Professional Documents
Culture Documents
This report is a document of the borrower. The views expressed herein do not necessarily represent
those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your
attention is directed to the “Terms of Use” section of this website.
In preparing any country program or strategy, financing any project, or by making any designation of
or reference to a particular territory or geographic area in this document, the Asian Development
Bank does not intend to make any judgments as to the legal or other status of any territory or area.
OPERATOR’S EHS REPORT
TANGGUH LNG
BP Indonesia
Perkantoran Hijau Arkadia
Tower D, Lantai 5
Jl. TB Simatupang Kav 88
JAKARTA 12520
OPERATOR’S EHS REPORT
TANGGUH LNG
TABLE OF CONTENT
CHAPTER I INTRODUCTION ...................................................................................................................... 6
A. COMPANY PROFILE....................................................................................................................... 6
B. ACTIVITY LOCATION ..................................................................................................................... 7
C. ACTIVITY DESCRIPTION ............................................................................................................... 8
C.1 Current Operation ................................................................................................................... 8
C.2 Construction Phase of Tangguh Expansion Project (TEP) ............................................. 11
C.3 Survey, Seismic and Exploration Drilling ......................................................................... 27
D. LENDERS AUDIT UPDATE .......................................................................................................... 27
CHAPTER II IMPLEMENTATION AND EVALUATION ........................................................................... 30
A. CURRENT OPERATIONS ............................................................................................................. 30
A.1 Environmental Aspect .......................................................................................................... 30
A.2 Social Aspect ......................................................................................................................... 62
B. CONSTRUCTION OF TANGGUH EXPANSION PROJECT (TEP) ........................................... 99
B.1 Environmental Aspect .......................................................................................................... 99
B.2 Social Aspect ....................................................................................................................... 146
C. SURVEY, SEISMIC, AND EXPLORATION DRILLING ............................................................ 161
C.1 Environmental Aspect ........................................................................................................ 161
C.2 SOCIAL Aspect .................................................................................................................... 165
D. HEALTH ASPECT ........................................................................................................................ 167
D.1 Tangguh Operation............................................................................................................. 167
E. SAFETY ASPECT ........................................................................................................................ 171
E.1 Tangguh Operation............................................................................................................. 171
E.2 Tangguh Expansion Project .............................................................................................. 173
CHAPTER III CONCLUSION .................................................................................................................... 176
A. Environmental Aspect ............................................................................................................... 176
B. Social Aspect .............................................................................................................................. 176
C. Health Aspect .............................................................................................................................. 177
D. Safety Aspect .............................................................................................................................. 177
2
OPERATOR’S EHS REPORT
TANGGUH LNG
LIST OF FIGURES
3
OPERATOR’S EHS REPORT
TANGGUH LNG
LIST OF TABLES
4
OPERATOR’S EHS REPORT
TANGGUH LNG
TABLE 46 INDUSTRIAL HYDINE PERFORMANCE INDICATOR ACHIEVEMENT FOR 1ST SEMESTER 2018 PERIOD
............................................................................................................................................................. 168
TABLE 47 KPI OF OCCUPATIONAL HEALTH 1ST SEMESTER 2018 ..................................................................... 170
TABLE 48 KEY INDICATORS ON TANGGUH OPERATIONS SAFETY PERFORMANCE .......................................... 173
TABLE 49 TEP ONSHORE HSE STATISTIC........................................................................................................ 175
5
OPERATOR’S EHS REPORT
TANGGUH LNG
CHAPTER I INTRODUCTION
A. COMPANY PROFILE
Permits related to the AMDAL : 1. Minister of Environmental Decree No. 125 of 2013
regarding Wastewater discharge permit into the
sea for BP Berau Ltd, Sumuri District;
2. Head of Teluk Bintuni Regency Letter no.
188.4.5/A-40 year 2014) regarding Wastewater
discharge to surface water in Babo Site;
6
OPERATOR’S EHS REPORT
TANGGUH LNG
B. ACTIVITY LOCATION
Tangguh LNG is located on the south shore of Bintuni Bay in Teluk Bintuni Regency,
Papua Barat Province, as indicated in Figure 1.
Tangguh
LNG
7
OPERATOR’S EHS REPORT
TANGGUH LNG
C. ACTIVITY DESCRIPTION
Tangguh LNG is a facility which produces and exports LNG and gas condensate. The
current development includes facilities for the production, collection and transmission
of natural gas and associated liquids from the Vorwata gas field. The gas is produced
from offshore locations and transported via pipelines to the onshore LNG plant to be
purified and liquefied into LNG for marine export via LNG tankers.
Tangguh LNG Operations have two offshore platforms in water depths of 50m to 60m
located in the Vorwata field, designated VR-A and VR-B. Fifteen production wells have
been drilled from these two platforms; however, one had to be abandoned due to
technical reason. The gas is transported from the VR-A and VR-B platforms by two
separate 61 cm (24”) diameter subsea pipelines of 20.5 km and 19.3 km in length
respectively to the Onshore Receiving Facilities (ORF) at the Tangguh LNG plant, which
comprises of two processing trains, where gas is processed into LNG.
8
OPERATOR’S EHS REPORT
TANGGUH LNG
VR-B VR-A
The marine facilities consist of: (a) 1.6 km long jetty to an LNG loading dock; (b) separate
1.2 km long trestle to a multi-purpose dock (“Combo Dock”) used to support importation
of equipment and materials as necessary to operate the LNG plant including cargo and
marine personnel transportation; to load condensate tankers, to import material and
equipment for any projects or construction activities, and offshore drilling operations;
(c) Construction jetty, which was used during the construction phase and is currently
retained as a backup for any additional project works.
To support Tangguh LNG Operations, there are non-production facilities such as
accommodations, office, workshop, warehouse, laboratory, helipad and waste
management facilities.
Tangguh also operates supporting facilities in Irarutu III Village, Babo District, Teluk
Bintuni Regency, Papua Barat Province, which comprise the operation of the Babo
Airstrip, Babo Jetty and Camp, in accordance with the approved Environmental
Management and Monitoring Efforts. These facilities exist to support the crew change
activities as it is a transit point for personnel going to Tangguh LNG.
• Tangguh achieved GREEN award for PROPER 2017 - 2018. This is first time for
Tangguh operation achieve beyond compliance rank. This rank indicates
operational of Tangguh LNG comply with regulation and implement beyond
compliance. The Green and Gold PROPER are awarded among 179 companies
from 1900 companies assessed in 2018. The PROPER audit is annual
environmental assessment performed by MoEF (Ministry of Environmental and
Forestry)
9
OPERATOR’S EHS REPORT
TANGGUH LNG
10
OPERATOR’S EHS REPORT
TANGGUH LNG
In the effort to increase production capacity, BP and its partners are currently
expanding Tangguh LNG facility in sequence for additional one train capacity
including its supporting facilities, or hereafter known as “Tangguh Expansion Project
(TEP)”.
The expansion project consists of offshore and onshore development. The offshore
scope includes 13 new development wells and 1 DCRI well at 2 new normally
unattended installations (NUI), tied in by pipelines to the onshore LNG plant. The
onshore scope comprises of one additional natural gas liquefaction train of a similar
design and capacity to existing trains, an onshore receiving facility (ORF), a new LNG
and condensate loading jetty, additional boil off gas (BOG) recovery facilities, utilities,
flares and the infrastructure to support three train operation. Figure 05 below shown
the illustration of Tangguh Expansion Project scope, both offshore and onshore
In this reporting period, engineering and procurement process have been majorly
completed with only minor remaining actions to be followed up. Installation of offshore
11
OPERATOR’S EHS REPORT
TANGGUH LNG
platforms commenced in July 2018 and completed in September 2018 and October 2018
for WDA and ROA respectively.
As part of the WDA platform installation, there are 14 each of 30-inch conductor pipe
installed on the well slot. The installation of this conductor pipe is part of the preparation
for well drilling activity that will be performed once the platform is ready for drilling.
Due to the potential of hard soil condition, some of the conductor pipe installation was
performed using drill and drive method with sea water as recirculation medium. No
mud or chemical added to the process, cutting generated which only in the form of mix
soil and sea water were discharged overboard during the activity at -10 m depth. Sea
water monitoring performed during this activity show no exceedances of sea water
quality standard, particularly TSS concentration within 500 m of discharge location
which also confirm the result of dispersion study performed for this activity.
Used mud generated from HDD activity, which cannot be reused or recycled back to the
system is disposed to soil disposal location within Tangguh site. LC-50 and TCLP have
been performed for the mud composition and confirmed the mud is non-toxic. Total
approx. 3,500 m3 volume of mud being disposed to the disposal point onshore during
overall HDD campaign. In addition to mud, dispersed solid also generated during HDD
activity in offshore part, by the end of HDD campaign, total approx. 17,000 m 3 solid is
generated and dispersed at the HDD exit point offshore. Following the completion of
HDD activity, the mud pit is backfilled to allow preparation of piling activity for onshore
pipeline installation to commence.
12
OPERATOR’S EHS REPORT
TANGGUH LNG
FIGURE 7 (LEFT) HDD DRILLING RIG. (RIGHT) MUD DISPOSAL TO SOIL DISPOSAL
LOCATION
13
OPERATOR’S EHS REPORT
TANGGUH LNG
All marine vessel emergency procedure and facilities in the vessel including vessel crew
training records are verified during MVAC (Marine Vessel Authoritization Certificate)
process. Diesel-engine power generators are operated in vessel and onshore in
accordance to vendor manual. Dedicated competent personnel to operate generators
are available. All generators capacity are below 570 kwth.
14
OPERATOR’S EHS REPORT
TANGGUH LNG
All equipment, prior to mobilization to site, will be verified through EMA (Equipment
Mobilization Approval) process to ensure equipment is in good condition. Also,
maintenance at site will be performed by competent personnel.
The Gas Transmission progress update is included in the section C.2.1 above
Letter of Award of Onshore LNG Train 3 EPC was issued to CSTS (Chiyoda, Saipem,
Tripatra and Suluh Ardhi Engineering) Consortium on 15 July 2016 and the contract was
signed on 25 August 2016. In this reporting period, CSTS continue to perform detail
engineering design in Jakarta and construction activity at site.
Total Personnel On-Board (POB) at site for TEP construction activities in this reporting
period continue to ramp-up and as of 31 December 2018 total POB (Personnel On-Board)
at site reached 5,018 personnel. In this reporting period, site activities are focusing on
construction works for temporary and permanent facilities. General civil works for
temporary and permanent facilities are on-going, such as new hauling road and access
road, piling activities, foundation works, concrete works and drainage system
installation at MCB, Train 3 process and utility areas. For marine facilities, in this
reporting period, BOF (Bulk Offloading Facility) piling completed and continue finger
and RoRo concrete works. Piling of LNG Jetty 2 is on-going including jetty head section.
15
OPERATOR’S EHS REPORT
TANGGUH LNG
Construction workers are accommodated in 4 different camps, i.e. Stinkul Camp, Matoa
Camp, Pioneer Camp, and Early Camp. Stinkul and Matoa Camps are the existing facility
which previously operated by GOO. Sewage water from Stinkul Camp and Matoa Camp
are treated in the existing STP facility (STP-A capacity of 400 m3/day and STP-C capacity
of 800 m3/day, respectively). Source of the fresh water is generated from seawater which
the sea water intake is located at Combo Dock and pumped in to existing Reverse
Osmosis (RO) unit for fresh water treatment and distributed through pipeline to Stinkul
and Matoa Camp.
Pioneer Camp and Early Camp are new-built temporay facility constructed by CSTS.
Pioneer Camp construction was completed and now fully occupied. Early Camp and its
supporting facilities, such as laundry, kitchen and dining hall have been in operational
since August 2018. Completion of electrical works for Early Camp and installation of
new generator. Two new temporay STPs, partial STP Early Camp and STP Pioneer Camp
with a capacity of 150 m3/day have been installed and operational. Installation of STP
Early Camp extension is on-going with a total treatment capacity of 2,750 m3/day. New-
built temporary RO unit for Pioneer Camp, Early Camp, and construction activity has
been in-operational with temporary seawater intake is located at BOF area. New
temporary seawater intake installation at the existing Combo Dock Pontoon is on-going.
FIGURE 9 TOP LEFT) NEW MCB PILING ACTIVITY, (TOP RIGHT) TRAIN 3 PILING AND
FOUNDATION WORK, (BOTTOM LEFT) BOF ACTIVITY, (BOTTOM RIGHT) LNG JETTY 2
PILING ACTIVITY
16
OPERATOR’S EHS REPORT
TANGGUH LNG
Capital dredging at Bulk Off-Loading Facility (BOF) was performed in 2017 by Boskalis
BHD (Backhoe Dredger) Magnor to create approach channel, finger and turning basin to
intended depth allowing vessel to berth and unberth with no tidal restriction. A volume
of 750,000 m3 soil material was dredged at that time. High sedimentation rate in this
area effects the dredged channel and basins and causing it to become shallower within
8 months. In turn, vessel berthing and unberthing are restricted and can only be
performed during high tide. In a view of construction progress, this potentially impacts
project delay.
In December 2018, maintenance dredging at BOF was initiated to deepen BOF approach
channel, finger and turning basin. The contract is awarded to PT Adhiguna Keruktama
using Trailing Suction Hopper Dredger (TSHD) method. This method is assessed to be
the most suitable for loose and soft soil such as sand, silt, gravel, and clay. Sediment
build-up occurred within BOF area for over a year is mostly loose and soft soil. In
comparison to previous capital dredging campaign, dredged soil type tends to be virgin
clay material, which BHD method was more suitable for this type of hard soil.
2 (two) TSHD will be utilized for performing dredging campaign at BOF, they are Inai
Kekwa with hopper capacity of 500 m3 and King Arthur III with hopper capacity of 2,500
m3. At the moment, Inai Kekwa is performing dredging focusing on deepening the
channel targeting a depth of -1m LAT. This intends to provide sufficient draft for King
Arthur III to work at BOF as the vessel are more than twice larger than Inai Kekwa. King
Arthur III is scheduled to be mobilized by February 2019.
17
OPERATOR’S EHS REPORT
TANGGUH LNG
18
OPERATOR’S EHS REPORT
TANGGUH LNG
1. Slope preparation – slope angle shall be less than 1(V) : 4.1(H) and if in any case
slope angle is steeper than 1(V) : 4(H), jute geotextile will be placed. This is to
minimize impact of topsoil and planted seeds being washed out from runoff.
Placement of jute geotextile will be done after topsoil spreading.
19
OPERATOR’S EHS REPORT
TANGGUH LNG
FIGURE 15 (LEFT) POT HOLES MAKING, (RIGHT) PLANTING SEEDS IN PREPARED POT
HOLES
Of approximately 170 Ha temporary construction areas, soil disposal areas and slopes
are required to be revegetated using cover crop. Sequence of cover crop revegetation
is determined through risk-based assessment, i.e. area with high potential of erosion,
20
OPERATOR’S EHS REPORT
TANGGUH LNG
sandy material and steep slopes. As of December 2018, cover crop revegetation
activities have progressed and on-going at the slope adjacent to BOF, slope behind new
RO, and access road slopes.
FIGURE 16 (TOP) BOF AREA, (MIDDLE) NEW RO FACILITY AREA, (BOTTOM) ACCESS
ROAD AREA
For PASS management in soil disposal area, considering the nature of the spoil soil
material disposed to the disposal areas, the soil type is mostly cohesive or in other
words their permeability is very low, therefore infiltration of rain water can be
considered negligible. In addition, more compaction of the soil is achieved through
heavy equipment, i.e. dozers, excavators, vibro-compactors and dump trucks which
21
OPERATOR’S EHS REPORT
TANGGUH LNG
continue working on top of the stockpiles and traveling back and forth. This compaction
will limit the occurrence of acid run-off conditions. In turn, the runoff will only flow on
the surface and limited volume of soil becomes available to potential leaching, while
the major volume will affect by the underground flow and will not contribute to the
production of acid waters. Also impact of acid water to the surrounding groundwater
will be unlikely.
Regular flora and fauna protection training and campaign including marine mammal
protection are continuously performed at Tangguh site to increase workers awareness
in protecting flora and fauna at Tangguh site. Posters and signage of protected flora and
fauna are posted in the prominent locations i.e. HSE information boards at the
workplace. No hunting and fishing policy are enforced to all employees, including
prohibition to bring in and bring out any flora and fauna. Flora species for revegetation
activity can only use local species as specified in project specification. No fire policy in
the forest is also enforced. Smoking is only allowed in dedicated smoking areas. Fauna
sighting form is consistently filled out by workers when fauna is sighted.
22
OPERATOR’S EHS REPORT
TANGGUH LNG
translocated plants from wild boar and deer. Translocated plants are also tagged using
QR Code to provide information on plant species, date of translocation, and plant
condition. Translocation of priority species will continue to be performed at dedicated
translocation area and monitoring, watering, and fertilizer appliance also continue to be
performed for translocated plants.
23
OPERATOR’S EHS REPORT
TANGGUH LNG
24
OPERATOR’S EHS REPORT
TANGGUH LNG
• For resident vessels, non-hazardous and hazardous wastes are managed through
transportation to existing onshore facility for further treatment and disposal. At this
stage, no hazardous wastes generated from vessels are transferred onshore yet.
Wastes will be temporariy stored at the jetty and picked-up by dedicated personnel
to be transported to waste management facility.
• For transient vessels, non-hazardous wastes are managed in accordance to MARPOL
requirements or transferred to the port harbour. Hazardous wastes are managed by
the vessel owner
Starting October 2017, existing Matoa and Stinkul Camps are operated and occupied by
TEP workers. Wastewater from these camps are treated in the existing STP-A at a
capacity of 400 m3/day and STP-C at a capacity of 800 m3/day. Treated STP effluents are
discharged to the existing common outfall at -13m LAT of LNG Jetty 1. New built STPs
for Pioneer Camp and Early Camp were completed in currently in the commissioning
stage. Treated effluent from these STPs are discharged to the new built temporary
common outfall at -6m LAT of LNG Jetty 1. Requirements of flow meter and sampling
points; daily record of flow rate, monitoring of effluent water are complied with. Treated
25
OPERATOR’S EHS REPORT
TANGGUH LNG
STP effluent wastewater is utilized for road dust suppression. The treated effluent water
which met the discharge permit standard, and chlorinated. Road sweeper is in use to
remove dirt on paved road. Maximum speed limit requirement is implemented at site
i.e. maximum of 30km/hour on main road.
Existing Reverse Osmosis (RO) is also operated by CSTS. Reject brine from this facility
is discharged to the existing common outfall at -13m LAT of LNG Jetty 1. Construction
of new temporary RO is completed in September 2018 and now is in commissioning
stage. Reject brine from this facility is discharged to the new built temporary common
outfall at -6m LAT of LNG Jetty 1. Requirements of flow meter and sampling points;
daily record of flow rate, monitoring of effluent water are complied with. Wastewater
discharge permit for the new facilities is in approval process to Minister of the
Environment, which expected to be issued by Q1 2019. Intensive communication with
MoEF is performed in regular basis to track the progress of the permit.
Wastewater from concrete cement mixer wash is collected in neutralizing pit. This
wastewater contains high pH concentration due to the nature of cement. Prior to
discharge to surface water, the alkaline water is treated with acid. Upon confirmation
from laboratory analysis that the pH and TSS parameters are within regulatory
standards, the treated wastewater is discharged to surface water. In this reporting
period, there is no Hydrotest without chemical activity as temporary piping works are
completed. 3-monthly wastewater discharge permit implementation report is reported
regularly to government institutions.
Temporary diesel generators are installed at the construction areas as the primary
source of electricity i.e. Accomodations, BOF, new Reverse Osmosis, and waste
management facility. Standard operational procedure for generator was developed to
ensure the equipment is operated in line with vendor specification. Competent
operators and mechanics are employed to operate and maintain the equipment. The
26
OPERATOR’S EHS REPORT
TANGGUH LNG
Any hydrocarbon and chemical spills are reported and handled in accordance to
applicable procedures. All contaminated materials are securely packed and stored in
licensed temporary hazardous waste storage. In this reporting period, there are 7 minor
spill cases below 1 barrel. Oil and chemical training and drills related to hydrocarbon
and chemical spill response are delivered to relevant workers. In addition, CSTS has
established Emergency Response Team (ERT) in case spill magnitude escalates where
the subcontractor requires additional supports, CSTS ERT will be mobilized. Any spill
on waters, marine vessel crew are competent for spill response. Spill prevention drill
are performed regularly by vessel crew. SOPEP is provided in every vessel as Tier 1
response equipment.
Marine facilities activity scopes are included in Onshore EPC scopes. Update is
explained in point C.2.3.
The Uba Deep-1 is an exploratory well. The well was spudded-in on 24 November 2018
and currently being drilling on 12-1/4” hole section.
During this reporting period, the Tangguh Lenders Consultants, representatives of the
lenders group, and a team from ADB conducted a series audit visits for compliance
review on social and environmental aspects. The third audit visit was conducted in July
and September 2018, following with the fourth audit in November 2018 for social aspect.
The objective of the visits is to evaluate social and environmental performance, as well
as to confirm the implementation of agreed corrective actions of non-compliance
issues. As resume in the second lenders audit in February 2018, it was concluded that
27
OPERATOR’S EHS REPORT
TANGGUH LNG
there is one non-compliance level 2 in regard with social related issue and one re-
opened NC level 1 related environmental, against the ADB SPS.
BP agreed to implement several corrective actions to respond the findings and non-
compliance issues. During the third and fourth audits in July, September and November
2018, BP showed good progresses to implement the corrective action and provided
comprehensive evidences to the lender consultant. Therefore, both audits concluded
that there is no non- compliance issue for social aspect. Meanwhile, there is one
remaining non-compliance on environmental aspect due to lack of ASS assessment and
management plan issue.
The following table provides the corrective action updates for the non-compliance
issues:
Corrective Action
No Implementation Update
Requested
Environmental
1 Total Suspended Corrective Action Plan has been submitted for review,
Solid (TSS) issue from which consist of the following:
land clearing. 1. Perform maintenance of the existing
TSS monitoring in sedimentation ponds and improvement as
surface waters in required to meet TSS quality standard,
construction areas 2. Perform temporary revegetation at the cleared
shows that there are area which are not planned to be used for
elevated levels that construction activities within a minimum period
exceed the standards of 3 months after reached Final Grade Level
downstream of (FGL), using local Papua species,
cleared areas. Erosion 3. Perform additional monitoring at downstream
control measures are location outside project footprint to confirm there
in place, which is no impact outside project footprint (in
include temporary consideration with baseline condition).
culverts, biomass
placement along the Currently all the actions are ongoing with details
clearing limit, and provided in Lenders Operator 6 Monthly Report.
sedimentation ponds
downstream of
effluent runoff. These
mitigation measures
and notably the
sedimentation ponds
are not effective at
managing the impact.
Social
1 Workforce
Management Responding to the non-compliance issue, a series of
Insufficient engagement meeting with the communities were
socialization and conducted from February to November 2018. A
28
OPERATOR’S EHS REPORT
TANGGUH LNG
Corrective Action
No Implementation Update
Requested
unclear information comprehensive engagement process that involved
on the number and WFM team of Tangguh expansion project, community
type of workers relation and security team. A robust engagement
required during guideline was developed to ensure the meeting is
various phases of meaningful and accommodate lenders’ requirements.
construction is The engagements are focused to familiarize workforce
causing anxiety and recruitment procedure for Train 3 project, to update
tension in the project status, and to respond to community concerns
communities. over Tangguh project. Between July - December 2018,
engagements were conducted in Babo, TMB, Saengga,
Onar, Taroy, Weriagar, Padang Agoda, Meterabu,
Furada, Tofoi, and Andamata.
All evidences of engagement activities were recorded
and reviewed during audit by ADB team and lenders
consultant in July, September and November 2018.
A summary of engagement report is provided in the
evaluation on social section.
During audit July 2018, the lenders consultant also advised several recommendations
for some areas that BP need to improve both on environmental and social aspects. The
implementation of corrective actions of lenders recommendations is provided in the
appendix.
29
PERATOR’S EHS REPORT
TANGGUH LNG
A. CURRENT OPERATIONS
A.1 ENVIRONMENTAL ASPECT
A.1.1 I MPLEMENTATION
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
Noise level Operation of a. Noise level Noise level: See Appendix 1 Comply
increase the LNG b. Engine/equipmen a. Measured noise level using the Sound Level Meter by
Plant and its t maintenance PT Intertek Utama Services in September 2018.
supporting records b. Conducted compliance evaluation by comparing
facilities analysis results with the Minister of Environment
Decree No. 48 Year 1996 and all results comply with
the regulatory requirements
c. Conduct trend analysis
Location: 2 locations on the perimeter fence of Tangguh
Period: Once every 6 months for the perimeter fence
30
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
b. Checked records of the flared gas volume, fuel gas
volume and the amount of CO2 from the feed gas
incinerated in AGI and flared
c. CO2 emission in 2018 is 4925 kilotonnes.
Location: LNG Plant and its supporting facilities
Period: Annually
31
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
Natural Water a. Ensure the There is no No
geohydrologic resource volume of water resource reportable
al change with provision extracted provision from activity
potential from groundwater is groundwater during this
disruption to groundwater the optimum extraction yet reporting
community extraction yield according period
well and land alternative to pumping test
subsidence and groundwater
extraction permit
b. Minimise impact
to community
groundwater
availability in
Tanah Merah and
Saengga by
minimising the
potential of sea
water intrusion
(TDS < 1.000
mg/L); and
c. Minimise the
potential of land
subsidence (< 5
cm) related to
long term
groundwater
extraction
Marine biota Offshore Gas Type and abundance Maintained positive impact by: Perform Fishery, marine mammal and mangrove survey. Comply
abundance Platform of nekton, and a. Solid waste from the operations of offshore facility Latest Fishery, marine mammal and mangrove survey has
and diversity marine mammal such as offshore gas platform is sent onshore for been performed in end 2016 - early 2017.
diversity compared further treatment Location: Berau Bay and Bintuni Bay
to environmental Period: Once every 3 years
b. Implemented No Fishing policy
baseline condition
during AMDAL
Sea water Earth a. TSS a. Dredging procedure is available, valid and has been Sea water and plankton monitoring Comply.
quality and bundwall concentration in socialized to related employee. a. Conducted seawater sampling and measure TSS This activity
marine biota installation sea water does is
b. Dredged material from existing construction jetty was concentration by Internal laboratory. External sampling
abundance and not exceed completed
disposed to the approved disposal area stipulated in was performed in August 2017 for TSS and sediment in 2017
and diversity dredging standard outside
material safety exclusion the AMDAL, and to the nearshore dredged material seabed at the dredging location and disposal area.
placement zone at Marine collection pit which later to planted with mangrove b. Conduct compliance evaluation by comparing TSS
for shoreline Facility area in and its associate species. concentration analysis result with seawater standards
protection dredging area or c. Corrective action is performed in the monitoring according to MoE Decree No. 51 Year 2004 (See Table
500 meters from result shows that TSS distribution is not accordance at Attachment I) and analysis result will also be
dredging with standard and baseline
location
32
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
according to compared with environmental baseline data from
MoE Decree No. AMDAL study
51 Year 2004 by c. Plankton sampling has been performed in August 2017
considering
d. Monitor the activity record of dredging contractor to
environmental
baseline during understand dredging location and volume and ensure
AMDAL disposal of dredged material is conducted according to
b. Minimise the approved location in AMDAL
potential Location : At the nearest Safety Exclusion Zone (for Marine
reduction of Facility) from dredging location or 500 meter distance from
Plankton, dredging location
benthos and Period :
nekton a. Internal monitoring (seawater quality analysis: TSS
abundance and parameter) is conducted weekly during dredging
marine mammal activity. In one monitoring period, sampling will be
disturbance conducted before, during and after dredging
compared to b. External monitoring, including seawater ( TSS
environmental parameter) and plankton by laboratory is conducted
baseline during once during dredging activity and once after dredging is
AMDAL conducted
c. Record checking is conducted at vessel/office
33
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
Marine Sea Minimise the a. Marine mammal protection procedure, LNG and Perform fishery, marine mammal and mangrove survey. Comply
mammal Transportati potential of marine condensate loading procedure and emergency Latest Fishery, marine mammal and mangrove survey has
disruption on activity, mammal disruption response procedure are available, valid, and has been been performed in end 2016 - early 2017.
including compared to socialized to related employees, emergency response Location: Berau Bay and Bintuni Bay
LNG and environmental team and vessel crew Period: Once every 3 years
condensate baseline during b. Solid waste and wastewater management procedure
product AMDAL: for sea transportation activity is available, valid, and Marine mammal awareness training is provided for marine
transportatio a. Marine biota has been socialized to related employees crew and the training records are kept.
n and diversity (type) c. Emergency response procedure at vessel is available, Location: Onshore or in the vessel
logistic and abundance, valid, and has been socialized to vessel crew Period: During sea transportation activities in the operations
transportatio specifically d. Emergency response facility in the vessel is available phase
n for marine mammal in accordance with developed procedure
Tangguh b. Marine mammal
LNG e. Implemention of No Fishing policy A system is already in place to ensure that all vessels
awareness
Operations f. Routine maintenance to engine/equipments is operated for Tangguh LNG Operations are already
training
peformed according to specified schedule to ensure maintained appropriately in accordance with MARPOL
c. Vessel engine
that the engine/equipments are working efficiently requirements.
maintenance
records g. Prioritizing sailing in deeper area (>12 m) when the Location: Vessel
sea condition is calm Period: Once every 6 months
h. Reduced vessel speed if approaching marine
mammal until the marine mammal swims away
i. Conducted solid waste and wastewater management
in accordance with Government Regulation No. 21
Year 2010, Permenhub No. PM 29 of 2014 Regarding
Pollution Prevention in Marine Environment and
MARPOL also applicable regulations.
j. Managed ballast water in accordance with
Government Regulation No. 21 Year 2010,
Permenhub No. PM 29 of 2014 Regarding Pollution
Prevention in Marine Environment and MARPOL eg.
Ballast water exchange shall be done after the vessel
leaves port prior to entering the bay.
k. Recorded ballast exchange (date, location, volume,
and vessel’s name)
l. Provided separate containments for bilge water and
ballast water
m. Provided pre-separation tank for bilge water as per
MARPOL
34
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
Air Quality Flaring a. Total amount of a. Conducted calculation and recording of flaring a. Conducted opacity monitoring using an accredited See Chapter II Comply
Emission flaring emission amount laboratory in July 2018. Subchapter
< 3% of feed gas b. Conducted reduce flaring program, by: b. Conducted compliance evaluation by comparing the A.1.2.1 and
b. Flaring opacity 1) Implemented BOG (Boil Off Gas) recovery from analysis results with the Minister of Environment Appendix 1
complies with LNG storage facility and LNG loading system to Regulation No. 13 Year 2009 (refer to Table in
standard as per Tanker Appendix I). All parameters comply with the regulatory
MoE Regulation 2) Plant facility was designed to transfer processed requirements
No. 13 Year 2009 gas to flaring system for safe burning and in c. Calculated the actual flare emission volume and
emergency condition including relief valves, compared it with the planned volume
blowdown valves and operation/maintenance vent d. Total amount of flaring emission for this reporting
3) Optimised TAR frequency and the amount of Plant period was 0.28% of feed gas
Shut Down, both planned (Gas Turbine Location: Flare stack
inspection) and unplanned Period: Once every 6 months
Air Quality Operational a. Emission from a. Ensured the installed thermal treatment complies to The emission monitoring at non hazardous waste thermal For the current Comply
from Solid Non-hazardous emission standards treatment has been conducted in August 2018. operation, there
Waste (Non- waste Thermal b. Updated operational procedure for each thermal are only non-
hazardous) Treatment treatment unit and conduct training and socialisation hazardous
Incinerator maintenance:
Thermal complies with to operators waste
Engine/equipment maintenance system is in place incinerators
Treatment standards in MoE c. There is no hazardous waste thermal treatment unit (SAPPM) to ensure that maintenance is conducted in
Decree No. 13 on site yet accordance with the determined schedule
Year 1995 d. Only burned waste according to specification for non-
(Attachment 1) Location: Workshop/incinerator location
hazardous waste thermal treatment unit
b. Emission from Period: Once every 6 months
e. Operated thermal treatment unit according to its
Hazardous waste specification (Burner, blower and feed rate)
incinerator
f. Conducted daily recording for amount and type of
complies with
burnable waste and thermal treatment operational
standards in
condition for each incinerator
Head of
g. Conducted routine maintenance to
Environmental
engine/equipments according to specified schedule to
Impact Agency
ensure that the engine/equipments are working
Decree No. 03
efficiently
Year 1995
h. Defined sampling locations and provide sampling
facility according to applicable regulations
Sea Water Wastewater a. WWT effluent of: a. Conducted wastewater minimisation effort by: Produced water, Oily contaminated water, Chemically See Appendix 1 Comply
Quality and treatment 1) Produced 1) Considering groundwater utilisation (as substitute contaminated water and sewage:
marine biota from LNG Water or supplement of desalination unit). Desktop a. Collected treated wastewater samples from the Detailed
abundance Plant and its (temperature, Study has been completed and there is no detail compliance point and analysed for the required monitoring
and diversity supporting pH, Oil and parameters in accordance with the applicable results are
facilities Grease, Total regulations by PT Intertek Utama Services until reported in the
Phenol, H2S, October 2018 and in November – December, the quarterly
Ammonia, monitoring was conducted by PT Sucofindo on a implementation
COD, monthly basis report of the
Methanol) b. Checked the daily wastewater discharge flowrate wastewater
2) Oily records discharge to
Contaminated sea permit no.
35
PERATOR’S EHS REPORT
TANGGUH LNG
Water (pH, Oil schedule that has been planned to conduct c. Calculated the load of each of the treated wastewater 125 year 2013.
and Grease, pumping test. streams discharged to sea through multiplying the Produced water
Total Organic 2) There is no detail plan to reuse of treated flowrate by the concentration (analysis results) and oily
Carbon) wastewater from Produced Water Treatment d. Conducted compliance evaluation by comparing contaminated
3) Chemically (PWT) unit for utility purpose. analysis results with the wastewater regulatory water,
Contaminated b. Conducted wastewater treatment and maintain WWT standards: chemically
Water (pH, operational stability to ensure treated wastewater has 1) Produced water, Oily contaminated water, contaminated
COD, TSS and complied with standards prior to discharge to sea. Chemically contaminated water: Minister of water and
Total Metal) c. Updated wastewater management procedure and Environment Regulation No. 19 Year 2010, sewage are also
complies with conducted socialisation to related employees applicable Permit and the IFC EHS Guidelines for briefly
standards as per d. The following treated wastewater are discharged to LNG Activity 2007 (refer to Table in Appendix I) evaluated in
MoE Regulation sea: 2) Sewage: Minister of Environment Decree No. 112 Chapter II
No. 19 Year 2010, Year 2003 and the IFC General EHS Guidelines 2007 Subchapter
1) Produced water from PWT unit
applicable (refer to Table in Appendix I) A.1.2
2) Oily contaminated water from CPI unit, treated in
permit, IFC EHS e. Conducted compliance evaluation by comparing the
the PWT unit
Guidelines for actual flowrate with the maximum allowable flowrate
3) Chemically contaminated water from
LNG Activity f. Conducted compliance evaluation by comparing the
Neutralisation Pit
2007 and calculated load with the maximum allowable load
4) Sewage from STP
Minister of
5) Reject Brine from Desalination Unit and RO Unit g. Conducted trend evaluation for concentration, flowrate
Environmental
e. Currently, wastewater is discharged to sea at -13 m and load of the effluent
Decree No. 125
LAT at LNG Jetty for LNG Plant 1 and 2 operational Location:
of 2013 regarding
activity until LNG Plant 3 construction is completed a. Compliance points of each treatment plant
Wastewater
f. There was no wastewater from non-routine activities b. Specifically for methanol, collect samples at a 100 m
discharge permit
during this period radius from common outfall
into the sea for
BP Berau Ltd, g. Installed flow meter and sampling facility at each Period:
Sumuri Distr treatment plant effluent pipe
a. Quality analysis is conducted on a monthly basis
b. STP effluent (pH, h. Conducted daily volume recording for each
b. Flowrate record is taken on a daily basis
BOD, TSS, Oil discharged wastewater
and Grease) i. Discharged treated wastewater according to
allowable maximum flowrate Effluent water (Nitrate and Phosphate) was monitored
complies with
standards as per j. Produced water is treated using physical, biological a. Collected effluent water samples from each compliance
MoE Decree No. and chemical treatment point
112 Year 2003 k. DAF sludge from PWT Unit, and sludge from CPI unit b. Conducted trend analysis by comparing the discharge
and General EHS are sent to a licensed hazardous waste treatment water quality with the seawater quality for Nitrate and
Guidelines 2007 facility. Refers to Goverment Regulation 101/2014, Phosphate.
c. Effluent from Biosludge is not clasified as hazardous waste. Location: Each compliance point
other wastewater Preparation of Biosludge disposal into controlled Period: Once every 6 months
treatement landfill.
comply with l. Study for the reuse of DAF sludge, biosludge and
Seawater Quality affected by the treated wastewater
standards as per sludge from the CPI unit as soil ameliorant is
discharge (Clarity, Turbidity, TSS, temperature, pH, DO, Oil
related completed.
and Grease, Total Phenol, H2S, Ammonia, Total Ammonia,
regulations m. Chemically contaminated water is treated by Nitrate, Phosphate, Mercury, Chromium, Arsenic,
d. Minimise the wastewater neutralisation system using neutralizer Cadmium, Copper, Lead and Nickel) was monitored in July
potential chemical addition and December 2018:
reduction of n. Oily contaminated water is transferred to the
a. Collected seawater samples from upstream and
plankton produced water treatment plant, through the CPI unit,
downstream of the common outfall at a 30 m and 100
abundance and for treatment
m radius and conduct analysis for the required
diversity and o. Sewage is treated using physical, biological and parameters
nekton chemical treatment. Sludge from treatment process is
36
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
abundance disposed to landfill. Tangguh operates STP Utility, b. Conducted compliance evaluation by comparing
compared to STP Zone A and STP zone C to treat the sewage. analysis results with the regulatory standards in the
environmental p. Oily contaminated water from workshop and Minister of Environment Decree no. 51 Year 2004 (refer
baseline during warehouse activities is transferred to Collection Pit to Table in Appendix I), also taking into consideration
AMDAL and pumped to produced water treatment plant baseline conditions during AMDAL
(Abundance, through the CPI unit. c. Conducted trend analysis
diversity index q. Engine/equipment maintenance system is in place Location: Upstream and downstream of the common
and equitability (SAPPM) to ensure that maintenance is conducted in outfall at a 30 m and 100 m radius
index of marine accordance with the determined schedule Period: Once every 3 months
plankton and
benthos)
e. Surface water Plankton was monitored in in July and December 2018:
quality (pH, DO, a. Collected plankton and benthos samples
TDS, TSS and b. Calculated the abundance, diversity index and
other main equitability index of the plankton and benthos
parameters c. Collection, identification and calculation is done by PT
related to the Intertek Utama Services
characteristic of Location: Upstream and downstream of the common
the wastewater) outfall at a 30 m and 100 m radius for plankton and 100 m
radius for benthos
Period: Once every 6 months for plankton and benthos
Sediment quality (Cu, Cr, Cd, Hg, Pb, As, Zn, Sb, Ni, Ag)
was monitored in January 2018:
a. Collected sediment samples and analyse for the
required parameters using an accredited laboratory
b. Conducted trend analysis
Location: Upstream and downstream of the common
outfall at a 100 m radius
Period: Once every 6 months
Sea water Water a. Treated reject a. Reject brine management procedure is available, a. Collected seawater samples and analyse for salinity See Chapter II Comply
quality due to provision brine complies valid, and has been socialized to related employees using PT Intertek Utama Services until October 2018 Subchapter
salinity from with standards b. Reject brine is discharged at sea at -13 m LAT at LNG A.1.2.5 and
increase and desalination according to Jetty for LNG Plant 1 and 2 operational activity Appendix 1
reduction of alternative applicable c. Installed flow meter and sampling facility at reject
plankton Wastewater Detailed
brine outlet
abundance Discharge Permit monitoring
d. Discharged reject brine according to allowable
and diversity to Sea results and
maximum flowrate flowrate are
b. Minimise the
e. Conducted daily recording of discharged reject brine reported in the
potential
volume quarterly
reduction of
f. Engine/equipment maintenance system is in place implementation
plankton
equitability and (SAPPM) to ensure that maintenance is conducted in report of the
diversity accordance with the determined schedule Wastewater
compared to Discharge to
37
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
environmental and continue with PT Sucofindo from November to Sea Permit no.
baseline during December 2018 125 year 2013
AMDAL b. Collected wastewater samples and measure pH using
PT Intertek Utama Services
c. Checked records of daily wastewater discharge flowrate
d. Conducted compliance evaluation by comparing
analysis results with the regulatory standards in the
Wastewater Discharge to Sea Permit
e. Conducted compliance evaluation by comparing actual
flowrate with the maximum allowable flowrate
f. Conducted trend analysis for concentration and
flowrate of the effluent
Location:
a. Upstream and downstream of the common outfall at a
30 m radius and natural locations (out of exclusion
zone) for salinity as per the requirement in the
Wastewater Discharge to Sea Permit
b. Discharge point of the desalination unit (pH and
flowrate)
c. Flowrate reading is conducted on the desalination
unit’s flowmeter
Period:
a. Quality analysis is done on a monthly basis
b. Flowrate record is taken on a daily basis
Terrestrial Operation of Flora and fauna Flora and fauna survey was conducted in January- Comply
flora and fauna the LNG diversity February 2016. Final report is completed
change Plant and its Location: Buffer zone location in Tangguh
supporting Period: Once every 5 years during Operations phase
facilities
38
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
Sea water Refueling at a. Minimise the a. Hazardous material management procedure is Comply
quality and Marine possibility of available, valid, and has been socialized to related
marine biota Facility area offshore fuel spill employees
abundance b. Offshore spill b. Fuel and Chemical Management Procedure is
and diversity response can be available, valid, and has been socialized to related
done effectively employees
as per procedure c. Emergency response procedure is available, valid, and
hence will not has been trained to emergency response team (ERT)
affect water d. Appointed Emergency Response Team for fuel and
quality and chemical spill
marine biota
e. Ensured storage containers are built compatible with
the materialand are in good condition
f. Ensured every stored material is recorded and
completed with MSDS
g. Performed efforts to response oil spill in accordance
with Oil Spill Contingency Plan and conduct spill
response training according to planned schedulefor
example oil spill drills
Wastewater Wastewater a. Wastewater management procedure is available, valid, Perform fishery, marine mammal and mangrove survey. See Appendix 1 Comply
management management and has been socialized to related employee Latest Fishery, marine mammal and mangrove survey has and Chapter II
from vessel complies with b. Conducted sewage treatment in accordance with been performed in end 2016 - early 2017. Subchapter
operational standards in Government Regulation No. 21 Year 2010 and Location: Berau Bay and Bintuni Bay A.1.2.7
activity Government MARPOL Annex IV prior to discharge to sea Period: Once every 3 years
Regulation No. 21 c. Conducted oily contaminated water treatment by
Year 2010, MARPOL, using Oil Water Separator in accordance Government
Permenhub No. PM Regulation No. 21 Year 2010 and MARPOL Annex I
29 of 2014 prior to discharge to sea
Regarding Pollution
d. Managed ballast water according to Government
Prevention in Marine
Regulation No. 21 Year 2010 and MARPOL
Environment and
e. Recorded ballast water exchange (date, location,
applicable
volume and vessel’s name)
regulations
39
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
Solid waste a. Solid waste (non- General Management: a. Conducted record checking of amount and type of Comply
(non- hazardous) a. Hazardous and non-hazardous solid waste waste that being generated and sent to storage and
hazardous) management is management is available, valid, and has been treatment facility at Tangguh site
and conducted in socialized to related employees b. Conducted record checking of amount and disposal
Hazardous accordance with b. Conducted solid waste segregation (Non-hazardous location of comminuted food waste discharged to sea
Waste Government and hazardous solid waste) c. Conducted record checking and hazardous waste
management Regulation No. manifest transmittal
c. Implemented 3R system (Reduce, Reuse, Recycle)
activity in 21 Year 2010,
d. Categorized non-hazardous solid waste into organic, d. Monthly inspection of solid waste and hazardous
offshore MARPOL,
recyclable, burnable and inert waste waste management facility according to applicable
actvitiy Permenhub No.
procedure
PM 29 of 2014
Regarding Non-Hazardous Solid Waste Management: Location: Solid waste and hazardous waste treatment
Pollution facility at vessel
a. Conducted solid waste management in accordance
Prevention in with Government Regulation No. 21 Year 2010 and Period: Record checking is conducted monthly; Inspection
Marine MARPOL Annex V is conducted monthly
Environmentand b. No garbage disposal to sea, except food waste which
related complies with MARPOL Annex V requirements
regulations c. No disposal of solid non-hazardous waste to sea
b. Hazardous waste
d. Organic, recyclable, and inert waste management
management is from small vessel and tug boat which operate around
conducted in jetty location is sent to Tangguh LNG onshore waste
accordance with management facility
Government
e. Waste from LNG and condensate tankers is not
Regulation No.
managed onshore. Vessel manager will manage
101 Year 2014,
generated waste by following requirements in
Permenhub No.
Government Regulation No. 21 Year 2010 and
PM 29 of 2014
MARPOL Annex V
Regarding
Pollution f. Comminute food waste to size less than 25 mm for
Prevention in further disposal to sea with distance more than 3 nm
Marine from nearest land.
Environment, g. Uncomminuted waste can only be disposed to sea at
MARPOL and distance more than 12 nm from the nearest land
related h. Maintain records of treated waste
regulations
Hazardous Waste Management:
a. Conducted hazardous waste management in
accordance with Government Regulation No. 101 Year
2014
b. Conducted labelling for hazardous waste container
c. Hazardous waste management from small vessel and
tug boat which operate around jetty area is sent and
stored/treated at Tangguh LNG onshore hazardous
waste management facility and subsequently will be
40
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
sent to licensed hazardous waste treatment facility for
further treatment
d. Hazardous waste from LNG and condensate tankers is
not treated at onshore facility. Vessel manager will
manage generated waste by following requirements
in MARPOL and related regulations.
e. Transfer hazardous waste to licensed waste facility for
further treatment
f. Use permitted hazardous waste transporter facility
41
PERATOR’S EHS REPORT
TANGGUH LNG
42
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
disturbance
compared to
environmental
baseline during
AMDAL
Surface water Onshore Solid waste (non- Solid Waste (non-hazardous) and Hazardous Waste a. Checked records of the amount and type of waste that See Chapter II Comply
quality, solid waste hazardous) and Management has been produced and delivered to the storage and Subchapter
groundwater, (non- hazardous waste General Management : treatment facilities in Tangguh A.1.2.10
and soil hazardous) management a. Hazardous and non-hazardous solid waste b. Checked records of waste that has been treated in
quality; solid and complies with Tangguh (for example incineration, composting, etc) Hazardous
management procedure is available, valid, and has
non-hazardous hazardous requirements in c. Checked records of the solid waste amount disposed to waste
been socialized to related employees
waste and waste Law No. 18 Year the Non-hazardous waste landfill management is
b. Conducted solid waste segregation (Non-hazardous
hazardous management 2008 and d. Checked records of the recyclable waste sent to the reported in a
and hazardous solid waste) quarterly basis
waste activity Government external recycling company
Regulation No. 101 c. Implemented 3R system (Reduce, Reuse, Recycle) in the
e. Checked records and delivery of the hazardous waste
Year 2014 (Amount d. Categorized non-hazardous solid waste into organic, hazardous
manifest
of solid non- recyclable, combustible and inert waste waste storage
f. Conducted weekly inspection of the solid waste and
hazardous waste hazardous waste treatment facilities in accordance with permit
and hazardous Non-Hazardous Solid Waste Management: the applicable procedure implementation
waste that has a. Waste storage facility is constructed with Location: Solid waste and hazardous waste treatment report.
been produced and impermeable floor to prevent soil contamination facilities in Tangguh
managed) b. Food waste is managed by the composting process Period: Throughout the management of solid waste and Tangguh LNG
or disposal to Non-hazardous waste landfill hazardous waste; weekly inspection started using its
new landfill
c. Recyclable waste is collected and sent to waste
facility for the
recycling company
management of
d. Combustible waste is incinerated using non-
its inert waste.
hazardous waste incinerator
Monitoring
e. Timber waste is collected, chipped into wood chips program for the
for raw material for composting process, utilisation new landfill will
in revegetation activity or used as landfill liner be initiated
f. Inert waste is disposed to Non-hazardous waste during the next
landfill reporting
g. Conducted recording of generated waste and its period and will
management activity be reported as
per the
Hazardous Waste Management: requirement.
a. Hazardous waste is packed using appropriate
container and packaging which will not react with
the contained material
b. Hazardous waste is stored in permitted Temporary
Hazardous Waste Storage Facility
c. Hazardous waste is sent to licensed hazardous waste
treatment facility using permitted hazardous waste
transporter facility
43
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
d. Maintained hazardous waste manifest and reported
it regularly to related agency
Groundwater Non- Groundwater quality a. Solid waste management and non-hazardous waste a. Collected groundwater samples from ground water See Appendix 1 Comply
quality hazardous around Non- landfill operational procedure is available, valid, and wells around old landfill and around new Landfill in
waste landfill hazardous waste has been socialized to related employees October 2018 and analyse for the required parameters
operational landfill complies b. Solid waste disposed to non-hazardous waste landfill by using an accredited laboratory
with standard are food waste and other non-hazardous waste b. Conducted compliance evaluation by comparing
according to according to applicable procedure (e.g.: inert waste) analysis results with the Class I groundwater quality
Government c. Hazardous waste is not disposed to non-hazardous regulatory standards in Government Regulation No. 82
Regulation No. 82 waste landfill Year 2001, also taking into consideration baseline
Year 2001 Class 1 by d. Designed non-hazardous waste landill so it does not conditions during AMDAL
considering contaminate surrounding groundwater: c. Conducted trend evaluation
environmental 1) Proposed non-hazardous waste landfill location Location: 4 monitoring wells
baseline condition was compacted before lined with HDPE Liner
during AMDAL Period: Once every 6 months
2) Non-hazardous waste landfill is lined with HDPE
(Attachment 1) Liner, both at Non-hazardous waste landfill Main
Pond and Leachate Pond
3) Leachate pond was sized appropriately to prevent
leachate overflow
4) Leachate is transferred to Sewage Treatment Plant
prior to discharge
5) Installed Monitoring Well in the upstream and
downstream of non-hazardous waste landfill
based on study result
6) There are currently 5 monitoring wells in total
e. Conducted routine inspection of Non-hazardous
waste landfill integrity
44
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
Soil Fuel and a. Minimise the a. Hazardous material management procedure is Facility condition and hazardous material and waste Comply
contamination Chemical possibility of available, valid, and has been socialized to related management:
Storage onshore fuel and employees a. Inspected hazardous material and waste storage facility
Facility and chemical spill b. Emergency response procedure is available, valid, prior to operation in accordance with the applicable
Refueling b. Onshore spill and has been socialized/trained to emergency procedure
Facility; response can be response team (ERT) b. Conducted weekly inspection of containers, storage
hazardous done effectively c. Appointed Emergency Response Team for fuel and system, storage warehouse condition, emergency
waste facility as per procedure chemical spill response system, and other facilities
hence will not d. Ensured fuel and chemical storage container are built Location:
contaminated the compatible with the material and are in good a. Fuel and chemical storage warehouse
land condition b. Temporary hazardous waste storage
e. Ensured fuel and chemical storage and refueling c. Refuelling station
location is safe from flood or is on a higher elevation Period:
f. Minimum requirements of storage facility are as a. Storage facility inspection is conducted once before it
follows: is used
1) Completed with a bunded area that will be able to b. Routine inspection is done on a weekly basis
contain 110% of the volume of the largest
container, or 25% of the total volume
2) The building, including the floor and the bund Spill clean-up, the soil TPH concentration and
wall, must be constructed with a impermeable management of hydrocarbon contaminated materials:
material a. Visual monitoring to ensure that the oil spill response
3) The floor construction must have a slope of at is conducted in accordance with the procedure
least 1% towards sump pit or Oil Water Separator Location:
(OWS) a. Location of the spill and the contaminated soil
4) Completed with a sump pit for facilities with a b. Temporary hazardous waste storage
roofed shelter
Period: During clean-up of contaminated soil
5) Completed with an Oil Water Separator (OWS)
unit for facilities without a roofed shelter
6) Completed with spill kit Hazardous material and waste spill records:
7) Completed with MSDS information All spills are recorded, noting the amount and type of the
g. Conducted routine clean up of oily contaminated spilled hazardous material and waste, spill location and the
water trapped in sump pit or OWS for further spill handling efforts
treatment Location: Location of the spill and the contaminated soil
h. Put label and symbol on the container (package) and Period: When a spill occurs
storage area
i. Conducted regular inspection/audit
j. Treat contaminated soil by excavated, separated and
collected to Temporary Hazardous Waste Storage for
further treatment
k. Ensure clean up process is performed well and
conduct TPH soil test (if necessary) according to MoE
Decree No. 128 Year 2003
Natural Marine Minimise impact or a. Use trestle structure at LNG terminal Coastline monitoring was conducted as part of the AMDAL In
Oceanographic Facility at change of natural b. Corrective action will be conducted if there is any document development in 2013 through satellite image of compliance
al changes erosion and abrasion which is not as expected in ANDAL coastline condition around the location. Based on
45
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
including operations sedimentation document which caused by Tangguh LNG activity and condition and monitoring in 2015, the Environmental
current pattern phase according to erosion needs to be mitigated permit is updated to accommodate the management and
changes, coast and sedimentation monitoring of the shoreline protection and the project is
line abrasion rate in the area completed in 2017
and accretion Location: Coastline location around activity location
Period: Monitoring is conducted twice in 5 years.
Babo
Seawater a. Waste a. Turbidity & a. Implemented a procedure to disallow waste disposal Conducted seawater monitoring as per requirements in See Appendix 1 Comply
Quality from clarity into the sea September 2018 by PT Intertek Utama Services
vessels b. Acidity b. Provided oil drum and waste bin Location: Waters around the jetty
b. Leakage c. Chemical content Period: Once every 6 months during operations phase
and oxygen level
d. Oil content
e. TSS
f. Temperature
Sediment Wastes from Elements in the Implemented a procedure to not allow waste disposal Conducted sediment monitoring as per requirements in See Appendix 1 Comply
harbour sediment such as into the sea September 2018 by PT Intertek Utama Services
activities Oil, Hg, Pb, Cd, Cu, Location: Waters around the jetty
including Cr, Zn, Ni and Mn Period: Once every 6 months during operations phase
wastes from
the
boats/other
wastes from
the harbour
which are
disposed
into the
water and
settle
Aquatic a. Wastes Decline in diversity Implement a procedure to not allow waste disposal into Conducted plankton and benthos monitoring as per See Appendix 1 Comply
biology from and population of the sea requirements in September 2018 by PT Intertek Utama
vessels plankton and Services
b. Leakage benthos Location: Waters around the jetty
Period: Once every 6 months during operations phase
a. Noise a. Operation a. Noise level is a. Provide toilets, septic tank and sewage tank, and a. Noise and air quality are compared with the regulatory See Appendix 1 Comply
b.Air Quality of the measured with temporary waste disposal area standards set by the Minister of Environment
c. Water Babo dB(A) and b. Provide storage for fuel, oil and other substances b. Disturbance to flight operation is supervised to ensure
Quality Airstrip Kepmen LH. No. which are easily absorbed into the soil and water implementation of SOP
d.Protected b. Passenge 48. bodies
Location: Irarutu III Village, Babo District
species r and MENLH/11/1996 c. Regulate land use in accordance with the noise
Period: Monitoring done once every 6 months during the
cargo b. Surface water boundaries of a public airstrip
Airstrip’s operations phase
services quality as per d. Protect plant growth and seedless vegetation in the
Government viscinity of Babo Airstrip to reduce noise and cutting
c. Facility
Regulation no. 82 obstacle vegetation
and utility
year 2001 Class 2
46
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
manage c. Fauna sightings
ment with respect to
d. Solid and noise from the
liquid operation of
wastes Babo Airstrip
manage
ment
a. Air Quality Maintenance Government a. Operated generator in accordance with the existing As per Decree of Decree of MoEF No. 13 tahun 1995, See Appendix 1 Comply
and Noise of harbour & Regulation no. 41 engine and equipment operation guidelines emission at disel generator with capacity < 570 kWth shall
b. Potential marine year 1999 and KEP- b. Conducted routine maintenance for existing be monitored every 3 yearly.
decline of facilities and 48/MENLH/II/1996 equipment Routine diesel generator maintenance is performed as per
air quality operation of schedule.
c. Conducted routine maintenance for generator in
the main Location: Camp and supporting facilities.
accordance with the existing engine and equipment
camp operation guidelines Period: twice during operational phase
d. Personnel working near source of noise wears
earplugs
a. Soil Quality Potential ex a. Minimize the a. Ex-lube oil is stored in the hazardous waste storage Comply
b. Fuel and lube oil possibility of fuel which has a secondary containment and an oil
wastewater spillage spillage separator. The storage is inspected regularly and after
spillage and b. Effective heavy rainfall, hydrocarbon is filtered and only
other handling of uncontaminated water is discharged
untreated spillage to soil in
domestic accordance with
waste the procedure as
effluent to not
c. Improper contaminate the
disposal of soil
47
PERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Remarks
Impact Status
Manage
non-organic
waste
a. Flora and Operation of Flora and fauna Field observation of birds was conducted in 2011 Comply
Fauna Main Camp baseline prior to Location: Around the airstrip
b. Fauna project Period: Twice during operational phase
displaceme commencement
nt
48
OPERATOR’S EHS REPORT
TANGGUH LNG
A.1.2 E VALUATION
The result of Ambient monitoring activity conducted in Sept 2018 (Semester 2 - 2018)
indicates that all parameters are in compliance with the AMDAl Standard.
Tables 1-7 show the results of Ambient Air Monitoring; Emission from Boilers, Gas
Turbine, Regeneration Gas Heaters; and Acid Gas Incinerator Stack.
49
OPERATOR’S EHS REPORT
TANGGUH LNG
50
OPERATOR’S EHS REPORT
TANGGUH LNG
51
OPERATOR’S EHS REPORT
TANGGUH LNG
Monitoring Result
Parameter (Unit) Standard
Jul-18 Aug-18 Sep-18
Oct-18 Nov-18 Dec-18
Copper mg/L 0.002 0.007 0.010 0.004 0.10 <0.01
Lead mg/L <0.001 <0.001 <0.001 <0.001 <0.02 <0.02
Mercury mg/L <0.00005 <0.00005 <0.00005 <0.00005 <0.0006 <0.0006
Nickel mg/L <0.001 <0.001 <0.001 <0.001 <0.01 0.07
Selenium mg/L <0.0005 <0.0005 <0.0005 <0.0005 <0.001 <0.001
Silver mg/L <0.001 <0.001 <0.001 <0.001 <0.003 <0.003
Thalium mg/L <0.001 <0.001 <0.001 <0.001 <0.03 <0.03
Vanadium mg/L <0.001 <0.001 <0.001 <0.001 <0.01 <0.01
Zinc mg/L 0.023 0.018 0.019 0.013 0.08 0.15
Total toxic
Total
mg/L metals < 5 0.0005 0.0005 0.0005 0.018 0.190 0.240
metal
mg/L
In accordance with Tangguh AMDAL and the wastewater discharge to sea permit no.
125 year 2013, only pH and salinity will be monitored with regards to brine water. In this
reporting period, the parameters were all in compliance with the permit requirements.
30 m from
Salinity 0
/00 discharge 26.30 30.00 28.10 24 34 28.0
location
30 m from Rad. 30 m
discharge maksimum
Salinity location 5%
%
dari salinitas
-1.52 0.33 -3.20 0.00 1.18 0.00
Increment and
exclusion exclusion
zone zone
52
OPERATOR’S EHS REPORT
TANGGUH LNG
A.1.2.5 S EWAGE
Treated effluent from the Sewage Treatment Plants (STP) is sampled and analyzed at
the discharge points prior to being discharged to sea at the -13m LAT common outfall
at the LNG jetty. The effluent discharge is monitored, and the result is compared with
the standards in Tangguh AMDAL and the wastewater discharge to sea permit no.
125/2013. All analysed parameters are in compliance with the requirements in this
reporting period, as shown in Table 11 - 13.
A.1.2.6 S EAWATER
Seawater monitoring was conducted twice during the reporting period (August and
December) at 4 locations at 30 m and 100 m upstream and downstream discharge
locations, as shown at attachment I. It was found that some parameters i.e. Turbidity,
and Nitrate orus were above the regulatory limit. Exceedances of these parameters have
been observed in Tangguh Integrated AMDAL (2002) baseline data as well as in the
updated environmental baseline information in the wider Bintuni Bay region conducted
in 2012/2013.
53
OPERATOR’S EHS REPORT
TANGGUH LNG
Biochemical
Oxygen
Demand BOD5 mg/L 20 <2 <2 <2 <2
Oil and Grease mg/L 5 <0.5 <0.5 <0.5 <0.5
Phenols mg/L 0.002 <0.001 <0.001 <0.001 <0.001
Surfactants MBAS mg/L 1 <0.01 <0.01 <0.01 <0.01
mgSn/
Tributyltin** L 0.01 <0.01 <0.01 <0.01 <0.01
Total
hydrocarbon mg/L 1 <1 <1 <1 <1
54
OPERATOR’S EHS REPORT
TANGGUH LNG
SW-3 SW-4
SW-1 SW-2
Location (downstrea (downstrea
(upstream) (upstream)
Parameter m) m)
Regulatory
Unit 12-Aug-18 12-Aug-18 12-Aug-18 12-Aug-18
Limit
Polynuclear
Aromatic
Hydrocarbons*
* mg/L NA <0.1 <0.1 <0.1 <0.1
Microbiological Tests
MPN/
Total Coliform 100
Bacteria ml 1000 ND ND ND ND
PLANKTON
sel/10 No No No No No
Plankton 0 ml blooming blooming blooming blooming blooming
SW-3 SW-4
SW-1 SW-2
Location (downstrea (downstrea
(upstream) (upstream)
Parameter m) m)
Regulatory
Unit 21-Dec-18 21-Dec-18 21-Dec-18 21-Dec-18
Limit
Physical Tests
Nutrient
Heavy Metals
Chromium
Hexavalent mg/L 0.005 <0.0017 <0.0017 <0.0017 <0.0017
mg/L
Arsenic 0.012 <0.004 <0.004 <0.004 <0.004
mg/L
Nickel 0.05 <0.01 <0.01 <0.01 <0.01
Dissolved Metals
Cadmium Cd mg/L 0.01 <0.003 <0.003 <0.003 <0.003
55
OPERATOR’S EHS REPORT
TANGGUH LNG
SW-3 SW-4
SW-1 SW-2
Location (downstrea (downstrea
(upstream) (upstream)
Parameter m) m)
Regulatory
Unit 12-Aug-18 12-Aug-18 12-Aug-18 12-Aug-18
Limit
Organics
Biochemical
Oxygen 9.92 9.92 9.90 9.95
Demand BOD5 mg/L 20
Oil and Grease mg/L 5 <2 <2 <2 <2
56
OPERATOR’S EHS REPORT
TANGGUH LNG
In accordance with the wastewater discharge to sea permit no. 125 year 2013, water
quality in the open drainage shall be monitored in three areas: ORF, Utility and MCB.
Two parameters were analysed on a monthly basis as per the requirement, TOC and Oil
& Grease, and both parameters for all area were found to be in compliance and far
below the regulatory standards, as seen in Table 15 - 17. Additional parameters, which
are pH, DO, TDS and TSS, were monitored in as per the AMDAL requirement and found
to be within the regulatory limits.
57
OPERATOR’S EHS REPORT
TANGGUH LNG
Quarterly surface water monitoring waste conducted at the creek near new landfill area.
The creek is downstream of Drainage water from Utility and MCB area. The result of
surface water monitoring in Quarter 3 and 4 of 2018 comply with surface water quality
as per Government Regulation 82 of 2001 class 2.
58
OPERATOR’S EHS REPORT
TANGGUH LNG
Emission monitoring at Non hazardous waste was conducted in August 2018. All
parameter meets the standard. Dioxin dan Furan was not monitored in this period.
Refers to regulation, dioxin dan furan monitoring perion are every 5 years.
59
OPERATOR’S EHS REPORT
TANGGUH LNG
Monitoring
Regulation
AMDAL Result of Non
Parameter (Unit) P 70/2016
Standard Hazardous
Standard
Incinerator
Mercury Hg mg/Nm3 N/A 3 <0.05
A.1.2.9 B ABO
60
OPERATOR’S EHS REPORT
TANGGUH LNG
Treated effluent from the Sewage Treatment Plants (STP) is sampled and analyzed at
the discharge points prior to being discharged to surface water. The effluent discharge
is monitored and the result is compared with the standards in Tangguh AMDAL and the
wastewater discharge to sea permit no. 188.4.5/A-40 Year 2014. All analysed parameters
are in compliance with the requirements in this reporting period, as shown in Table 22.
During this reporting period, ambient air and noise, surface water, seawater and
benthos were analysed in September 2018 and all parameters were in compliance with
the regulatory standard.
61
OPERATOR’S EHS REPORT
TANGGUH LNG
A.2.1 I MPLEMENTATION
This section provides updates on social commitments as stipulated in the Tangguh Social Management as a part of AMDAL document for the period of July - December 2018. It covers Trains 1 and 2
operations, as well as Train 3 construction project. The achievements captured in this section focuses on the progress of the five-year deliverable AMDAL commitments as desribed in the Tangguh
Sustainable Development Program (TSDP).
3. To increase community access to clean • To improve community health services quality and
water and sanitation facilities, Tangguh access:
62
OPERATOR’S EHS REPORT
TANGGUH LNG
63
OPERATOR’S EHS REPORT
TANGGUH LNG
64
OPERATOR’S EHS REPORT
TANGGUH LNG
65
OPERATOR’S EHS REPORT
TANGGUH LNG
Local According to the AMDAL, 1. Supporting development of agriculture Tangguh’s local economic development program aims Tangguh’s local On track
Economic there were several and fisheries and market network to create multiplier benefits for Teluk Bintuni and economic development
Developme commitments indicators development for local products, Tangguh Fakfak Regencies, as well as support sustainable activity is one of the
nt under local economic LNG will support the local government development in the region. The program creates programs in the
development program. to: opportunities for economic activities among livelihood restoration
Below are the main • Develop a broader marketing network indigenous people for increasing their income and initiative. This was
indicators set out for the for the local products produced by the welfare. The program combines the previous Tangguh designed to ensure the
short term: Indigenous People. Livelihood program targeted at the primary sector, with income of indigenous
1. Supporting facilities/ • Optimise the absorption of local the Business Incubation program that focused on households and the
infrastructure for products in agriculture, fisheries, enhancing indigenous entrepreneur capacity. community surrounding
agricultural, fisheries foods, and others. the LNG plant is not
and other production The Tangguh Indigenous Enterprise Development adversely affected. There
activities of selected 2. To increase the capacity and numbers of Program (TIEDP) targets Indigeous People (IP) to are two kinds of activities
Indigenous People from available financial institutions that can be improve entrepreneurship and involve in the business in the IEDP which are
areas surrounding accessed by Indigenous People, Tangguh supply chain, not only at Tangguh but also the wider defined by business type
Tangguh LNG Operation LNG will support the local government in industries in Papua Barat region. and scope, namely the
site and market network developing community-based economic Primary sector and the
development for local institutions that are already available for To achieve the economic program commitments there Secondary sector.
products. the Indigenous People. were several activites completed during this reporting
2. Increase capacity and period: The Primary sector is
numbers of available 3. To improve capacity strengthening for focused on agricultural
financial institutions Indigenous People in managing micro 1. To strengthen agriculture and fisheries programs in programs in south shore
that can be accessed by enterprises, Tangguh LNG will support the community region, while the
Indigenous People the local government to: fisheries program is
66
OPERATOR’S EHS REPORT
TANGGUH LNG
67
OPERATOR’S EHS REPORT
TANGGUH LNG
68
OPERATOR’S EHS REPORT
TANGGUH LNG
69
OPERATOR’S EHS REPORT
TANGGUH LNG
70
OPERATOR’S EHS REPORT
TANGGUH LNG
Education Program indicators set out 1. Tangguh LNG will support local Tangguh education program aims to support the local Tangguh education On track,
and under the education and government efforts in the development of government to improve basic education quality and appointed Cardno- except
Training training programs: flagship schools at elementary, junior high increase community access to education. In provisi as implementing flagship
Program and senior high school level in five collaboration with Teluk Bintuni Education Office and partner to provide school
1. Flagship school districts across the North and South Tangguh’s implementing partner, Tangguh education technical assistance for program
developed according to shores of Bintuni Bay as well as the Kokas team delivered some outputs including: the Teluk Bintuni and development
the concept agreed with District. Fakfak Education Offices. as it is
local government 2. Tangguh LNG will support the Local 1. Flagship school development The program also challenging
2. Availability of adequate Government efforts to improve the Signing of MoU of Bintuni Bay BP-Pemda for collaborated with three and we need
facilities and existing education infrastructure at Flagship School Program based on AMDAL local foundations (YPK, numerous
infrastructure in schools elementary, junior high and senior high Document and TSDP Book. It took place at Asthon YPPK and supports
having a high school levels in the areas surrounding Manokwari Hotel on 11 October 2018, attended Muhammadiyah), and from other
proportion of Tangguh LNG Operation site. by the Regent and a group from BP VP C & EA local universities (UNIPA stakeholders.
Indigenous People 3. To improve student participation levels in and Education. and UNCEN) to support
students. education, Tangguh LNG will: several activities
3. Student participation • Support local government efforts in including scholarship,
levels in education capacity building of the Education mentoring, and literacy
activities per school Offices to achieve education quality programs.
level standards. A new implementing
4. Capacity building • Provide scholarships for outstanding partner was recruited,
programs for the Teluk students selected from the Indigenous Yayasan Nusantara
Bintuni Education Office People in senior high schools across 2. Improvement of school facilities and Sejati, to support the
officials in delivering its the areas surrounding Tangguh LNG infrastructure flagship school
functions and Operation site. • Maintaining “Rumah Pintar” program in development for the next
responsibilities • Provide financial aid through a Babo and Weriagar districts three years.
(tupoksi); scholarship program for outstanding
students from selected Indigenous 3. Improvement of student participation in
Outcome indicators below People in the area surrounding education
are set out for the long Tangguh LNG Operation site; Bintuni
term commitment Bay, Fakfak and other regions in • Facilitated Open Day event of SMP YPK
(achieved within 5 years): Papua to continue their education at Tanah Merah Baru. Open Day is an activity
5. Type of skills attained by the university level. carried out by schools to promote schools to
Indigenous a wider community. This activity emphasizes
71
OPERATOR’S EHS REPORT
TANGGUH LNG
72
OPERATOR’S EHS REPORT
TANGGUH LNG
73
OPERATOR’S EHS REPORT
TANGGUH LNG
74
OPERATOR’S EHS REPORT
TANGGUH LNG
Governance To measure the success of 1. To support the increasing of government The Governance program aims to support Teluk The Governance On track,
the governance program, personnel performance in planning, Bintuni administration yo develop a competent, Program is carried out to except north
the following outcome budgeting and administration, Tangguh transparent and accountable government. The program encourage the local shore
indicators were set out: LNG will: includes capacity strengthening for the local government and key housing
• Method and type of • Support the Local Government efforts government, Integrated Community Based Security stakeholders to take a program.
support for increasing in increasing the professional capacity (ICBS), and Civil Society Organization strengthening lead on local
government personnel of the officials at the village and district (CSOs). The governance program has an important role development in the
performance in planning, levels in areas surrounding Tangguh in ensuring the sustainability of Tangguh LNG in the future, as well as to
budgeting and LNG Operation site at Teluk Bintuni future. create sustainable
administration; and Fakfak Regencies. development in Bintuni
• Support in-migration • Support local government in providing For this period, some outputs were delivered, and Fakfak regions. The
management; good quality public services to the including: governance program
• Participation levels of people especially on health, education engages several key
Civil Society and public economy at the village, 1. Supported the government officials’ performance in stakeholders including
Organizations (CSO), district and regencial levels. planning, budgeting and administration: local government
indigenous organisations • Comply with the prevailing laws • Trained 20 government officials of Teluk Bintuni apparatus at regency,
and local media in regarding anti-bribery and anti- on planning, budgeting and monitoring related district and village level,
planning, implementing corruption, as well as uphold and issues. police and military,
and evaluating promote ethical business practices. • Conducted training and mentoring on role and media, NGOs and
programs; • Encourage the formation of functions to several government officials of communities.
• Community initiatives for cooperation forum among Teluk Bintuni Regency, involving
75
OPERATOR’S EHS REPORT
TANGGUH LNG
76
OPERATOR’S EHS REPORT
TANGGUH LNG
6. Tangguh LNG will provide direct benefit to Training on population data management
Indigenous People in accordance with public
consultation process. 3. Increased participation level of CSO:
• Continued mentoring for Sianiri Foundation in
Babo on organization management.
• Facilitated cemetery visit of the three clans from
the early resettlement project, Simuna, Wayuri,
and Siwana during IED FITRI and Christmas.
5. ICBS
77
OPERATOR’S EHS REPORT
TANGGUH LNG
78
OPERATOR’S EHS REPORT
TANGGUH LNG
79
OPERATOR’S EHS REPORT
TANGGUH LNG
80
OPERATOR’S EHS REPORT
TANGGUH LNG
81
OPERATOR’S EHS REPORT
TANGGUH LNG
82
OPERATOR’S EHS REPORT
TANGGUH LNG
External 1. Level of community and 1. To build good perception about The external relations team manage the relationship On track
Relations stakeholders Tangguh in the community, Tangguh with the key stakeholders at all levels through ongoing
understanding about
Program Tangguh social programs LNG will: communication and engagement. This is to support the
2. Reliable supply of • Support the development for stability of Tangguh LNG and maximize benefits of its
electricity for Teluk Indigenous People living in areas presence in the bay. The team also manages the
Bintuni Regency surrounding Tangguh LNG Operation grievance mechanism process from the communities
site, involving the planning from the associated with Tangguh operation and project and
community and local government with continued to preserve local values and cultures.
focus on sustainable activities.
• Actively build harmonious mutual Improved community and stakeholder perception on
relationships with all stakeholders with Tangguh by:
the principles of equality, partnership,
trust, respect and appreciation. • Conducted regular visits to districts and villages
surrounding Tangguh to provide update on the
2. To provide reliable supply of electricity project and to maintain positive relationship with
for the Teluk Bintuni Regency, Tangguh key stakeholders. During this reporting period, The
LNG will provide power to the State Comrel team invited leaders from Sumuri
Electricity Company (PLN) taken from community to Tangguh LNG site to get updates on
the oversupply of LNG plant at 4 Tangguh construction.
Megawatts and will be increased to a
maximum of 8 Megawatts in accordance • Facilitated key stakeholders visit to Tangguh LNG
with the ability of Tangguh LNG. site to update and oversee project activities,
including lenders and lenders consultant visit to
several villages, including Tomu, Tanah Merah
Baru, and Tofoi. The team also met with the local
government representatives in Bintuni and Fakfak.
83
OPERATOR’S EHS REPORT
TANGGUH LNG
Electricity program
In fulfilling AMDAL commitment to provide electricity in
Bintuni, Tangguh Sustainability Program has delivered
several activities including:
• Continue technical support for Regional Business
Own (BUMD) development with focus on
business segment developments.
84
OPERATOR’S EHS REPORT
TANGGUH LNG
Papuan 1. Number of indigenous 1. Tangguh LNG will make a long-term Papuan Development Program is an effort from On track
Worker and other Papuans strategic plan for its Papuan Workforce Tangguh to train skilled workers ready for TEP, as well
participating in the
Relations development programs, Development, serving as a guideline for as to pursue our AMDAL commitment of 85% Papuan
and and Apprentice and Tangguh itself as well as its contractors, workers at Tangguh operation by 2029.
Developme Challenger programs. the government and other stakeholders, There are several outputs were achieved during July –
2. Technical education
nt in order to achieve the target of 85% December 2017 including:
institutions (Polinef and
SMK Bintuni) meeting Papua workforce by 2029. • Supported Indigenous People and Papuan
the education service 2. Tangguh LNG will work together with participation in Apprentice and Challenger
standards; and BLK related stakeholders in the development programs
Sorong meeting
accreditation standards. of a work training centre (BLK) to • Facilitated ‘Coaching and motivation sharing
3. Career development and develop basic technical skills, and the sessions with Papuan students”. The program
training programs for development of a polytechnic school. has been held in several cities in Indonesia
Tangguh LNG’s 3. To develop Indigenous People and aiming to share the knowledge and inspiring the
workforce from the
Indigenous People and Papuan workforce, Tangguh LNG and its students to prepare themselves to compete in
other Papua regions to major contractor will: working industry after graduation. during the
meet Tangguh LNG’s • Require contractors to fulfil the program we shared BP Social Investment
short, medium and long
term needs commitment on capacity building for Program for Teluk Bintuni and Fakfak as well as
workforce from Indigenous People and commitment to All Papuan. The program also
other Papua regions. Each contractor will tries to build the database students that has
develop and implement educational participated in the programs.
programs and workforce development in
accordance with the nature and terms of
the contract (construction, operation,
onshore vs. offshore) so that they can
supply workforce from Indigenous
People and other Papua regions with
competencies required by Tangguh LNG.
• Work with the agencies/institutions to
provide skills training, particularly to
selected Indigenous People living in
areas surrounding Tangguh LNG
85
OPERATOR’S EHS REPORT
TANGGUH LNG
86
OPERATOR’S EHS REPORT
TANGGUH LNG
87
OPERATOR’S EHS REPORT
TANGGUH LNG
A.2.2 E VALUATION
Several specialist organizations have been commissioned to carry out initiatives within
the TSDP, including NGOs, universities, and service providers. Recently there were 27
local institutions involved in the implementation of Tangguh social program.
Overall social condition in Bintuni remains relatively stable. The number of security
incidents at Tangguh LNG is low and has been low in nature, although the focus of
ensuring security and proper preventive measures towards radicalism threat essentially
in Babo has been elevated. The construction of Tangguh Expansion Project (TEP) started
after FID was signed in July 2016. It is expected that the project will bring benefits to the
local. The Tangguh expansion project has seen increasing trend of challenges,
especially in terms of workforce recruitment and labor relations, that could lead to
community and labor unrest. Thus far, these challenges have manifested themselves in
the form of protests and boat detentions in select locations, utilized by community
members to further air their grievance. Total of 12 boat detentions incidents occurred
in 2018 due to community action of expressing their dissatisfaction towards recruitment
result of Train 3 project. We have engaged the community and resolved the issues to
ensure the incidents were not prolonged.
In addition, during this reporting period, we received 42 concerns from the communities
through grievance cards, and mostly on related job opportunities for Train 3 project and
asking clarification on workforce recruitment processes. We recognized that there is one
concern identified as real grievance when one person from Tomu claimed that a
Tangguh boat hit the person’s boat and damaged the person’s belongings, thus
claiming compensation. The grievance has been responded and the social, security and
marine team is currently working to clarify the issue with the complainant.
88
OPERATOR’S EHS REPORT
TANGGUH LNG
The ICBS program continues to promote community awareness about prevailing law
and its role in securing the Tangguh LNG project as Bintuni and national assets.
Villagers are regularly updated on project, zone exclusion and trespassing policies for
the Tangguh LNG project, which allows them to understand the project benefit and
encourages their participation. Compared to 2017, exclusion zone and trespassing
violations tend to increase. It is reported that there were twelve boat detentions
incidents occurred throughout 2018, undertaken by community unsatisfied with TEP
workforce recruitment.
89
OPERATOR’S EHS REPORT
TANGGUH LNG
Meanwhile, the governance program continues its effort to support the Teluk Bintuni
regency on engaging all key stakeholders at national and local levels to response
community aspiration on the fairness of oil and gas revenue management issue. The
formulation of special bylaw on oil and gas revenue sharing fund (Perdasus DBH) is
progressing. The working group for Perdasus DBH has been established to support the
advocacy processes of Perdasus DBH. Tangguh facilitated the working group to have a
serial discussion with the Parliament of Papua Barat Province and Ministry of Home
Affair in Manokwari to seek inputs and finalize the Perdasus draft. Perdasus DBH is
expected to provide legal basis for the settlement of rising compensation claims by adat
communities affected by oil and gas operations and optimize local development.
The Tangguh community health program continues its effort to support the Health
Office Regency of Teluk Bintuni to improve the community health status by increasing
awareness on healty life style and leverage access to quality basic health services both
prevention and treatment. The program implementation is still focused on 14 priority
villages. During this reporting period there is no significant health issue reported.
Several outcomes were achieved, including maintaining malaria prevalence at low
level, referring 312 people with TB symptom for early diagnosis and treatment, and
keeping a low ratio of children with mal-nutrition status at the village. However, based
on regular surveillance, the fatality rate of severe diarrhea in 2018 was 1% or slightly
increased compared to 2017 (0%) due to rainy season. Two fatality cases reported from
the village due to severe diarrhea. Investigation and mitigation have been undertaken
to understand the root of causes and prevent future cases. Health awareness sessions
90
OPERATOR’S EHS REPORT
TANGGUH LNG
on promoting hygiene, clean water and healty sanitation were held in communities to
minimize of diarrhea cases among villagers. The program also supported the health
clinic at the village to distribute oral rehydration solution to the community as first aid.
6.3%
3.9%
2.3%
1.0%
1.0%
0.3% 0.4%
0.0%
91
OPERATOR’S EHS REPORT
TANGGUH LNG
2987
2
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
Whereas the primary sector has been working with micro-level enterprises for several
years, and will continue to do so, the Indigneous Enterprise Development Program
(IEDP) is intended to create larger entities. Technical assistance for indigenous people
enterprises to be able to access Tangguh LNG contracts as well as other institutions
was continued. We prioritize the indigenous people as LED program beneficiaries by
enhancing their capacity in entrepeneurship and providing them with an alternative
business besides working as employees at Tangguh.
The three indingenous “SUBITU” businesses (United Tribal Group of Bintuni) continue
its business as professional to receive work order from the Tangguh, community and
the local government. Taking into consideration local demand and potential market,
Tangguh facilitated the establishment a new branch of SUBITU in Manokwari. The new
office opening ceremonial was held on September 4, 2018 attended by Papua Barat
Governor, Vice Regent of Teluk Bintuni and Papua University Rector. This new unit
business is focused on selling its garment products and Air Conditiner maintenance.
Meanwhile, after contract signing with TEP catering contractor (PSU) in March 2018,
SUBITU MART continue to supply fresh vegetable, fruits and egg to support project
activities. Total supply SUBITU Mart to PSU catering until December 2018 is 92 tones
worth more than US$ 221,900. More over, to respond market demand on fresh egg and
chicken meat, the IEDP team supported development of chicken farming and livestock
92
OPERATOR’S EHS REPORT
TANGGUH LNG
as an alternative business for local people. This program is fully supported by the local
government of Teluk Bintuni.
The SUBITU also continues to provide close mentoring of business development to help
existing indigenous entrepreneurs, and to foster newly formed enterprises, to engage
both with Tangguh as a customer, or with others. From January until December 2018,
there were 53 mentees (17 of them are women business owners) participated in one-
on-one business mentoring for various aspects. Some of them participated in
procurement for Tangguh and government requests. In 2018, two local enterpreneur
received a new contract from Tangguh valued at US$1.8 million for general services.
Since the technical business assistance program started in 2006 there have been 30
Papuan contractors involved in the Tangguh operation. Total contract value for those
contractors has reached more than US$220 million.
40 250
203
200
30 30
150
20
100
10
50
4
0 3 -
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
Although the trend of local entrepreneur’s involvement in the Tangguh project has been
increasing, it is still dominated by contractors from Sorong Township and only a few
93
OPERATOR’S EHS REPORT
TANGGUH LNG
from Bintuni and Fakfak Regencies. There are several reasons: (i) lack of capacity of
Bintuni and Fakfak enterprenurers to fulfill oil and gas standard requirements; (ii)
infrastructures in Sorong is more advance to support business activities and create a
competitive business interm of economic aspect; (iii) among bintuni’s and Fakfak
enterpeneurers perceive that tender process in oil and gas industries is more difficult
and complicated compared the government sector. It reduces their entusiasm to
participate in the tender. To motivate and increase the local entrepreneurs’ capacity
especially from Teluk Bintuni and Fakfak Regencies, numerous business mentoring and
workshops are conducted with a variety of topics. During 2018, in total seven business
workshops were conducted, involving 137 local businesses, of which 37 were women
business owners. The IEDP team also continues to encourage the local government to
comprehensively assist local entrepreneurs with business development and improve
the Teluk Bintuni business climate.
94
OPERATOR’S EHS REPORT
TANGGUH LNG
Unskilled 12 6 0 18 100% 1%
Note: starting 2017 the definition of Papuan is Indigenous and Papuan workforce with more than
75 days site)
The table above show the current achievement of Indigenous People and Papuan people
workforce in Tangguh Operation. According to the table above, as of December 2018,
total Papuan workforce at Tangguh operation reached 56% of total Tangguh operation
employees, where 21% of them are indigenous from 62 villages surrounding the project.
There is an increase from 2017 (51%). Several efforts were made to increase the
proportion of skilled Papuan workforce, including by providing technical training for
existing Papuan employees and developing an apprentice program for talented Papuan
students to be professional employees. According to the table above, there are 308
Papuan employees at skilled and managerial level or 35% of total employee.
95
OPERATOR’S EHS REPORT
TANGGUH LNG
comprehensive trainings on variety topics. Our scholarship program for best Papuan
students also continued, providing opportunity for them to access advance education.
Recently, 54 local students received scholarships to attend senior high school and
university level. Since 2008, Tangguh has provided scholarship to 723 local students at
senior high schools and university levels including those who participated in apprentice
program at Ciloto. Meanwhile, flagship school program development in Tanah Merah
Baru has good progress. This as an effort to accelerate the quality of education in this
area. MoU for the implementation Flagship School Program was signed by BP and the
local government of Teluk Bintuni in Manokwari on 11 October 2018 and followed by
the opening ceremony in TMB village in October by the Regent of Teluk Bintuni.
Meanwhile, the three-year apprentice program Ciloto also continued. There are 112 best
Papuan youth from three batches, since the program started in 2016. This program is a
feeder pool for the future employment at Tangguh Operations. The first-batch’s
participants currently have assignment at Tangguh site to expose them with field
experience.
The Community Relations work together with Security and TEP WFM team actively to
maintain a positive relationship with key stakeholders and the communities at the
village and district level. The conversation relation is focused on Train 3 project
commencement (onshore and offshore activities), and north shore housing
implementation. They have regular visits to the villages and districts, as well as support
all contractors for engagements with the communities and stakeholders, as well as to
respond and manage community questions and concerns related the project. During
this reporting period, social tension and security incidents to Tangguh slightly increased
compared to the previous report due to TEP activities. According to the security data,
there were 12 boat detentions, 10 peace demonstrations and 5 blockades by the
community to Tangguh site occurred throughout 2018 as their expression to seek
project attention of their concerns. So far, the incident handling efforts managed to
overcome the issue without significant harm or disruption to the Tangguh project
activity.
96
OPERATOR’S EHS REPORT
TANGGUH LNG
100
80
60 50
40 27
10 13 12 11
20 7 6 3 4
0
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
97
OPERATOR’S EHS REPORT
TANGGUH LNG
The NSH program eventually started in May 2018 involving three contractors to build
183 houses. Prelimenary works of this project have been completed including
contractor’s office, workshop and workers camps. Until end of December 2018, the
progress to complete the houses has been very slow. The community in the three
districts were frustrated with this situation and voiced their anger during lenders visit in
July 2018. The local government of Teluk Bintuni visited Weriagar and Tomu on
December 15th, 2018 to meet community and explain the update about the housing
construction and the plan for the project continuation.
98
OPERATOR’S EHS REPORT
TANGGUH LNG
B.1.1 I MPLEMENTATION
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
Gas Exploitation (Offshore Platform Transportation and Installation, and Drilling) Activity
Marine biota • Sea Minimise the potential Sea transportation Activity a. Conduct visual observation and All environmental WDA and ROA Comply
abundance Transporta reduction of nekton a. Update marine mammal protection procedure and routinely record marine mammal management and Installation
and diversity tion abundance and marine conduct socialisation to related employees and vessel sighting monitoring plan started in July
Activity mammal diversity crew b. Conduct fishery surveys (Nekton requirements were 2018 and
• Offshore compared to environmental b. Update solid waste and wastewater management sample collection and fishermen’s implemented in completed in
Gas baseline during AMDAL procedure for sea transportation activity and conduct catch data collection and marine adherence to AMDAL RKL- September
Platform socialisation to related employees mammal (visual, if possible using a RPL requirements. 2018 (WDA)
Installation c. Update emergency response procedure at vessel and hydrophone) and October
Activity conduct training to vessel crew c. Check vessel engine maintenance 2018 (ROA)
Fishery and marine
• Gas Well d. Provide emergency response facility in the vessel in records to ensure that maintenance is
mammal survey will be
Drilling accordance with developed procedure conducted according to the determined
executed in March 2019 by
including e. Implement No Fishing policy schedule
Bogor Agricultural
Drilling f. Conduct routine maintenance to engine/equipments Institute (IPB).
Mud and according to specified schedule to ensure that the
Cuting engine/equipments are working efficiently
Records of wastewater
Discharge g. Prioritizing sailing in deeper area (>12 m) when the sea
discharge and solid waste
and DCRI condition is calm
generation are maintained
h. Reduce vessel speed if approaching marine mammal until
in the vessel log book.
the marine mammal swims away
Routine inspection is
i. Conduct solid waste and wastewater management in
performed to verify the
accordance with Government Regulation No. 21 Year 2010
implementation
and MARPOL also applicable regulations. Solid waste and
compliance towards
wastewater management will be discussed more details in
procedures.
EMP regarding seawater quality
Environmental Induction
j. Manage ballast water in accordance with Government
and Marine mammals
Regulation No. 21 Year 2010 and MARPOL. Ballast
protection socialization to
exchange is anticipated will not happen often since most
all vessel crew have been
of the vessels will arrive at Tangguh LNG in loaded
conducted and
condition
documented.
k. Record ballast exchange (date, location, volume, and
vessel’s name)
Offshore Gas Platform Installation a. Conduct visual observation and All environmental WDA and ROA Comply
a. Update marine mammal protection procedure and routinely record marine mammal management and Installation
conduct socialisation to related employees and vessel sighting monitoring plan started in July
crew b. Conduct fishery surveys (Nekton requirements were 2018 and
sample collection and fishermen’s catch implemented in completed in
September
99
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
b. Update solid waste and wastewater management data collection and marine mammal adherence to AMDAL RKL- 2018 (WDA)
procedure for sea transportation activity and conduct (visual, if possible using a hydrophone) RPL requirements. and October
socialisation to related employees c. Check vessel engine maintenance 2018 (ROA)
c. Conduct routine maintenance to engine/equipments records to ensure that maintenance is Fishery and marine
according to specified schedule to ensure that the conducted according to the determined mammal survey will be
engine/equipments are working efficiently scheduleis conducted according to the executed in March 2019 by
d. Conduct solid waste and wastewater management in determined schedule Bogor Agricultural
accordance with Government Regulation No. 21 Year 2010 Institute (IPB).
and MARPOL also applicable regulations. Solid waste and
wastewater management will be discussed more details in
EMP regarding seawater quality
Gas Well Drilling a. Collect seawater samples and conduct Drilling activity is VRB 10 well Comply
a. Update marine mammal protection procedure and analysis for the concentration of the continuing this period and reached Target
conduct socialisation to related employees required parameters done by an AMDAL commitments Depth on 16
accredited laboratory have been captured in July 2018
b. Update solid waste and wastewater management
procedure for drilling activity and conduct socialisation to b. Conduct compliance evaluation by contractor HSE plan and
related employees comparing analysis results with the implemented with
Minister of Environment Regulation No. evidence.
c. Conduct solid waste and wastewater management in
51 Year 2004 (refer to Table in Appendix Environmental monitoring
accordance with Government Regulation No. 21 Year
I), also taking into consideration work have been
2010, MARPOL and applicable regulations.
baseline condition during AMDAL performed with all
d. Conduct management plan in drilling mud and cutting
Check the records of the mud and drill parameters in compliance.
discharge activity in accordance with AMDAL and Drilling
cuttings amount which are discharged
Mud and Cutting Dumping Permit
overboard
e. Implement JNCC Guideline when conducting Vertical
Seismic Profile (VSP) during drilling, with procedures as
follows:
1) Conduct observation of marine mammal spotting
within 500 m distance for 30 minutes prior to VSP
activity
2) If marine mammal is spotted within 500 m
distance, then the activity is suspended to allow for
marine mammal to swim away
3) Implement “Soft Start” procedure
Drilling Mud and Cuting Discharge a. Collect sediment samples and conduct
analysis for the concentration of the
a. Update drilling activity procedure and conduct training to
required parameters done by an
related employees about environmental management in
accredited laboratory
drilling activity
b. Conduct compliance evaluation by
b. Update drilling mud and cutting management with
comparing analysis results with the
overboard discharge method procedure and conduct
ANZECC Guidelines (refer to Table in
socialisation to related employees
Appendix I), also taking into
100
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
c. Update emergency response procedure for drilling mud consideration baseline condition during
and cutting management and conduct socialisation to related AMDAL
employees
d. Conduct LC50 96 hours test to Water Based Mud at least
once prior to be used at the same sludge waste system in the a. Collect samples of plankton and benthos
same basin of offshore drilling activities b. Calculate abundance, diversity index
e. If using Water Based Mud, the waste that will be and uniformity index for plankton and
discharged are: benthos
c. Collection, identification and calculation
1) Used sludge and excess mud with LC50 96 hours >
will be conducted by an accredited
30.000 mg/L
laboratory
2) Drill cutting
d. Conduct trend evaluation by comparing
f. If using Synthetic Based Mud, the waste that will be analysis results with baseline condition
discharged are: during AMDAL
1) Drill cutting with oil on cutting content < 6,9%
g. If using Oil Based Mud, the drilling mud and cutting will
not be discharged to the sea
h. Conduct sludge recycle as much as possible ,e.g.: using
Solid Control Unit
i. Conduct activities in accordance with applicable Drilling
Mud and Cutting Dumping Permit and related procedures
j. Record volume of drilling mud and cutting discharge to sea
a. Conduct visual observation and
routinely record marine mammal sighting
DCRI
b. Conduct fishery surveys (Nekton sample
a. Update drilling activity procedure and conduct training to
collection and fishermen’s catch data
related employees about environmental management in
collection and marine mammal (visual, if
drilling activity
possible using a hydrophone)
b. Update drilling mud and cutting management with re-
c. Check vessel engine maintenance
injection method procedure and conduct socialisation to
records to ensure that maintenance is
related employees
conducted according to the determined
c. Update emergency response procedure for drilling mud
scheduleis conducted according to the
and cutting management with DCRI method and conduct
determined schedule
socialisation to related employees
d. Ensure the re-injection zone is not located in the
freshwater aquifer zone
e. Only conduct re-injection of waste type according to DCRI
Permit
f. Only conduct re-injection in the wells and formation
according to DCRI Permit
g. Conduct subsurface modeling to understand drilling mud
and cutting distribution pattern which re-injected in the
injection zone and percentage of injection zone injected
with drilling mud and cutting
h. Record injected drilling mud and cutting volume
101
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
If technical problem occurs with re-injection process and
drilling mud or cutting does not comply with the Overboard
Discharge option, then drilling mud and cutting will be sent to
licensed waste management facility
Air Quality Power Diesel Generator emission a. Update diesel generator operational procedure and a. Collect air emission samples at All environmental WDA and ROA Comply
Generation complies with standards conduct socialisation to diesel generator operator sampling points of the stack and management and Installation
from Diesel from MoE Regulations No. b. Operate generator in accordance with its specification, conduct analysis for the concentration monitoring plan started in July
Generator 13 Year 2009 and General both operational load and time of the required parameters done by an requirements were 2018 and
EHS Guideline 2007 c. Conduct routine maintenance to engine/equipments accredited laboratory implemented in completed in
according to specified schedule to ensure that the b. Conduct compliance evaluation by adherence to AMDAL RKL- September
machine/equipments are working efficiently comparing analysis results with the RPL requirements. 2018 (WDA)
Minister of Environment Regulation No. and October
13 Year 2009 and the General EHS 2018 (ROA)
Diesel generator emission
Guidelines 2007 (refer to Table in
monitoring results
Appendix I)
indicate that all
c. Conduct trend analysis
parameters are in
d. Check the generator maintenance
compliance with relevant
records to ensure that its maintenance
Indonesia regulation
is conducted in accordance with the
standards.
determined schedule
102
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
environmental baseline d. Record the sewage flowrate. If possible, for Offshore GPF and EPCI
during AMDAL measurement is done with a flowmeter Activity (TEP-9001-PLA-
e. Conduct trend analysis HS-BP5-0012).
Seawater quality
a. Collect seawater samples and conduct
analysis for the concentration of the
required parameters done by an
accredited laboratory
b. Conduct compliance evaluation by
comparing analysis results with the
Minister of Environment Regulation No.
51 Year 2004 (refer to Table in
Appendix I), also taking into
consideration baseline condition during
AMDAL
c. Conduct trend evaluation
Ballast water
Check the ballast water exchange records
to compare with the MARPOL requirements
103
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
(at least the date, location, volume and
vessel’s name)
Marine biota
a. Collect plankton samples
b. Calculate abundance, diversity index
and uniformity index of the plankton
c. Collection, identification and calculation
will be conducted by an accredited
laboratory
d. Conduct trend evaluation by comparing
analysis results with baseline condition
during AMDAL
104
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
Solid waste a. Solid waste (non- Solid Waste (non-hazardous) and Hazardous Waste a. Check records of the amount and type All environmental WDA and ROA Comply
(non- hazardous) Management of waste that has been produced and management and Installation
hazardous) management is General Management : delivered to the storage and treatment monitoring plan started in July
and conducted in facilities in Tangguh requirements were 2018 and
a. Update hazardous and non-hazardous solid waste
Hazardous accordance with b. Check records of the amount and implemented in completed in
management procedure and conduct socialisation to
Waste Government Regulation disposal location of food waste that has adherence to AMDAL RKL- September
related employees
management No. 21 Year 2010, been comminuted and disposed to the RPL requirements. 2018 (WDA)
b. Conduct solid waste segregation (Non-hazardous and
activity in MARPOL and related sea and October
hazardous waste)
offshore regulations c. Check the records and delivery of the 2018 (ROA)
c. Implement 3R system (Reduce, Reuse, Recycle) Drilling activity have
actvitiy b. Hazardous waste hazardous waste manifest
d. Categorize non-hazardous solid waste into organic, started on this period and
management is d. Conduct weekly inspection of the solid
recyclable, burnable and inert waste AMDAL commitments
conducted in waste and hazardous waste treatment
with regards to waste
accordance with facilities in accordance with the
Non-Hazardous Solid Waste Management : management have been
Government Regulation applicable procedure
captured in contractor
No. 85 Year 1999, a. Conduct solid waste management in accordance with
HSE plan and
MARPOL and related Government Regulation No. 21 Year 2010, MARPOL Annex
implemented with
regulations V and applicable regulations
evidence.
c. Minimise the potential b. Do not dispose garbage to sea, except food waste which
conditional change of shall be in compliance with MARPOL Annex V
plankton and benthos requirements
diversity and c. Comminute food waste to size less than 25 mm for further
equitability also marine disposal to sea with distance more than 3 nm from nearest
mammal disruption land
compared to d. Dispose uncomminuted waste at distance more than 12
environmental baseline nm from the nearest land
during AMDAL e. Transport non-hazardous solid waste except food waste to
onshore facility at Tangguh LNG or other locations for
further treatment
f. Record generated and disposed waste (daily)
105
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
and/or Marine as per procedure hence c. Update emergency response procedure and conduct accordance with the applicable adherence to AMDAL September
Facility will not disturb water training to emergency response team (ERT) procedure RKL-RPL requirements. 2018 (WDA)
quality and marine biota d. Appoint Emergency Response Team for fuel and chemical b. Conduct weekly inspection of and October
spill containers, storage system, storage 2018 (ROA)
e. Ensure fuel and chemical storage container are built warehouse condition, emergency
compatible with the material and are in good condition response system, and other facilities in
Drilling activity have
f. Ensure every stored material is recorded and accordance with the applicable
started on this period and
accompanied with MSDS procedure
AMDAL commitments
g. Minimum requirements for storage facility are as follows:
with regards to chemical
1) Completed with bunded area that will be able to Spill clean-up handling have been
contain 110% of the volume of the largest container or
a. Visual observation of oil film on the captured in contractor
25% of the total volume in the storage facility
water to ensure that the oil spill HSE plan and
2) Building construction, including the floor and bunded
response is conducted in accordance implemented with
area must be constructed with a impermeable material
with the procedure evidence.
3) Treat oily contaminated water trapped in the bunded
b. If required, conduct seawater quality
area
analysis for the Oil and Grease
4) Completed with spill kit
parameter in accordance with the
h. Put label and symbol on the container (package) and
applicable procedure (emergency
storage area
response procedure) to ensure that the
i. Conduct regular inspection to fuel and chemical storage
spill clean-up activity is conducted as
and refueling facility
per the procedure
j. Perform efforts to response oil spill in accordance with
c. Record any spill that at least notes the
Oil Spill Contingency Plan and conduct spill response
amount and type of the spilled
training according to planned schedule
hazardous material and waste, spill
location and the spill handling efforts
Soil Onshore Fuel a. Minimise the possibility a. Update hazardous material management procedure and a. Inspect hazardous material and waste All environmental WDA and ROA Comply
contaminatio and Chemical of onshore fuel and conduct socialisation/training to related employees storage facility prior to operation in management and Installation
n Storage chemical spill b. Update emergency response procedure and conduct accordance with the applicable monitoring plan started in July
Facility and b. Onshore spill response training to emergency response team (ERT) procedure requirements were 2018 and
Refueling can be done effectively c. Appoint Emergency Response Team for fuel and chemical b. Conduct weekly inspection of implemented in completed in
Facility as per procedure hence spill containers, storage system, storage adherence to AMDAL RKL- September
will not contaminated d. Ensure fuel and chemical storage container are built warehouse condition, emergency RPL requirements. 2018 (WDA)
the land compatible with the material and are in good condition response system, and other facilities in and October
e. Ensure fuel and chemical storage and refueling location is accordance with the applicable 2018 (ROA)
safe from flood or is on a higher elevation procedure
f. Minimum requirements of storage facility are as follows:
1) Completed with a bunded area that will be able to Spill clean-up
contain 110% of the volume of the largest container, or
a. Visual observation to ensure that the oil
25% of the total volume
spill response is conducted in
2) The building, including the floor and the bund wall,
accordance with the procedure
must be constructed with a impermeable material
b. If required, conduct soil TPH analysis
3) The floor construction must have a slope of at least 1%
(as per the Minister of Environment
towards sump pit or Oil Water Separator (OWS)
Decree No. 128 Year 2003) on location
106
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
4) Completed with a sump pit for facilities with a roofed after the soil has been cleaned up to
shelter ensure that the contaminated soil
5) Completed with an Oil Water Separator (OWS) unit for excavation has been done as per the
facilities without a roofed shelter; procedure
6) Completed with spill kit c. Record any spill that at least notes the
7) Completed with MSDS information amount and type of the spilled
g. Conduct routine clean up of oily contaminated water hazardous material and waste, spill
trapped in sump pit or OWS for further treatment location and the spill handling efforts
h. Put label and symbol on the container (package) and
storage area
i. Conduct regular inspection/audit
j. Treat contaminated soil by excavated, separated and
collected to Temporary Hazardous Waste Storage for
further treatment
k. Ensure clean up process is performed well and conduct
TPH soil test (if necessary) according to MoE Decree No.
128 Year 2003
107
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
b. Minimise the depth depending on the actual adherence to AMDAL RKL- Pipeline
conditional change of depth and 2 m above the seabed RPL requirements. installation
benthos diversity and started in
equitability outside 500 b. Analyse for TSS using an accredited Seawater monitoring October 2018
m distance from activity laboratory result during trenching and ongoing.
location compared to c. Conduct compliance evaluation by and rock dumping
environmental baseline comparing analysis results with the activities are in
during AMDAL seawater quality regulatory standards compliance with relevant
c. Minimise the potential as per the Minister of Environment Indonesian regulation
reduction of nekton Regulation No. 51 Year 2004 (refer to standards.
abundance and marine Table in Appendix I), also taking into
mammal diversity consideration baseline condition during
disturbance compared AMDAL
to environmental d. Monitor record of pre-trench material
baseline during AMDAL dumping to track the dumping location
and volume and ensure that the pre-
trench material disposal is done at the
agreed location in accordance with the
AMDAL
Hydrotest a. Hydrotest wastewater Gas transmission end of pipe direct discharge to sea at a. Collect seawater samples with the Offshore pipeline Start by Q1 Comply
water management in Offshore Platform alternative: following requirements: hydrotest procedure has 2019
discharge for accordance with a. Update Hydrotest activity procedure to ensure that the 1) If depth is less than 10 m, collect been developed, including
the Wastewater Discharge dosage of chemicals used are in accordance with the sample 2 m below sea level the chemical cocktail
alternatives of to Sea Permit requirements (planned) and conduct procedure 2) If depth is between 10 – 20 m, composition. All
: b. Minimise the potential socialisation and training to related employees collect samples 2 m below sea level chemicals are listed as
a. Gas reduction of nekton b. Use chemicals as approved by DITJEN MIGAS and 2 m above the seabed approved MIGAS
transmissi abundance and marine c. Select environmentally friendly chemicals for dewatering 3) If depth is deeper than 20 m, collect chemicals. Discharge
on end of mammal disruption process samples 2 m below sea level, mid- location of the hydrotest
pipe compared to d. Construct discharge end pipe which is likely to be located depth depending on the actual water will be performed in
direct environmental baseline at Offshore Platform in 3 m depth below sea level depth and 2 m above the seabed 3 different locations (Near
discharge during AMDAL e. Ensure discharged wastewater complies with maximum b. Analyse for DO using an accredited HDD exit point, WDA
to sea at flowrate limit as stated in Wastewater Discharge to Sea laboratory platform, and ROA
Offshore Permit c. Conduct compliance evaluation by platform).
Platform comparing analysis results with the
b. Onshore seawater quality regulatory standards
Management and
storage as per the Minister of Environment
monitoring requirements
and Regulation No. 51 Year 2004 (refer to
for hydrotest and
discharge Table in Appendix I), also taking into
preservation activity have
to sea consideration baseline condition during
been incorporated into
AMDAL
Project Environmental
d. Record concentration of the chemicals
Management and
used
Monitoring Plan for
Offshore GPF and EPCI
Activity (TEP-9001-PLA-
HS-BP5-0010).
108
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
Onshore Storage and Discharge to Sea alternative: a. Collect seawater samples with the Not applicable – this Not Applicable Not
following requirements: alternative is not chosen. Applicable
a. Update Hydrotest activity procedure to ensure that the
dosage of chemicals used are in accordance with the 1) If depth is less than 10 m, collect
requirements (plan) and conduct procedure socialisation sample 2 m below sea level
and training to related employees 2) If depth is between 10 – 20 m,
b. Use chemicals as approved by DITJEN MIGAS collect samples 2 m below sea level
c. Select environmentally friendly chemicals for dewatering and 2 m above the seabed
process 3) If depth is deeper than 20 m, collect
d. Construct impermeable temporary onshore storage facility samples 2 m below sea level, mid-
to collect hydrotest water depth depending on the actual
e. Conduct hydrotest water discharge at -6 m LAT in LNG depth and 2 m above the seabed
Jetty location b. Analyse for DO using an accredited
f. Ensure discharged wastewater complies with maximum laboratory
flowrate limit as stated in Wastewater Discharge to Sea c. Conduct compliance evaluation by
Permit comparing analysis results with the
seawater quality regulatory standards
as per the Minister of Environment
Regulation No. 51 Year 2004 (refer to
Table in Appendix I), also taking into
consideration baseline condition during
AMDAL
d. Record concentration of the chemicals
used
Sea Water Nearshore TSS concentration in sea a. Update wastewater management procedure and conduct a. Collect seawater samples with the All environmental Started in July Comply
Quality Pipeline water complies with socialisation to related employees following requirements: management and 2018 and
Installation standard in MoE Decree No. b. Conduct land clearing only at designated area 1) If depth is less than 10 m, collect monitoring plan completed in
with HDD 51 Year 2004 by considering c. Manage drainage pattern and sediment control sytem sample 2 m below sea level requirements are October 2018.
alternative environmental baseline including sediment trap and sedimentation pond along 2) If depth is between 10 – 20 m, implemented in
condition during AMDAL cleared area during HDD activity collect samples 2 m below sea level adherence to AMDAL RKL-
d. Use Water Based Mud and conduct mud test prior usage and 2 m above the seabed RPL requirements.
to confirm it is non hazardous material 3) If depth is deeper than 20 m, collect
e. Reuse mud by using Shaker Unit to separate mud and samples 2 m below sea level, mid-
Seawater monitoring
cutting depth depending on the actual
result indicates that all
f. Used mud and cutting from HDD will be collected in a depth and 2 m above the seabed
parameters are in
pond that will be constructed near the HDD location. Once b. Analyse for TSS using an accredited
compliance with relevant
finished, the pond will be closed and revegetated. Another laboratory
Indonesian regulation
alternative is to dispose the used mud into non-hazardous c. Conduct compliance evaluation by
standard.
landfill at Tangguh site. comparing analysis results with the
seawater quality regulatory standards
g. Conduct revegetation in affected area after the activity is as per the Minister of Environment
completed. Regulation No. 51 Year 2004 (refer to
h. If required, pre-trench material will be disposed in disposal Table in Appendix I), also taking into
location and the disposal will be recorded e.g. volume, consideration baseline condition during
actual coordinate of disposal location and disposal time AMDAL
d. Monitor record of pre-trench material
dumping to track the dumping location
109
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
and volume and ensure that the pre-
trench material disposal is done at the
agreed location in accordance with the
AMDAL
Nearshore TSS concentration in sea a. Minimise land clearing area by only conduct land clearing a. Collect seawater samples with the Not application – As per Not Applicable Not
Pipeline water complies with in the designated area (including mangrove) following requirements: shore approach study Applicable
Installation standard in MoE Decree No. b. Design Trenching and Shore-Pull activity by considering 1) If depth is less than 10 m, collect result that was conducted
with 51 Year 2004 by considering erosion mitigation factor sample 2 m below sea level during pre-FEED, HDD
Trenching environmental baseline c. Manage drainage pattern and sediment control (including 2) If depth is between 10 – 20 m, method is selected for
and Shore- condition during AMDAL sediment trap and pond) collect samples 2 m below sea level shore approach pipeline.
Pull d. Conduct revegation in affected area after the activity is and 2 m above the seabed
alternative completed 3) If depth is deeper than 20 m, collect
e. If required, pre-trench material will be disposed in disposal samples 2 m below sea level, mid-
location and the disposal will be recorded e.g. volume, depth depending on the actual
actual coordinate of disposal location and disposal time depth and 2 m above the seabed
b. Analyse for TSS using an accredited
laboratory
c. Conduct compliance evaluation by
comparing analysis results with the
seawater quality regulatory standards
as per the Minister of Environment
Regulation No. 51 Year 2004 (refer to
Table in Appendix I), also taking into
consideration baseline condition during
AMDAL
d. Monitor record of pre-trench material
dumping to track the dumping location
and volume and ensure that the pre-
trench material disposal is done at the
agreed location in accordance with the
AMDAL
Soil erosion Onshore Minimise soil erosion and a. Minimise land clearing area by only conduct land clearing a. Conduct visual observation for All environmental Started in Comply
and surface Trenching TSS concentration in the in the designated area (including mangrove) turbidity management and November
water quality surface water complies with b. Design Onshore Trenching activity by considering erosion b. Collect surface water samples and monitoring plan 2018 and
standard in Government mitigation factor analyse the required parameters requirements are ongoing.
Regulation No. 82 Year c. Manage drainage pattern and sediment control including internally or by an accredited implemented in
2001 Class 2 by considering sediment trap and sedimentation pond along cleared area laboratory adherence to AMDAL RKL-
environmental baseline in trenching activity c. Conduct compliance evaluation by RPL requirements.
during AMDAL d. Conduct revegation in affected area after the activity is comparing analysis results with the
completed regulatory standards of Class 2 in the
Government Regulation No. 82 Year
2001, also taking into consideration
baseline condition during AMDAL
d. Conduct trend evaluation
110
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
e. Visual observation on the availability
and effectiveness of the erosion
control facilities for example drainage
pattern, slope modification, jute net, or
planting vines, soft material handling
f. Visual observation at locations prone
to erosion, for example slopes,
stockpiles, etc
g. Visual observation during revegetation
Sea Water a. Wastewater Wastewater management a. Update wastewater management procedure and conduct Sewage All environmental Started in Comply
Quality from vessel complies with requirements socialisation to related employees a. Collect samples of the treated effluent management and October 2018
b.Wastewater in Government Regulation b. Conduct sewage treatment in accordance with (at the discharge pipe) and conduct monitoring plan and ongoing.
managemen No. 21 Year 2010, MARPOL Government Regulation No. 21 Year 2010 and MARPOL analysis for the concentration of the requirements are
t in offshore and applicable regulation Annex IV prior to discharge to sea required parameters done by an implemented in
construction c. Conduct oily contaminated water treatment by using Oil accredited laboratory adherence to AMDAL RKL-
Water Separator in accordance Government Regulation RPL requirements.
No. 21 Year 2010 and MARPOL Annex I prior to discharge b. Conduct visual observation for floating
to sea material and foam at the discharge pipe
d. Complies with requirements in Government Regulation c. Conduct compliance evaluation by
No. 21 Year 2010 and MARPOL for ballast water. Ballast comparing analysis results and visual
water exchange is anticipated tobe rarely conducted since observation with the standards set in the
most of the vessel will arrive in Tangguh LNG in loaded Wastewater Discharge to Sea Permit
condition d. Record the sewage flowrate. If possible,
e. Record ballast water exchange (date, location, volume and measurement is done with a flowmeter
e. Conduct trend analysis
vessel’s name)
Laboratory analysis
a. Collect samples of the treated effluent
(at the discharge pipe) and conduct
analysis for the concentration of the
required parameters done by an
accredited laboratory
b. Conduct compliance evaluation by
comparing analysis results with the
111
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
standards set in the Wastewater
Discharge to Sea permit and MARPOL
c. Record the wastewater flowrate. If
possible, measurement is done with a
flowmeter
d. Conduct trend evaluation
Seawater quality
a. Collect seawater samples and conduct
analysis for the concentration of the
required parameters done by an
accredited laboratory
b. Conduct compliance evaluation by
comparing analysis results with the
Minister of Environment Regulation No.
51 Year 2004 (refer to Table in
Appendix I), also taking into
c. consideration baseline condition during
AMDAL
d. Conduct trend evaluation
Ballast water
Check the ballast water exchange records
to compare with the MARPOL requirements
(at least the date, location, volume and
vessel’s name)
Marine biota
a. Collect plankton samples
b. Calculate abundance, diversity index
and uniformity index of the plankton
c. Collection, identification and calculation
will be conducted by an accredited
laboratory
d. Conduct trend evaluation by comparing
analysis results with baseline condition
during AMDAL
112
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
a. Solid waste a. Solid waste (non- General management a. Check records of the amount and type All environmental Started in Comply
from vessel hazardous) a. Update hazardous and non-hazardous solid waste of waste that has been produced and management and October 2018
b. Solid waste management is management procedure and conduct socialisation to delivered to the storage and treatment monitoring plan and ongoing.
(non- conducted in related employees facilities in Tangguh requirements are
hazardous) accordance with b. Check records of the amount and implemented in
b. Conduct solid waste segregation (non-hazardous waste
and Government Regulation disposal location of food waste that has adherence to AMDAL
and hazardous waste)
hazardous No. 21 Year 2010, been comminuted and disposed to the RKL-RPL requirements.
c. Implement 3R system (Reduce, Reuse, Recycle)
waste MARPOL and applicable sea
regulations d. Categorise non-hazardous solid waste into organic waste, Check records and delivery of the
manageme c.
b. Hazardous waste recyclable waste, burnable waste and inert waste hazardous waste manifest
nt activity
during management is d. Conduct weekly inspection of the solid
offshore conducted in Non-hazardous solid waste management : waste and hazardous waste treatment
constructio accordance with a. Conduct solid waste management in accordance with facilities in accordance with the
n Government Regulation Government Regulation No. 21 Year 2010, MARPOL Annex applicable procedure
No. 85 Year 1999, V and applicable regulations
MARPOL and applicable b. Do not dispose garbage to sea, except treated food waste
regulations in accordance with MARPOL Annex V requirements
c. Comminute food waste to size less than 25 mm for further
disposal to sea with distance more than 3 nm from nearest
land
d. Dispose uncomminuted waste at distance more than 12
nm from the nearest land
e. Record generated and disposed waste (daily)
Offshore Fuel a. Minimise the possibility a. Update hazardous material management procedure and a. Inspect hazardous material and waste All environmental Started in Comply
and Chemical of offshore fuel and conduct socialisation/training to related employees storage facility prior to operation in management and October 2018
Storage chemical spill b. Update Fuel and Chemical Management Procedure and accordance with the applicable monitoring plan and ongoing.
Facility and b. Offshore spill response conduct training/socialisation to related employees procedure requirements are
Refueling can be done effectively c. Update emergency response procedure and conduct b. Conduct routine inspection of implemented in
Facility as per procedure hence training to emergency response team (ERT) containers, storage system, storage adherence to AMDAL
will not affect water warehouse condition, emergency RKL-RPL requirements.
d. Appoint Emergency Response Team for fuel and chemical
quality and marine biota response system, and other facilities in
spill
accordance with the applicable
e. Ensure storage containers are built compatible with the
procedure
materialand are in good condition
113
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
f. Ensure every stored material is recorded and completed
with MSDS
g. Minimum requirements for storage facility are as follows:
1) Completed with bunded area that will be able to
contain 110% of the volume of the largest container or Spill clean-up:
25% of the total volume in the storage facility
a. Visual observation of oil film on the
2) Building construction, including the floor and bunded
water to ensure that the oil spill
area must be constructed with a impermeable material
response is conducted in accordance
3) Treat oily contaminated water trapped in the bunded
with the procedure
area
b. If required, conduct seawater quality
4) Completed with spill kit
analysis for the Oil and Grease
h. Put label and symbol on the container (package) and parameter in accordance with the
storage area applicable procedure (emergency
i. Conduct regular inspection to fuel and chemical storage response procedure) to ensure that the
and refueling facility spill clean-up activity is conducted as
j. Perform efforts to response oil spill in accordance with Oil per the procedure
Spill Contingency Plan and conduct spill response training c. Record any spill that at least notes the
according to planned schedule amount and type of the spilled
hazardous material and waste, spill
location and the spill handling efforts
Soil Onshore Fuel a. Minimise the possibility a. Update hazardous material management procedure and a. Inspect hazardous material and waste All environmental Started in Comply
Contaminati and Chemical of onshore fuel and conduct socialisation/training to related employees storage facility prior to operation in management and October 2018
on Storage chemical spill b. Update emergency response procedure and conduct accordance with the applicable monitoring plan and ongoing.
Facility and b. Onshore spill response training to emergency response team (ERT) procedure requirements are
Refueling can be done effectively c. Appoint Emergency Response Team for fuel and chemical b. Conduct weekly inspection of implemented in
Facility as per procedure hence spill containers, storage system, storage adherence to AMDAL
will not contaminated warehouse condition, emergency RKL-RPL requirements.
d. Ensure fuel and chemical storage container are built
the land response system, and other facilities in
compatible with the materialand are in good condition
accordance with the applicable
e. Ensure fuel and chemical storage and refueling location is
procedure
safe from flood or is on a higher elevation
f. Minimum requirements of storage facility are as follow:
Spill clean-up:
1) Completed with a bunded area that will be able to
a. Visual observation to ensure that the oil
contain 110% of the volume of the largest container, or
spill response is conducted in
25% of the total volume
accordance with the procedure
2) The building, including the floor and the bund wall,
b. If required, conduct soil TPH analysis
must be constructed with a impermeable material
(as per the Minister of Environment
3) The floor construction must have a slope of at least 1%
Decree No. 128 Year 2003) on location
towards sump pit or Oil Water Separator (OWS)
after the soil has been cleaned up to
4) Completed with a sump pit for facilities with a roofed
ensure that the contaminated soil
shelter
excavation has been done as per the
5) Completed with an Oil Water Separator (OWS) unit for
procedure
facilities without a roofed shelter
6) Completed with spill kit
114
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
7) Completed with MSDS information c. Record any spill, noting the amount
g. Conduct routine clean up of oily contaminated water and type of the spilled hazardous
trapped in sump pit or OWS for further treatment material and waste, spill location and
h. Put label and symbol on the container (package) and the spill handling efforts
storage area
i. Conduct regular inspection/audit
j. Treat contaminated soil by excavated, separated and
collected to Temporary Hazardous Waste Storage for
further treatment
k. Ensure clean up process is performed well and conduct
TPH soil test (if necessary) according to MoE Decree No.
128 Year 2003
Terrestrial Land clearing a. Conduct land clearing a. Update land clearing and tree cutting procedure and a. Compare the actual to planned land All environmental Started in Comply
Flora and as planned to minimize conduct socialisation to related employees clearing area management and January 2017
Fauna disruption to terrestrial b. Minimise land clearing by only conducting land clearing in b. Check the tree cutting inventory data monitoring plan and completed
flora and fauna designated area c. Maintain records of visual observation requirements are in November
b. Minimum disruption to of fauna sightings during activity implemented in 2017
c. Implement no fire policy for land clearing activity
terrestrial flora and d. Compare the actual to planned adherence to AMDAL
d. Implement reduced impact logging technique to reduce
fauna revegetation area RKL-RPL requirements.
impact from tree cutting:
e. Maintain records of cover crop data
1) Develop Skid Trail and Log Landing plan, avoid buffer
(type and amount) and trees used for Revegetation is scheduled
zone and area with slope more than 50%
revegetation to be performed toward
2) Construct Skid Trail and Log Landing as planned f. Routinely monitor the success rate of
3) Cut the vines the end of project phase.
the Revegetation Program through the
4) Timber cutting in accordance with Skid Trail following parameters: density,
5) Timber waste cutting diversity, survival rate and canopy
e. Maintain buffer zone cover
f. Conduct revegetation in the cleared area which will not
be used for permanent facility or construction access.
Using local Papua plants.
g. Implement no flora fauna disturbance and not entering or
carrying out flora fauna from or to Tangguh LNG
h. Implement no hunting and fishing policy at Tangguh LNG
area
i. Install signage of wild animal presence and crossing,
especially protected and endangered animals
j. Install fence and signage to avoid wild life disturbance to
employees and project installation
LNG Plant Construction Activity
Noise Level a. Earthwor Noise level complies to a. Use inspected and certified equipments according to a. Internal monthly and external 6- All environmental Started in Comply
k activity standards in MoE Decree applicable regulation monthly noise monitoring using Sound management and October 2016
including No. 48 Year 1996 and b. Conduct routine maintenance to engine/equipments Level Meter, particularly during peak monitoring plan and on-going.
Land General EHS Guidelines according to specified schedule to ensure that the activity requirements are
Clearing engine/equipments are working efficiently implemented in
115
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
and Site 2007 in Tangguh Perimeter c. Only conduct land clearing in designated area b. Conduct compliance evaluation by adherence to AMDAL
Preparati Fence location d. Maintain buffer zone as noise barrier comparing analysis results with the RKL-RPL requirements.
on such regulatory standards in the MoE Decree
as cut No. 48 Year 1996 (refer to Table in Internal and external
and fill Appendix I of RKL-RPL) noise monitoring are
b. Construct c. Prepare noise monitoring trend performed in regular
ion of evaluation basis at Tangguh outer
LNG d. Check engine/equipment maintenance perimeter fence and
Plant and records to ensure that maintenance is Tanah Merah Baru
its conducted in accordance with the Village. Noise monitoring
supportin determined schedule results are in compliance
g with the consent level.
facilities
Natural Earthwork Minimum natural a. Develop Earthwork plan map which provides information a. Conduct visual monitoring when All environmental Start in March Comply
hydrological activity hydrological change about: change of drainage patterns occurred management and 2017 and on-
change including b. Land clearing plan and compare the actual drainage monitoring plan going
including Land Clearing c. Cut and fill plan including amount of excavated and pattern with the planned drainage requirements were well
surface run and Site stockpiled soil pattern implemented.
off increase, Preparation d. Initial and final topography from site preparation b. Compare the actual drainage pattern
drainage such as cut e. Natural drainage pattern and drainage management plan with the hydrology map in the plan
pattern and fill during Earthwork including erosion control
changes, f. Conduct land clearing and site preparation only at
creek designated area
morphology g. Maintain riparian area with the minimum of 100 meters
changes, for large river and minimum 50 meters for small river in
and creek accordance with Government Regulation No. 38 Year
flowrate 2011
increase h. Minimise natural flow pattern change of Ephemeral
i. If Earthwork at creek is inevitable then culverts, bridges
and artificial drainage or other method will be installed
j. Ensure culverts, bridges, drainage or other facility can
accommodate peak flow of creek/river
k. Design drainage pattern at affected area to transfer
surface run off to natural flow
l. Construct sedimentation pond in the downstream
affected area before receiving water body to minimise
impact
m. Build facilities to reduce run off flow rate hence
minimizing river morphological change
n. Conduct revegetation (grass/cover crop) at cleared area
which will not be used yet for construction activity in the
period of minimum 3 months. Using local Papua plants
116
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
Soil erosion Earthwork Minimise soil erosion and a. Develop land clearing and site preparation activity plan by a. Conduct visual monitoring (weekly or All environmental Started in Partially
and sea activity TSS concentration in considering erosion mitigation factor after heavy rain) and inspection of the management and March 2017 comply
water quality including surface water complies with b. Earthwork activity will start after main facility of erosion erosion controls monitoring plan and on-going
impact due Land Clearing standards in Government and sedimentation control is available b. Conduct visual monitoring and inspection requirements are
to TSS and Site Regulation No. 82 Year c. Manage drainage pattern and sediment control by: at locations which are prone to erosion implemented in
concentracti Preparation 2001 Class 2 by considering 1) Create temporary or permanent drainage and weekly or after heavy rain adherence to AMDAL
on increase such as cut environmental baseline construct dike and water channel c. Settling pond effluent visual weekly RKL-RPL requirements.
and fill during AMDAL 2) Ensure water channel and/or creek is not blocked monitoring or after rain and internal pH
3) Provide Retaining Wall with wall slope more than 2:1 analysis Surface water monitoring
4) Install jute net or plant cover crop to maintain wall results indicated that all
stability especially in the area with wall slope ratio parameters are in
more than 3:1 or wall/slope height more than 3 meters compliance with relevant
Indonesian regulation
5) Install Sediment Trap in various drainage locations
standard.
6) Provision of Sedimentation Pond at downstream of
drainage before entering receiving water body
7) Conduct routine clean up for trapped sediment in
Sediment Trap and Sediment pond
8) Sediment pond volume shall be able to control TSS
during peak rain condition (hour)
9) If sediment pond volume is ineffective then other
control efforts need to be done
10) Conduct revegetation (grass/cover crop) at cleared
area which will not be used yet for construction
activity in the period of minimum 3 months. Using
local Papua plants
d. Conduct routine inspection to erosion and sedimentation
control facility to ensure those facilities in maximum
function, especially after rain
Natural Water a. Ensure the volume of a. Groundwater production well will be designed to extract a. Maintain daily records of groundwater Groundwater study Started in Comply
geohydrologi resource extracted groundwater groundwater from aquifer at a depth of 300 – 400 m hence use from the production wells commenced in December December
cal change provision is the optimum yield it will not disturb shallow groundwater which is typically b. Collect groundwater samples and 2018. The study requires 1 2018 and
with from according to pumping used for groundwater source for community in Tanah conduct groundwater quality analysis production well and 1 ongoing
potential groundwater test and groundwater Merah Baru and Saengga villages. for salinity and TDS, weekly basis for monitoring well to be
disruption to extraction extraction permit b. Groundwater extraction for Tangguh LNG will be limited production wells and 3 monthly basis for constructed to assess the
community alternative b. Minimise impact to to deeper groundwater aquifer (>150 m). Groundwater monitoring wells volume of production
well and land community aquifer at a depth over 150 meters will be protected with c. Maintain records of the groundwater including any potential
subsidence groundwater availability steel casing installation levels of the production wells, subsidence and impact to
in Tanah Merah and c. Groundwater pumping/extraction volume is determined monitoring wells and community wells. community groundwater.
Saengga by minimising by groundwater pumping test result witnessed by related Monitor weekly for production well, All environmental
the potential of sea government institutions (Ministry of Environment) and monthly for monitoring well and 3 management and
water intrusion (TDS < based on groundwater utilisation permit according to monthly for community wells monitoring plan
1.000 mg/L); and related regulations d. Maintain records of the landscape requirements were
c. Minimise the potential d. Measure groundwater level from community well in Tanah change at the land subsidence incorporated in the work
of land subsidence (< 5 Merah and Saengga villages as environmental baseline monitoring station. Monitor in 3 method statement.
information monthly basis.
117
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
cm) related to long term e. Install groundwater monitoring well at a depth of 150 m
groundwater extraction which is located between Tangguh LNG groundwater
production well and community groundwater well to
monitor the potential reduction of groundwater level from
groundwater utilisation activity
f. Install groundwater monitoring well at a depth of 150 –
400 m to monitor the potential of sea water migration
g. Install land subsidence monitoring station around
groundwater production wells locations
h. Update numerical model based on new data from
production test well with depth of 400 m and nearby
monitoring well with depth of 150 m (Pumping test for 10
days) to verify pumping flow rate, other aquifer
parameters, potential effect of fault and aquifer salinity to
a depth of 400 m
i. Proposed production wells location, monitoring wells, and
well design will be determined based on modelling result
j. By the end of construction phase, numerical modelling in
AMDAL will be re-calibrated using monitoring and
groundwater extraction/pumping data during construction
phase
k. Use Water Based Mud (WBM) which is non toxic for
groundwater well and monitoring well drilling activities.
Drilling mud will be tested for TCLP and LD50 prior to use
l. Used mud and cutting from groundwater well drilling
activity will be disposed to non-hazardous waste landfill at
Tangguh LNG or will be collected in a pond that will be
constructed near the drilling location. Once groundwater
well drilling is finished, the pond will be closed and
revegetated.
m. Mitigation efforts will be conducted to avoid sea water
intrusion such as extraction/pumping reduction of
groundwater production well around shore area, or
construct additional groundwater production well further
south near to Tangguh LNG perimeter fence
Terrestrial a. Land a. Conduct land clearing a. Update land clearing and tree cutting procedure and a. Compare the actual land clearing area Land clearing commenced Started in Comply
Flora and Clearing as planned to minimize conduct socialisation to related employee with the planned area (review in 3 in January 2017 and January 2017
Fauna b. Constructi disruption to terrestrial b. Minimise land clearing by conducting land clearing only in monthly basis) completed in November and completed
on of LNG flora and fauna designated area b. Maintain records of the fauna sightings 2017. All environmental in November
Plant and b. Minimum disruption to c. Implement no fire policy for land clearing activity during land clearing and construction of management and 2017.
its terrestrial flora and d. Implement reduced impact logging technique to reduce the LNG Plant and its supporting monitoring plan
supportin fauna impact from tree cutting: facilities requirements are
g facilities c. Conduct flora and fauna survey in the implemented in
buffer zone, 1 time during construction
phase
118
OPERATOR’S EHS REPORT
TANGGUH LNG
1) Develop Skid Trail and Log Landing plan, avoid buffer d. Compare actual re-vegetation area with adherence to AMDAL
zone and area with slope more than 50% the plan RKL-RPL requirements.
2) Construct Skid Trail and Log Landing as planned e. Maintain records of cover crop (type and
3) Cut the vines amount) and the planted trees Flora and Fauna Survey
4) Timber cutting in accordance with Skid Trail f. Conduct routine monitoring of the will be executed by Q4
5) Chip timber waste success rate of the re-vegetation 2019. The survey will be
e. Maintain buffer zone program through a number of performed by IPB (Bogor
f. Conduct revegetation in the cleared area which will not parameters: density, diversity, survival Agricultural Institute).
be used for permanent facility or construction access. rate and canopy cover
Using local Papua plants g. Monitoring of specific invasive species
g. Implement no flora fauna disturbance and not entering or presence within site area
carrying out flora fauna from or to Tangguh LNG
h. Implement no hunting and fishing policy at Tangguh LNG
site
i. Install signage of wild animal presence and crossing,
especially protected and endangered animals
j. Install fence and signage to avoid wild life disturbance to
employee and project installation
k. Confirm that no savannah forest will be removed by the
projects
l. Minimize the loss of mangrove forest
m. Collect plant materials for priority plant species during pre-
construction surveys
n. During the initial tree clearance, a representative sample of
orchid specimens will be collected from felled trees. These
will be moved to a suitable plant nursery on site or, where
possible, directly replanted into adjacent un-affected forest
area
o. Tree harvesting area clearly designated and mapped and no
clearance outside the tree harvesting areas
p. Enforcement of no unauthorized access into the buffer zone
q. Enforcement of pest control management
r. Raised awareness in the local community of the risk of dogs
and cats as a threat to local wildlife
s. Weed control progamme properly undertaken, in
accordance with SSO for Weed Control
t. Employment of forestry specialist
u. Qualified ecologist on-site during pre-construction work
and during tree clearance
v. Qualified environmental team on-site and with clear
accountability and responsibilities
w. Socialization of the ecological importance of the site and
ecological toolbox talks
x. No habitats within 10m of major permanent-river removed.
y. Vegetation clearance kept to a minimum
z. Only marked trees will be removed
aa. Biodiversity conservation awareness is undertaken as part
of the EPA
119
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
bb. Completion of pre-construction monitoring survey
cc. Implementation of post-construction surveys and ongoing
monitoring
dd. Produce Invasive Species Management Plan and ensure
that the plan covers all mitigation as outlined in the
CHA/BAP
Marine Sea Minimise the potential of a. Update marine mammal protection procedure and a. Conduct fishery (nekton sample All environmental Started in Comply
mammal Transportatio marine mammal disruption conduct socialisation to related employees and vessel collection and fishermen catch data management and October 2016
disruption n for compared to environmental crew collection) and marine mammal (visual, monitoring plan and on-going
Workforce, baseline during AMDAL b. Update solid waste and wastewater management if possible using a hydrophone) survey. requirements are
Equipment procedure for sea transportation activity and conduct Survey is to be conducted 1 time during implemented in
and Material socialisation to related employees construction phase. adherence to AMDAL
c. Update emergency response procedure at vessel and b. Verify marine mammal awareness RKL-RPL requirements.
conduct training to vessel crew training records delivered to vessel crew
d. Provide emergency response facility in the vessel in against the records in the training matrix
Marine mammals and
accordance with developed procedure c. Conduct records check of vessel engine
fisheries survey will be
e. Implement No Fishing policy maintenance to ensure that
executed in March 2019.
f. Conduct routine maintenance to engine/equipments maintenance is conducted in
The survey will be
according to specified schedule to ensure that the accordance with the determined
performed by IPB (Bogor
engine/equipments are working efficiently schedule
Agricultural Institute).
g. Prioritizing sailing in deeper area (>12 m) when the sea d. Check ballast water exchange records
condition is calm against MARPOL requirements (at least
h. Reduce vessel speed if approaching marine mammal until the date, location, volume and vessel’s
the marine mammal swims away name), review in 6-monthly basis
i. Conduct solid waste and wastewater management in
accordance with Government Regulation No. 21 Year 2010
and MARPOL also applicable regulations. Solid waste and
wastewater management will be discussed more details in
EMP regarding seawater quality
j. Manage ballast water in accordance with Government
Regulation No. 21 Year 2010 and MARPOL. Ballast
exchange is anticipated will not happen often since most
of the vessels will arrive at Tangguh LNG in loaded
condition.
k. Record ballast exchange (date, location, volume, and
vessel’s name)
Air Quality a. Land Ambient air quality a. Land clearing, site preparation and construction material a. Collect ambient air samples and analyse Land clearing started in Started in Comply
Preparatio complies with standards excavation only conducted at planned area the required parameters internally or by January 2017 and January 2017
n according to Government b. Conduct routine watering. Watering shall be adjusted with an accredited laboratory in 6-monthly completed in November and completed
b. Constructi Regulation No. 41 Year seasonal condition and rainfall. If possible, watering can basis 2017. All environmental in November
on of LNG 1999 and General EHS b. Conduct compliance evaluation against management and 2017
Plant and Guidelines 2007 analysis results in Government monitoring plan
its (Attachment 1) Regulation No. 41 Year 1999 and the requirements are
General EHS Guidelines 2007 (refer to implemented in
Table in Appendix I RKL-RPL)
120
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
supportin be done by using treated domestic sewage which already c. Conduct ambient air monitoring result adherence to AMDAL
g facilities complies with standard trend analysis RKL-RPL requirements.
c. Set maximum speed for land transportation in site
preparation and construction area at of 30 km/hour Ambient air monitoring
d. Conduct routine maintenance to engine/equipments result indicates that all
according to specified schedule to ensure that the parameters are in
engine/equipments are working efficiently compliance with relevant
e. Conduct operational management for incinerator and Indonesian regulation
generator in order to comply with emission standards standard.
f. Conduct revegetation (grass/cover crop) at cleared area
which will not be used yet for construction activity in the
period of minimum 3 months. Using local Papua plants
Incinerator a. Emission from Non- a. Ensure the installed incinerator comply with emission a. Conduct air emission monitoring at the All environmental Started in Comply
Operational hazardous waste standards sampling points on the stacks (1 yearly for management and October 2018
from Solid incinerator complies b. Update operational procedure for each incinerator and non-hazardous waste incinerator and 3- monitoring plan and ongoing.
Waste (Non- with standards in MoE conduct training and socialisation to operators monthly for hazardous waste incinerator) requirements are
hazardous) Decree No. 13 Year 1995 c. Only burn waste according to specification for non- b. Conduct compliance evaluation by implemented in
and (Attachment 1) hazardous waste incinerator and according to permit for comparing analysis results with the adherence to AMDAL
Hazardous b. Emission from hazardous waste incinerator applicable regulations: RKL-RPL requirements.
Waste Hazardous waste d. Operate incinerator according to its specification (Burner, 1) Non-hazardous waste incinerator
Management incinerator complies blower and feed rate) emission as per the Minister of
Emission monitoring
activity with standards in Head e. Hazardous waste incinerator complies with design Environment Decree No. 13 Year 1995
result of non-hazardous
of Environmental according to Head of Environmental Impact Agency (refer to Table in Appendix I RKL-RPL)
waste incinerators
Impact Agency Decree Decree No. 03 Year 1995 and completed with permit from 2) Hazardous waste incinerator emission
indicates that all
No. 03 Year 1995 related agency as per the Head of Environmental
parameters are in
(Attachment 1) f. Conduct daily record for amount and type of burnable Impact Agency Decree No. 03 Year 1995
compliance with relevant
waste and incinerator operational condition for each (refer to Table in Appendix I RKL-RPL)
Indonesian regulation
incinerator c. Conduct air emission trend analysis
standard.
g. Conduct routine maintenance to engine/equipments d. Check incinerator maintenance records to
according to specified schedule to ensure that the ensure that maintenance is conducted in
engine/equipments are working efficiently accordance with the determined There will no plan to
h. Define sampling locations and provide sampling facility schedule. Review in 6-monthlyl basis install hazardous waste
according to applicable regulations incinerator for TEP
construction phase. All
hazardous wastes will be
shipped out to offsite
licensed facility.
121
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
Power Emission from Diesel a. Update diesel generator operational procedure and a. Conduct air emission monitoring at All environmental Started in Comply
Generation Generator complies with socialise it to operators sampling points of the stack and conduct management and November
analysis for the concentration of the monitoring plan 2016 and on-
from Diesel standards according to MoE b. Operate generator according to its specifications both
requirements are
Generator Regulation No. 13 Year operational load and time required parameters by an accredited going
implemented in
2009 and General EHS c. Conduct routine maintenance to engine/equipments laboratory adherence to AMDAL
Guideline 2007 according to specified schedule to ensure that the b. Conduct compliance evaluation by RKL-RPL requirements.
engine/equipments are working efficiently comparing analysis results with the
d. Define sampling locations and provide sampling facility Minister of Environment Regulation No. Emission monitoring
according to applicable regulations 13 Year 2009 and the General EHS results of diesel
Guidelines 2007 (refer to Table in generators indicate that
all parameters are in
Appendix I RKL-RPL)
compliance with relevant
c. Conduct trend analysis Indonesian regulation
d. Check the generator maintenance records standard.
122
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
outfall at a 100 m radius (Salinity) and pH
at the effluent point of desalination unit
b. Daily flow rate record
Surface Solid waste Solid waste (non- Solid Waste (non-hazardous) and Hazardous Waste a. Check records of the amount and type of All environmental Started in Comply
water (non- hazardous) and hazardous Management waste that has been produced and management and October 2016
monitoring plan and on-going
quality, hazardous) waste management General Management: delivered to the storage and treatment
requirements are
groundwater and complies with requirements a. Update hazardous and non-hazardous solid waste facilities implemented in
, and soil hazardous in Law No. 18 Year 2008 management and conduct socialisation to related b. Check records of waste that has been adherence to AMDAL RKL-
quality waste and Government employees treated in Tangguh (for example RPL requirements.
management Regulation No. 85 Year b. Conduct solid waste segregation (Non-hazardous and incineration, composting, etc)
activity during 1999 hazardous solid waste) c. Check records of the solid waste amount
construction c. Implement 3R system (Reduce, Reuse, Recycle) disposed to the non-hazardous waste
d. Categorize non-hazardous solid waste into organic, landfill
recyclable, burnable and inert waste d. Check records of the recyclable waste sent
to the external recycling company
e. Check records and delivery of the
hazardous waste manifest
f. Conduct inspection in weekly basis
123
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
Non-Hazardous Solid Waste Management: All environmental Started in Comply
management and October 2016
a. Waste storage facility will be completed with impermeable
monitoring plan and ongoing
floor to prevent soil contamination requirements are
b. Food waste will be managed by extracted using macerator implemented in
and/or composting process and/or disposal to Non- adherence to AMDAL RKL-
hazardous waste landfill RPL requirements.
c. Recyclable waste will be collected and sent to waste
recycling company
d. Burnable waste will be incinerated using non-hazardous
waste incinerator
e. Timber waste will be collected, chipped into wood chips
for raw material for composting process, utilisation in
revegetation activity or used as landfill cover
f. Inert waste will be disposed to non-hazardous waste
landfill
g. Conduct recording of generated and treated waste
124
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
3) Non-hazardous waste landfill capacity shall calculate Indonesian regulation
leachate management to prevent leachate overflow standard.
4) Leachate will be transferred to Sewage Treatment
Plant prior to discharge
5) Install Monitoring Well in the upstream and
downstream of non-hazardous waste landfill based on
study result
6) Number of Monitoring Well shall represent
groundwater upstream and downstream area around
non-hazardous waste landfill, minimum 1 monitoring
well in the upstream and 3 monitoring well in the
downstream
7) Conduct routine inspection of Non-hazardous waste
landfill integrity
Water Wastewater a. Effluent from WWT and a. Update wastewater management during construction Sewage Treatment Plant: All environmental Started in Comply
Quality Management STP comply with procedure and conduct socialisation/training to related management and October 2016
a. Collect treated sewage samples at the
employees monitoring plan and ongoing
standards in MoE compliance points and analyse the requirements are
Decree No. 112 Year b. Conduct effort to minimise wastewater required parameters monthly as per the implemented in
2003 and General EHS c. Install wastewater discharge pipe at sea at location applicable regulations, by an accredited adherence to AMDAL RKL-
Guidelines 2007 according to study result (-6 m LAT) laboratory RPL requirements.
b. Effluent from WWT and d. Several potential wastewater and its management system b. Check records of the daily wastewater
other wastewater from LNG Plant construction activities are: discharge flow rate
comply with standards 1) Sewage will be treated using physical, biological and c. Calculate the load for each treated
according to related chemical treatment (either using activated sludge or wastewater discharged to sea
regulations other method) prior to discharge to sea. Sludge from d. Conduct compliance evaluation by
c. Surface water quality treatment process will be disposed to Landfill and/or comparing analysis results with the
complies with standards as raw material for composting and/or soil enricher regulatory standards in the Wastewater
according to material and/or similar utilisation according to study Discharge to Sea Permit, Minister of
Government Regulation result which is now being conducted and/or treat the Environment Decree No. 112 Year 2003
No. 82 Year 2001 Class biological sludge in the incinerator. and the General EHS Guidelines 2007
2 and/or environmental 2) If possible, treated sewage which already complies to (refer to Table in Appendix I of RKL-RPL)
baseline during AMDAL standards will be used to water the road or other e. Conduct compliance evaluation by
(parameter pH, TDS, utilisation comparing the actual flow rate with the
TSS and main 3) Wastewater from Batching Plant will be neutralized maximum allowable flow rate
parameters which are first prior to discharge to surface water f. Conduct compliance evaluation by
related with wastewater 4) Other wastewater (including wastewater from comparing the calculated load with the
characteristics) commissioning activity) which is not potentially maximum allowable load
d. Sea water quality contaminated with oil or other chemicals will be g. Conduct trend analysis for concentration,
complies with standards analysed for key parameters prior to discharge to flow rate and load of the discharged
according to MoE surface water. If there is any incompliance from the wastewater
Decree No. 51 Yaer 2004 key parameters then treatment will be conducted prior
and/or environmental to discharge
Sea Water Quality
baseline during AMDAL 5) Other wastewater (including wastewater from
commissioning activity) which is potentially a. Collect seawater samples upstream and
(parameter pH, Salinity,
contaminated with oil or other chemicals will be downstream from the common outfall at
analysed for key parameters (e.g.: pH, TSS, COD, and
125
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
BOD, TSS, Oil and Oil and Grease) and other relevant parameters to a 100 m radius and conduct analysis for
Grease) determine the treatment method prior to discharge to the required parameters every 3 months
sea b. Compare the analysis results with the
6) Oily contaminated water from workshop and regulatory standards in the Minister of
warehouse activities will be transferred to Collection Environment Decree No. 51 Year 2004
Pond and Oil Water Separator (OWS) Unit. Oily (refer to Table in Appendix I of RKL-RPL),
contaminated water trapped in Oil Water Separator also taking into consideration baseline
Unit will be taken out regularly and sent to Temporary conditions during AMDAL
Hazardous Waste Storage Facility for further c. Conduct trend analysis
treatement. Treated wastewater will be discharge to
surface water (creek). Surface Water:
e. Conduct wastewater treatment and ensure treated
a. Collect surface water samples and
wastewater complies with standards prior to discharge to
monthly internal analysis for pH, TDS and
receiving water body
TSS
f. No wastewater dilution and mixing from different sources
b. Collect surface water samples and
conduct analysis every 3 months for the
required parameters by an accredited
laboratory
c. Conduct compliance evaluation by
comparing analysis results with the Class
2 surface water regulatory standards in
Government Regulation No. 82 Year 2001,
also taking into consideration baseline
conditions during AMDAL
d. Conduct trend evaluation
Contour Site Contour changes is as a. Develop Site Preparation activity plan which covers: All environmental Started in Comply
changes Preparation planned management and March 2017
1) Initial contour before activity
monitoring plan and ongoing
2) Activity plan including final contour requirements are
3) Present information about drainage pattern, implemented in
topography, etc. adherence to AMDAL RKL-
b. Conduct Site Preparation activity as planned RPL requirements.
Soil Fuel and a. Minimise the possibility a. Update hazardous material management procedure and Inspect hazardous material and waste All environmental Started in Comply
contaminatio Chemical of onshore fuel and conduct socialisation/training to related employees storage facility prior to operation in management and December
n Storage chemical spill b. Update emergency response procedure and conduct accordance with the applicable procedure monitoring plan 2016 and
Facility and b. Onshore spill response training to emergency response team (ERT) a. Conduct weekly inspection of requirements are ongoing
Refueling can be done effectively c. Appoint Emergency Response Team for fuel and chemical containers, storage system, storage implemented in
Facility as per procedure hence spill warehouse condition, emergency adherence to AMDAL RKL-
will not contaminated response system, and other facilities in RPL requirements.
d. Ensure fuel and chemical storage containers are built
the land compatible with the materialand are in good condition accordance with the applicable
procedure Minor LOPC (Loss of
e. Ensure fuel and chemical storage and refueling location is
b. Visual monitoring to ensure that the oil Primary Containment)
safe from flood or is on a higher elevation
spill response is conducted in cases less than 1 barrel in
f. Minimum requirements of storage facility are as follows:
accordance with the procedure this reporting period is 7
cases. All spill cases were
126
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
1) Completed with a bunded area that will be able to c. If required, conduct soil TPH analysis at reported and handled in
contain 110% of the volume of the largest container, or the affected area(as per the Minister of accordance to applicable
25% of the total volume Environment Decree No. 128 Year 2003) procedures. All
2) The building, including the floor and the bund wall, after remediation to ensure that the contaminated materials
must be constructed with a impermeable material clean-up has been done as per the were securely packed and
3) The floor construction must have a slope of at least 1% procedure stored in licensed
towards sump pit or Oil Water Separator (OWS) d. Record any spill, noting the amount and temporary hazardous
4) Completed with a sump pit for facilities with a roofed type of the spilled hazardous material waste storage.
shelter and waste, spill location and the spill
5) Completed with an Oil Water Separator (OWS) unit for handling efforts
facilities without a roofed shelter;
6) Completed with spill kit
7) Completed with MSDS information
g. Conduct routine clean up of oily contaminated water
trapped in sump pit or OWS for further treatment
h. Put label and symbol on the container (package) and
storage area
i. Conduct regular inspection/audit
j. Treat contaminated soil by excavated, separated and
collected to Temporary Hazardous Waste Storage for
further treatment
k. Ensure clean up process is performed well and conduct
TPH soil test (if necessary) according to MoE Decree No.
128 Year 2003
Top Soil Managed the affected top a. Update Top Soil Management procedure and conduct a. Conduct monthly logbook checks from All environmental Started in Comply
stripping soil to maintain its amount socialisation/training to related employees the excavation and storage of topsoil management and March 2017
Top soil shall consist of organic soil which is free from b. Conduct weekly inspection of topsoil monitoring plan and ongoing
during and quality b.
requirements are
Earthwork subsoil mixture, stump, root, rock, weeds and etc. management
implemented in
c. The depth of top soil excavation is 20 mm, unless adherence to AMDAL RKL-
specifically defined RPL requirements.
d. Segregate and store Top Soil at specific locations provided
for revegetation
e. Provide drainage system around stock pile area
f. Use light excavator/stripper when conducting Top Soil
stripping
g. Provide erosion control facility and conduct seed dispersal
(cover crop) to protect Top Soil
Acid Sulfate Earthwork a. Minimise the a. Where ground-disturbing work is proposed, the EPC a. Record of Soil Assessment by the EPC All environmental Started in Comply
Soil (ASS) activity contamination of ASS to Contractor is required to assess the soil in advance of any Contractor; management and March 2017
vegetation, groundwater construction activities for ASS potential and map the area at b. Record of Soil Management including monitoring plan and on-going
including
requirements are
Land Clearing and surface water risk; ASS Management by EPC Contractor;
implemented in
and Site b. Surface water quality b. Where ASS is excavated, the ASS needs to be covered (or re- c. Weekly pH monitoring at effluent of adherence to AMDAL RKL-
Preparation complies with buried) to exclude oxygen at the designated area proposed settlement/treatment pond to be RPL requirements.
Government Regulation conducted by the EPC Contractor;
No. 82 Year 2001 Class 2
127
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
such as cut and/or environmental by the EPC Contractor and approved by BP (as the appointed d. Surface water monitoring, including pH
and fill baseline during AMDAL operator on behalf of Tangguh); at upstream and downstream (50-100 m Surface water monitoring
c. Where Acid Runoff Drainage (ARD) occurs, it is to be from effluent) to be conducted on a results indicate that pH
collected into neutralization pond and neutralized (e.g. with monthly basis by the EPC Contractor concentration is in
hydrated lime or crushed limestone) to ensure its pH meet and to be checked quarterly by External compliance with relevant
the requirement before releasing it to the environment; and Laboratory appointed by the EPC Indonesian regulation
d. Exposed ASS is to be treated and neutralized with materials Contractor; standard.
such as hydrated lime or crushed limestone before final e. Surface water monitoring at upstream
disposal to prevent ARD. and downstream (50-100 m from
effluent) to be conducted every 6
months as per RPL requirement by
External Laboratory appointed by the
EPC Contractor; and
f. Surface water monitoring at upstream
and downstream (50-100 m from
effluent) to be conducted every 3
months as per RPL requirement by EPC
Contractor Internal Laboratory.
Construction of Marine Facilities
Benthos Dredging for Minimise the potential a. Update dredging procedure according to scenario in a. Plankton and benthos sampling, 1 x Maintenance dredging at Started in Comply
abundance Marine reduction of benthos ANDAL and conduct training/socialisation to related during dredging activity and 1 x after BOF commenced in December
Facility abundance and diversity employees dredging completed at 500 m distance December 2018. All 2018 and
Construction compared to environmental b. Conduct dredging only in designated area from dredging, disposal and control environmental ongoing.
baseline during AMDAL c. Use appropriate dredger to minimiseduration of impact locations. management and
d. Conduct corrective action if monitoring result shows that b. Calculate plankton and benthos monitoring plan
TSS distribution is not in accordance with simulation in abundance, diversity index, and requirements are in
ANDAL study equitability index adherence to AMDAL RKL-
c. Sampling, identification and RPL requirements.
calculation will use accredited Seawater monitoring
laboratory shows that all parameters
d. Compare calculation result with data are in compliance with
from environmental baseline taken standard requirements.
during AMDAL study (monitoring
result will be compared with
monitoring from AMDAL
implementation of LNG 1 and 2 (if
available)
e. Collect sediment samples and conduct
analysis according to determined
parameter using accredited laboratory
1 x during dredging and 1 x after
dredging
f. Compare sediment analysis result with
ANZECC Guideline (see Table in
128
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
Attachment I of RKL-RPL) and
environmental baseline during AMDAL
g. Conduct trend analysis
Marine Sea Minimise the potential of a. Update marine mammal protection procedure and a. Conduct fisheries (nekton sampling and All environmental Started in Comply
mammal Transportatio marine mammal disruption conduct socialisation to related employees and vessel data collection of fishermen catch) and management and December
crew marine mammal survey (visual, if monitoring plan 2016 and
disruption n for compared to environmental
requirements are
Workforce, baseline during AMDAL b. Update solid waste and wastewater management possible using hydrophone), 1 x during ongoing
implemented in
Equipments procedure for sea transportation activity and conduct peak of construction and 1 x after adherence to AMDAL RKL-
and Material socialisation to related employee construction RPL requirements.
c. Update emergency response procedure at vessel and b. Record checking of delivered marine
conduct training to vessel crew mammal training to vessel crew and
Marine mammals and
d. Provide emergency response facility in the vessel in compare it with training matrix
fisheries survey will be
accordance with developed procedure c. Check ballast water exchange records
executed in March 2019.
e. Implement No Fishing policy against MARPOL requirements (at least The survey will be
f. Conduct routine maintenance to engine/equipments the date, location, volume and vessel’s performed by IPB (Bogor
according to specified schedule to ensure that the name), review in 6-monthly basis Agricultural Institute).
engine/equipments are working efficiently
g. Prioritizing sailing in deeper area (>12 m) when the sea
condition is calm
h. Reduce vessel speed if approaching marine mammal until
the marine mammal swims away
i. Conduct solid waste and wastewater management in
accordance with Government Regulation No. 21 Year 2010
and MARPOL also applicable regulations. Solid waste and
wastewater management will be discussed more details in
EMP about seawater quality
j. Government Regulation No. 21 Year 2010 and MARPOL.
Ballast exchange is anticipated will not happen often since
most of the vessels will arrive at Tangguh LNG in loaded
condition
k. Record ballast exchange (date, location, volume, and
vessel’s name)
129
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
Noise Level Construction Noise level complies with a. Conduct routine maintenance of engine/equipment a. Measure noise level using sound level All environmental Started in May Comply
of BOF standards in MoE Decree according to specified schedule to ensure that the meter which conducted both by internal management and 2017 and
facility, LNG No. 48 Year 1996 and engine/equipments are working efficiently (monthly) or accredited laboratory (6 monitoring plan ongoing.
Jetty 2 and General EHS Guidelines b. If possible, the use of muffler or noise reduction method monthly especially at the peak activities) requirements are
Combo Dock 2007 in Tangguh Perimeter will be considered b. Conduct compliance evaluation by implemented in
extension Fence location c. If necessary, noise barrier at impact source and receptor comparing analysis results with the adherence to AMDAL RKL-
area (sensitive public facility) will be built Minister of Environment Decree No. 48 RPL requirements.
Year 1996 (refer to Table in Appendix I of
d. Activity which is potentially can cause high noise level will
RKL-RPL) Regular noise monitoring
only be conducted up to 14 hours per day
c. Conduct trend analysis is performed internally in
d. Check engine/equipment maintenance monthly basis and
records to ensure that maintenance is externally in 6 monthly
conducted in accordance with the basis by accredited
determined schedule laboratory at outer
perimeter fence and
Tanah Merah Baru village.
Results of the noise
monitoring are within
consent level.
Marine biota Construction a. Minimise the potential a. Update marine mammal protection procedure and conduct a. Conduct fishery (nekton sample All environmental Started in May Comply
abundance of BOF reduction of benthos socialisation to related employees and vessel crew collection and fishermen catch data management and 2017 and
collection) and marine mammal (visual, monitoring plan ongoing.
and diversity facility, LNG diversity and equitability b. Update solid waste and wastewater management
requirements are
Jetty 2 and compared to procedure for sea transportation activity and conduct if possible using a hydrophone) survey.
implemented in
Combo Dock environmental baseline socialisation to related employees Survey is to be conducted 1 time during adherence to AMDAL RKL-
extension during AMDAL construction phase. RPL requirements.
c. Conduct routine maintenance to engine/equipments
b. Minimise the potential b. Verify marine mammal awareness
according to specified schedule to ensure that the
reduction of nekton training records delivered to vessel crew
engine/equipments are working efficiently
abundance and marine against the records in the training matrix
d. If possible, maintain noise level from activity gradually
mammal disruption c. Conduct records check of vessel engine
e. Do not dispose solid waste to sea during Marine Facility maintenance to ensure that
compared to
construction maintenance is conducted in accordance
environmental baseline
f. Conduct solid waste and wastewater management with the determined schedule
during AMDAL
according to Government Regulation No. 21 Year 2010 and d. Check ballast water exchange records
MARPOL also applicable regulations against MARPOL requirements (at least
the date, location, volume and vessel’s
name), review in 6-monthly basis
Sea water Dredging and a. TSS concentration in sea a. Update dredging procedure according to preferred method a. Collect seawater samples and measure Maintenance dredging at Started in Comply
quality and Disposal of water does not exceed and conduct training/socialisation to related employees TSS concentration both by Internal BOF commenced in December
marine biota Dredged standard outside safety b. Conduct dredging only in designated area (weekly) and accredited laboratory December 2018. All 2018 and
abundance Material for exclusion zone at Marine c. Conduct corrective action if monitoring result shows that (during and after dredging) at 500 m environmental ongoing.
and diversity Marine Facility area in dredging TSS distribution is not in accordance with simulation in distance from dredging location, 500 m management and
Facility area or 500 meters from ANDAL study from the disposal location (upstream monitoring plan
construction dredging location d. Dispose dredged material only at designated location in and downstream) and control location requirements are in
according to MoE Decree AMDAL and dredging permit b. Conduct compliance evaluation by
No. 51 Year 2004 by comparing analysis results (TSS
130
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
considering e. Record dredged material disposal (volume, actual disposal concentration) with seawater standards adherence to AMDAL RKL-
environmental baseline coordinate and disposal time) according to MoE Decree No. 51 Year RPL requirements.
during AMDAL 2004 (See Table in Attachment I of RKL-
b. TSS concentration in sea RPL) with environmental baseline data Seawater monitoring
water outside 500 m during AMDAL study shows that all parameters
distance from dredging c. Monitor dredging location and volume are in compliance with
disposal area complies and ensure disposal of dredged standard requirements.
with MoE Decree No. 51 material is conducted according to
Year 2004 by considering approved location in AMDAL
environmental baseline
during AMDAL
c. Minimise the potential
reduction of plankton
abundance and diversity
compared to
environmental baseline
during AMDAL
d. Minimise the potential
reduction of nekton
abundance and marine
mammal disruption
compared to
environmental baseline
during AMDAL
Sea water Solid waste a. Solid waste (non- General Management : a. Conduct record checking of amount and All environmental Started in Comply
quality and (non- hazardous) management type of generated waste and sent to management and December
a. Update hazardous and non-hazardous solid waste
monitoring plan 2016 and
marine biota hazardous) is conducted in management and conduct socialisation to related employee storage and treatment facility at
requirements are
abundance and accordance with Tangguh site ongoing.
b. Conduct solid waste segregation (Non-hazardous and implemented in
and diversity Hazardous Government Regulation hazardous solid waste) b. Conduct record checking of amount and adherence to AMDAL RKL-
Waste No. 21 Year 2010, disposal location of comminuted food RPL requirements.
c. Implement 3R system (Reduce, Reuse, Recycle)
management MARPOL and related waste discharged to sea
d. Categorize non-hazardous solid waste into organic,
activity in regulations c. Conduct record checking and
recyclable, burnable and inert waste
Marine b. Hazardous waste hazardous waste manifest transmittal
Facility management is d. Weekly inspection of solid waste and
construction conducted in accordance Non-Hazardous Solid Waste Management: hazardous waste management facility
with Government a. Conduct solid waste management in accordance with according to applicable procedure
Regulation No. 85 Year Government Regulation No. 21 Year 2010, MARPOL Annex
1999, MARPOL and V and applicable regulations
related regulations b. Do not dispose garbage to sea, except food waste which
complies with MARPOL Annex V requirements
c. Organic, recyclable, and inert waste management from
small vessel and tug boat which operate around jetty
131
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
location will be sent to Tangguh LNG onshore waste
management facility
d. Organic, recyclable, and inert waste management from
small vessel and tug boat which operate around jetty
location will be sent to Tangguh LNG onshore waste
management facility
e. Waste from other type of vessel (large vessel) will not be
managed onshore. Vessel owner will manage generated
waste by following requirements in MARPOL Annex 5,
such as
1) Comminute food waste to size less than 25 mm for
further disposal to sea with distance more than 3 nm
from nearest land. Uncomminuted waste can only be
disposed to sea at distance more than12 nm from the
nearest land
2) Transport non-hazardous solid waste except food
waste to waste management facility for further
treatment
3) Record generated, disposed and treated waste
Hazardous Waste Management: a. Conduct inspection to hazardous All environmental Started in Comply
material and waste storage facility prior management and March 2017
a. Conduct hazardous waste management in accordance with
to use according to applicable monitoring plan and ongoing
Government Regulation No. 85 Year 1999 and applicable requirements are
regulations procedure
implemented in
b. Conduct weekly inspection to adherence to AMDAL RKL-
b. Conduct labelling for hazardous waste container
container, storage system, storage RPL requirements.
c. Record generated and treated waste according to
warehouse condition, available
applicable regulations
emergency response system and other
d. Hazardous waste management from small vessel and tug facilities according to applicable
boat which operate around jetty area will be sent and procedure
stored/treated at Tangguh LNG onshore hazardous waste c. Visual monitoring of oil film at sea to
management facility and subsequently will be sent to ensure oil spill response has been
licensed hazardous waste treatment facility for further conducted following procedure.
treatment d. If necessary, seawater quality analysis
e. Hazardous waste from other vessels (large vessel) will not for Oil & Grease parameter will be
be treated at onshore facility. Vessel owner will manage conducted according to applicable
generated waste by following to requirements in MARPOL procedure (emergency response
and related regulations. Transport hazardous waste to procedure) to ensure that spill clean-up
licensed waste management facility for further treatment process has been conducted following
f. Use permitted hazardous waste transporter facility procedure
e. Record spill event noting (at the
minimum) the type and amount of
hazardous material and waste spill, spill
location, and the response conducted
132
OPERATOR’S EHS REPORT
TANGGUH LNG
Environment
Source of Compliance
al Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes Schedule
Impact Status
Manage
Offshore Fuel a. Minimise the possibility a. Update hazardous material management procedure and a. Conduct weekly inspection to All environmental Started in Comply
and Chemical of offshore fuel and conduct socialisation/training to related employees hazardous material and waste storage management and December
monitoring plan 2016 and
Storage chemical spill b. Update Fuel and Chemical Management Procedure and facility prior to use according to
requirements are
Facility and b. Offshore spill response conduct training/socialisation to related employees applicable procedure ongoing
implemented in
Refueling can be done effectively c. Update emergency response procedure and conduct b. Conduct weekly inspection to adherence to AMDAL RKL-
Facility as per procedure hence training to emergency response team (ERT) container, storage system, storage RPL requirements.
will not affect water d. Appoint Emergency Response Team for fuel and chemical warehouse condition, available
quality and marine biota spill emergency response system and other
facilities according to applicable
e. Ensure storage containers are built compatible with the
procedure
materialand are in good condition
c. Visual monitoring of oil film at sea to
f. Ensure every stored material is recorded and completed
ensure oil spill response has been
with MSDS
conducted following procedure
g. Minimum requirements for storage facility are as follow:
d. If necessary, seawater quality analysis
1) Completed with bunded area that will be able to
for Oil & Grease parameter will be
contain 110% of the volume of the largest container or
conducted according to applicable
25% of the total volume in the storage facility
procedure (emergency response
2) Building construction, including the floor and bunded procedure) to ensure that spill clean-up
area must be constructed with a impermeable material process has been conducted following
3) Treat oily contaminated water trapped in the bunded procedure
area e. Conduct recording of spill event which
h. Completed with spill kitPut label and symbol on the informs (at the minimum) about type
container (package) and storage area and amount of hazardous material and
i. Conduct regular inspection to fuel and chemical storage waste spill, spill location, and the
and refueling facility response conducted
j. Perform efforts to response oil spill in accoradance with
Oil Spill Contingency Plan and conduct spill response
training according to planned schedule
Wastewater Wastewater management a. Update wastewater management procedure and conduct a. Conduct record checking of wastewater All environmental Started in Comply
management complies with standards in socialisation to related employees management against MARPOL management and December
monitoring plan 2016 and
from vessel Government Regulation No. b. Conduct sewage treatment in accordance with requirements
requirements are
operational 21 Year 2010, MARPOL and Government Regulation No. 21 Year 2010 and MARPOL b. Check ballast water exchange records ongoing
implemented in
activity applicable regulations Annex IV prior to discharge to sea against MARPOL requirements (at least adherence to AMDAL RKL-
c. Conduct oily contaminated water treatment by using Oil the date, location, volume and vessel’s RPL requirements.
Water Separator in accordance Government Regulation name), review in 6-monthly basis
No. 21 Year 2010 and MARPOL Annex I prior to discharge
to sea
d. Complies with requirements in Government Regulation
No. 21 Year 2010 and MARPOL for ballast water. Ballast
water exchange is anticipated to rarely conducted since
most of the vessel will arrive in Tangguh LNG in loaded
condition
e. Record ballast water exchange (date, location, volume and
vessel’s name)
133
OPERATOR’S EHS REPORT
TANGGUH LNG
B.1.2 E VALUATION
The ambient air quality monitoring is performed in 6-monthly period at two locations
within Tangguh perimeter fence as appointed in the AMDAL dcocument, one is near
BOF and one is near the existing Log Pond. The result of air ambient monitoring activity
conducted in November 2018 indicates that all parameters are in compliance with the
relevant Indonesian regulation.
The result of emission monitoring activity conducted at Rig in November 2018 indicates
that all parameters are in compliance with the relevant Indonesian regulation.
134
OPERATOR’S EHS REPORT
TANGGUH LNG
Baseline Data
Regula- (Range Value) AMDAL 2014 14571 a13
No Parameter Unit tory
AQN AQN AQN RIG
Limit* AQN 9
10 11 12 ENSCO
106
Dominant Wind west
- - west west west west
6 Direction from
Weather - - - - - - Clear
7
Ambient Tests
Carbon Monoxide,
µg/Nm3 30000 1260 < 1140 1370 < 1140 <11
1 CO** (1 Hour)
135
OPERATOR’S EHS REPORT
TANGGUH LNG
mg/
Total Particulate - 150 68 10 56 26
Nm3
Hydrogen mg/
H2S n/a <2 <2 <2 <2
Sulphide Nm3
B.1.2.2 Noise
The noise monitoring is performed in 6-monthly period in four areas, two at Tangguh
perimeter fence (near BOf and near Log Pond) and two in the nearest village (Tanah
Merah Baru – TMB) as appointed in the AMDAL document. The monitoring performed
in TMB village is intended to measure potential noise impact from construction activity
of the marine facilities.
The result of noise monitoring performed in September 2018 indicates that noise level
in daytime is in-comliance with the relevant Indonesian regulation of <55dB, both at
perimeter fence and at TMB area. The result of night time noise monitoring shown
exceedances in all locations of >45 dB. These exceedances are resulted from natural
noises, e.g. from animal noises from the forest at the location during monitoring being
performed, and not noise generated from project activity.
136
OPERATOR’S EHS REPORT
TANGGUH LNG
TSS mg/L 50 43 9 2 2 10 5
137
OPERATOR’S EHS REPORT
TANGGUH LNG
TSS mg/L 50 33 3 3 1 4 1
TSS mg/L 50 11 3 1 13 2 1
B.1.2.4 Dredging
Baseline monitoring for the upcoming maintenance dredging activity was performed in
September 2018. Baseline monitoring was performed in 3 locations, i.e. BOF, ECJ and
Saengga River Estuary during High Tide and Low Tide. During Low Tide conditions, the
TSS parameter are consistently high in three locations exceeding the quality standard,
whcih reflects the natural condition. In addition, weekly internal monitoring upon the
execution of BOF dredging which commenced in third week of December 2018. Weekly
seawater monitorings indicate all parameters are in-compliance with the relevant
Indonesian regulation.
138
OPERATOR’S EHS REPORT
TANGGUH LNG
The result of seawater monitoring activity conducted starting in August 2018 indicates
that all parameters are within compliance except for Nitrate and Phosphorus which is
consistent with AMDAL baseline condition of Bintuni Bay
139
OPERATOR’S EHS REPORT
TANGGUH LNG
EV 181915 14571 b
Reg. VRB VRB Dump
Parameter (Unit)
Limit High Low Dump High
Tide Tide Control UD1 Low tide Tide
Brightness m - 10 10 10 NA >5 NA
Garbage - None None None None None None None
Odor - Natural Odorless Odorless Odorless Odorless Odorless Odorless
Oil Film - None None None None None None None
pH S.U. 7.0 - 8.5 7.98 7.91 8.01 7.94 8.14 7.94
Salinity g/L 34 29.2 29.2 27.5 31 30 31
Temperatu
oC 28-32 30.8 31.3 30.0 28.3 31.8 28.7
re
Total
Suspended mg/L 80 2 2 1 <10 <10 <10
Solids, TSS
Turbidity NTU 5 0.8 1.0 <0.5 1 4 2
Cyanide
(Total), mg/L 0.5 <0.005 <0.005 <0.005 < 0.01 < 0.01 < 0.01
CN-
Sulphide
mg/L 0.01 <0.005 <0.005 <0.005 < 0.001 < 0.001 < 0.001
as H2S
Total
Ammonia, mg/L 0.3 <0.001 <0.001 <0.001 < 0.01 < 0.01 < 0.01
NH3-N
Nitrate,
mg/L 0.008 <0.02 <0.02 <0.02 0.1 0.12 0.13
NO3-N
140
OPERATOR’S EHS REPORT
TANGGUH LNG
EV 181915 14571 b
Reg. VRB VRB Dump
Parameter (Unit)
Limit High Low Dump High
Tide Tide Control UD1 Low tide Tide
Total
Phosphoru mg/L 0.015 0.029 0.055 0.039 0.12 0.11 0.14
s as P
As mg/L 0.012 0.0008 0.0009 0.0010 < 0.004 < 0.004 < 0.004
Cd mg/L 0.001 <0.0001 <0.0001 <0.0001 < 0.0006 < 0.0006 < 0.0006
Cr6+ mg/L 0.005 <0.002 <0.002 <0.002 < 0.0017 < 0.0017 < 0.0017
Cu mg/L 0.008 <0.001 <0.001 <0.001 < 0.003 < 0.003 < 0.003
Pb mg/L 0.008 <0.001 <0.001 <0.001 < 0.003 < 0.003 < 0.003
Hg mg/L 0.001 <0.00005 <0.00005 <0.00005 < 0.0017 < 0.0017 < 0.0017
Ni mg/L 0.05 <0.001 <0.001 <0.001 < 0.01 < 0.01 < 0.01
Zn mg/L 0.05 <0.005 <0.005 <0.005 < 0.01 < 0.01 < 0.01
Total
MPN/10
Coliform 1000( g) ND ND ND < 1.8 < 1.8 < 1.8
0 ml
(total)g
sel/100
Salmonella nil1 ND ND ND nil1 nil1 nil1
ml
BOD5 mg/L 20 <2 <2 <2 9.38 6.5 6.55
DO mg/L >5 5.45 5.44 5.52 4.46 4.6 4.78
Oil &
mg/L 1 <0.5 <0.5 <0.5 < 0.45 < 0.45 < 0.45
Grease
Surfactants
mg/L 1 <0.01 <0.01 <0.01 < 0.03 < 0.03 < 0.03
, MBAS
Total
Hydrocarb mg/L - - - - - - -
ons
Total
mg/L 0.002 <0.001 <0.001 <0.001 < 0.001 < 0.001 < 0.001
Phenols
PAHs Total µg/L 0.003 <0.1 <0.1 <0.1 < 0.0004 < 0.0004 < 0.0004
PCBs Total µg/L 0.01 <0.01 <0.01 <0.01 < 0.008 < 0.008 < 0.008
TBT µg Sn/L 0.01 <0.01 <0.01 <0.01 < 0.008 < 0.008 < 0.008
Pesticides
ug/L 0.01 <0.01 <0.01 <0.01 < 0.008 < 0.008 < 0.008
Total
Sea water quality monitoring for HDD activity is performed in August 2018 during peak
HDD activity for reaming 26”. The monitoring result shown the TSS parameter are in
compliance with the relevant Indonesian regulation.
TSS mg/L 80 50 20 62
141
OPERATOR’S EHS REPORT
TANGGUH LNG
Sea water quality monitoring for top pile drilling activity is performed one time in
August 2018 during top pile drilling is performed for conductor pile installation at WDA
platform. The monitoring result shown the TSS parameter are in compliance with the
relevant Indonesian regulation.
TSS mg/L 80 17 11 9
The result of seabed monitoring activity conducted starting in August 2018 indicates
that all parameters are within compliance.
142
OPERATOR’S EHS REPORT
TANGGUH LNG
EV 181915 14571 a
Reg. VRB VRB Dump
Parameter (Unit)
Limit High Low Control High
Tide Tide Tide
Al mg/dry kg - 8850 8210 8200 9383
As mg/dry kg 70 15.8 19.6 16.2 7.85
Ba mg/dry kg - 12.4 11.3 15.9 12
Cd mg/dry kg 10 0.04 0.04 0.03 1.74
Cr mg/dry kg 370 24.7 27.2 26.6 21.8
Co mg/dry kg - 11.0 11.4 12.9 8.97
Cu mg/dry kg 270 9.0 7.9 9.2 9.77
Fe mg/dry kg - 22600 23700 21800 15405
Pb mg/dry kg 220 12.4 12.2 14.2 12
Mn mg/dry kg - 330 984 342 300
Hg mg/dry kg 1 0.04 0.05 0.03 0.26
Mo mg/dry kg 0.3 0.4 0.2 < 0.72
Ni mg/dry kg 52 29.0 28.2 32.0 24.9
Se mg/dry kg 0.3 0.3 0.4 2.93
Ag mg/dry kg 3.7 0.06 0.07 0.06 0.11
Sn mg/dry kg 0.7 0.6 0.6 63.9
Zn mg/dry kg 63.0 62.0 67.0 66.8
TPH (C6-
mg/kg - <2 <2 <2 <1.25
C9)
TPH (C10
mg/kg - <2 <2 <2 <1
to C36)
Oil &
mg/dry kg - <10 <10 <10 <20
Grease
Total
mg/dry kg - <0.025 <0.025 <0.025 <10
Phenols
Sediment quality monitoring for HDD activity was conducted one time during peak of
HDD activity (reaming 40”). The monitoring result shown the sediment quality are in
compliance with the relevant quality standard.
143
OPERATOR’S EHS REPORT
TANGGUH LNG
Sediment quality monitoring for top pile drilling activity is performed one time in
August 2018 during top pile drilling is performed for conductor pile installation at WDA
platform and one time in October 2018 after the activity is completed. The monitoring
result shown the sediment quality are in compliance with the relevant quality standard.
The result of cuttings monitoring activity conducted starting in July 2018 indicates that
all parameters are within compliance.
144
OPERATOR’S EHS REPORT
TANGGUH LNG
145
OPERATOR’S EHS REPORT
TANGGUH LNG
B.2.1 I MPLEMENTATION
The section below provides upates on the implementation of RKL and RPL on social aspect during construction project as stipulated in the AMDAL document throughout the period of July to December
2018.
Environmental Compliance
Source of Impact Success Indicator Social Management Plan Social Monitoring Plan Remarks
Impact to Manage Status
Demographic Job opportunities and a. The availability of a. Conduct social survey and • Completed. Social census and The social census and Comply
(Migration, business opportunities Socio-Economic and census in 2016 survey was conducted in early 2016 livelihood survey activities
Population during the operation phase population data on 3,497 households in eight were conducted to
Structure and due to workforce b. Conducting a study of b. (i) Implement governance districts. The final report was shared understand the dynamic of
Population recruitment and incoming migration and program by providing to the Teluk Bintuni government for social paramaters trend,
Growth) demobilization activities its negative impact mentoring for the Local their consideration. The next social migration pattern, various
c. Functioning of Government of Teluk Bintuni census is planned for 2019. livelihood activities in the
population control and Fakfak Regencies on Another social study to update the community, as well as
system governance principals issues livelihood indicators among the community acceptance on
d. Indigenous People lead (ii) Delivering a refresher community were conducted in 2017 Tangguh project. These
the village development training for civil society and 2018 involving PSKK UGM and studies were involving PSKK
process organization University of Indonesia. UGM.
e. Availability of Civil • To improve the capacity of the local The capacity building for
Administration and government on good governance local governments and CSO
Information System principal as well as roles and is involving Kemitraan as
functions, Tangguh facilitated the implementing partner.
several training targeted
government officials at regency and
district level, including (i) planning
and budgeting for Bappeda of Teluk
Bintuni; (ii) population and
migration management; and (iii)
integrated planning.
• As part of capacity building
program for civil society
organization, the governance team
provided mentoring and technical
assistance to two local foundations,
Sianiri in Babo and YPMS in TMB
which focused on organization
development.
Workforce Job opportunities for a. Strategies for a. Tangguh LNG will require its • The Tangguh Train 3 contractor has • Until December 2018, Comply
Indigenous People and workforce recruitment contractors to develop developed a strategic plan and there were 595
local community due to recruitment strategy for documentation for Papuan Indigenous People hired
146
OPERATOR’S EHS REPORT
TANGGUH LNG
workforce recruitment and and demobilization in Indigenous People, Bintuni- workforce, including Indigenous by Tangguh LNG’s Train 3
demobilization operation phase Fakfak, West Papua, Papua, People, including: contractor. Compared to
b. Graduates from and National o Procedure for workforce the AMDAL, we have met
selected Indigenous b. Tangguh LNG will require its recruitment and demobilization to achieve the target.
People to continue contractor to enforce for local Papuan Although Tangguh has
higher education in workforce recruitment with o Workforce management plan prioritized Indigenous
leading university in prioritizing local Indigenous o Local content People to involve in T3
Papua and National People, Bintuni, and Fakfak, o Grievance procedure and project and fulfill AMDAL
based on accreditation West Papua, Papua, and settlement guideline commitments, there has
issued by Directorate of National These documents cover strategy been an increased
Higher Education c. Tangguh LNG will require its and planning for local workforce, demand for job requests
c. Achieved the target of contractor to develop Papuan including on hiring, mobilization from the communities.
workforce percentage workforce in order to increase and demobilization, workforce
complies with their skills their skills through grievance, and upskiling plan for • Close coordination with
workforce table by giving them opportunity to local hires. The documents have the Teluk Bintuni and
d. At the end of contract, participate in trainings been modified to accommodate Fakfak Man Power Offices
workers accept their d. At the end of employment lenders recommendations during has been conducted. The
rights and are contract, Tangguh LNG will previous audit. meeting is focused to
demobilized to their require its contractor to update the Train 3 project
previous point of hire demobilize its workers to their as well as request
The project team and its contractor
previous point of hire support for any workforce
continue to conduct workforce
recruitment socialization in the related issues. A series of
villages to ensure the community socialization events on
understands the recruitment workforce recruitment
process. Until end of December procedure continued in
2018, we have exceeded to achieve 12 locations.
the AMDAL target for workforce These meetings aim to
from IP, Bintuni / Fakfak and familiarize the Train 3
Papuan. activities, its impact, as
well as to update the
workforce recruitment
As required in the EPC contract,
procedure. During the
CSTS, as the main TEP contractor,
meeting the project team
continues its commitment to train
provided explanations on
IP and Papuan employee to
IP workforce
upgrade their skill and capacity.
prioritization, project
During 2017 until 2018, there were
stage and skill
646 Papuan employees trained for
requirements,
various fields.
recruitment procedure,
and also the mechanism
of mobilization and
demobilization process.
However, according to
the lenders requirement,
147
OPERATOR’S EHS REPORT
TANGGUH LNG
As part of upskilling
program, various
trainings for indigenous
people and Papuan
workforce conducted. We
recognized that some of
321 training participants
have been upgraded their
skill level.
Changes in Local Job opportunities and c. Absorption of local a. Implement stocking point 6. The project team maintain The livelihood and IEDP Comply
Business Growth, business opportunities products from program in 8 villages community participation in the programs collaborated with
Changes in during operation phase agriculture and fisheries Tangguh supply chain program PUPUK and local
livelihood patterns due to workforce sector; data of local b. Conduct business mentoring through cooperative and stocking universities (UNIPA, and
and level of recruitment and products of agriculture for local entrepreneur through points. Between July – December UNCEN) to implement the
income demobilization and fisheries sectors IEDP program. 2018, total supply of fresh activities.
absorbed from the agriculture and fisheries products
villages in surrounding for TEP activities was 177 tonnes
area od Tangguh LNG (worth more than US$388,000). In
b. Indigenous People get ratio, supply of fresh agriculture
the capital access and and fisheries products from
business loan stocking points to Tangguh
c. The formation of catering has reached in the range
business administration 23%-26% of total demand of
of local products those products.
marketing in the market
located in and outside 7. As a part of the stocking points
Bintuni Bay Region program, the project also
d. The availability of provided support technical
intermediate assistance that included:
good/service which offer - Facilitated business meetings
services for Tangguh between community cooperatives
LNG and PSU for supply chain issues
e.Percentage of - Facilitated water quality
contribution of local assessment to Arguni cooperative
government revenue to ensure their fisheries product
148
OPERATOR’S EHS REPORT
TANGGUH LNG
Assimilation, Job opportunities and a. Note taken from regular a. Support community to • Continued capacity building for Comply
Acculturation, business opportunities art and cultural activities participate in cultural festival Yayasan Sianiri Foundation in Babo
Changes in Social during operation phase in art and cultural center and Simuri Community
Values and Norms, due to workforce of Indigenous People Development Foundation (YPMS) in
Changes in recruitment and b.Development of Tanah Merah Baru. These
Cultural Heritage demobilization traditional houses in the organizations are the
selected villages representations for indigenous
c. Activities of Art and people from Iratutu and Soway
cultural promotions with clans.
economic value • Conduct high level cultural trainig
for TEP workforce employee
Community The operation phase of a. Notes from public a. Conduct regular visit to the • Continued engagement with key Comply
Perception and LNG Plant activities consultation with local village and community to stakeholders in the vilages to
Social Tension including workforce, community update the operation maintain a positive relationship and
related to the business opportunities due b. Notes from public activities to update both operations and
impact of Tangguh to workforce recruitment consultation with local project progress. The engagements
LNG activities, and demobilization government b. Facilitate Tangguh involved Comrel, WFM and CSTS
namely workforce, c. Functioning of grievance stakeholders visit to LNG site team.
business procedure for local • Continued to perform a series of
opportunities, on community c. Manage community socialization meetings to familiarize
fishery activity and d. The establishment and grievance project activities and obtain support
sea transportation functioning of the from the community, including
accessibility Stakeholder Forum in offshore drilling, and North Shore
disturbances, and Bintuni Bayand Berau Housing projects.
seawater Bay • Conducted a series of workforce
intrusion. In recruitment socializations were also
addition, the conducted, targeting community in
growing 12 priority villages including TMB,
expectations of Saengga, Babo, Weriagar, Tomu,
community also Aranday, Furada, Padang Agoda,
needs to be Meterabu, Tofoi, Taroy and Onar.
managed • Continued to manage community
considering the grievances. During this reporting
impact that period, 24 concerns were received
community expect from local communities through
greater benefits both the grievance card and verbal
from Tangguh request. Most of them requested for
LNG, such as job opportunities in TEP. We also
education received 134 concerns and
149
OPERATOR’S EHS REPORT
TANGGUH LNG
Marginalization of Social competition a. The main beneficiaries of a. Implement livelihood program Tangguh is commited to prioritizing IPs The program is a part of the Comply
Indigenous People between Indigenous social program is in the villages in the livelihood activities and Tangguh operation.
and vulnerable People and new settlers Indigenous People b. Provide business mentoring maintained their participation in supply
group b. Activities of Art and for IP business development chain in TEP activites through stocking
cultural promotion with through IEDP program point program. There are 445 IPs
economic value involved in stocking point program and
c. Indigenous People and actively supply fisheries and agriculture
vulnerable group have products to Tangguh catering including
access to livelihood to support TEP activities.
program During this reporting period, several
outputs were achieved including:
• Continued the supply chain program
from eight stocking points to
Tangguh. Most of the stocking point
members are indigenous people.
• Trained 30 people from Arguni,
Taver, Andamata, Furir and Fior on
post-harvest product processing
(dried fish). The training was also
150
OPERATOR’S EHS REPORT
TANGGUH LNG
To provide entrepreneurship
opportunities for Indigenous People:
• Continued technical assistance to
strengthen “the creative house
program (Rumah Kreatif Fakfak)
including (i) participating in small
enterprises business exhibition in
Fakfak, and (ii) developing network
with the community cooperatives in
surrounding of Arguni and Kokas
area. Most of the creative house
members are indigenous people.
• Facilitated business meeting
between Taroy cooperative with
shrimp distributors in Bintuni Town.
• Business mentoring to Nyemat
saving loan cooperative on financial
reporting and to conduct annual
meeting, involving 15 members.
• Business mentoring to MIRO
cooperative at Tomu village for
household business activities
including sago crackers and fresh
water fisheries development.
• Trained saving and loan
cooperatives committee in Weriagar,
Mogotira, Tomu, Ekam, Kampung
Rejosari on management and
business development in Bintuni
Town, involving 26 people. The
same training for Fakfak region was
conducted in Kokas, involving 32
participants from Goras,
Darembang, Fior, Arguni, Taver,
Kokas, and Syiangga.
• Facilitated the annual meeting of
cooperatives member in Kokas,
Taver, Fior, and Furir.
151
OPERATOR’S EHS REPORT
TANGGUH LNG
Decline in Access Job opportunities and a. Tangguh LNG a. Implement basic education During this reporting period, the There is no specific Comply
to Public Service business opportunities contribution in program including (i) training education program delivered some education program
including during operation phase infrastructure for local government official, outputs towards the quality on basic addressed for TEP. The
Education due to workforce development in villages local education foundation and education: program is a part of
recruitment and in area surrounding teachers on education issues; • Provision seven full time teachers to Tangguh operation
mobilisation which emerge Tangguh LNG (ii) mentoring for schools support flagship school program in
honey pot syndrome; b. Students derived from b. Provide scholarship for student TMB
influence new settler and Indigenous People have from selected Indigenous • Improve of student participation in
their families to settle in access and service to People education by:
villages in area obtain good education c. Facilitate a flagship school - Maintained ‘Rumah Pintar
surrounding Tangguh LNG as well as quality of development in TMB Program” (community learning
operation site education significantly center) in Babo and Weriagar
c. Development of flagship - Trained 17 teachers in TMB on
schools creative learning.
- Trained teachers on evaluation
assessment on learning process.
• Changes in Job opportunities and a. Indigenous People have a. Conduct baseline study on • Health impact assessment There is no specific Comply
Disease business opportunities access and service to project impact to the public completed in 2016 and the result community health program
Pattern, during operation phase healthcare appropriate health issues. was used as TEP baseline addressed for TEP. The
Changes in due to workforce with good standard b. Support Local Government information. program is a part of
Disease recruitment and b. Hospital in Bintuni program in developing • Continued technical assistance for Tangguh operation
Prevalence mobilisation which emerge become referral hospital hospital in Bintuni as referral Aranday puskesmas to provide
• Changes in honey pot syndrome; and changes into Local hospital emergency services as referral for
Access to influence new settler and Public Service Agency c. Facilitate development of high risk births (PONED), while in
Healthcare, their families to settle in c. Controlled the spread Emergency Obstetric Service Babo the service has been fully
and villages in area and prevalence of in Babo and Aranday implemented. The construction of
• Changes in surrounding Tangguh LNG communicable diseases d. Conduct malaria control PONED Aranday in progress. It is
Environmental operation site in villages surrounding program expected the construction will be
Health Tangguh LNG operation e. Support mother and child completed by 2019.
site health program
152
OPERATOR’S EHS REPORT
TANGGUH LNG
153
OPERATOR’S EHS REPORT
TANGGUH LNG
154
OPERATOR’S EHS REPORT
TANGGUH LNG
155
OPERATOR’S EHS REPORT
TANGGUH LNG
B.2.2 E VALUATION
Tangguh Expansion Project continued its construction project to build a third LNG
processing train and the supporting associated facilities. As of the December 2018,
major activities have been completed, both for onshore and offshore sites to achieve
the operation target by 2020. There were 40 sub-contractos of the project are involved.
AMDAL states that Tangguh train 3 project has to have a significant impact on local
employment opportunities especially indigenous people and Papuans. In December
2018, more than 7500 people were hired to support train 3 construction, including 582
of indigenous people (8%) who live in the area surrounding Tangguh. TEP also recruited
690 local people from Bintuni and Fakfak regions and 650 people from other-Papuan
region. With these employee figures, Tangguh expansion project has achieved its target
for Indigenous People, Bintuni and Papuan as stipulated in the AMDAL.
Tangguh and its contractors also closely work with the manpower office at the regency
and provincial levels to manage workforce related issue and ensure the provision of
workforce system is aligned with project requirements and local regulation. Regular
forum was conducted in quarterly basis to update them with the Tangguh expansion
project as well as to seek advise and support for any workforce related issue. Regular
audit was also performed by the manpower of Papua Barat Province to ensure the
project contractors and its sub-contractors comply to workforce regulation and
standard.
156
OPERATOR’S EHS REPORT
TANGGUH LNG
Picture Quarterly Forum with Man Power Regency at Province and Regency Level
During this reporting period, the number of workers involved in the train 3 project has
increased to meet construction phase of Train 3 activities. However, job request remains
an issue conveyed by community through various channels including grievance and
during engagements at the villages. Tangguh expansion project is committed to recruit
and prioritize IPs and Papuans who live in the Bintuni Bay and Fakfak Regency as
stipulated in the AMDAL. The recruitment process at the district and village levels is
carried out in accordance with the standard and comprehensive protocol, which has
been agreed between BP, CSTS and Manpower Agency. The recruitment procedure has
also accommodated lenders' inputs during the audit process. The TEP WFM team also
always coordinates with the head of villages and districts, for any recruitment from the
village.
To fulfill demand on semi-skilled and skilled workforce, various efforts was made by the
Tangguh project including asking the local government of Teluk Bintuni to develop
standardized and certified training that will support the project. In collaboration with
Petrotekno, in june and July 2018, the Teluk Bintuni Government trained 100 local
people to participate in certified training on rigger and scaffolding that was fully funded
by the local government. As many as 63 the successful participants have been recruited
by the train 3 sub-contractors. The project also recruited a portion of the workforce
previously trained by Tangguh in Cepu during 2016 and 2017.
Moreover, as part of EPC contract requirements, the main contractor of train 3 project
has an obligation to develop IP and Papuan workers for those who recruited as part of
upskilling program. Since 2017, CSTS has been implemented a systematic training
progam and the implementation is updated regularly to BP in monthly basis.
The program involving HR Representative subcontractors with priority on competency
needed in the project, current majority / crucial position (job title) and future majority /
crucial position (based on man mobilization planning). During the last two years, there
were 646 IP and Papuan workers participated upskilling program on various subjects.
157
OPERATOR’S EHS REPORT
TANGGUH LNG
Those training programs achieved good results, where several people recognized that
there have been an upgrad in their skills which provide them with greater opportunity
to find a better position in the future.
Regular engagements to key stakeholders at the villages and districts level continued to
take palce to maintain a positive relationship and manage their expectations on
Tangguh project. The engagements involved head of village and various community
representatives such as youth leader, adat and religious leader, cooperative members
and women group representative. During the meeting the project team and its
contractor shared the update of project implementation, refresh TEP workforce
procedure, as well as responding to all questions and concerns from the participants.
158
OPERATOR’S EHS REPORT
TANGGUH LNG
159
OPERATOR’S EHS REPORT
TANGGUH LNG
According to the audit by CSTS in November and December 2018, the perenctage of
local purchase has fulfilled in the range of 23% to 28% of total need of fresh products in
TEP. Demand of fresh agriculture and fisheries products from community stocking
points is increasing, along with the escalation activities in TEP which involve a large
workforce number.
160
OPERATOR’S EHS REPORT
TANGGUH LNG
C.1.1 I MPLEMENTATION
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes
Impact Status
Manage
Sea water Sea water a. Solid waste (non- Air Quality Management Comply
quality, Air quality, Air hazardous) a. Operate generator in accordance with a. Check the generator maintenance records to ensure that a. up to date
quality, Soil quality, Soil management is its specification, both operational load its maintenance is conducted in accordance with the generator
contamination contaminatio conducted according to and time determined schedule maintenance
and marine n and marine Government Regulation b. Conduct routine maintenance to records is available
biota biota No. 21 Year 2010, engine/equipments according to
abundance and abundance MARPOL and related specified schedule to ensure that the
diversity and diversity regulations machine/equipments are working
b. Hazardous waste efficiently
management is
conducted according to Solid Waste (non-hazardous) and
Government Regulation Hazardous Waste Management
No. 85 Year 1999, a. Check records of the amount and type of waste that has a. waste segregation
General Management: been produced and delivered to the storage and
MARPOL and related was conducted
a. Update hazardous and non-hazardous treatment facilities in Tangguh
regulations during Uba Deep 1
solid waste management and conduct b. Check records of the amount and disposal location of
c. Wastewater drilling campaign
socialisation to related employees food waste that has been comminuted and disposed to
management is b. waste record and
b. Conduct solid waste segregation (Non- the sea
conducted according to transmittal are
hazardous and hazardous solid waste) c. Check the records and delivery of the hazardous waste
Government Regulation available
c. Implement 3R system (Reduce, Reuse, manifest
No. 21 Year 2010, c. food waste was
and Recycle)
MARPOL and related comminuted and
d. Categorize non-hazardous solid waste
regulations
into organic, recyclable, burnable and
d. Minimise the possibility
inert waste
of fuel and chemical
spill
e. Spill response can be Non-Hazardous Solid Waste Management :
done effectively as per a. Conduct solid waste management in
procedure accordance with Government
Regulation No. 21 Year 2010 and
MARPOL Annex V
b. Do not dispose garbage to sea, except
food waste which complies with
MARPOL Annex V requirements
161
OPERATOR’S EHS REPORT
TANGGUH LNG
c. Comminute food waste to size less than d. Conduct weekly inspection of the solid waste and disposed according
25 mm for further disposal to sea with hazardous waste treatment facilities in accordance with to MARPOL Annex
distance more than 3 nm from nearest the applicable procedure
land
d. Dispose uncomminuted waste at
distance more than 12 nm from the
nearest land
e. Record generated and disposed waste
(daily)
162
OPERATOR’S EHS REPORT
TANGGUH LNG
163
OPERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes
Impact Status
Manage
c. Conduct solid waste and wastewater
management in accordance with
Government Regulation No. 21 Year
2010, MARPOL and applicable
regulations
a. Inspect hazardous material and waste storage facility a. Emergency
d. Implement JNCC Guideline when
prior to operation in accordance with the applicable Response
conducting Seismic Survey, with procedure Procedure, spill kit,
procedures as follow:
b. Conduct weekly inspection of containers, storage system, bunkering procedure
1) Conduct observation of marine
storage warehouse condition, emergency response are available during
mammal spotting within 500 m
system, and other facilities in accordance with the Uba Deep 1 drilling
distance for 30 minutes prior to VSP
applicable procedure campaign
activity
c. Visual observation of oil film on the water to ensure that b. no spill occurred
2) If marine mammal spotted within
the oil spill response is conducted in accordance with the during Uba Deep 1
500 m distance, then the activity is
procedure campaign
suspended to allow for marine
d. If required, conduct seawater quality analysis for the Oil
mammal to swim away
3) Implement “Soft Start” procedure and Grease parameter in accordance with the applicable
procedure (emergency response procedure) to ensure
that the spill clean-up activity is conducted as per the
Fuel and Chemical Storage and Refueling
procedure
at Offshore and/or Marine Facility
e. Record any spill that at least notes the amount and type
a. Update hazardous material of the spilled hazardous material and waste, spill location
management procedure and conduct and the spill handling efforts
socialisation/training to related
employees
b. Update fuel and chemical management
procedure and conduct
164
OPERATOR’S EHS REPORT
TANGGUH LNG
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes
Impact Status
Manage
training/socialisation to related
employees
c. Update emergency response procedure
and conduct training to emergency
response team (ERT)
d. Appoint Emergency Response Team for
fuel and chemical spill
e. Ensure fuel and chemical storage
container are built compatible with the
materialand are in good condition
f. Ensure every stored material is
recorded and completed with MSDS
g. Put label and symbol on the container
(package) and storage area
h. Conduct regular inspection to fuel and
chemical storage and refueling facility
i. Perform efforts to response oil spill in
accordance with Oil Spill Contingency
Plan and conduct spill response
training according to planned schedule
C.2.1 I MPLEMENTATION
Environmental
Source of Compliance
Impact to Success Indicator Environmental Management Plan Environmental Monitoring Plan Notes
Impact Status
Manage
Workforce and Exploratio a. Data of local and a. Tangguh LNG will require its No activity was Comply
business n activity, Papua workforce contractors to employ limited number a. Define business opportunities for the community conducted during this
opportunities either absorbed in seismic of workers at unskilled/low skilled level reporting period as
Seismic activity working as Community Relation team Tangguh seismic
activities b. Data of local products with prioritizing Indigenous People in project was completed
and/or from Indigenous Bintuni Bay and Fakfak. in May 2018.
Well People b. Optimizing local products absorption The project team has
Drilling from agriculture and fishery sectors. demobilized, including
Exploratio the local workforce.
n During the project,
there were four local
165
OPERATOR’S EHS REPORT
TANGGUH LNG
Community Exploration a. Notes taken from a. Conducting public consultation for local No grievance was Comply
Perception and activity, public consultation community regarding exploration either a. Manage community grievance related project received during this
Social Tension either with local community seismic and/or well gas drilling reporting period in
Seismic b. Functioning of b. Running a grievance procedure for local relation to the seismic
activities grievance procedure community project, as the project
and/or Well for local community has been completed.
Drilling and data of grievance
Exploration by local community
C.2.2 E VALUATION
Social activities are implemented in an integrated way both for operation and Tangguh expansion project. The evaluation of social program including construction project is captured in section A.2.2.
166
OPERATOR’S EHS REPORT
TANGGUH LNG
D. HEALTH ASPECT
D.1 TANGGUH OPERATION
In the 2nd semester of 2018 (Jul-Dec), Tangguh Heath completed the 2018 health
program that were planned to cover Tangguh Operations worker at Tangguh LNG site
and Babo camp. There was no major injury, however there were several minor injuries
with first aid categorization (6).
The Health function is managing the Industrial Hygiene, Occupational health and
Medical service program. The main objective of Occupational health & Industrial
hygiene areas is to prevent any Occupational related illness occurred (both directly or
indirectly) because of the work. In case the illness occurred then medical service is
responsible to manage the case.
To support the objective, any potential or suspected related illnesses is recorded and
investigated. This approach is aimed to prevent any possibility of occurrence of
definitive Occupational illness. The bellow table shows profile of Occupational illness
and suspected occupational illness from July to December of 2018. None were proven
as occupational illness upon review..
PERFORMANCE
Table 1: Industrial hygiene performance indicator achievement for period of year 2018
167
OPERATOR’S EHS REPORT
TANGGUH LNG
INDUSTRIAL HYGIENE
4 Near Miss 0 0 0 0 0 1 1 2 3 3 3 3 3 3
0 0 0 0 1 0 1 1 0 0 0 0
Actual 0 0 0 0 1 0 1 1 0 0 0 0 3
YTD 0 0 0 0 1 1 2 3 3 3 3 3
Monitor Target 0 0 0 0 0 0 0 0 0 0 0 0 0
YTD 0 0 0 0 0 0 0 0 0 0 0 0 Monitoring
Industrial hygiene health plan has been carried out according to the existing plan with
YTD achievement 99.66% from January to December 2018, meanwhile for May are
below <100% (98%) achievement with total routine and non-routine activities are
deliverable is 585 activities.
Three near misses reported during year 2018 regarding IH Issues. Brittle dust mask
reported during maintenance activity case and Hydrocarbon contaminated water at new
Mosque ablution and several locations i.e. main workshop, tennis court, dormitory and
kitchen case. Welding rod heater insulation material confirmed as ACM due to
insufficiently handover data from KJP to BPLTC.
Based on 2018 Tangguh LNG Site Risk Register, the industrial hygiene general risks
include food safety, benzene, asbestos containing materials, heat stress and excessive
noise. And the specific risks are mercury and welding fume during several Projects.
in year 2018 IH involve in several projects such as, supported routine Dryer after filter
change out, Amine Carbon Filter Change Out, Kitchen - Laundry and Mess hall
extension, New Water Tank TK-1002 at central area, Infill Project, Mini TAR Project, New
Kitchen on Bintuni Office and “Pos Inap” area, support TEP during increase of diarrhea
cases, and support Deep Water Project.
Heat stress assessment program covered almost all positions within production and
non-production facilities that have been identified in qualitative approach having
moderate and significant exposures. This monitoring result will be used for updating
SEG document. Workers classified as significant and moderate groups will be included
in health surveillance group.
168
OPERATOR’S EHS REPORT
TANGGUH LNG
Part of IH awareness and capability program, quarterly bulletin has been released with
relevant topics for TLNG workers and IH campaign provided during Health Fair event.
The site IH team also provided 70 from 52 IH awareness sessions as attended and
attended by more than 100 people for 22 groups of contractors, in total.
Food safety programs include bi-weekly kitchen inspection and food safety committee
meeting carried out by Food Safety Committee team, which consists of Logistics,
Indocater, IH and OH team. Annually food safety reviews were led by Industrial
Hygienist and INCA QHSE Manager together with food safety committee. The results of
these reviews were presented to the site management for their continuous support and
commitment in ensuring the agreed actions are properly closed by both BP and
Indocater as the catering provider. Food safety program delivered well, no increase and
outbreak reported during year 2018.
Tangguh LNG Occupational health program are consist of Primary care (PC), Fit for task
(FFT), Health surveillance (HS), Medical emergency response & preparedness (MERP),
Communicable Diseases control (CDC) , Health promotion (HP) & Wellness Program.
169
OPERATOR’S EHS REPORT
TANGGUH LNG
PERFORMANCE
8 High-Risk Employee in = 100% x (Number of employees Monitor 9.25 9.51 10.03 10.15 10 8.1
Wellness Program (%) with High Risk in Wellness Risk
program/ Number of employees)
The fit for task program consistently maintained 100 % compliance of all workers and
visitor by applying strict conformance except for October a worker breach and have to
be deployed back for further follow up. Field check to workers that conducted high risk
tasks were done to check conformance of fitness to their applied task.
The Health surveillance program keep monitoring workers health with exposure to
known hazard. The surveillance program was applied to workers that were exposed to
noise, dermal irritants, ionizing radiation, chemicals (benzene, mercury) and vibrations.
There were 5 months, noise exposed workers surveillance achieving 97% (slightly below
target) as the audiometer was send offsite for recalibration. The noise surveillance is
still very successful since there was no shift of hearing threshold up to this day.
The First Aider program is challenging as it involved many first aider individually and
many contractors to renew their certification and skill check. Many efforts of reminder,
exercises of basic & advance first aid, drills and skill checks to ensure readiness and that
Tangguh site is covered with first aiders. Periodic Medical emergency drill and exercises
were conducted with Tangguh Expansion Project clinic team to enhance team
cooperation in case of major emergency happens. A celebration of First aider
community of Tangguh was also conducted to engage and to recognize the contribution
of first aiders. During the second semester 2018, first aider coverage was always above
target due to consistent efforts of routine reminder to each department.
The onsite malaria transmission was kept zero. These highlight Tangguh Health
achievement in maintaining zero malaria transmission for long 9 years since 2010. The
170
OPERATOR’S EHS REPORT
TANGGUH LNG
malaria control efforts have shielded both Tangguh Operations and Tangguh Expansion
Project from malaria that may threat 5000+ workers and it’s potential disruption.
Health promotion program delivers a lot of health talk within the workers or contractors.
They are focused on morning toolbox to convey relevant health messages, awareness
and practical guidance to all working group.
There were 20 urgent referrals and 1 medical evacuation occurred during 2nd semester
of 2018. The medical evacuation was safely transfer to hospital in Bintuni
VCT campaign was the major health promotion events to encourage workers in pro-
actively checking their HIV status as early as possible. This event was proven successful
by the great number of participants compared to previous years.
As continuous improvement in health promotion for first aiders and wellness messages
have been launched through social media group as it enable efficient platform
accessible to targeted workers.
QLI (Quality life improvement) program continues to support sport, health promotion,
games and other social engagement activities among workers. Specific Health
promotion program and initiative were delivered, which include:
E. SAFETY ASPECT
By the end of 2018, overall HSE Performance is better than last year, where there is no
Major Incident nor High Potential Incident recorded within this year. Another lagging
indicator, such as LOPC performance is improving this year. There is no LOPC with
severity level A-G in 2018, compared to 1 (one) LOPC Severity G in 2017 regarding LNG
Release from Rundown Line at Top of MCHE and by pass Valve during TAR 8 in May
2017.
However, during 2nd semester of 2018, we have 1 (one) recordable injury in October 2018
related to insect bite; a personnel’s right check swollen due to late reporting of his injury
leading to severe inflammation which categorized as medical treatment. This case was
171
OPERATOR’S EHS REPORT
TANGGUH LNG
bringing a great learning opportunity for Tangguh personnel to be more vigilant of their
surrounding hazard and to always report immediately if they feel unwell in order to
prevent escalated severe injury. Immediate intervention was introduced to prevent the
re-occurrence, such as performing safety stand down to all Tangguh personnel, sharing
the lesson learned from the recent incident. This intervention is also followed by site
leadership action to cascade the message to working level during toolbox talk and safety
conversations.
To strengthen barrier at upstream and address human performance risk barrier, Task
Improvement Process (TIP) for Production and MPO procedure was implemented to
thoroughly analyze critical tasks within the execution process of the targeted tasks. It is
designed to aid operations personnel to identify opportunities to improve the likelihood
of successful human performance of those tasks and minimize human error.
There is also a program related to safety culture improvement, where the objective of
this program is to check the current state of safety culture performance post new blue
print organization implemented in 2nd half of 2018. The result of this program is used by
leadership team to capture opportunities after organization changing. In addition, we
continue building Human Factor muscle through monitoring Self Verification (SV)
walkthrough by developing Human Factor pocket book to provide tips on how to
successfully implement and embed Human Factor into the way we work.
Contractors plays a very important roles in Tangguh site activities. They contribute
about 70% of BP total manhours and about 65% majority of incidents since they directly
exposed to hazards during task execution. Hence, selection the capable and competent
contractor is very important to reduce risk entering the Tangguh site. This process to
screen, select and manage contractor during contract is stipulated in Contractor Safety
Management System (CSMS) Procedure. CSMS Procedure is also evidence of
regulatory compliance to Oil & Gas Regulator, SKK Migas and also the BP Upstream
Procedure.
The simplification also applied for HSE training program. In Q4 2018, we have
successfully transformed classroom-VIP HSE Induction and regular site visit induction
into online HSE Induction for VIP. This process will be continued by converting the NUI
HSE Induction, Site Office employee HSE induction, and Site Permit Worker Induction.
These remaining inductions are currently being reviewed by HSE team to ensure the
content accuracy and its assessment in maintaining the personnel competency.
From leading indicator perspective, we also made improvement by regularly
developing safety input highlight through data gathering and analyzing of all safety
input variables in Tangguh, such as Safety Observation, Control of Work SV, and
Upstream HSE SV. Recommendation action is formed based on the common issues or
specific concern within the week and transform it into Weekly One Pager Summary
which then used by site leadership team to establish intervention program for the
following week.
172
OPERATOR’S EHS REPORT
TANGGUH LNG
Within this year, we could fully comply to BP Practice 100401 (Upstream Driving in
Safety) version B04. After its implementation in Q1 2017, we are running with 4 items
of deviations, Office Land Transport (Jakarta) has went through the plan and closed it
out in September 2018. Currently, office Jakarta land transport has fully compliance in
regard to driver working hour (daily and weekly), IVMS installation in our vehicle
including the analysis and curtain airbag in our operation car. While, we are still
progressing with the forward plan for the Tangguh LNG land transport.
In reporting period from July 2018 to December 2018, Tangguh Expansion Project
primarily focused on completing early works activities, and starting the main
construction activities in permanent facilities, which are Train-3 area, Utility area, ORF
area, and LNG Jetty area. The piling activities in Train-3, Utility, and ORF areas nearly
completed, the foundation activities are ongoing, and the steel structure erection was
started, while the piling activities in LNG Jetty areas is progressing.
The EPC Contractor (CSTS Consortium) continued to mobilize the workers and has
reached approximately 5,000 people at the end of December 2018. With the new people
onsite, Tangguh Expansion Project have had strong focus on safety training for the new
people, therefore CSTS Consortium as the EPC Contractor started the Hazard School in
Tangguh Site. Contractor Control of Work Procedure in Greenfield Area was being
updated to having more control on the construction activities at site. In addition, EPC
Contractor started to build the incident management capability and conduct joint
exercise with GOO IMT team.
Total workhours recorded at the end of December 2018 around 12,507,198 workhours
and there are 10 (ten) recordable injured incident happened in 2018. Several actions are
created from these incident and tracking using action tracking system and the actions
are closed monitored in weekly basis to ensure all the closing action are followed up
correctly. As part of learning from the incident, improvement on the relevant Job Safety
173
OPERATOR’S EHS REPORT
TANGGUH LNG
Analysis, Procedure has been completed and verification on the similar construction
activities has been progressing to prevent similar incident happened.
The Subcontractor Camp in the Early Camp area has started to be occupied and the
camp readiness inspection review conducted as formal process. Camp committee
meeting and bi-weekly joint inspection was held to monitor the camp welfare quality
and ensure the camp and associated facilities and equipment are ready and worked
properly.
As part of the ramping up of the workers, training facilities called as Hazard School was
opened on August 2018. The purpose of Hazard School is to train workers in
identification of hazards, how to use the hand tools safely and how to select the correct
tools for the job. In this facility, many subjects of the classroom training and practical
training have been conducted, such as greenfield control of work, working at heights,
flagman training, line of fire, keep your hand safe training, etc. On December 2018, a
new Supervisor Safety Leadership Training was launched to reinforce the good
attitudes and advance the safety behavior of the frontline supervisor. In addition, to
promote positive safety culture and good behavior, recognition and reward program
was introduced. The weekly and monthly reward program is provided for the worker(s)
who demonstrated expected values and behaviours, encourages everyone to embed
the safety behaviours throughout daily work.
The greenfield Control of Work (COW) process has been updated recently and rolled-
out to all project personnel. The key roles involved in the control of work process, such
as Area Issuing Authority, Operating Authority and Permit Holder, have been trained
and assessed to ensure they understand with the new process. To manage
simultaneous activities (SIMOPS), a daily coordination meeting is reinforced with
participation of CSTS Site Manager. The new STARRT (Safety Task Analysis and Risk
Reduction Talk) Card system is introduced at the worksite. Prior to start the work,
STARRT meeting will be held on each location and each permit holder or supervisor will
share and discuss the risks associated with the work activities on the day. Then, the
STARRT Card will be filled by the permit holder and signed by Area Issuing Authority to
authorize the start of the work.
To monitor the HSE Performance at the field, EPC Contractor (CSTS Consortium)
restarted the Self-Verification program with coaching from BP GPO Team. The program
is strengthened by empowering CSTS personnel to conduct the Self-Verification
activities with the help of GPO Construction Team. There are task level oversight,
system level oversight, and construction safety oversight including weekly
management walkthrough. All actions raised from the oversight is tracked and the
closure is monitored weekly in the site action tracker.
In order to strengthen the Field Incident Management Team capabilities, the Incident
Management System (IMS) Training has been conducted for BP GPO Site Management
Team and CSTS Site Management Team to increase the level of knowledge of Incident
Management System. After the training, bi-weekly emergency exercises were
conducted by CSTS Field Incident Management Team (CSTS FIMT) to refresh the
knowledge, test the effectiveness and coordination of emergency communication
among CSTS Field Incident Management team, BP GPO team and BP GOO Incident
Management Team.
174
OPERATOR’S EHS REPORT
TANGGUH LNG
This year, CSTS Consortium has fully mobilized the emergency response team, with the
ambulances equipped with rescue equipment and the fire truck. Several joint
emergency exercises were conducted by CSTS team, GPO team, and GOO team to test
the tactical plan responding to emergency situations:-
• Joint emergency fire drills in Fuel Station area between GOO ERT and CSTS ERT
as part of readiness for first fuel transfer into new fuel diesel tank,
• Emergency evacuation exercise in Train-3 and Utility Area which all project
personnel in Train-3 and Utility area mustering to the West Muster Point with
total approximately 500 people,
• A mass casualty drill with scenario of shuttle bus lost control and rolled over to
the ditch at Pioneer Camp.
Fatality 0
First Aid 22
175
OPERATOR’S EHS REPORT
TANGGUH LNG
A. ENVIRONMENTAL ASPECT
• Tangguh achieved GREEN award for PROPER 2017 - 2018. This is first time for
Tangguh operation achieve beyond compliance rank.
• Tangguh has implemented EMS refers to ISO 14001:2004 since 2010 and certified
by Certivication Body TUV Rheinland. The audit was conducted on 27 until 29
August 2018 with no NC and some recommendation.
• Mangrove revegetation is successfully conducted at dredging placement area.
• Environmental monitoring results at Compliance Point conducted by accredited
External Laboratory comply with Waste Water Discharge Permit (Decree of MoE
125 / 2013).
• Environmental monitoring results at Emission Stacks conducted by accredited
External Laboratory comply with regulatory standard.
• Hazardous waste is stored and recorded in permitted Hazardous Waste Storage at
Tangguh Site and transported to PPLi as final licensed hazardous waste company.
Hazardous waste transported is licensed and equipped with Manifest.
• Total amount of flaring for this reporting period was 0.28% of feed gas,
• All requirement in AMDAL have been implemented in Tangguh, and
• No complaints from the local communities during the reporting period related to
the environment
B. SOCIAL ASPECT
The Tangguh Sustainable Development Program (TSDP) is a part of Tangguh operations
impact management which refers and complies with AMDAL commitments. During this
reporting period, Tangguh continues to deliver significant milestones to respond to the
community concerns, and mitigate any social issues related as part of Tangguh
operation and project’s dynamics. The social program also becomes an entry point for
a positive relationship between Tangguh project and its stakeholders especially
communities in the villages around of the project. The implementation of “work with”
principal in the program remains challenging due to lack of capacity and different
priority in social development issues from the local government. Through the
governance program, Tangguh will continue to encourage and influence the local
government to take initiative and lead social development for their communities.
176
OPERATOR’S EHS REPORT
TANGGUH LNG
C. HEALTH ASPECT
D. SAFETY ASPECT
Several Safety programs and intervention in Tangguh Operation within the second half
of 2018 as follows,
• By the end of 2018, overall HSE Performance is better than last year, where there
is no Major Incident nor High Potential Incident recorded within this year.
• Strengthening safety data analysis and recommendation by creating safety
campaigns across Tangguh:
- Performing safety stand down
- Sharing lessons learned
- Implement task improvement process
- Developing human factor pocket book
- Online HSE induction
• Within this year, we could fully comply to BP Practice 100401 (Upstream Driving
in Safety) version B04.
Several Safety programs and intervention in Tangguh Expansion Project within the
second half of 2018 as follows,
• As part of the ramping up of the workers, training facilities called as
Hazard School was opened on August 2018.
• To monitor the HSE Performance at the field, EPC Contractor (CSTS
Consortium) restarted the Self-Verification program with coaching from
BP GPO Team.
177
OPERATOR’S EHS REPORT
TANGGUH LNG
1.1. Environmental
178
OPERATOR’S EHS REPORT
TANGGUH LNG
179
OPERATOR’S EHS REPORT
TANGGUH LNG
180
OPERATOR’S EHS REPORT
TANGGUH LNG
181
OPERATOR’S EHS REPORT
TANGGUH LNG
1.2. Social
182
OPERATOR’S EHS REPORT
TANGGUH LNG
183
OPERATOR’S EHS REPORT
TANGGUH LNG
184
OPERATOR’S EHS REPORT
TANGGUH LNG
185
OPERATOR’S EHS REPORT
TANGGUH LNG
186
OPERATOR’S EHS REPORT
TANGGUH LNG
S5. Land certificate village Ongoing BP to facilitate a meeting between BP team facilitated The environmental
infrastructure in TMB Government and Head of Villages and agriculture of Bintuni Regency and
1) Community in Saengga inquired and Head of District in TMB and The Finance and Regional Asset
on the ownership of the BP Saengga to explain once and for all Management Department of Bintuni
shelter in TMB. the ownership of the shelter Regency to visit TMB on October 4th.
2) The ADB mission was informed They met with key stakeholders from TMB
by BP Team that there is an and Saengga villages including Head of
ongoing ownership dispute on Villages, adat leader from Simuna clan
the shed as it is located in and communities. The meeting is a part of
between the villages of TMB and land verification program from the local
Saengga. The BP Team added government. During the meeting the
that transfer document has been government representative explain the
issued but ownership has not ownership and plan to verify of the public
been communicated to RAV infrastructures assets in both villages.
communities.
187
OPERATOR’S EHS REPORT
TANGGUH LNG
188
OPERATOR’S EHS REPORT
TANGGUH LNG
189
OPERATOR’S EHS REPORT
TANGGUH LNG
190
OPERATOR’S EHS REPORT
TANGGUH LNG
191
OPERATOR’S EHS REPORT
TANGGUH LNG
192
OPERATOR’S EHS REPORT
TANGGUH LNG
193
OPERATOR’S EHS REPORT
TANGGUH LNG
194
OPERATOR’S EHS REPORT
TANGGUH LNG
S14. Papuan Local Content Opportunity for 1) BP to follow up the concern 1. BP has met the Fakfak Government on
1) The Government of Fakfak improvement raised by the Fakfak Government October 30th and clarified about the
mentioned that BP procures all its and respond. workforce recruitment and local supply
goods and services 2) Lenders and LESC will review chain issue at regency level.
overwhelmingly from Sorong BP’s its latest Local Content data In regard the supply chain issue BP
and not from Fakfak and Bintuni showing the distribution of team explained about the economic
(B/F). Project spend in goods and program in Fakfak which supported by
2) Pemda in Fakfak believes that this services in Papua Barat. Tangguh and shared the opportunity
is in conflict with BP’s Diversified of local contractor involvement in
Growth Strategy in the AMDAL to
Tangguh train 3 project. BP will
create the economic arteries in
continue to have regular meeting with
Bintuni Bay and Berau Bay by
setting the city of Babo, Kokas Pemda Fakfak in the future.
and Bintuni as the growth centres 2. BP has shared the local content data
3) They understand BP’s that showing the distribution of goods
requirements for big and and services from Papua Barat
complex technical engineering Province for Tangguh Expansion
goods and service cannot be Project to lenders during November
supplied from B/F however for
2018 audit. All local content data from
smaller businesses such as
supply of mineral water can be the contractor will be monitored
sourced from Bintuni and Fakfak. regularly.
195
OPERATOR’S EHS REPORT
TANGGUH LNG
S15. Arguni - community’s requests for Opportunity for 1) BP to engage with Local 1. Jetty repairing issues and removal the
jetty and honorary fees for meeting improvement Government and Community broken jetty:
attendance Leaders to work out a solution BP continue to encourage the local
Communities in Arguni expressed for the all the concerns raised government to facilitate and There is a
their concerns at BP and have from community including the good progress on Arguni’s jetty. The IEDP
demanded BP to do the following: jetties and honorarium fees. team met the cooperative committee and
1) Fix the jetty in Arguni as well as 2) The repair of the jetty will be Arguni’s Community Representative in late
provide extension to current important for everyone to be October 2018 to look for the solution on
jetties in Furir and Andamata able access Arguni including jetty issue. The cooperative and
BP’s personnel to assist and community agreed to build temporary
2) If BP is not fixing the jetty BP
oversee the operations of the bridge with good quality instead to fix
should remove the broken jetty
livelihood program activities. permanent jetty. The jetty renovation was
from their water
completed on December 2018.
3) Provide honorary fees to
attendees at BP’s meetings in Honorarium fee issues
their villages
4) Provide Report that shows the As explained during the meeting with
impact of its economic/livelihood community, BP will not provide
programs in their villages
honorarium fee to the participant for any
The LC is of the impression that
meetings in the village if there is no
BP’s contribution is becoming less
regulation applied. It is also explained to
visible to them.
the Pemda’s Fakfak during meeting on
October 30th. BP will consistently to
communicate this to the external
stakeholders in the future.
196
OPERATOR’S EHS REPORT
TANGGUH LNG
197
OPERATOR’S EHS REPORT
TANGGUH LNG
198
OPERATOR’S EHS REPORT
TANGGUH LNG
199
OPERATOR’S EHS REPORT
TANGGUH LNG
200
OPERATOR’S EHS REPORT
TANGGUH LNG
201