A2R A1R

A2R A1R
150 MT CRANE FOR TRUSS
ASSEMBLY

A2L A1L

A2L A1L

ROLLER DETAIL

DESCRIPTION CAPACITY QTY

HILL MAN ROLLER FOR MAIN TRUSS 200 MT 32 NOS

HILL MAN ROLLER FOR LN. NOSE 100 MT 14 NOS

COLOR LEGEND

EXISTING BLACK

MAIN TRUSS RED


TEMPORARY STRUCTURE BLUE

STAGE 2 (WITHOUT RAILWAY TRAFFIC BLOCK)


ASSEMBLY SEQUENCE FOR OWG.
1. THE FIRST PROCEDURE DURING ERECTION CONSISTS OF PLACING CAMBER
PCE NO:- e-30057-DRM/4-D
JACKS OVER ON WHICH TO SUPPORT THE STRUCTURE. THE CAMBER JACKS
SHOULD BE SET WITH THEIR TOP LEVEL AND WITH SUFFICIENT RUN-OUT TO
ALLOW FOR LOWERING OF PANEL POINTS EXCEPT THE CENTER BY THE
NECESSARY AMOUNT TO PRODUCE THE REQUIRED CAMBER IN THE MAIN
GIRDERS.
WESTERN RAILWAY
2. THE BOTTOM CHORD MEMBERS SHALL THEN BE PLACED ON THE CAMBER
JACKS CAREFULLY LEVELED WITH THE HELP OF CRANE AND CHECKED FOR
STRAIGHTNESS .
3. ERECT AND ASSEMBLE CROSS GIRDERS,STRINGER AND BOTTOM BRACING
WITH THE HELP OF CRANE AND CONNECT WITH BOTTOM CHORD.
4. ERECT VERTICAL AND DIAGONAL MEMBERS, EXCEPT THE END RAKERS, IN
AHMEDABAD SECTION VG-SIOB SECTION
THEIR PROPER POSITION ON THE BOTTOM CHORDS.
5. ALL PANEL POINTS, EXCEPT THE CENTRE, SHALL NOW BE LOWERED BY THE
AMOUNT TO PRODUCE THE CORRECT CAMBER IN THE MAIN GIRDERS AS
SHOWN ON THE CAMBER DIAGRAM
6. ERECT THE TOP CHORD PIECE BY PIECE WORKING SYMMETRICALLY
BET- AHMEDABAD VG-SIOB SECTION
STARTING FROM THE CENTER OUTWARDS, EACH PIECE BEING CAMBERED IN
TURN .
7. ERECT AND ASSEMBLE END RAKERS WITH THE HELP OF CRANE. LAUNCHING METHODOLOGY OF STEEL TRUSS FOR RHS ROB AT CHAINAGE Km. 115+275, BETWEE
8. PROVIDE FINAL TORQUE IN ALL THE BOLTS IN ACCORDANCE WITH
PRE-DECIDED PROCEDURE OR AS PER RDSO GUIDELINES.
9. CHECK THE TORQUE OF BOLTS IN THE STRUCTURE AS PER RDSO
VSV-DHG STATION (EP 618/13-14) ALONG AHMEDABAD VG-SIOB SECTION OF WESTERN RAILWAY A
GUIDELINES.
10. AFTER COMPLETING THE ERECTION AND ASSEMBLY OF MAIN TRUSS OVER
TRESTLE SUPPORT, VERIFY CAMBER AT BOTTOM CHORD BY LIFTING THE
CHAINAGE 115+275 OF AHMEDABAD – VIRAMGAM – MALIYA ROAD PROJECT
ASSEMBLED STRUCTURE AT L0 AND L13 NODES

Signature block

MANJUL MATHUR Digitally signed by MANJUL MATHUR


A2R A1R
CBE-CCG
150 MT CRANE FOR TRUSS
ASSEMBLY
A2R A1R Date: 2022.06.23 17:07:32 +05'30'

DYCE-DESIGN-CCG HIMANSHU SHARMA Digitally signed by HIMANSHU SHARMA


Date: 2022.06.23 11:03:12 +05'30'

AXEN-DESIGN-CCG
XEN-DESIGN-CCG N K Chaudhary Digitally signed by N K Chaudhary
Date: 2022.06.22 15:56:01 +05'30'
TARUN RAVISHCHANDRA JAIN Digitally signed by TARUN RAVISHCHANDRA JAIN
DRM-AHMEDABAD
Date:2022.05.24 05:36:28 +05'30'

PARIMAL NARENDRA SHINDE Digitally signed by PARIMAL NARENDRA SHINDE


ADRM-INFRA-ADI
Date:2022.05.21 02:38:09 +05'30'

PAWAN KUMAR SINGH Digitally signed by PAWAN KUMAR SINGH


SRDOM-ADI
Date:2022.05.12 05:58:25 +05'30'

rashtra deep Digitally signed by rashtra deep


SRDSTE(SIG)-ADI
Date:2022.05.13 02:51:06 +05'30'
RAILWAY TRAFFIC & POWER BLOCK KALLARAM MEENA Digitally signed by KALLARAM MEENA
SRDEE(TRD)-ADI
STAGE
DURATION IN
ACTIVITY [ TRAFFIC & POWER BLOCK]
NO. OF
BLOCKS
TRAFFICS & POWER Date:2022.05.16 01:08:44 +05'30'
A2L A1L MINUTES
REQUIRED
BLOCK REQUIRED

VIKAS GARHWAL Digitally signed by VIKAS GARHWAL


A2L A1L STAGE-4 240
LAUNCHING OF TRUSS TOWARDS ABUTMENT A2R
TILL LAUNCHING NOSE TIP REACHES AT TRESTLE 1 NOS EXISTING TRACK SRDEN(Co)-ADI
T1B & T3A (TOTAL PULLING 35.132 MTR). Date:2022.05.16 11:15:04 +05'30'
LAUNCHING OF TRUSS TOWARDS ABUTMENT A2R.
STAGE-5A 180 1 NOS EXISTING TRACK VIJENDRA KUMAR MEENA Digitally signed by VIJENDRA KUMAR MEENA
(TOTAL PULLING 20.715 MTR)
DEN(WEST)-ADI
Date:2022.05.12 04:15:16 +05'30'
LAUNCHING OF TRUSS TOWARDS ABUTMENT A2R,
STAGE-5B 180 TILL MAIN TRUSS WILL REACH AT FINAL POSITION 1 NOS EXISTING TRACK

SHAILESH SHEKHAR SHETTY Digitally signed by SHAILESH SHEKHAR SHETTY


OVER ABUTMENT (TOTAL PULLING 20.0 MTR)

SSE-DESIGN-III-CCG Date: 2022.06.17 14:50:30 +05'30'

DRM / ADI / NO.7152


IT IS CERTIFIED THAT DESIGN & DRAWING IS CONFIRMING AS PER LATEST IRC / MORTH
GUIDELINES FOR ROB'S AS ON DATE
GIRDER AND CRANE SPECIFICATION LOAD CHART FOR DEMAG AC 435 OR

CRANE MODEL NO:- DEMAG AC 435 EQUIVALENT CAPACITY 85% LOADING DSGN PROOF CHECK IIT/NIT
1 CAPACITY OF CRANE 150 MT
OPERATING
(RADIUS)
BOOM LENGTH
SUPERVISION CONSULTANT TO CONCESSIONAIRE :
(METER)

2 WORKING RADIUS 16MTR METERS 35.1 M 40.7 M 46.2 M M/s PITES LIMITED (MUMBAI)
14 30.6 27.6 24.2
3 BOOM LENGTH 40.7 MTR
16 27.4 25.1 22.2

WEIGHT OF GIRDER 18 24.7 22.9 20.1


4 12 MT
TO BE LIFTED.

5 CRANE LIFTING CAPACITY 25.1 MT

6 COUNTER WEIGHT 44 MT
CONTRACTOR :
HMM INFRA LIMITED, AMBALA, HARYANA DSGN CON 1 DSGN CON 2

CONCESSIONAIRE :
M/s AHMEDABAD MALIYA TOLLWAY LIMITED

TITLE : DRAWING : HHS 12 21 2397 REV : SCALE: GSRDC OFFICER


CLIENT:
LAUNCHING METHODOLOGY OF STEEL TRUSS FOR 71 M R-1 NOT FOR SCALE
PROJECT : SPAN AT RHS ROB, CHAINAGE Km. 115+275 FOR GUJRAT STATE ROAD DEVELOPMENT
CORPORATION
AHMEDABAD-VIRAMGAM - MALIYA AHMEDABAD VIRAMGAM MALIYA ROAD PROJECT GOVERNMENT OF GUJRAT
BETWEEN VASADVA-DHRANGADHRA RAILWAY STATION SCALE : DATE SIZE DRAWING
PROD PROJECT
IN LIEU OF LC NO. 41SPL AT RAILWAY Km. 618/13-14 25.12.2021 A1 01 OF 03
REV. DATE DESCRIPTION OF REVISIONS DISN DRWN CHKD APPD