The Major Scope of Services

POR No.: Y220914003


POR Subject: Inspection and certification of Fire Detection system in Acetylene Plant
End User Code: (Dept. Code). Production Support (P260)
Requested By: (Dept.).Production Support

Project No.: H-2140


Project Name: Operation
ETA:N/A
ETD:N/A

Issued & Confirmed By:

Initiators, Dept. Head


Approval
Name: Daniel Unnoonny Name: Majid
Al Housni
Sign. Sign.

Department Stamp:
1) The Objective:
Assyad Drydock’s Acetylene Plant is generating Acetylene Gas at a rate
70.0M3/hour. As the gas is spontaneously explosive the following detection
system are installed in the plant.
1. Heat detector(1No)
2. Gas detector(2No’s)
3. Flame Detector (1No)
4. Deluge Valve system (General)
2) Scope of Work
1. Dry-dock request calibration and certification of the above equipment’.
2. If the any of the above equipment found nonfunctional during inspection,
rectify the equipment or recommend for correction to the end user and
certify after getting confirmation of correction from the Dry-dock.
3. Issue certificate of Inspection

.
3) Type of Work(s):
Successful bidder shall inspect the above equipment and if not functioning

4) Attachment:
Photos of the Fire Extinguishers are attached

5) The Contractors Scope Of Works:


Visit the site and inspect it by taking to their facility or in ODC yard and
inspect and certify. Label shall be pasted on the cylinders with inspection date
and valid up to period. .

6) Requirement’s/ Recommendation:
nil

7) The Reason of Requesting the Outsources: It is mandatory to inspect fire


extinguisher system annually to check its performance and issue certificate by
a 3rd party.