You are on page 1of 52

New Checklists Standard

Enhancing Your Daily Cockpit Operations

This presentation was presented during the webinars on 19 DEC 2019 and 08 JAN 2020

We provide you with a pptx version so that operators can easily extract information to develop their own training material.

We presented a version covering from the A320 to the A380, but we used, as a basis, the A350/A380 electronic checklists (Black background
For A320/A330/A340 operators you will find from slide 42 the equivalent slides for the A320/A330/A340 paper checklists (White background)

1 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NTRODUCTION

Objectives:
• Listen to Operators and involve them

Airbus cooperated with • Limit head-down tasks in dynamic phases

some operators to revise • Clarify when to start a checklist, how to perform


it
the normal checklists.
• Ensure that techniques are consistent (callouts,
checks)

• Be in line with international recommendations

Collaboration • Harmonize between fleets

• Enhance efficiency

2 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NTRODUCTION
Explain

End 2020
Realistic Readiness
roadmap to embrace

Success
Training Training
timing preparation

3 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
N EW N ORMAL C HECKLISTS
Agenda

• Support Material

• Checklist review

• Updated Flight Ops Documentation

• A350/A380 ECAM update

• Roadmap

4 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
N EW N ORMAL C HECKLISTS
Agenda

• Support Material

• Checklist review

• Updated Flight Ops Documentation

• A350/A380 ECAM update

• Roadmap

5 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
S UPPORT M ATERIAL

After the phase of communication


• Flight Operational Conference in Montreal in May 2018

• AIRBUS FOT 999.0070/19 “Forthcoming SOP, FCTM and Normal


Checklist changes” October 2019

• Operational Seminars in October, November and December 2019

• Update of AIRBUS FOT 999.0070/19 “Forthcoming SOP, FCTM


and checklist changes” December 2019 to invite operators to
webinars and provide material to prepare training.

Comes the preparation

6 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
S UPPORT M ATERIAL

Transition from current to new checklists: Airbus provides the changes one year in advance to:

• Limited training effort for pilots already trained and • AnaIyse SOP / Checklists changes

experienced on Airbus aircraft. • Submit to National Authorities ( if needed)

• Self study • Prepare training material

• Recommended Training level B • Get Flight crews ready

• Specific briefings to be prepared

7 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
S UPPORT M ATERIAL

Documents for being prepared

Set of documents on AirbusWorld

8 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
S UPPORT M ATERIAL
SOP changes (extract A350) Tasksharing changes FCTM for new checklists

9 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
S UPPORT M ATERIAL

All documents are in AIRBUSWorld

10 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
N EW N ORMAL C HECKLISTS
Agenda

• Support Material

• Checklist review

• Updated Flight Ops Documentation

• A350/A380 ECAM update

• Roadmap

11 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NFORMATION ABOUT THE NEW CHECKLISTS
Before Start Checklist

Two checklists, No “down to the line” or


with fewer items “below the line” concept

Enhanced C/L responses


for numerical values or
control positions

Operational Advantage

✓ Shorter C/L limits the potential


Enhanced wording of interruption
✓ Each C/L corresponds to a
dedicated phase
12 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NFORMATION ABOUT THE NEW CHECKLISTS
After Start Checklist

Moved to Taxi C/L

Sensed line

Operational Advantage

Shorter C/L

13 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NSIGHT I NTO T HE N EW C HECKLISTS No “down to the line” or
“below the line” concept
Before Takeoff Checklist

(A350 only)

Moved to Before Start


and Departure
Change C/L New line

Operational Advantage
Less head-down
time during taxi ✓ Shorter C/L limits the potential
and line-up of interruption
✓ Each C/L corresponds to a
dedicated phase
14 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NSIGHT I NTO T HE N EW C HECKLISTS
Departure Change Checklist

New C/L

Operational Advantage

✓ Ensure that new takeoff data are taken into


account

✓ Additional safety net to cope with late changes

✓ The DEPARTURE CHANGE checklist is designed


to protect the flight crew against erroneous
setting (FMS RWY, SID, CONF, T/O SPEEDS…)
after a change in the departure clearance

15 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NSIGHT I NTO T HE N EW C HECKLISTS
AfterTakeoff/Climb Checklist

Operational Advantage

✓ Workload reduction during


a dynamic flight phase

✓ New flow pattern to mitigate


the risk of inapropriate
configuration

16 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NSIGHT I NTO T HE N EW C HECKLISTS
Approach Checklist

(A350 only)

Lines moved from


the Landing C/L

17 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NSIGHT I NTO T HE N EW C HECKLISTS
Landing Checklist

Lines moved to
Approach C/L

(A350 only)

(A350 only)

Operational Advantage

Workload reduction during a


dynamic flight phase

18 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NSIGHT I NTO T HE N EW C HECKLISTS
After Landing Checklist

Operational Advantage

Workload reduction

19 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NSIGHT I NTO T HE N EW C HECKLISTS
Parking Checklist

Operational Advantage

Shorter C/L

20 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NSIGHT I NTO T HE N EW C HECKLISTS
Securing the Aircraft Checklist

Operational Advantage

Shorter C/L

21 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
N EW N ORMAL C HECKLISTS
Agenda

• Support Material

• Checklist review

• Updated Flight Ops Documentation

• A350/A380 ECAM update

• Roadmap

22 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
R EVISED C HECKLISTS

Generic pdf available eQRH load for generic

for information checklists & Tasksharing for

information available FEB 2020

23 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
R EVISED C HECKLISTS
Avionics Upgrade
(FWS)

FWS: Flight Warning System


24 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
R EVISED SOP S
New Flow Patterns

There are new flow patterns :


• Before pushback
• Before Line-up
• Acceleration altitude (Takeoff/Go-Around)
• When Parking

Enhanced sequence of actions


Helps flight crews memorize actions

25 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
R EVISED SOP S
New Flow Pattern - Before pushback

A350 A380 A320/A330/A340

26 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
R EVISED SOP S
New Flow Pattern – TAXI

A320/A330/A340

27 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
R EVISED SOP S
New Flow Pattern – Line-up

A350/A380 A320/A330/A340

28 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
R EVISED SOP S
New Flow Pattern - Acceleration

A350/A380

29 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
R EVISED SOP S
New Flow Pattern - Parking

A350 A380 A320/A330/A340

30 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
O THER D OCUMENTATION U PDATES
Checklist Triggers

Objective: To know when to initiate each checklist.

Example:

Checklist Trigger
Cockpit Preparation After the flight crew completed the departure briefing
After Start On hand signal from the ground personnel.
Line-Up ➢ Line-up clearance received, and
➢ Line-up flow pattern completed.

Consistent use of checklists

31 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
O THER D OCUMENTATION U PDATES
Checks & Callouts

Objective: To know what to check and what to call out.

Example: Before Start checklist


PARKING BRAKE……………..____

PM PF
“Parking Brake?“
Checks the PARK BRK memo
Responds“ON “

Consistent use of checklists

32 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
N EW N ORMAL C HECKLISTS
Agenda

• Support Material

• Checklist review

• Updated Flight Ops Documentation

• A350/A380 ECAM update

• Roadmap

33 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
ECAM U PDATE

The electronic checklists are hosted in the FWS

• Aircraft: A new FWS standard will be released in 2021 (Batch 7)


• Simulator: A new data package will be released in 2021

Aircraft Simulator
A350 A380 A350 A380
FWS S7 FWS L70 Std 1.3 Std 1.5

FWS: Flight Warning System


34 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
ECAM U PDATE
Example of deployment strategy

Dec 2020 FWS S7 certification (A350) Release of simulator data package std 1.3 (A350)
FCOM/FCTM release FWS L70 certification (A380) Release of simulator data package std 1.5 (A380)

Simulator "Old C/L" "New C/L"

Update with the load


sent by Airbus Update with data package

Aircraft "Old C/L" "New C/L"

Update with the load Update all a/c with FWS


sent by Airbus, via the ECT
(Airbus is studying a solution for
operators without ECT)

2020 2021
ECT: ECAM Customization Tool
35 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
ECAM U PDATE ON S IMULATORS
Summary: To load the new C/L on the simulator before data package std 1.3 (A350) or 1.5 (A380)

Airbus Operators with the ECT


• With the ECT :
Create and send the load ✓ Import the Airbus load
that contains the new C/L ✓ If required, customize the C/L
✓ Publish the load
• Insert the load on the simulator

Airbus Operators without the ECT


Create and send the load that contains the new C/L Insert the load on the simulator

36 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
ECAM U PDATE ON A IRCRAFT
Summary: To load the new C/L on the a/c before FWS S7 (A350) or L70 (A380)

Airbus Operators with the ECT


• With the ECT :
Create and send the load ✓ Import the Airbus load
that contains the new C/L ✓ If required, customize the C/L
✓ Publish the load
• Insert the load on the a/c

Airbus Operators without the ECT


Under study

37 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
N EW N ORMAL C HECKLISTS
Agenda

• Support Material

• Checklist review

• Updated Flight Ops Documentation

• A350/A380 ECAM update

• Roadmap

38 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
R OADMAP

End 2020
Q4 2019

✓ FOT Release of the new checklists and associated SOPs:


✓ Regional Seminars, Webinars ✓ FCOM/FCTM update
✓ Advance copies (SOP, C/L, FCTM, etc.) ✓ QRH update (except A350/A380).

Anticipate flight crew training

39 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
C ONCLUSION

➢ No major change in SOP or Checklist policy


➢ Just adaptation of SOP and tasksharing

➢ Limited necessary training

➢ Enhanced operational performance

40 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
N EW B RIEFINGS

Presentation from 2019 seminar:


• Already available on AirbusWorld
• Then on AirbusWIN in 2021 after FCTM publication.

Video with briefing examples:


• Q1 2020 on AirbusWorld
• Then on AirbusWIN in 2021 after FCTM publication.

FCTM relative to new briefing is on AirbusWorld

41 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
The following slides are based on A320 Family/A330/A340 checklists

42 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NFORMATION ABOUT THE NEW CHECKLISTS
Before Start Checklist
Two checklists, No “down to the line” or
with fewer items “below the line” concept

Enhanced C/L responses


for numerical values or
control positions

Operational Advantage

✓ Shorter C/L limits the potential of interuption

Enhanced wording ✓ Each C/L corresponds to a dedicated phase

43 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NFORMATION ABOUT THE NEW CHECKLISTS
After Start Checklist

Enhanced C/L responses


for numerical values or
control positions

44 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NFORMATION ABOUT THE NEW CHECKLISTS
Before Takeoff Two checklists,
with fewer items

Operational Advantage
Move to
Before Start ✓ Shorter C/L limits the potential of interuption

✓ Each C/L corresponds to a dedicated phase

No “down to the line” or


“below the line” concept

Less head-down time


during taxi and line-up

45 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NFORMATION ABOUT THE NEW CHECKLISTS
Departure Change

New

Operational Advantage

✓ Ensure that new takeoff data are taken into

account

✓ Additional safety net to cope with late changes.

✓ The DEPARTURE CHANGE checklist is

designed to protect the flight crew against

erroneous setting (FMS, CONF…) after a

change in the departure clearance.


46 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NFORMATION ABOUT THE NEW CHECKLISTS
After Takeoff

Operational Advantage

✓ Reduce the workload during a dynamic flight

phase

✓ New flow pattern to mitigate the risk of

inappropriate configuration

47 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NFORMATION ABOUT THE NEW CHECKLISTS
Approach

Line moved from landing C/L

48 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NFORMATION ABOUT THE NEW CHECKLISTS
Landing

Line moved to approach C/L

Operational Advantage

✓ Workload reduction during dynamic phase


49 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NFORMATION ABOUT THE NEW CHECKLISTS
After Landing

Operational Advantage

✓ Workload reduction

50 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NFORMATION ABOUT THE NEW CHECKLISTS
Parking

Operational Advantage

✓ Shorter Checklist
51 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)
I NFORMATION ABOUT THE NEW CHECKLISTS
Securing

Operational Advantage

✓ Shorter Checklist

52 DD MONTH YEAR Presentation title runs here (go to Header and Footer to edit this text)

You might also like