD)
5
5
2 2
2
1
1
0 0 0
0
Head Eyes & face Ears Respiratory Hands & arms Trunk Feet &
system
1
1
0 0 0
0
Head Eyes & face Ears Respiratory Hands & arms Trunk Feet &
system
(YTD)
0 0 0
Trunk Feet & legs Fall Protection Other
1
0 0 0
Trunk Feet & legs Fall Protection Other
STOP - Position of People 2013 (YTD)
Other 0
Awkward positions/static postures 0
Repetitive Motions 0
Inhaling, Absorbing, or Swallowing a hazardous
substance 1
Contacting electrical current 0
Contacting temperature extremes 0
Falling 0
Caught in, out, or between objects 0
Striking against or being struck by objects 3
0 1 2 3
3
3 4
STOP - Tools & Equipment 2013 (YTD)
Hazard Recognition
Sickness/ Injury
1
0.9
0.8
Jul
0.7
Aug
0.6
Sep
0.5
Oct
0.4
Nov
0.3
Dec
0.2
0.1
000000 000000 000000 000000 000000 000000
0
Procedure Procedure not Procedure not Procedure not Other Orderliness, not
unavailable known understood followed followed
Sep
0.5
Oct
0.4
Nov
0.3
Dec
0.2
0.1
000000 000000 000000 000000 000000 000000
0
Procedure Procedure not Procedure not Procedure not Other Orderliness, not
unavailable known understood followed followed
P CARD RECORD 2012
Jun Jul Aug Sep Oct Nov Dec TOTAL
0 0
Nov Jul Dec
Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Aug
Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Err:504
Sep Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Oct
Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Nov
Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Dec
Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
0 0 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
ction Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Jul
Aug
Sep
Oct
Nov
Dec
0
Jul
Aug
Sep
Oct
Nov
Dec
0
Jul
Aug
Sep
Oct
Nov
Dec
0 0
condi-
Jul
Aug
Sep
Oct
Nov
Dec
00
ss, not
ed
Sep
Oct
Nov
Dec
00
ss, not
ed
Reactions of people
Adjusting P.P.E 1
Changing position 0 Reac
Rearranging job 0
Stopping job 0
Attaching Grounds 0 Other 0
Performing Locks 0
Performing Locks 0
Other 0
Attaching Grounds 0
P.P.E
Head 1 Stopping job 0
Eyes & face 1
Rearranging job 0
Ears 0
Respiratory system 0 Changing position 0
Hands & arms 8
Trunk 0 Adjusting P.P.E
Feet & legs 0
Fall Protection 1
Other 0
Other 0
Equip Unsafe condition
Orderliness not known 0
Orderliness not understood 0
Orderliness, not followed 0 Other 0
Other 0
Equip Unsafe condition
Equip Used incorrectly
EquipWrong for the job 0
Other 0
Tools In unsafe condition
Tools Used incorrectly 0
Tools Wrong for the job
Other 0
Procedure inadequate 0
Procedure unavailable
Reactions of people
Other 0
forming Locks 0
ching Grounds 0
Stopping job 0
earranging job 0
nging position 0
djusting P.P.E 1
P.P.E
Other 0
Fall Protection 1
Feet & legs 0
Trunk 0
Hands & arms 8
piratory system 0
Ears 0
Eyes & face 1
Head 1
Other 0
Awkward positions/static postures 0
Repetitive Motions 0
Inhaling, Absorbing, or Swallowing a
hazardous substance 0
Contacting electrical current 1
Contacting temperature extremes 2
Falling 12
Caught in, out, or between objects 2
ing against or being struck by objects 2
Tools
Other 0
quip Unsafe condition 6
Tools
Other 0
quip Unsafe condition 6
Equip Used incorrectly 1
quipWrong for the job 0
Other 0
ls In unsafe condition 1
Tools Used incorrectly 0
ools Wrong for the job 1
Procedures
Other 0
Procedure inadequate 0
Procedure unavailable 2
No
A Ln L
TIn
-ino- -
-
In -
teta
te v l
r-e
te r-
v
nEne n
tio --
vU en-
c on-
tio
n ur
sn
tio n
S
s
a a
gfe
(UN
no er
(U
O b-n 0
SOb
me
EnAF n
-- %
s
s a
e fe
r-
c s
oEe
turr
A c t
a
Avvna
a
CT
g d
e-
-
tio&n
tio n 0% 50% 100 %
ON
meIn - L
C so n
tes
Ytr-
)
d i-
ven-
tio n )
tio n
STOP CARD RECORD
(1)
INTERVENTION