#NAME? SHIFT REPORT LIFTING EQUIPMENT
DATE : 8-Feb-2023 SHIFT : 1
No Equipment Readyness
Status Not Description
. Ready
Ready
A Stradle Carrier
1 SC-01 not ready ✓ • drive AR2-A1 eror F7
saturation
2 SC-02 stanby ready ✓
3 SC-03 Operasional ✓
4 SC-04 Standby ready ✓
5 SC-05 Standby ready ✓
B Reach Stacker
1 RS -01 Operasional ✓
2 RS-02 Operasional ✓
3 RS-03 Operasional ✓
4 RS-04 Operasional ✓
5 RS- 19 Operasional ✓
C Empty Handler
1 EH-01 Operasional ✓
D Excavator
• hose oil cooler leaks
1 EXC-01 Standby ready ✓
• daun trackshoe crack
• seal cylinder arm leaks
2 EXC-02 Standby ready ✓ • level glass hydraulic leaks
• cover fuel tank broken
• O-ring kit block Valve Leaks