You are on page 1of 1

Go back to Index Page

128 PID45
Description and measuring

RE2501 Induction air preheating relay


Function Activates the preheating coil.
Wiring diagram
VCADS Pro

EB7, diagnostic signal


EB25, preheating relay signal
Control unit/ Control cable 86 ≈ U ᵇᵃᵗ (relay not
cable harness: - Frame ground activated)
≈ 0 V (relay
activated)
1) 2) 3)
Supply cable 85
- Frame ground ≈ U ᵇᵃᵗ

1) 2) 3)
Supply cable 30
- Frame ground ≈ U ᵇᵃᵗ

1) 2) 3)
Component: (a) 85 - 86 ≈ 30 Ω

1) 2) 3) 4)
Specific part of EB7 - EB58 ≈ 0.55 x U ᵇᵃᵗ
system (b) (closed circuit)
≈ 0 V (open
circuit)
1) 2) 3)

≈ U ᵇᵃᵗ (relay not


EB25 - EB58 activated)
≈ 0 V (relay
activated)

a. Blue/red cable to relay disconnected (cable goes towards control unit).


b. Blue/red cable and black cable connected to relay on respective connections.

You might also like